High Performance Chilled Water Systems: Earthwise Hvac
High Performance Chilled Water Systems: Earthwise Hvac
High Performance Chilled Water Systems: Earthwise Hvac
HIGH PERFORMANCE
CHILLED WATER SYSTEMS
EarthWise HVAC
Chiller Tower Systems
2012
EarthWise Menu
Simon Ho IR CS ANZ 1
EWS CTO SEP 2012
Simon Ho IR CS ANZ 2
EWS CTO SEP 2012
Simon Ho IR CS ANZ 3
EWS CTO SEP 2012
Chiller Tower
Key Parameters
CT
CH
Simon Ho IR CS ANZ 4
EWS CTO SEP 2012
Tower Control
On/Off
Two-speed fan
VSD/VFD
Tower performance (WB, Load, Fan speed, Flow)
Optimization involves multi-dimensional sub-system
that must be integrated with chiller performance as a
system
Manual / trial and error or,
Dynamic monitoring and reset optimization
Predictive
Dynamic feedback
ON/OFF
% FAN kW
2-SPEED
50%
VFD
0% 50% 100%
10
FAN SPEED
Simon Ho IR CS ANZ 5
EWS CTO SEP 2012
35
30
COLD WATER, C
25
100% Load
75% Load
50% Load
20
25% Load
15
10
5 10 15 20 25 30
WET BULB, C
11 Note: Cooling tower with constant flow and 100% fan speed, 4K design approach
35
30
COLD WATER, C
25
26 CWB
FAN kW
20 CWB
20
14 CWB
10 CWB
15
Fan kW
10
0
30% 40% 50% 60% 70% 80% 90% 100%
FAN SPEED
12 Note: Cooling tower with constant flow and 50% load
Simon Ho IR CS ANZ 6
EWS CTO SEP 2012
WB
13
total
energy consumption, kW
chiller
optimal
control point
tower
0
17 19 21 23 25 27 29
condenser water temperature, C
Simon Ho IR CS ANZ 7
EWS CTO SEP 2012
180
160
140
Power Input, kW
120 CT kW
CH AFD kW
100
Total
80 CH non-AFD kW
Total
60
40
20
0
20 22 24 26 28 30
CT Cold Basin, C
16
Simon Ho IR CS ANZ 8
EWS CTO SEP 2012
180
160
140
Power Input, kW
120 CT kW
CH AFD kW
100
Total
80 CH non-AFD kW
Total
60
40
20
0
14 19 24 29
CT Cold Basin, C
17
90
80
Power Input, kW
70
60 CT kW
CH AFD kW
50
Total
40 CH non-AFD kW
Total
30
20
10
0
20 22 24 26 28 30
CT Cold Basin, C
18
Simon Ho IR CS ANZ 9
EWS CTO SEP 2012
80
70
Power Input, kW
60
CT kW
50
CH AFD kW
40
Total
CH non-AFD kW
30 Total
20
10
0
14 16 18 20 22 24
CT Cold Basin, C
19
80
70
Power Input, kW
60
CT kW
50 CH AFD kW
Total
40
CH non-AFD kW
30 Total
20
10
0
10 12 14 16 18 20 22 24
CT Cold Basin, C
20
Simon Ho IR CS ANZ 10
EWS CTO SEP 2012
21
CTO - Necessities
System Level Controls
Knowledge of chiller performance at various loads and
ambient; know chiller limits
Tower fan power characteristics
Pump motor power characteristics if variable flow
Drives tower fans to near optimal CT set point
VFD on tower fan motors
Good quality ambient RH sensor
Commissioning M&V
TRACER
SYSTEM
LEVEL
CONTROLS
22
Simon Ho IR CS ANZ 11
EWS CTO SEP 2012
23
CTO comparisons
1,200,000
CHW Plant Annual Energy Cons [kWh]
~ 6%
1,000,000
800,000
Towers
600,000
Pumps
Chillers
400,000
200,000 2 3 yr
payback
40% ROI
-
15C 18C 20C 22C 25C CTO
Simon Ho IR CS ANZ 12
EWS CTO SEP 2012
RH T
T
F
TRACER
SYSTEM
LEVEL
CONTROLS
F
25
MECHANICAL COOLING
EVAP COOLING
AIRSIDE ECON E-A HEAT REC
CT PL HX
Minimize active
FC CHLR
cooling &
E-A HEAT REC heating
CHILLER HEAT REC Heat Recovery
Free Cooling
GAS HEAT
HEATING CALL
05 15 25 35
Ambient Temperature C
26
Simon Ho IR CS ANZ 13
EWS CTO SEP 2012
27
Simon Ho IR CS ANZ 14
EWS CTO SEP 2012
compressor
Free Cooling WC Chiller
Refrigerant migration cycle
Operates when CT
water is cool enough;
e.g. less than 13C
45 to 60% design refrigerant
capacity with CHW vapor
reset
Minimizes reheat condenser
No change in CHW pipe
work
No additional maintenance
Available with centrifugal evaporator
chillers > 700kW economizer
30
Simon Ho IR CS ANZ 15
EWS CTO SEP 2012
Free-cooling Chiller
1MW chiller (FC mode)
31
Parallel
piping
Switchover
free cooling /
mechanical
cooling
Mixing issue
all or
nothing
LOAD
32
Simon Ho IR CS ANZ 16
EWS CTO SEP 2012
CDWP
17oC 6oC
CHWP
Free Cooling Conventional
Centrifugal non-FC Chiller
34
Simon Ho IR CS ANZ 17
EWS CTO SEP 2012
TRACER
SYSTEM
LEVEL
T
CONTROLS
T R
T
T
System Level T
integration of F
controls ensures
optimal control
and efficiency
35
Simon Ho IR CS ANZ 18