Invoice Copy: S.No Item Progress This Bill Contract (RS.)
Invoice Copy: S.No Item Progress This Bill Contract (RS.)
Invoice Copy: S.No Item Progress This Bill Contract (RS.)
AP.
Clients : SNJ DISTILLERIES PRIVATE LIMITED
Contractor : M/s. CHETTINAD BUILDERS Pvt.Ltd.,Chennai
Name of the work : CIVIL (STRUCTURAL) WORKS
LOI/CO/Contract No :
INVOICE COPY
PROGRESS
CONTRACT
S.No ITEM
(Rs.) This Bill
A TOTAL WORKDONE
C TOTAL(A+B=C) #REF!
D DEDUCTIONS:
3 TDS 2% #REF!
TOTAL(D) #REF!
NET PAYABLE =C-D #REF!
NOW PAYABLE :
ONE CRORE FIFTY EIGHT LAKH SIXTY EIGHT THOUSAND THREE HUNDRED AND THIRTEEN R
RA Bill no : 001'
PROGRESS
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
0.00 #REF!
58,579,979.00 #REF!
#REF!
#REF! #REF!
Footing Excavation
F1 A2 Cum 1 2.25 2.4
F1 A3 Cum 1 2.25 2.4
F2 C1 Cum 1 2.55 2.7
F2 C3 Cum 1 2.55 2.7
F1 E2 Cum 1 2.25 2.4
F1 E3 Cum 1 2.25 2.4
Plinth Beam Excavation
PB1 beam A3-C3 Cum 1 3.99 0.65
PB1 beam C3-E3 Cum 1 4.06 0.65
PB1 beam A1-C1 Cum 1 3.99 0.65
PB1 beam C1-E1 Cum 1 4.06 0.65
PB2 beam A2-A3 Cum 1 3.38 0.65
PB2 beam E2-E3 Cum 1 3.38 0.65
PB3 beam C2-C3 Cum 1 3.08 0.65
PB2 beam E1-E2 Cum 1 2.18 0.65
PB2 beamand injecting chemical
Providing D1-D2 Cum 1 2.18 0.65
emlusions
PB2 beam for pre-construction anti- D1-E1 Cum 1 2.51 0.65
termite treatment and creating continous
chemical barrier under and all around
the column pits, wall trenches, top
surfaces of plinth Total
filling, junctions of
walls and floors, along the external
perimeter of buildings, expansion joints,
1.07
over the top surface of consolidated
earth on which plinth protection is to be
laid, surrounding
Footing of pipes and conduits
Excavation
etc. complete, in accordance with
F1 A2 Sqm 1 1.65 1.8
IS:6313 (Part II). (Plinth area of the
F1
building at ground level shall only be A3 Sqm 1 1.65 1.8
F2
measured): Using Chloropyriphos C1 Sqm 1 1.95 2.1
Emulsifiable
F2 concentrate 1%. C3 Sqm 1 1.95 2.1
F1 E2 Sqm 1 1.65 1.8
F1 E3 Sqm 1 1.65 1.8
Total
2.0 Plain Cement Concrete
Breadth
Length
S.No Description GRID NO Unit Nos
( L)
Providing and laying plain cement ( B)
concrete with coarse sand and graded
stone aggregate, 20 mm nominal size in
2.05 foundations,footings and under floors on
grade laid and cured including necessary
formwork etc., complete, of nominal
mix : 1:4:8
Footing Excavation
F1 A2 Cum 1 1.65 1.8
F1 A3 Cum 1 1.65 1.8
F2 C1 Cum 1 1.95 2.1
F2 C3 Cum 1 1.95 2.1
F1 E2 Cum 1 1.65 1.8
F1 E3 Cum 1 1.65 1.8
Total
3 Reinforced Cement Concrete Work
Providing and laying in position, specified
Design mix of RCC, including compacting
and curing complete but excluding
centering, shuttering and reinforcement,
3.01 M-25 grade of concrete : In foundations
and at 00 LVL structures like footings,
plinth beams,rafts & slab (if
any),concrete floor, floor drains etc
below and up to finished floor LVL.
Footing
A2,A3,E2,E
F1 - Flat portion Cum 4 1.45 1.6
3
A1 A2
Tapper portion - Column size
A2,A3 Cum 4 2.32 0.22
(A2=450+100X300+100)
F2 C1,C3 Cum 2 1.75 1.9
A1 A2
Tapper portion - Column size
2 3.325 0.325
(A2=450+100X300+100)
Plinth Beam
Total
Breadth
Length
S.No Description GRID NO Unit Nos
( L)
( B)
Providing and laying in position ,
specified Design mix of RCC, including
compacting and curing, complete, but
3.02 excluding centering, shuttering and
reinforcement, M-25 Grade of concrete:
in Columns and piers of any shape and
profile,RCC walls etc at all levels.
Column
C1 From footing top to plinth beam top - A3,E3,A2,E
Cum 4 0.3 0.45
F1 type 2
C1 From footing top to plinth beam top -
C3,C2 Cum 2 0.3 0.45
F2 type
Plinth Beam
Total
Column
C1 From footing top to plinth beam top - A3,E3,A2,E
Sqm 4 1.5
F1 type 2
C1 From footing top to plinth beam top -
C3,C2 Sqm 2 1.5
F2 type
Total
UILDERS PRIVATE LIMITED
E LIMITED (BREWERY DIVISION), NELLORE AP
oom & Excise Office
nt Sheet - RA bill - 001
Depth
Remar
Qty
ks
( D)
2.05 11.070
2.05 11.070
2.05 14.114
2.05 14.114
2.05 11.070
2.05 11.070
0.35 0.908
0.35 0.924
0.35 0.908
0.35 0.924
0.35 0.769
0.35 0.769
0.35 0.701
0.35 0.496
0.35 0.496
0.35 0.571
79.973 Cum
2.970
2.970
4.095
4.095
2.970
2.970
20.070 Sqm
Depth
Remar
Qty
ks
( D)
0.1 0.297
0.1 0.297
0.1 0.410
0.1 0.410
0.1 0.297
0.1 0.297
2.007 Cum
0.2 1.856
T1-T2
0.2 0.868
0.2 1.330
T1-T2
0.3 0.938
0.45 1.775
0.45 1.775
0.45 0.760
0.45 0.760
0.45 0.760
0.45 0.294
0.45 0.294
0.45 0.386
11.797 Cum
Depth
Remar
Qty
ks
( D)
1.35 0.729
1.25 0.338
2.85 2.309
3.375 Cum
2.050 Mt
0.2 4.880
0.3 4.380
0.45 5.918
0.45 5.513
0.45 5.648
0.45 5.513
0.45 2.804
0.45 2.534
0.45 2.804
0.45 2.534
0.45 5.067
Depth
Remar
Qty
ks
( D)
0.45 0.846
0.45 0.981
0.45 0.846
0.45 0.981
0.45 1.287
0.45 1.557
54.089 Sqm
1.35 8.100
1.25 3.750
2.85 25.650
37.500 Sqm
Rebar Mes. Sh 14 of 45
Chettinad Builders Private Limited
Project : SNJ DISTILLERS PRIVATE LIMITED (BREWERY DIVISION), NELLORE
BBS for Guard Room & Excise Office
N O No P Cutting Size of S
Sl No Description Dia
M M Length 8 Tor 10 Tor 12 Tor
A Footing 0.00 0.00 0.00
F1 -
1 1450 1600 200 0.00 0.00 0.00
A3,E3,A2,E2
L span - C/C 150 100 1500 100 10 4 10 1.700 0.00 68.00 0.00
S span- C/C 150 100 1350 100 10 4 11 1.550 0.00 68.20 0.00
L span - C/C 125 100 1800 100 10 2 14 2.000 0.00 56.00 0.00
S span- C/C 125 100 1650 100 10 2 15 1.850 0.00 55.50 0.00
B Plinth Beam
PB1- A3 to E3
1 13150 300 450 0.00 0.00 0.00
& A2-E2
Rings at end - 4X2 100 250 400 8 8 16 1.380 176.64 0.00 0.00
Rings at Mid - 2X2 200 250 400 8 4 16 1.380 88.32 0.00 0.00
Rebar Mes. Sh 15 of 45
Chettinad Builders Private Limited
Project : SNJ DISTILLERS PRIVATE LIMITED (BREWERY DIVISION), NELLORE
BBS for Guard Room & Excise Office
N O No P Cutting Size of S
Sl No Description Dia
M M Length 8 Tor 10 Tor 12 Tor
Rings at end - 2X2 100 250 400 8 8 15 1.380 165.60 0.00 0.00
Rings at Mid - 2X1 200 250 400 8 4 13 1.380 71.76 0.00 0.00
Rings at end - 2X1 100 250 400 8 2 15 1.380 41.40 0.00 0.00
Rings at Mid - 1X1 200 250 400 8 1 13 1.380 17.94 0.00 0.00
Rings at end - 1X1 100 250 400 8 2 19 1.380 52.44 0.00 0.00
C1 column-
1 A3,C3,E3,A2,C 1350 300 450 0.00 0.00 0.00
2,E2
C1 column-
1 A3,C3,E3,A2,C 3350 300 450 0.00 0.00 0.00
2,E2
5 Botling Plant & Ware House 798.583 504.681 217.328 12.295 606.222
25 Grade
VDF IPS FLOOR Total M25 Total
METALLIC
89.218 107.362
12.680 22.814
16.500 16.500
355.927 806.551
1089.162 1385.384
0.000 5.750
0.000 2.000
3.000 3.000
0.000 1.250
0.000 164.219
193.500 319.500
42.000 192.000
330.000
RAB 007
Total 4115.42 MT
1 Upto date received qty 233.432 155.187 162.030 143.421 83.616 52.510
Borrowed from IMFL Site 51.500 28.760 15.230
Shifted To IMFL Site -10.953 -7.835 -10.532
Total Receipt (A) 284.932 183.947 177.260 132.468 75.781 41.978
1 Guard block - RA-1 0.473 0.154 0.147 0.662 0.614 0.000
Guard block - RA-2 0.000 0.000 0.000 0.000 0.000 0.000
Guard Block - RA -4 0.000 0.000 0.000 0.000 0.000 0.000
Guard Block - RA -5 1.474 0.279 0.115 0.681 0.367 0.000
Guard Block - RA -6 0.566 0.000 0.000 0.000 0.000 0.000
Total
830.196
95.490
-29.320
896.366
2.050
0.000
0.000
2.916
0.566
1.506
1.663
2.792
0.000
5.519
2.697
1.494
4.882
8.643
10.180
4.000
0.000
12.884
21.117
32.224
31.521
33.009
0.999
23.636
153.463
60.212
124.906
27.538
0.000
5.953
14.995
32.202
19.290
21.155
0.315
36.181
13.743
4.592
0.440
10.274
2.857
0.000
27.402
28.657
788.473
23.654
812.127
56.000
28.239
CHETTINAD BUILDERS PRIVATE LIMITED
#REF!
1 M10 461.00 160.00 73.76 #REF! 160.00 #REF! #REF! #REF! #REF!
2 M25 712.50 330.00 235.13 #REF! 330.00 #REF! #REF! #REF! #REF!
#REF!
RAB 006
Total 812.13 MT
E Physical Stock 56 MT
12.7
Cum
Cum
Cum
Cum
Cum
Sl.No Description of Item Grid No Unit Nos L B D Quantity
Cum
Kg
CHETTINAD BUILDERS PRIVATE LIMITED
#REF!
REINFORCEMENT STEEL RECONCILIATION STATEMENT
Steel Statement
1 Upto date received qty 233.432 155.187 162.030 143.421 83.616 52.510
Upto Date received qty -SNJ 86.293 104.280 67.001 34.613 19.132 15.724
Phase 2
Total
830.196
327.043
1157.239
2.050
0.000
0.000
2.916
0.566
1.506
1.663
2.792
0.000
5.519
2.697
1.494
4.882
8.643
10.180
4.000
0.000
12.884
21.117
32.224
31.521
33.009
0.999
23.636
153.463
60.212
124.906
27.538
0.000
5.953
14.995
32.202
19.290
21.155
0.315
36.181
13.743
4.592
0.440
10.274
2.857
0.000
27.402
28.657
0.000
55.081
843.554
25.307
868.861
237.000
51.378
GP2
400 25 10000 12847
50 25 1250 7543.82
800 25 20000 9695.2
120 25 3000 1332
34250 31418.02
2831.98
1.779 3.618
2.235 3.398
1.773 5.787
5.787 2220 12847.14 12.803
28422.66
-5827.34