Attention: Mark Pritchard / Nick Jago

The document is a letter from WT Partnership responding to a variation claim from Grindley Construction regarding isolation switches installed on fan coil units at St Mary's Villa in Concord. WT Partnership has adjusted the claimed amount down from $8,887 to $7,728, finding the original rate for supplying and installing the isolation switches to be too high. They recommend approval of the variation for the lower amount based on comparable projects and allowances of $50 per switch and one hour of installation labor for 48 switches.

Uploaded by

Henriel Hao
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX or read online on Scribd
0% found this document useful (0 votes)
48 views

Attention: Mark Pritchard / Nick Jago

The document is a letter from WT Partnership responding to a variation claim from Grindley Construction regarding isolation switches installed on fan coil units at St Mary's Villa in Concord. WT Partnership has adjusted the claimed amount down from $8,887 to $7,728, finding the original rate for supplying and installing the isolation switches to be too high. They recommend approval of the variation for the lower amount based on comparable projects and allowances of $50 per switch and one hour of installation labor for 48 switches.

Uploaded by

Henriel Hao
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX or read online on Scribd
You are on page 1/ 4

9 March 2010

Quantity Surveyors
and Construction
Cost Consultants

Trustees of Catholic Aged Care Sydney


Level 24 Northpoint
C/- Davis Langdon Australia Pty Ltd Miller Street 100
Level 5 North Sydney
New South Wales 2060
100 Pacific Highway Australia
NORTH SYDNEY NSW 2060
Locked Bag No. 2137
North Sydney NSW 2059

ATTENTION: MARK PRITCHARD / NICK JAGO Tel61 2 9929 7422


Fax61 2 9957 3161
Email
[email protected]
Website
Dear Sir,
www.wtpartnership.com.au

Director
R C Moir MRICS FAIQS AIAMA
RE: ST MARY’S VILLA - CONCORD, VARIATION RECOMMENDATIONS J J Ferrarin BBld FAIQS

ISOLATION SWITCHES TO FAN COIL UNITS P Anseline BappSc (QS) AAIQS


N C Deeks BSc MRICS AAIQS MACostE
M A Tebbatt BappSc (QS) AAIQS
P T Elphick BSc MRICS AAIQS
WT Partnership confirms that we have received the following variation claims prepared by J S Osenton BSc Hons
Grindley Construction Pty Ltd for works undertaken on the above project; P Bower AAIQS

Associate
M M Lee MRICS AAIQS ACIOB
L Ferlauto Build (CE) Hons
J Lum Build (CE) Hons AAIQS
V No Description Initial Claim Recommend D M Faugust BSc Hons MRICS
$ $ I R Menzies BCon Mgt Hons AAIQS MRICS
G O P Heaton BSc (QS) MRICS
72 Isolation switches to fan coil units 8,887.00 7,728.00 S Hensley BCon Mgt Hons AAIQS
M Ostapenko B.Build (CE) Hons
P Dally DipSurv MRICS
We have adjusted the value of this variation for the following reasons.
Offices in Australia
Adelaide – Brisbane – Canberra
In our opinion the rate for the supply and installation of the isolation switches are high and Gold Coast – Hobart – Melbourne
exceeds market value. Based on comparable projects of similar magnitude, scope and site Perth - Sydney
conditions we would allow $50 for the isolation switch and an hour for insatallation. We have WT Partnership International Ltd
assessed the 48 isolation switches at $140 each. Group Offices
China – Estonia – Fiji – Greece
Hong Kong - Indonesia – Ireland
Italy – Macau - New Zealand
We recommend approval of this variation to the amount noted. The value stated above is Singapore – Spain – Sweden
inclusive of Grindley preliminaries, overheads & administration but exclusive of GST. United Kingdom - Vietnam

International Association
Brunei – MRBC Partnership

WT Partnership Aust Pty Ltd


Should you require any further information please do not hesitate to contact the Trading as WT Partnership
undersigned. ACN 006 040 768
ABN 45 997 181 713

Yours faithfully
WT PARTNERSHIP

PHIL ANSELINE
#VALUE!
Grindley WTP
Item Description Quantity Unit Rate
Amount Amount

St Mary's Villa - 224


Variation #16 Rev1 Miscellaneous Alterations

1 Supply & install security access control to Door187 1.00 no 4,569.00 4,569.00 4,569.00

2 Supply & install revised doors to Door187 as per A034_H 1.00 no 857.00 857.00

1)Securty access to D187 comprise supply & install of the following:


Cable for 2xKEY PADS 3 PAIR 62.00 no 3.30 204.60 204.60
Cable for 2xCARD READERS 3 PAIR 62.00 no 3.30 204.60 204.60
Cable for 1xELECTRIC STRIKE FIG 8 31.00 no 2.70 83.70 83.70
Ditto 4 CORE 31.00 no 2.78 86.18 86.18
Supply, installation & commissioning of equipment 1.00 no 3,990.50 3,990.50 3,990.50
SUB TOTAL 4,569.58

WTP cost analysis for supply, install & commissioning of security access to D187
Supply Costs:
2xKEY PADS 3 PAIR 2.00 no 500.00 1,000.00
2xCARD READERS 3 PAIR 2.00 no 600.00 1,200.00
1xconcept 2 door controller 1.00 no 1,200.00 1,200.00
1xELECTRIC STRIKE FIG 8 1.00 no 400.00 400.00

Labour Costs:
2xKEY PADS 3 PAIR 2.00 no 300.00 300.00
2xCARD READERS 3 PAIR 2.00 no 300.00 300.00
1xconcept 2 door controller 1.00 no 300.00 300.00
1xELECTRIC STRIKE FIG 8 1.00 no 300.00 300.00
SUB TOTAL 5,000.00

The rates for the above items are based on equivalent items on the 'Security Merchants Costs Guide 2003'. Additionally on the
30th June 2010 i contacted Michael Schneider from Cage Security Alarms Pty Ltd on 138811 about the costs of this system.
Based on his review of the different components of this system, the supply and installation of an equivalent system
is in the order of $4,000-5,000.

2)Revised D187 comprise supply & install of the following:


Cut in 1x4th hinge to frame to suit revised door size 1.00 no 125.00 125.00
Hinge service 1.00 no 25.00 25.00
Replace door to suit unequal pair 1.00 no 465.00 465.00
Bolection moulds-supply moulds & recut only 1.00 no 167.00 167.00
Door delivery 1.00 no 75.00 75.00
SUB TOTAL 857.00

Nick Jago from Davis Langdon raised concerns regarding the additional delivery charge of $75 for the door.
The reason for this replacement was due to the current one opening into an adjacent electric cupboard. I was informed
upon contacting Darren McEvoy from Grindley Construction that the reason for the additional delivery charge was due
to the replacement order been placed after the initial delivery of doors. Another reason given by Darren was that
the electrical subcontractor, Colbros Electrical is a middleman that orders different items from different suppliers and in turn
incurs a delivery charge for every order they place.
Sub Total 5,426.00

Grindley P.O & M @ 15% 0.15 % 813.90 0.00

Total 6,239.90