This project quality plan outlines requirements for a carpentry project. It includes a checklist of 5 points to verify such as using approved materials, protecting finished surfaces, and using proper fasteners. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge to ensure the carpentry work meets specifications.
This project quality plan outlines requirements for a carpentry project. It includes a checklist of 5 points to verify such as using approved materials, protecting finished surfaces, and using proper fasteners. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge to ensure the carpentry work meets specifications.
This project quality plan outlines requirements for a carpentry project. It includes a checklist of 5 points to verify such as using approved materials, protecting finished surfaces, and using proper fasteners. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge to ensure the carpentry work meets specifications.
This project quality plan outlines requirements for a carpentry project. It includes a checklist of 5 points to verify such as using approved materials, protecting finished surfaces, and using proper fasteners. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge to ensure the carpentry work meets specifications.
Project No. 19 Project Name Project detail/ Location
Check list for Carpentry
Location: Sheet No.
S. No. Points to be verified Yes No N/A Remarks
1 Is the requirement of bitumen paint or wood preservative for wood protection against termites met 2 Approved materials / samples / drawings are available at site
3 Has the protection for the finished surfaces been properly
provided 4 Is the type of fasteners ascertained from RE prior to the work 5 Is the method and material for concealing the fasteners been decided with RE Other special requirements/Remarks: