100% found this document useful (2 votes)
480 views2 pages

Flow Diagram of CHP

The document is a flow diagram of a coal handling plant showing the layout of various components. It includes a wagon tippler complex, crusher house, pent house, crushed coal stockpiles, reclaim hopper complex, and three coal handling units. The diagram shows the flow of coal from receiving at the wagon tippler through crushing and stockpiling to reclaim and feeding the coal handling units. It provides clarification on items like the type of wagons to be handled, inclusion of a belt scale and ship loader conveyor, and number of flap gates.

Uploaded by

Naresh Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
480 views2 pages

Flow Diagram of CHP

The document is a flow diagram of a coal handling plant showing the layout of various components. It includes a wagon tippler complex, crusher house, pent house, crushed coal stockpiles, reclaim hopper complex, and three coal handling units. The diagram shows the flow of coal from receiving at the wagon tippler through crushing and stockpiling to reclaim and feeding the coal handling units. It provides clarification on items like the type of wagons to be handled, inclusion of a belt scale and ship loader conveyor, and number of flap gates.

Uploaded by

Naresh Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WAGON TIPPLER COMPLEX WAGON TIPPLER COMPLEX WAGON TIPPLER COMPLEX

CRUSHER HOUSE (CH-1)

PENT HOUSE
TP-2 (PH-1)

2
5
DW SW DS CW

TP-3

TP-15

CRUSHED COAL STOCKPILE-1 RECLAIM HOPPER


COMPLEX

CRUSHED COAL STOCKPILE-2

TP-4

CRUSHED COAL STOCKPILE-3 TP-16

CRUSHED COAL STOCKPILE-4

TP-5 PENT HOUSE


PH-2

TP-17

CRUSHED COAL STOCKPILE-5

CRUSHED COAL STOCKPILE-6

TP-7

TP-6

TP-8

TP-9 TP-10 TP-11 TP-12 TP-13 TP-14

UNIT#1 UNIT#2 UNIT#3

Signature Not Verified Digitally signed by PRADEEP


CHANDEKAR
Date: 2014.02.04 12:09:11 IST
Reason: CAT I
Location: NTPCEOC
ENERGO ENGINEERING PROJECTS LIMITED

COMPLIANCE REPORT Date- 22/01/14

OWNER NTPC

PROJECT KUDGI STPP Phase # 1 (3x800MW)

CONSULTANT DEVELOPMENT CONSULTANTS PRIVATE LTD, KOLKATA

COAL HANDLING PLANT SUPPLIER ENERGO ENGINEERING PROJECTS LTD.

Drawing / Document Title:


Drawing / Document No 9573-155-PVM-L-006
1. FLOW DIAGRAM OF COAL HANDLING PLANT

S.No. NTPC Comment on Rev-0 Reply from DCPL/ENERGO NTPC Reply

1 Show all MCC rooms. Noted & Incorporated in revised drg.

2 Show main CHP control room. Noted & Incorporated in revised drg.

3 Show pump house 1 & 2. Noted & Incorporated in revised drg.

4 Indicate type of wagons to be handled by WT Noted & Incorporated in revised drg.

5 Indicate belt scale for boom conv Noted & Incorporated in revised drg.

6 Include SAC, indicate its haulage capacity in Technical Table. Noted & Incorporated in revised drg.

No. of Flap Gate actuators will be 52 as marked in the drawing, however the quantity of flap gate
7 Indicate 2 nos. of Flap Gate at every 3 way Flap Gate
will be 40. This includes 12nos. 3-way Flap Gates and 28 nos. 2-way Flap gates.

8 Revise the total number of Flap Gate to 52 Noted & Incorporated in revised drg.

9 MCC shall be located outside TP-8 Noted & Incorporated in revised drg.

10 Following points to be added in the notes- Noted & Incorporated in revised drg.

This drg is meant to show only coal flow path & does not indicate comprehensive
a Noted & Incorporated in revised drg.
scope of work.

All the convs will be provided with all accessories such as idlers, drives, belt
b Noted & Incorporated in revised drg.
cleaners, belt switches, tensioning devices as per technical specification.

c ILMS shall be with tramp iron chutes & each TP shall have dust/debris chute. Noted & Incorporated in revised drg.

Complete DS, CW, SW, PW, air conditioning, ventilation shall be as per technical
d Noted & Incorporated in revised drg.
specification.

Scope of supply for TP-9 to TP-14 shall be as per scope mentioned in technical
e Noted & Incorporated in revised drg.
specification.

f PAC, split ACs & window ACs shall be provided as per technical specification. Noted & Incorporated in revised drg.