Drilling-Manual Revision PDF
Drilling-Manual Revision PDF
Drilling-Manual Revision PDF
GENERAL CONTENTS
CHAPTER SUBJECT
1. B.O.P.EQUIPMENT
2. WELL CONTROL
3. ENVIRONMENTAL CONSIDERATIONS
4. DRILLSTRING
5. OPERATIONS
6. DRILLING FLUIDS
7. DRILLING EVALUATIONS
8. FISHING
9. DIRECTIONAL DRILLING
11. CEMENTING
12. SURVEYING
14. PERFORATING
15. STIMULATION
Illustrations
1.1 Introduction
The following BOP equipment is required:
A rig integrated diverter system.
A two-stack system containing a large bore and a small bore BOP stack.
After installation (pre-drilled or driven) of the marine conductor and prior to starting to drill
the hole for the surface casing string, the diverter has to be installed.
The diverter should be a rig integrated unit installed under the rotary table. (Regan KFD
or similar). The unit is permanently installed. The minimum rated working pressure is to
be 34.5bar (500psi).
The unit is hydraulically operated using remote control panels.
The diverter system should incorporate a kill line complete with a check valve.
The diverter unit should be operated with a self-contained accumulator and control
system. This unit should be located in a safe area away from the rig floor.
The diverter control system operator should be capable of operating the diverter unit
from two locations, one of which has to be near the drillers position.
The control panels should have the minimum of functions. The control systems should
be hooked up in a way that whilst closing the packing element always one valve in either
the starboard or port side ventline stays open. A proper selection can be made later
depending on the wind direction. Whilst closing the diverter packing element the flow line
valve must be closed.
Installation requirements for wellhead and BOP equipment also apply to diverter
equipment.
The diver housing complete with spacer nipples will also be used as bell nipple on top
of BOP stacks to be placed at a later stage. Therefore, sufficient spacer nipples and
crossover joints must be available.
1.3.1 Configuration
After setting and cementing the surface casing string and the installation of a casing head housing, a
large bore BOP stack must be installed. The configuration of this BOP stack (from top to bottom) is as
follows:
One 21 annular preventer working pressure 138bar (2 000psi).
One RAM type preventer equipped with proper sized Pipe RAMS, working pressure
138bar (2 000psi).
One RAM type preventer equipped with Blind or Shear RAMS, working pressure
138bar (2 000psi).
1.3.2 Outlets
The lower RAM type preventer also has two 3 flanged side outlets; one kill line and one choke line.
The kill line must be provided with two manually operated 3-138bar (2 000psi) gate valves, and a 3
check valve. The choke line must be equipped with one manually operated 3-138bar (2 000psi) gate
valve and one 3- 138bar (2 000psi) hydraulically operated valve (HCR).
WARNING:
In the drilling phase, the side outlets on the casinghead housing must be equipped with
two side outlet valves each.
1.4 Small bore (13 5/8) BOP stack (flanged connections)
1.4.1 Configuration
After the setting and cementing of the intermediate casing and the installation of a casing spool, the
small bore 135/8 BOP stack must be installed. The configuration (top to bottom) is as follows:
One 135/8 - 345bar (5 000psi) annular preventer.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
Figure 1.1 Large bore 211/4 BOP stack
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with blind/shear RAMS.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
1.4.2 Outlets
The middle RAM type preventer must have TWO 3-690bar (10 000psi) flanged side outlets for the kill
and choke lines. The kill line must be provided with two 3-690bar (10 000psi) manually operated gate
valves and a 3-690bar (10 000psi) check valve. The coke line must have one 3- 690bar (10 000psi)
manually operated gate valve and one 3-690bar (10 000psi) hydraulically operated gate valve
(HCR).
WARNING:
During the drilling phase the side outlets of the latest installed casing spool must each
have a double set of gate valves.
1.5.1 Configuration
BOP stack control systems consist of a independent automatic accumulator unit rated for 207bar (3
000psi ) working pressure with a control manifold. The control manifold should clearly show the
open and closed positions for the preventers and the hydraulically operated valves. The
accumulator unit must be equipped with 0-207bar (0-3 000psi) regulator valves (TR5 type) which
must be fail safe (to prevent loss of operating pressure).
The capacity of the accumulator must be sufficient to execute the following without recharging:
Closing and opening all preventers.
Closing the annular preventer again.
Closing one RAM type preventer.
Keeping all the above mentioned closed against the rated working pressure of the
preventers.
The unit should be located in a safe area away from the rig floor. It should include a low pressure
warning alarm and a hydraulic fluid level indicator or a low fluid level warming alarm.
WARNING:
Fire resistant high pressure control hoses (steel wrapped co-flex type) with a working
pressure of 207bar (3 000psi) must be used for the hydraulic control lines.
1.6 Choke manifold (flanged connections)
1.6.1 Configuration
The coke manifold must have a working pressure of 690bar (10 000psi) and must have at least two
adjustable chokes, of which one must be remotely operable from near the drillers position. The
minimum size for all choke lines and valves is 3.
1.6.2 Layout
An acceptable choke manifold layout is given in Figure 1.3.
Figure 1.3 Choke manifold layout
The kill and choke lines will tie into a kill and choke manifold, giving multiple choice functions as given
in Figure 1.4.
Figure 1.4 Kill and choke manifold
The vent line of the separator should be large enough to minimise backpressure (8 or
larger), and the separator capacity should be sufficient to handle the fluid/gas flow bleed off
from the choke manifold.
The (contaminated) mudflow leaving the separator shall have further treatment in the
degasser.
1.8 Degasser
The degasser separates the remaining gas from the contaminated mudflow coming from the
separator. The degasser functions by creating a vacuum above the mud in the degasser, thus
enabling gas evacuation from the mud. The degasser must have a proper vent system.
ANNULAR BOP
opening open
line close Closing line from accumulator unit
c/w TR type regulator valve
P-gauge
200bar
A drillpipe kelly cock in the open position with minimum bore equal to or greater than the internal
diameter of the drill collars is to be readily available to the rig floor at all times. It is to be properly
marked and must have collapsible, removable handles attached. It must be kept in the doghouse or
other readily accessible place to prevent freezing or contamination. Crossover subs from the valve to
the drill collars are to be kept with the valve at all times. Crossover should be a DC lift sub with DP
thread up and fishing neck of DC OD.
A gray style inside BOP with minimum internal diameter equal to the internal diameter of the DCs is
to be readily available to the rig floor at all times. It is to be sufficiently housed or shielded from
freezing or contamination. It is to be properly identified and have collapsible, removable handles.
Surface equipment. All surface equipment shall be tested to its maximum rated working
pressure but not lower than 345bar.
Casing. Casing should not be exposed to any (test) pressure higher than 80% of the
burst pressure of the weakest joint of the casing.
The annular preventer will be mechanically tested by closing on drillpipe or collars once
each day.
The pipe rams will be mechanically tested by closing on drillpipe once each day.
The blind ram will be mechanically tested by closing after each trip out of hole. Ram is to
remain open while out of hole.
The hydraulic valve and remote controlled choke are to be mechanically tested by
opening and closing once each day.
Notification of a closed manifold and revised kick control procedures must be posted in doghouse.
Illustrations
2.1 Introduction
The following BOP equipment is required:
A rig integrated diverter system.
A two-stack system containing a large bore and a small bore BOP stack.
After installation (pre-drilled or driven) of the marine conductor and prior to starting to drill
the hole for the surface casing string, the diverter has to be installed.
The diverter should be a rig integrated unit installed under the rotary table. (Regan KFD
or similar). The unit is permanently installed. The minimum rated working pressure is to
be 34.5bar (500psi).
The unit is hydraulically operated using remote control panels.
The diverter system should incorporate a kill line complete with a check valve.
The diverter unit should be operated with a self-contained accumulator and control
system. This unit should be located in a safe area away from the rig floor.
The diverter control system operator should be capable of operating the diverter unit
from two locations, one of which has to be near the drillers position.
The control panels should have the minimum of functions. The control systems should
be hooked up in a way that whilst closing the packing element always one valve in either
the starboard or port side ventline stays open. A proper selection can be made later
depending on the wind direction. Whilst closing the diverter packing element the flow line
valve must be closed.
Installation requirements for wellhead and BOP equipment also apply to diverter
equipment.
The diver housing complete with spacer nipples will also be used as bell nipple on top
of BOP stacks to be placed at a later stage. Therefore, sufficient spacer nipples and
crossover joints must be available.
2.3.1 Configuration
After setting and cementing the surface casing string and the installation of a casing head housing, a
large bore BOP stack must be installed. The configuration of this BOP stack (from top to bottom) is as
follows:
One 21 annular preventer working pressure 138bar (2 000psi).
One RAM type preventer equipped with proper sized Pipe RAMS, working pressure
138bar (2 000psi).
One RAM type preventer equipped with Blind or Shear RAMS, working pressure
138bar (2 000psi).
2.3.2 Outlets
The lower RAM type preventer also has two 3 flanged side outlets; one kill line and one choke line.
The kill line must be provided with two manually operated 3-138bar (2 000psi) gate valves, and a 3
check valve. The choke line must be equipped with one manually operated 3-138bar (2 000psi) gate
valve and one 3- 138bar (2 000psi) hydraulically operated valve (HCR).
WARNING:
In the drilling phase, the side outlets on the casinghead housing must be equipped with
two side outlet valves each.
2.4 Small bore (13 5/8) BOP stack (flanged connections)
2.4.1 Configuration
After the setting and cementing of the intermediate casing and the installation of a casing spool, the
small bore 135/8 BOP stack must be installed. The configuration (top to bottom) is as follows:
One 135/8 - 345bar (5 000psi) annular preventer.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
Figure 2.1 Large bore 211/4 BOP stack
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with blind/shear RAMS.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
2.4.2 Outlets
The middle RAM type preventer must have TWO 3-690bar (10 000psi) flanged side outlets for the kill
and choke lines. The kill line must be provided with two 3-690bar (10 000psi) manually operated gate
valves and a 3-690bar (10 000psi) check valve. The coke line must have one 3- 690bar (10 000psi)
manually operated gate valve and one 3-690bar (10 000psi) hydraulically operated gate valve
(HCR).
WARNING:
During the drilling phase the side outlets of the latest installed casing spool must each
have a double set of gate valves.
2.5.1 Configuration
BOP stack control systems consist of a independent automatic accumulator unit rated for 207bar (3
000psi ) working pressure with a control manifold. The control manifold should clearly show the
open and closed positions for the preventers and the hydraulically operated valves. The
accumulator unit must be equipped with 0-207bar (0-3 000psi) regulator valves (TR5 type) which
must be fail safe (to prevent loss of operating pressure).
The capacity of the accumulator must be sufficient to execute the following without recharging:
Closing and opening all preventers.
Closing the annular preventer again.
Closing one RAM type preventer.
Keeping all the above mentioned closed against the rated working pressure of the
preventers.
The unit should be located in a safe area away from the rig floor. It should include a low pressure
warning alarm and a hydraulic fluid level indicator or a low fluid level warming alarm.
WARNING:
Fire resistant high pressure control hoses (steel wrapped co-flex type) with a working
pressure of 207bar (3 000psi) must be used for the hydraulic control lines.
2.6 Choke manifold (flanged connections)
2.6.1 Configuration
The coke manifold must have a working pressure of 690bar (10 000psi) and must have at least two
adjustable chokes, of which one must be remotely operable from near the drillers position. The
minimum size for all choke lines and valves is 3.
2.6.2 Layout
An acceptable choke manifold layout is given in Figure 1.3.
Figure 2.3 Choke manifold layout
The kill and choke lines will tie into a kill and choke manifold, giving multiple choice functions as given
in Figure 1.4.
Figure 2.4 Kill and choke manifold
The vent line of the separator should be large enough to minimise backpressure (8 or
larger), and the separator capacity should be sufficient to handle the fluid/gas flow bleed off
from the choke manifold.
The (contaminated) mudflow leaving the separator shall have further treatment in the
degasser.
2.8 Degasser
The degasser separates the remaining gas from the contaminated mudflow coming from the
separator. The degasser functions by creating a vacuum above the mud in the degasser, thus
enabling gas evacuation from the mud. The degasser must have a proper vent system.
ANNULAR BOP
opening open
line close Closing line from accumulator unit
c/w TR type regulator valve
P-gauge
200bar
A drillpipe kelly cock in the open position with minimum bore equal to or greater than the internal
diameter of the drill collars is to be readily available to the rig floor at all times. It is to be properly
marked and must have collapsible, removable handles attached. It must be kept in the doghouse or
other readily accessible place to prevent freezing or contamination. Crossover subs from the valve to
the drill collars are to be kept with the valve at all times. Crossover should be a DC lift sub with DP
thread up and fishing neck of DC OD.
A gray style inside BOP with minimum internal diameter equal to the internal diameter of the DCs is
to be readily available to the rig floor at all times. It is to be sufficiently housed or shielded from
freezing or contamination. It is to be properly identified and have collapsible, removable handles.
Surface equipment. All surface equipment shall be tested to its maximum rated working
pressure but not lower than 345bar.
Casing. Casing should not be exposed to any (test) pressure higher than 80% of the
burst pressure of the weakest joint of the casing.
The annular preventer will be mechanically tested by closing on drillpipe or collars once
each day.
The pipe rams will be mechanically tested by closing on drillpipe once each day.
The blind ram will be mechanically tested by closing after each trip out of hole. Ram is to
remain open while out of hole.
The hydraulic valve and remote controlled choke are to be mechanically tested by
opening and closing once each day.
Notification of a closed manifold and revised kick control procedures must be posted in doghouse.
Illustrations
Forms
3.1 Introduction
The following BOP equipment is required:
A rig integrated diverter system.
A two-stack system containing a large bore and a small bore BOP stack.
After installation (pre-drilled or driven) of the marine conductor and prior to starting to drill
the hole for the surface casing string, the diverter has to be installed.
The diverter should be a rig integrated unit installed under the rotary table. (Regan KFD
or similar). The unit is permanently installed. The minimum rated working pressure is to
be 34.5bar (500psi).
The unit is hydraulically operated using remote control panels.
The diverter system should incorporate a kill line complete with a check valve.
The diverter unit should be operated with a self-contained accumulator and control
system. This unit should be located in a safe area away from the rig floor.
The diverter control system operator should be capable of operating the diverter unit
from two locations, one of which has to be near the drillers position.
The control panels should have the minimum of functions. The control systems should
be hooked up in a way that whilst closing the packing element always one valve in either
the starboard or port side ventline stays open. A proper selection can be made later
depending on the wind direction. Whilst closing the diverter packing element the flow line
valve must be closed.
Installation requirements for wellhead and BOP equipment also apply to diverter
equipment.
The diver housing complete with spacer nipples will also be used as bell nipple on top
of BOP stacks to be placed at a later stage. Therefore, sufficient spacer nipples and
crossover joints must be available.
3.3.1 Configuration
After setting and cementing the surface casing string and the installation of a casing head housing, a
large bore BOP stack must be installed. The configuration of this BOP stack (from top to bottom) is as
follows:
One 21 annular preventer working pressure 138bar (2 000psi).
One RAM type preventer equipped with proper sized Pipe RAMS, working pressure
138bar (2 000psi).
One RAM type preventer equipped with Blind or Shear RAMS, working pressure
138bar (2 000psi).
3.3.2 Outlets
The lower RAM type preventer also has two 3 flanged side outlets; one kill line and one choke line.
The kill line must be provided with two manually operated 3-138bar (2 000psi) gate valves, and a 3
check valve. The choke line must be equipped with one manually operated 3-138bar (2 000psi) gate
valve and one 3- 138bar (2 000psi) hydraulically operated valve (HCR).
WARNING:
In the drilling phase, the side outlets on the casinghead housing must be equipped with
two side outlet valves each.
3.4 Small bore (13 5/8) BOP stack (flanged connections)
3.4.1 Configuration
After the setting and cementing of the intermediate casing and the installation of a casing spool, the
small bore 135/8 BOP stack must be installed. The configuration (top to bottom) is as follows:
One 135/8 - 345bar (5 000psi) annular preventer.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
Figure 3.1 Large bore 211/4 BOP stack
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with blind/shear RAMS.
One 135/8 - 690bar (10 000psi) RAM type preventer equipped with pipe RAMS.
3.4.2 Outlets
The middle RAM type preventer must have TWO 3-690bar (10 000psi) flanged side outlets for the kill
and choke lines. The kill line must be provided with two 3-690bar (10 000psi) manually operated gate
valves and a 3-690bar (10 000psi) check valve. The coke line must have one 3- 690bar (10 000psi)
manually operated gate valve and one 3-690bar (10 000psi) hydraulically operated gate valve
(HCR).
WARNING:
During the drilling phase the side outlets of the latest installed casing spool must each
have a double set of gate valves.
3.5.1 Configuration
BOP stack control systems consist of a independent automatic accumulator unit rated for 207bar (3
000psi ) working pressure with a control manifold. The control manifold should clearly show the
open and closed positions for the preventers and the hydraulically operated valves. The
accumulator unit must be equipped with 0-207bar (0-3 000psi) regulator valves (TR5 type) which
must be fail safe (to prevent loss of operating pressure).
The capacity of the accumulator must be sufficient to execute the following without recharging:
Closing and opening all preventers.
Closing the annular preventer again.
Closing one RAM type preventer.
Keeping all the above mentioned closed against the rated working pressure of the
preventers.
The unit should be located in a safe area away from the rig floor. It should include a low pressure
warning alarm and a hydraulic fluid level indicator or a low fluid level warming alarm.
WARNING:
Fire resistant high pressure control hoses (steel wrapped co-flex type) with a working
pressure of 207bar (3 000psi) must be used for the hydraulic control lines.
3.6 Choke manifold (flanged connections)
3.6.1 Configuration
The coke manifold must have a working pressure of 690bar (10 000psi) and must have at least two
adjustable chokes, of which one must be remotely operable from near the drillers position. The
minimum size for all choke lines and valves is 3.
3.6.2 Layout
An acceptable choke manifold layout is given in Figure 1.3.
Figure 3.3 Choke manifold layout
The kill and choke lines will tie into a kill and choke manifold, giving multiple choice functions as given
in Figure 1.4.
Figure 3.4 Kill and choke manifold
The vent line of the separator should be large enough to minimise backpressure (8 or
larger), and the separator capacity should be sufficient to handle the fluid/gas flow bleed off
from the choke manifold.
The (contaminated) mudflow leaving the separator shall have further treatment in the
degasser.
3.8 Degasser
The degasser separates the remaining gas from the contaminated mudflow coming from the
separator. The degasser functions by creating a vacuum above the mud in the degasser, thus
enabling gas evacuation from the mud. The degasser must have a proper vent system.
ANNULAR BOP
opening open
line close Closing line from accumulator unit
c/w TR type regulator valve
P-gauge
200bar
A drillpipe kelly cock in the open position with minimum bore equal to or greater than the internal
diameter of the drill collars is to be readily available to the rig floor at all times. It is to be properly
marked and must have collapsible, removable handles attached. It must be kept in the doghouse or
other readily accessible place to prevent freezing or contamination. Crossover subs from the valve to
the drill collars are to be kept with the valve at all times. Crossover should be a DC lift sub with DP
thread up and fishing neck of DC OD.
A gray style inside BOP with minimum internal diameter equal to the internal diameter of the DCs is
to be readily available to the rig floor at all times. It is to be sufficiently housed or shielded from
freezing or contamination. It is to be properly identified and have collapsible, removable handles.
Surface equipment. All surface equipment shall be tested to its maximum rated working
pressure but not lower than 345bar.
Casing. Casing should not be exposed to any (test) pressure higher than 80% of the
burst pressure of the weakest joint of the casing.
The annular preventer will be mechanically tested by closing on drillpipe or collars once
each day.
The pipe rams will be mechanically tested by closing on drillpipe once each day.
The blind ram will be mechanically tested by closing after each trip out of hole. Ram is to
remain open while out of hole.
The hydraulic valve and remote controlled choke are to be mechanically tested by
opening and closing once each day.
Notification of a closed manifold and revised kick control procedures must be posted in doghouse.
Tables
Forms
4.1 Introduction
An imbalance of the formation pressure being higher than the hydrostatic pressure will allow
invading formation fluids to enter the wellbore. It is very important that the drilling personnel
understand the causes of kicks in order to prevent them from becoming uncontrollable.
Regular meetings should be held with the crews to discuss potential drilling situations which
could lead to a kick. The first line of kick detection is a well-trained crew.
4.1.2 Indications
While tripping.
1. Call alert.
2. Pick up until tool joint is above the floor.
3. Set slips and release elevators.
4. Install kelly cock in open position.
5. Close kelly cock.
6. Start pump and ensure that hole is full.
7. Shut down pump.
8. Divert flow to trip tank and zero tank.
9. Monitor and record volumes for 5-10 min.
10. If well is flowing, shut in immediately.
While out of the hole.
1. Call alert.
2. Start pump and ensure that hole is full.
3. Shut down pump.
4. Divert flow to trip tank and zero tank.
5. Monitor and record volumes for 5-10 min.
6. If well is flowing, shut in immediately.
NOTE: During winter operations it is Company policy to close the last valve to the degasser in the
choke manifold to help prevent freezing. This allows the bleed-off and manifold lines to be
pressurised to 2-5 bar with a 50/50 glycol/water mix. The valve must be opened prior to
shutting in the well. A notice (shown below) to open the valve must be posted in the
appropriate places.
Note: FOR ALL WELL CONTROL SITUATIONS WHILE DRILLING, WHILE TRIPPING
OR WHILE OUT OF THE HOLE, ENSURE THAT THE VALVE TO THE DEGASSER
IS OPENED
This notice is to be posted in the doghouse, manifold enclosed, Company mans office and Rig
Managers office.
While drilling:
1. Call alert.
2. Stop rotary.
3. Hoist kelly or top drive until tool joint is above floor.
4. Stop pump.
5. WINTER: Open manifold valve to degasser.
6. Open HCR through open choke.
7. Close annular preventer.
8. Slowly close choke. Do Not exceed MACP.
9. Allow pressures to stabilise (10 minutes).
10. Read and record SICP, SIDPP and tank gain.
While tripping:
1. Call alert.
2. Hoist until tool joint is above floor.
3. Set pipe in slips and release elevators.
4. WINTER: Open manifold valve to degasser.
5. Install kelly cock in open position.
6. Close kelly cock.
7. Open HCR through open choke.
8. Close annular preventer.
9. Slowly close choke. Do Not exceed MACP.
10. Pick up and make up kelly.
11. Open kelly cock.
12. Allow pressures to stabilise (10 minutes).
13. Read and record SICP, SIDPP and tank gain.
NOTE: If only one stand of collars is remaining in the hole it may be advisable to pull
the stand and treat the well as "Out of Hole".
Out of hole:
1. Call alert.
2. WINTER: Open manifold valve to degasser.
3. Open HCR through open choke.
4. Close blind rams.
5. Slowly close choke. Do Not exceed MACP.
6. Allow pressures to stabilise (10 minutes).
7. Read and record SICP and tank gain.
4.3.2 Floating unit (drillstring compensator operational).
While drilling:
1. Call alert.
2. Stop rotary.
3. Hoist kelly until tool joint is above floor at the predetermined position for landing
string on rams.
4. Stop pump.
5. WINTER: Open manifold valve to degasser.
6. Open HCR through open choke.
7. Close annular preventer.
8. Slowly close choke. Do Not exceed MACP.
9. Allow pressures to stabilise (10 minutes).
10. Close the uppermost rams (not variable bore rams).
11. Land string on rams.
12. Open annular preventer.
13. Set compensator in mid-stroke position.
14. Lock rams.
15. Read and record SICP, SIDPP and tank gain.
While tripping:
1. Call alert.
2. Hoist until tool joint is above floor at the predetermined position for loading string on
rams.
3. Set pipe in slips and release elevators.
4. WINTER: Open manifold valve to degasser.
5. Install kelly cock in open position.
6. Close kelly cock.
7. Open HCR through open choke.
8. Close annular preventer.
9. Slowly close choke. Do Not exceed MACP.
10. Pick up hang joint and make up kelly or top drive.
11. Strip hang joint through annular preventer to landing position.
12. Close the uppermost rams (not variable bore rams).
13. Land string on rams.
14. Open annular preventer.
15. Set compensator in mid-stroke position.
16. Lock rams.
17. Open kelly cock.
18. Allow pressures to stabilise (10 minutes).
19. Read and record SICP, SIDPP and tank gain.
NOTE: If only one stand of collars is remaining in the hole it may be advisable to
pull the stand and treat the well as "Out-of-Hole".
Out of hole:
1. Call alert.
2. WINTER: Open manifold valve to degasser.
3. Open HCR through open choke.
4. Close blind rams.
5. Slowly close choke. Do Not exceed MACP.
6. Allow pressures to stabilise (10 minutes).
7. Read and record SICP and tank gain.
While drilling:
1. Call alert.
2. Stop rotary.
3. Hoist kelly until tool joint is above floor at the predetermined position for landing
string on rams.
4. Stop pump.
5. WINTER: Open manifold valve to degasser.
6. Open HCR through open choke.
7. Close annular preventer.
8. Slowly close choke. Do Not exceed MACP.
9. Set pipe in slips.
10. Close lower kelly cock and bleed off kelly.
11. Remove kelly or top drive.
12. Pick up and make up drillpipe single and circulating head.
13. Pressure test circulating head.
14. Rig in compensator.
15. Open lower kelly cock.
16. Close uppermost rams (not variable rams).
17. Pick up string and remove slips.
18. Land string on uppermost rams
19. Open annular preventer.
20. Lock rams.
21. Allow pressures to stabilise (10 minutes).
22. Read and record SICP, SIDPP and tank gain.
While tripping:
1. Call alert.
2. Hoist until tool joint is above floor at the predetermined position for loading string on
rams.
3. Set pipe in slips and release elevators.
4. WINTER: Open manifold valve to degasser.
5. Install kelly cock in open position.
6. Close kelly cock.
7. Open HCR through open choke.
8. Close annular preventer.
9. Slowly close choke. Do Not exceed MACP.
10. Pick up and make up drillpipe single and circulating head.
11. Pressure test circulating head.
12. Rig in compensator.
13. Open kelly cock.
14. Close uppermost rams (not variable rams).
15. Pick up string and remove slips.
16. Land string on uppermost rams.
17. Open annular preventer.
18. Lock rams.
19. Allow pressures to stabilise (10 minutes).
20. Read and record SICP, SIDPP and tank gain.
NOTE: If only one stand of collars is remaining in the hole it may be advisable to
pull the stand and treat the well as "Out-of-Hole".
Out of hole:
1. Call alert.
2. WINTER: Open manifold valve to degasser.
3. Open HCR through open choke.
4. Close blind rams.
5. Slowly close choke. Do Not exceed MACP.
6. Allow pressures to stabilise (10 minutes).
7. Read and record SICP and tank gain.
The basic underlying principle in all well control methods is to "maintain bottomhole pressure
at a value equal to or slightly above formation pressure." Failure to recognise specific
situations can result in additional pressure being exerted on the formation and the casing
seat.
Prior to selecting a particular method of well control, the Company Representative should
consider the following variables affecting each method:
Depth of casing seat in relation to total depth.
Maximum allowable casing pressure.
Amount of barite on location.
Size of kick.
Time required to circulate out invading fluid.
Possible lost circulation zones.
Position of drillstring at time of kick.
Company requires that enough barite be stockpiled on location to allow mixing at one
sack/min. until more barite is available. A minimum of 50 tonnes is required.
Prior to completing the well control worksheet, isolate as many mud tanks as possible by
bypassing down the mud ditch, making the active mud system as small as practical, thus
minimising the required mixing times.
The calculations required to allow the kick to be circulated out and the well killed can be
done graphically or manually.
CAUTION:
Care must be taken to ensure that the proper graph is used. Graphs exist for mud
densities of 1.0-1.3 S.G. and mud densities of 1.3-1.6 S.G.
Information Required.
To use the well control nomograph properly the following information is required:
NOTE: The Initial Circulation Pressure (ICP) and Final Circulating Pressure (FCP)
DO NOT INCLUDE ANY OVERKILL.
Graphical mixing rate calculations (see Figures 2.1 and 2.2 *units=kPa and kg/m3).
NOTE: Graphical Well Control Worksheets, see form 2.1 at the back of this section.
One Circulation
STEP 1
Plot the reduced speed pump pressure (RSPP in bar previously recorded) on the vertical
RSPP line.
STEP 2
Plot the stabilised shut-in drillpipe pressure (SIDPP) on the left hand axis of the lower
graph.
Join the RSPP and SIDPP points with a straight line. From this line the initial circulating
pressure (ICP in bar) can be read from the intersection with the vertical ICP line.
STEP 3
From point 2 (SIDPP) draw a horizontal line to the right until it intersects with the line
representing the present true vertical depth of the well.
If a vertical line is projected downward from this point the density increase required to kill
the well can be read on the lower graphs horizontal axis. This density increase required
to kill the well does not have any overkill built into it.
STEP 4
From the intersection with the well depth line (Point 3) project a vertical line upwards until
it intersects the previously recorded speed pump rate line (RSPR in m3/min.) on the
upper graph.
STEP 5
From point 4 (intersection with the RSPR), project a horizontal line to the left until it
intersects with the left axis of the upper graph. From this intersection point the barite mix
rate (sxs/min), required to kill the well in one circulation, can be read.
The density required to kill the well (S.G.) can be determined by adding the density
increase required to kill the well to the original mud density.
STEP 6
If the required mix rate to kill the well is less than 1sx/min., or the rig is capable of mixing
at greater than 1sx/min., then project a vertical line downward from the original Point 4
until it intersects with the well depth line. When the required barite mix rate to kill the well
is less than 1sx/min. (40 kg/sx), Point 6 will be the same as the original Point 3.
STEP 7
From Point 6 project a horizontal line to the left until it intersects with the vertical Delta P
line.
STEP 8
From Point 7 draw a straight line through the intersection on the ICP line. Continue to
project this line until it intersects with the vertical final circulating pressure (FCP) line on
the nomograph. The final circulating pressure (FCP in bar) can be recorded from this
point (Point 8).
NOTE: If the required mix rate is greater than 1sx/min. or greater than the rig capacity,
then the well will require more than one circulation to kill. Immediately begin
mixing 1sx/min. at the previously plotted ICP and RSPR.
STEP 9
From Point 4 if a line is projected horizontally to the left, the required barite mix rate
(sxs/min.) to kill the well in one circulation can be read from the left-hand axis of the
upper graph (Point 5).
When the required mixing rate to kill the well is greater than the mixing capability of the
rig (i.e., >1sx/min.) then the well will require more than one circulation to kill. Immediately
start mixing at 1sx/min. at the previously plotted ICP and RSPR.
From point 4 follow the RSPR line back until it intersects with the horizontal 1sx/min
mixing rate line (Point 6). From Point 6 project a vertical line downward until it intersects
with the well depth line on the lower graph (Point 7).
NOTE: It is Company policy that all rigs working for the Company are capable of mixing
barite at a minimum rate of 1sx/min.
STEP 10
From Point 7 project a horizontal line to the left until it intersects with the vertical Delta P
line on the nomograph.
NOTE: From Point 7 the density increase (S.G.) which will be achieved on this
circulation can be read by projecting a vertical line down to the horizontal axis of
the lower graph.
STEP 11
From Point 8 project a line through the intersection of the vertical ICP line on the
nomograph.
STEP 12
Continue projecting the straight line from Point 9 until it intersects with the vertical final
circulating pressure (FCP) line on the nomograph (Point 10). The FCP (bar) at the end of
this circulation can be read from this point.
At the end of this circulation the well should be shut in and the pressure recorded again.
The nomograph must be filled out again and another circulation must be performed. This
process must be repeated until the well can be killed with a circulation requiring 1sx/min.
or less of barite.
NOTE: During this circulation the ICP must be gradually reduced to the FCP, as the new
density mud is circulated from the surface to the bit. From a practical standpoint
there is usually very little difference between the ICP and FCP. As long as
minimal overkill is being used (i.e., 7bar) the entire circulation can be made at
the ICP. If there is more than a 5bar difference between the calculated ICP and
FCP, then the circulating pressures should be adjusted as above.
Figure 4.1 Well control worksheets (steps 1 through 4)
Figure 4.2 Well control worksheets (steps 4 through 8)
STEP 2
Circulate the kill density mud from the surface to the bit. Slowly reduce the drillpipe
pressure from the ICP to the FCP.
NOTE: If there is not a great deal of difference between the ICP and FCP (i.e., <5bar)
then it is acceptable to circulate the kill density mud to the bit by holding the
drillpipe pressure constant at the ICP. If there is a large difference between the
ICP and FCP, then circulate the kill density mud to the bit in 5bar increments, as
shown in the well kill procedure example.
The ICP and FCP which are obtained from the well control nomograph or manual
calculations do not include any overkill. Approximately 7-14bar in the overkill margin
should be added to the calculated values when plotting the circulation pressures to be
followed during the well control operation.
STEP 3
1. Once the kill density mud is at the bit, hold the drillpipe pressure constant at the FCP
until the kill density mud reaches the surface. Once the kill density mud reaches
surface, the casing pressure should be equal to the amount of overkill being used, if
the well was capable of being killed in one circulation (i.e., a mixing rate of <1sx/min.
was required).
2. Stop the pump and allow the overkill to bleed off. Shut in the well. Both the drill pipe
and casing pressures should read zero pressure.
NOTE: If there is pressure remaining after shutting the well in and the drillpipe pressure
and casing pressure are equal, it may be due to trapped pressure in the wellbore
during the shut in. Bleed off the pressure and shut in the well again.
If more than one circulation is required to kill the well then the SIDPP and SICP
must be recorded again, and the well control problem solved for another
circulation.
Figure 4.3 Modified concurrent method
STEP 1
Calculate the circulating volume/time in minutes and strokes.
Calculate the circulating volume and time (strokes). The volume/strokes must be
segregated into 3 components:
Surface to bit (based on measured depth)
Bit to surface (based on measured depth)
Surface tank volume
1. Surface to Bit:
DP capacity (m3/m) x length (m) + Collar capacity (m3/m) x length (m)
= Volume surface to bit (m3)
Strokes = Volume (m3)
Pump Capacity (m3/stroke)
2. Bit to Surface (Annulus):
Annular Capacity Collars/OH (m3/m) x length (m)
+ Annular Capacity DP/OH (m3/m) x length (m)
+ Annular Capacity DP/Csg (m3/m) x length (m)
= Volume bit to surface (m3)
Circulating Volume:
Volume Surface to Bit (m3)
+ Volume Bit to Surface (m3)
+ Surface Tank Volume (m3)
= Circulating Volume (m3)
Circulating Time:
Circ. Time (min.) = Circulating Vol. (m3)
RSPR (m3/min.)
STEP 2
Calculate the density increase necessary to kill the well in one circulation.
The density increase (DI) required to kill the well can be found by utilising the SIDPP.
This DI does not include any excess. Once the well has been killed, additional barite
should be added to provide a 14bar overbalance while drilling.
DI (S.G.) = SIDPP
0.1 x DI
STEP 3
Calculate the barite mixing rate to kill the well in one circulation.
The barite mixing rate can be determined as follows:
1. Barite Required:
Barite Required (kg/m3)= 4.25 (S.G) x DI (S.G.)
4.25 (S.G.) - NMD(S.G.)
STEP 4
If the mixing rate to kill the well is greater than 1sx/min. or the rig mixing capability, then
calculate the density increase achieved with a circulation at 1sx/min.
When the mixing rate required to kill the well is greater than 1sx/min. or the rig's mixing
capability, then more than one circulation will be required to kill the well. In this case the
density increase that will be achieved with the present circulation at 1sx/min. or the rig's
mixing capability will be required:
NOTE: The above calculation has assumed 40kg sacks of barite. If the sack size is
different from this then the proper sack weight must be used. In addition, the
density of barite has been assumed to be 4250 kg/m3.
STEP 5
Calculate the ICP and FCP.
The calculation of the initial circulating pressure (ICP in bar) and the final circulating
pressure (FCP in bar) is dependent upon whether or not the well can be killed in one
circulation or not.
2. Mix Rate of 1sx/min. (more than 1 circulation required to kill the well):
ICP = (SIDPP + RSPP) x OMD
NMD
NOTE: The above calculations do not include any overkill. Approximately 7-14bar of
overkill should be held on the choke while circulating out the kick to prevent an
influx of formation fluids during well control operations.
STEP 6
Prepare a well control procedure graph as shown in figure 2.3. It is best to prepare the
graph without any overkill included in the actual pressure line. The overkill should be
shown on the stepped down pressures that the driller will actually be holding on the
choke. Complete the well control worksheet and control log at the back of this section
(Forms 2.2 and 2.3).
Crew Positions.
NOTE: The listed crew positions are applicable to alternate methods of well control.
Driller - Controls the choke at the remote station on the floor. Ensures valve to degasser
is open.
Assistant Driller - Assists the driller.
Derrickhand - Mixes barite as required at mixing station.
Floorhand 1 and 2 - Assists the derrickhand.
Rig Superintendent/Toolpusher - Ensures that all the crew members are performing
their duties as required. Ensures that all required equipment is operating properly and
any required standby equipment is available.
Company Representative - Monitors all rig operations to ensure that well kill plan is
carried out correctly.
Where: The Maximum Allowable Casing Pressure (MACP) is the surface pressure (bar) at
which the casing shoe will break down with the original mud density in the annulus. The
MACP must not be exceeded. Several items can assist in ensuring that the casing shoe is
not broken down, resulting in an underground blowout:
If the kick consists of a gas bubble, once the gas bubble has reached the casing shoe no
further increase in pressure at the casing shoe is possible. Thus, the MACP limits do not
apply once a gas kick has reached the casing shoe. This phenomenon is due to the fact
that high density mud is now being replaced by light density gas in casing annulus.
If the MACP limits are close to being reached the overkill can be slowly bled off to buy
more time while circulating out a kick. This may provide enough time to allow a gas
bubble to reach the casing shoe.
2. Circulate the wellbore to kill density mud with constant bottomhole pressure.
1. Calculate a new RSPP due to higher friction losses which will be experienced with
the increased kill mud density.
2. Calculate the density increase and the amount of barite required to kill the well. Mix
kill mud density.
3. Slowly crack open the choke and start the pump at the RSPR. Hold the SICP +
overkill constant until the pump is running smoothly.
4. Using the choke, hold the casing pressure constant at the above pressure until the
kill mud density reaches the bit. Read and record the drillpipe pressure at this point.
5. Using the choke hold the casing pressure constant at the above pressure until the kill
mud density reaches the bit. Read and record the drillpipe pressure at this point.
6. Holding the drillpipe pressure constant at the above pressure, circulate the kill mud
density to surface.
7. Stop the pump and shut in the well. Re-record the SIDPP and SICP. They should
read zero.
The wait and weight method allows the well to be killed in one circulation. If the kill mud
density has been pre-mixed prior to taking on a kick, this method provides the lowest
equivalent casing shoe pressures while killing the well.
The advantages and disadvantages of the various well kill methods are listed in Table 2.1.
Table 4.1 Advantages and disadvantages of well kill methods
Method Advantages Disadvantages
Driller's Simplest to teach. Higher casing pressure.
Very few calculations. Higher equivalent circulating densities at
Could circulate out high casing seat.
pressure/low volume gas pocket. Requires minimum of two circulations.
Wait and Weight Lowest casing pressure. Requires longest non-circulating time
Lowest equivalent circulating while mixing heavy mud.
density at casing seat. Pipe could stick during non-circulating
Avoid potential lost circulation period in shale or anhydrite sections.
during well killing procedures Requires more calculations.
The preferred method of killing a well is to bullhead the influx back into the source. The
Company Representative must be consulted prior to proceeding with well killing operations.
There are various methods to be utilised in order to kill a well. They are:
Normal circulation (down the tubing). This method is probably the most widely used in
the industry when killing flowing wells or wells with light fluid or gas in the annulus.
Surface equipment employed in these procedures include a pump and a choke to hold
back pressure while circulating. Summarised below are the procedures for this method:
1. Bleed off any gas head in wells containing liquids.
2. Re-check and record SITP and SICP.
3. Open the choke, start the pump, and bring up to normal circulating speed.
4. Adjust the choke, holding the casing pressure (SICP value) constant until the kill fluid
reaches the bottom of the tubing.
5. After the kill fluid reaches the bottom of the tubing string adjust the choke to hold the
tubing pressure constant until the kill fluid reaches the surface.
6. Stop the pump and shut the well in.
7. SITP and SICP should be zero.
When bleeding off any gas head that contains hydrogen sulphide (H2S), ensure that the
gas is routed through proper separation and flare equipment.
Reverse circulation (down the annulus). This method is probably most widely used in the
industry when killing pumping wells or wells with a packer and packer fluids in place.
Reverse circulation is normally used when a packer is in place and the annulus is filled
with an inhibited packer fluid. Either a sliding sleeve is opened, or the tubing is
perforated to provide access to the tubing string. Normally, the packer fluid density is
sufficient to balance formation pressure, and the kill fluid density will closely approximate
the packer fluid density.
If this is not the case, two circulations will be required to kill the well: one circulation to
displace the tubing to completion fluid, followed by the second, displacing the annulus
and tubing to kill fluid. The procedures shown below assume the annulus fluid is of
sufficient density to kill the well when contact has been established between the tubing
and casing:
1. Bleed off any gas head in wells containing liquids.
2. Re-check SITP and SICP.
3. Crack the choke and bring pump to a predetermined speed.
4. Hold the tubing pressure (SITP value) constant by adjusting the choke.
5. After the pump reaches a constant speed, hold the casing pressure constant until the
packer fluid has been circulated out.
6. Stop the pump and shut the well in.
7. SITP and SICP should be zero.
When bleeding off any gas head containing hydrogen sulphide (H2S), ensure the gas is
routed through proper separation and flare equipment. Should the packer fluid density be
less than required to kill the well, the above procedures should be followed until the
tubing volume has been displaced from the annulus with a similar density fluid. At this
point commence pumping kill fluid holding the tubing pressure constant until kill fluid
reaches the sliding sleeve or tubing perforations. The casing pressure would then be
held constant until kill fluid reaches the surface.
Bullheading is a term used to describe killing the well by forcing formation fluids back into
the formation by pumping kill fluid down the tubing. Formation fluids often affect the
feasibility of attempting to bullhead. Low viscosity fluids such as gas will flow back into
the formation at a faster rate than oil or water.
Gas will also have less tendency to plug the formation as it reverses the flow.
Gas migration may have a serious effect upon bullheading operations. Gas migration is
the upward movement of low-density fluids through high-density fluids. Factors affecting
gas migration rates include:
1. Fluid densities and viscosities.
2. Hole geometry.
3. Influx size.
Where low pump rates occur, the upward migration of gas may equal or exceed the
downward fluid rate, negating the advantages of bullheading. In some cases, it may
become necessary to increase viscosity to offset or slow down the gas migration rate.
Under some circumstances, back-up pressure may have to be applied to the casing
annulus to prevent tubing burst. This generally is used if tubing pressure becomes
excessive or the tubing integrity is questionable as a result of corrosion and erosion.
Always ensure that casing burst limits are not exceeded. In high-pressure pumping,
some operators favour a pressure relief valve installed on the tubinghead outlet. Should
a tubing failure occur this prevents over-pressuring the casing. In some instances the rig
pump may not be capable of operating at the required pressures; and may have to be
replaced with a suitable high-pressure pump.
NOTE: This method of well kill may not be used if the integrity of the wellbore is in
question, i.e., corroded basing, uphole perforations, etc.
Lubricate and bleed - this method is occasionally used for killing wells during workover
operations. It involves alternately pumping a kill fluid into the tubing, allowing the kill fluid
to fall, then bleeding off a volume of gas until kill fluid reaches the choke. As each
volume of kill fluid is pumped into the tubing the SITP should decrease by a calculated
value until the well is eventually killed.
Procedures:
1. Record the SITP and SICP.
2. Open the choke to flare, allowing gas to escape and momentarily reducing the SITP.
3. Close the choke and a valve downstream from the choke.
4. Slowly pump kill fluid until the pump pressure reaches the maximum allowable
working pressure, or some predetermined pressure.
5. Stop the pump.
6. Wait for the fluid to drop in the tubing. Fluid full rate is calculated by the gas migration
rate which is approximately 600m/hr.
Lubricating plugs, i.e., tubing plugs, bridge plugs, packers with a plug in place, and
backpressure valves. This method of killing a flowing well can be done safely with a
lubricator in place. The type of equipment that can be run on wireline are tubing blanking
plugs, plugged packers, and bridge plugs. Once the plug is in place, the tubing and/or
casing is bled off. With the well dead, the kill fluid can be circulated to the wellbore. This
method is most useful in the situation where a circulating string is not present (post
perforating) and the tubing string is live. Fill well without tubing.
Snubbing in with endless tubing. Endless tubing is often used to kill a producing well.
The method used is to circulate kill fluid down the endless tubing and up the production
tubing or casing (tubingless completion). This method would be applicable in the
situation where the production tubing is plugged, eliminating bullheading or tubingless
completion.
The procedures for killing a well using endless tubing are basically no different from
procedures for the normal circulation method. Outlined below are the basic procedures
for the endless tubing method (check with service company on tubing strength limit):
1. Rig in endless tubing unit, pressure test surface equipment, fill endless tubing with
kill fluid. Ensure that a check valve is in place.
2. Bleed off any gas head in wells containing liquids.
3. Re-check SITP and SICP.
4. Pressure up endless tubing to SITP valve and open master valve.
5. RIH endless tubing. Note: Fill tubing every 600 m to prevent collapse, monitor SITP
and bleed off, if necessary, pressure increase resulting from running the endless
tubing (in oil-filled tubing strings, bleed off volume should be closely monitored to
ensure proper volume is bled off).
6. After reaching desired depth, open the choke and bring pump up to desired speed.
7. Hold production tubing pressure (SITP value) constant by adjusting the choke.
8. After the pump reaches a constant speed, hold the endless tubing pressure constant
until kill fluid reaches the surface.
9. Stop the pump and shut the well in.
10. Shut in endless tubing and production tubing pressure should be zero.
11. If well is dead, prepare to pull endless tubing. Open the choke and start the pump
(minimum pump rate should equal the displacement of the endless tubing).
12. Adjust the choke to hold the overkill value constant on the production tubing.
13. Pull endless tubing.
14. After endless tubing is above master valve, stop the pump and shut the well in.
15. Check for pressure build-up on production tubing. If none is present, resume normal
operations.
After setting the casing it may be necessary to determine the pressure integrity of the
formation below the casing shoe. A formation leak-off test (FLOT) should be performed
when programmed and/or whenever required by regulatory bodies.
Leak-off test procedures (Leak-off test form 2.5 at the back of this section).
Where: EMD = Maximum equivalent mud density which can be held on the
casing shoe (kg/m3)
Figures 2.6 through 2.11 provide typical examples of what may occur when evaluating the open hole
fracture gradient.
NOTE: Figures 2.6 through 2.11 give pressures in kPa (1kPa = 0.01bar).
MACP (bar).
A line should be drawn on the graph which represents the surface pressure required to
obtain 2.2bar/10m at the casing shoe. This will be the maximum pressure which will be used
during the leak-off and it will equate to the maximum allowable casing pressure. Exceeding
this pressure during the leak-off test will not provide additional kick control as the formations
which will be exposed in the open hole section will not be capable of holding more than
2.2bar/10m. This line is not to exceed 80% of the Surface casing burst rating.
Stop Pumps.
If it appears that the leak-off has occurred well below the anticipated pressure it may be due
to filtration losses. Frequently, if the pump is stopped for a few minutes and then restarted,
the leak-off test will proceed to the required pressure. If the leak-off occurs at the same
pressure again it may be necessary to spot a gel pill over the shoe joint and repeat the test
again.
Figure 4.8 Incomplete leak-off test (filtration losses)
Figure 4.9 Leak-off test (open hole)
When performing an open hole test, higher pump rates are used. Begin the first stage of the
test at 10-20% of the RSPR (25-50 l/min.) and pump until the first leak-off occurs. This will
typically be well below the required leak-off pressure. Stop the pumps for a few minutes.
Begin pumping the second stage of the test by increasing the pump rate by 25-50 l/min.
(depending upon the initial leak-off pressure). Typically 3-4 stages will be required to
achieve the required leak-off pressure.
A leak-off should be achieved without exceeding 50% of the reduced-speed pump rate
recorded on the drilling rig (25% is preferred). If more than 50% of the pump rate is required
to overcome the leak-off rate, the ability to control the well while circulating out a kick is
questionable. A small cementing unit is preferred for performing the open hole leak-off test.
Continue increasing the pump rate in stages until a leak-off above the required leak-off
pressure is achieved. This should be achieved without exceeding 50% of the previously
recorded reduced-speed pump rate (25% is preferred). If more than 50% of the RSPR is
required to overcome filtration losses, the ability to circulate out a well kick is questionable.
Figure 4.10 Completed leak-off test (casing shoe cement failure)
If the leak-off has occurred at a value below 1.7bar/10m then there may not be sufficient
casing shoe integrity to handle a kick. Spot a viscous gel pill over the shoe and attempt the
leak-off test again. If the leak-off pressure does not increase on the second attempt it may
be due to a casing shoe cement failure or an incompetent casing shoe formation. Often the
shoe integrity can be improved by performing a bradenhead cement squeeze on the shoe
joint.
The Company Representative is to ensure that all Company and Government safety
procedures and regulations are being followed.
Safety procedure meetings and/or drills are to be conducted prior to any difficult or non-
routine operation. These meetings and drills are to be recorded in a safety meeting minutes
book and the tour book.
BOP drills are to be conducted regularly to ensure that the crews are familiar with their
responsibilities during a well shut-in. Blow out drills will be conducted prior to drilling out
surface casing and by each crew every seven days thereafter. The Company requires that
the following times are achieved during a well shut-in:
1 minute to have the pipe set in the slips.
3 minutes to have the well shut in.
5 minutes to be ready to circulate/strip/etc.
These values are maximum times. It is anticipated that the crews should be capable of much faster
times during normal shut-in situations. The daily BOP function test is a good time to conduct a BOP
drill. In addition, BOP drills should be conducted at unexpected times to ensure that the crew is alert
and proficient with shut-in procedures.
NOTE: Blow Prevention Drill form 2.6 at the back of this section.
Never run new or rough hardbanding inside of a casing string. It should always be buried in
open hole for a wear in period.
Sand content in the mud can be extremely erosive. It should be maintained below 0.5%.
If the BOP body is opened to changeover, the rams then the BOP door seals must be tested
again. This is typically accomplished with a cup style tester on a joint of drill pipe. Do not
exceed 80% of the casing burst rating or 50% of the annular BOP working pressure during
the test (10 minutes). Be sure to monitor the hook loads while testing as the cross-sectional
area of the cups may cause a significant hook load. It is not necessary to test the ram blocks
if a thorough visual inspection has been performed.
Contents
4.10 Introduction
The Company policy on environmental issues is for continuous environmental improvement with the
ultimate goal being:
No negative impact from operation emissions, discharges or dumping of waste.
Based on these considerations The Company strives to satisfy the public that every effort is
made, within reasonable limits, to work in an environmentally responsible way. For further
information on the environmental policy refer to the Company HSE manual.
3.2. Chemicals Used in Drilling
3.2.1.General
A wide variety of chemicals are used in the mixing of drilling fluids and cements.
Weighting Materials
H) MISCELLANEOUS
I) VERSA PRODUCTS
Only chemicals with a valid Safe Handling Of Chemicals SHOC" card shall be used
The SHOC cards contain important information on chemical products such as:
Composition of the chemicals.
Usage instructions.
Transport rules.
Toxicity of the products.
Safety/health instructions.
Classes of products used in water-base drilling fluids are:
Viscosifiers.
Filtrate Reducers.
Weighting Materials.
Alkalinity Modifiers.
Deflocculants.
Shale control Additives.
Lubricants.
Stuck Pipe Release Agents.
Defoamers.
Inorganic Salts.
Lost Circulation Materials.
Corrosion Control Agents.
Oil-base drilling fluids do not use such a wide range of chemicals as in water-base drilling
fluids, due to the inert non-polar nature of the oil external phase. Classes of products
used in oil-base drilling fluids are:
Emulsifiers.
Viscosifiers (Suspending Agents).
Rheology Enhancers.
Oil Wetting Agents (Dispersants or Thinners).
Filtration Control Additives.
Inorganic Materials.
3.2.2. Toxicity of drilling fluids
The short-term toxicity effects must now also include the long-term effects; including bioaccumulation and
biodegradation. The toxic effects of the drilling fluid chemicals, discharged into the environment, depend
on the characteristics of the chemical, the amount discharged and characteristics of the receiving
environment.
It is normal practise that after a technical evaluation by the Company, approval for field use shall be
obtained from the authorities. It is the Companies requirement that the biodegradability of all drilling fluid
chemicals can be demonstrated.
The reduction of waste is necessary to minimise the environmental risks and to reduce costs.
Environmental risk of a waste stream depends on the quantity and composition(s) of the waste stream
and also on the way in which it is disposed. It is the policy of the Company to display "good
housekeeping" practises in all venues at all times. Environmental risk by waste can be reduced by
minimising the quantity of waste streams from the primary sources and ensuring that the stream can be
disposed of and/or treated effectively.
Legislation states that the Company remains responsible for its waste up until the recognized legal
and recorded transfer to another party. Authorities require that all waste movements are
reported and are traceable, and that all information/documentation is retained for an "infinite" (20
years) period.
In order to be able to minimise waste streams it is first necessary to identify what types of components are
in the waste streams and in what quantity (percentage), their composition, and how to separate them.
4.10.5 3.3.3 Minimising of waste streams
DRILLING CONTRACTOR contribute in two ways to minimizing the environmental impact and disposal
costs of well engineering operations. Firstly by reducing the amount of waste produced and secondly by
keeping the waste "pure" by reducing the number of components per shipment.
Contents
4. DRILLSTRING......................................................................................................................i
4.1 Introduction ...................................................................................................................i
4.2 Drillstring Design ...........................................................................................................i
4.2.1 Drill collars............................................................................................................i
4.2.2 Heviwate drillpipe ............................................................................................... iii
4.2.3 Drillpipe .............................................................................................................. iv
4.2.4 Accessories...................................................................................................... xiv
4.3 Bottomhole Assemblies............................................................................................. xiv
4.4 Drillstring and BHA Inspections................................................................................. xvi
4.4.1 General ............................................................................................................ xvi
4.4.2 Inspection requirements for drill collars, crossovers etc. ................................. xvi
4.4.3 Inspection procedure for drillstring parts ......................................................... xvii
4.4.4 API standards.................................................................................................. xvii
4.4.5 Inspection requirements for drillpipes ............................................................. xvii
4.4.6 Inspection procedures for drillpipes ................................................................ xvii
4.4.7 Inspection requirements for Heviwate drillpipes..............................................xviii
4.4.8 Inspection procedure for HW drillpipe .............................................................xviii
4.5 Corrosion..................................................................................................................xviii
4.5.1 Forms of corrosion ..........................................................................................xviii
4.5.2 Actions against corrosion ................................................................................. xix
4.6 Remarks for Slip Handling Techniques..................................................................... xix
4.6.1 Proper slip handling techniques ....................................................................... xix
4.6.2 Slips and bushing requirements....................................................................... xix
4.6.3 Tests for slips and bushings.............................................................................. xx
Illustrations
Tables
5.1 Introduction
Drillstrings used by drilling contractors consist of the following:
Drill collars
The drill collars provide the weight on the bit and the weight to keep the drillstring in
tension whilst drilling.
Heviwate drillpipes
The Heviwate drillpipes enable a smooth changeover from the stiff drill collars to the
more flexible drillpipes.
Drillpipes
The drillpipes create the connecting pipe line/drive line to the surface.
Accessories
Accessories consist of all the extra tools required to assemble and to design a drillstring
fit to do the specific job.
The rotary shouldered pin connections shall all have an API stress-relief groove. The box
thread connections shall be provided with a Drilco bore back stress relief groove.
The spiral grooving (Sine k profile) of the drill collar bodies is a great feature to reduce
differential wall sticking.
For the recommended make up tongue for drill collar connections refer to API torque
specifications. These values are the minimum requirements.
The threads of drill collars not in use must always be equipped with proper steel thread
protectors to prevent damaging.
Length of drill collars
The required collar length to achieve maximum desired bit weight can be calculated as follows:
Ldc = Bitwm
(cos of angle) (NP) (BF) (Wc)
where:
Ldc = required collar length, (m) to achieve the maximum bit weight
Bitwm = maximum bit weight, (TONNE)
BF = buoyancy factor, dimensionless
Wc = collar weight (in-air),(kg/m)
cos of angle = hole angle from vertical (1 for vertical)
NP = neutral point design factor (0.85)
Operators usually run 10-15% more collars than Actual Bit Weight (ABW) would indicate. This gives a
safety margin and keeps the buoyancy neutral point within the collars when unforeseen forces move
the buckling point up into the weaker drillpipe section.
Adequate collar weight should be available to run 2.0 - 2.5T per inch of bit diameter on bits larger
than 61/4 and 1.5 - 1.6T per inch of bit diameter on bits smaller than 61/4.
Bottomhole assemblies must be designed to compensate for hole inclination. The most effective drill
collar force that can be applied to the weight-on-bit is equal to the true buoyant force corrected by the
cosine of the hole angle.
A good grade of drill collar lubricant containing 60% finely powdered metallic lead or 40 to
60% finely powdered metallic zinc should be applied to the threads and shoulders.
Lift subpins should be cleaned, inspected, and lubricated on each trip. If these pins have
been damaged and go unnoticed, they will eventually damage all of the drill collar boxes.
Torque control
Use the make up torque recommended for the specific joint size, outside diameter, and bore of
collars.
Torque is the measure of the amount of twist applied to two members as they are
screwed together. The product of the tong arm length in metres and the line pull in
newtons is newton metres of torque.
With a 4ft tong arm and 5 000 lb.line pull at the end of the tong,
TORQUE = 4ft x 5 000 lb = 20 000 ft/lbs
A line-pull measuring device (or torque measuring instrument) should be used in making
up drill collars. It is important that line-pull be measured when the line is at right angle or
90 degrees to the tong handle.
When applying line-pull to the tongs, apply a slow, steady pull rather than jerking the line.
Drill collars larger than 7 diameter usually require a double-line pull. For example, a
pulley at the tong handle is needed to obtain adequate line pull.
Refer to the Drilco Manual or equivalent for recommended makeup torque values for rotary
shouldered drill collar connections (various connection styles) and for commonly used drill collar OD
and ID sizes and styles.
The proper amount of makeup torque must be measured. There are two steps that must
be worked out for all hook-ups:
1. Look in the torque Tables and find the amount of makeup torque recommended for
the size drill collars and type of connections.
2. Divide this amount by the number of metres in the effective length of the tong arm.
This will give the total line pull at the end of the arm.
It is good practice to break different joints on each trip, giving the crew an opportunity to
look at each pin and box every two or three trips. Inspect the shoulders for galls, and
possible "wash-outs".
Thread protectors should be used on both pin and box when laying the drill collars down.
The safety clamp is required for handling collars over the hole. It is necessary that the nut is
made-up carefully. When not in use, the clamp should be kept in a safe place, free from
damage and corrosion.
Heviwate drillpipe required for offshore drilling operations are given in Table 4.2.
Whilst drilling the Heviwate drillpipes are normally kept in tension but they are also used in
compression to create weight on the bit. In cases of specific hole problems these might be a solution.
In these situations drill collars can be omitted.
5.2.3 Drillpipe
Drillpipes required for offshore drilling operations are given in Table 4.3.
NOTE: Sufficient pup joints of the same quality must be available for 5 and 3 drillpipe
strings on board the rig.
Figure 5.2 Drillpipe upsets
Typically, higher-strength pipe is required in the lower sections of the string for collapse resistance;
Drillstem testing causes the most severe collapse loading on the drillpipe. The most severe collapse
loading occurs when the evacuated (or partially empty) drillstring reaches the bottom of the well. The
load from the annular mud tends to cause pipe collapse. Failure to fill the drillpipe when running into
the well with a float valve in the drillstring, may also cause collapse. Completely plugged jets will
prevent mud from entering the drillpipe when tripping into the hole.
Drillpipe is usually designed with a factor of 1.3 since new pipe is seldom used when running a DST.
When the fluid levels inside and outside the pipe are equal, and provided the density of the drilling
fluid is constant, the collapse pressure is zero at any depth: there is no differential pressure. If,
however, there is no fluid inside the pipe the actual collapse pressure may be calculated by the
following equation:
Pc = (L) (Wg)
101.973
Use the API tables to calculate allowable collapse pressure. If the net pressure exceeds the
allowable collapse pressure then the string is underdesigned and should not be used.
Pac = Pp
SF
Buoyancy is included in the tension evaluation because the string is designed based on maximum
load. The tensile strength of drillpipe can be used to determine the correct working depth for a
particular grade of pipe. Static tension loads require sufficient strength in the top joint of drillpipe to
support the remaining submerged drillstring.
A design factor of 0.90 of the theoretical maximum tensile load is used to prevent permanent stretch
of the drillpipe. Specific safety factors may be obtained from the manufacturer for a particular grade of
pipe:
Pa = Pt x 0.9
A design safety factor may be calculated as the ratio of the maximum allowable design tension load to
the calculated tension load:
Depending upon the design criteria the length of drillpipe used for a particular grade of pipe can be
calculated as:
For SI calculations divide the first portion of the equation (Pt x 0.9) by 0.98065 if Pt is expressed in
daN.
Overpull on drillpipe
The term margin of overpull is used to represent the difference between the calculated load (P) and
the maximum allowable design tension load (Pa).
MOP = Pa - P
This minimum overpull factor is applied to the tension load. The factor was originated to ensure the
driller could safely pull a certain load on the pipe in the event of sticking.
Drillstring stretch
Suspension of the drillstring in the hole results in a stretch or elongation of the pipe. Various effects
such as string weight, buoyancy and temperature account for the increased length. The stretch of the
drillstring can be calculated for each individual effect, with the overall stretch being the total of the
previous values.
Effects of temperature:
et = 11.8 x 10-6 CL
eTot = es + et
Critical rotating speeds in drillpipe strings which cause vibrations are often the cause of crooked
drillpipe, excessive wear, rapid deterioration and fatigue failure. Critical rotational speeds will vary
with length and size of drillstem and collars and hole size. There is evidence in recent field tests that
excessive power is required at the rotary to maintain a constant speed at critical rotary speeds. This
power indicator, plus surface evidence of vibration, should warn the crew that they are in the critical
range.
The worst condition of vibration occurs when two types of vibrations occur simultaneously resulting in
serious damage to the drillstring. Table 4.4 shows the depths and rotary speeds at which the two
types of vibration can occur.
Table 5.4 Well depth and rotary speed for node and pendulum type vibrations
Drillpipe OD(inches) Critical RPM Vibration Coincidence Depths (m)
23/8 110 701 2865 - -
27/8 130 597 2438 5486 -
31/2 160 487 2011 4511 -
4 185 423 1706 3870 -
41/2 210 365 1524 3413 -
5 235 304 1372 3048 5334
51/2 260 298 1219 2743 4846
1. The pipe between each tool joint may vibrate in nodes, as a violin string. Table 4.5
predicts critical rotary speeds to +/- 15%.
2. The second type of vibration is the vibration of the entire drillstring similar to the spring
pendulum effect. This is less significant than the node type.
RPM = 78 638.4
L
Torsional strength is important when drilling deviated holes, deep holes, reaming, or when pipe is
stuck. Torque applied to pipe while drilling may be approximated by the following equation:
T = P x 9550
RPM
Care should be taken in picking up or laying down drillpipe to protect threads and shoulders of boxes
and pins.
Thread compounds
Pin and box threads and shoulders should be thoroughly cleaned and dried so that the
thread compound will properly adhere to the surface. Tool joints and other rotary
shouldered connections are subjected to high unit stress which may cause galling or
seizing without the benefit of a separating film. Thread compounds provide this film and
help minimise excessive make up. Thread compounds containing 40 to 60% by weight of
finely powdered metallic zinc are recommended.
Thread compounds should not be thinned for ease of application. Dilution will reduce the
amount of available metal filler.
Thread lubricants made according to API Bulletin 5A2 are not to be used on tool joints.
They are the API recommended lubricant for tubing and casing, and are made to have a
low co-efficient of friction allowing make up with low torque.
Spinning up
Before spinning up pipe, be sure connections are in alignment. High-speed rotation can
burn threads. Kelly spinners rotate the kelly at high rates into the mouse hole joint, and
then the mouse hole joint going into the joint in the rotary table. The connection must be
clean, adequately lubricated and the joint does not wobble and bind. After both spinning
operations, the rotary tongs should be used to tighten the joints to the recommended
torque.
Make up
Avoid forced make up of improperly engage threads. When stabbing, flat thread crest on
the pin can land opposite similar crests on the box, this results in jamming action and
forced make up which will cause serious damage. A slight amount of left-hand rotation
with tongs will free them. The stand can be lifted, rotated slightly and stabbed again.
Tonging
Tonging tool joints is the most important single factor in preventing tool joint damage.
Refer to API 7G for recommended make up torque values for the various sizes, types
and classes of tool joints.
The minimum makeup torque is 10% less than the recommended values. Below this
torque, joints may not develop sufficient strengths.
When making up or breaking out drillpipe stands, back-up tongs must be used to
prevent pipe slippage and damage.
Keep the tool joint as close to the rotary table as possible during makeup and break
out. There is a maximum height that a tool joint may be positioned above the rotary
slips and still resist bending. Line pull should not exceed recommended makeup
torque with tongs at 90 degrees to the jerk line.
Kelly-saver sub
The kelly-saver sub should be cleaned and inspected every time it is removed from
the rat hole and always maintained in good condition as it mates with every tool joint
box in the string.
Keep a spare kelly-saver sub in good condition on the rig at all times.
The length of kelly-saver subs can become critical if the box connection is re-cut
several times.
Alternating breaks
Come out of the hole on a different break each trip so that every connection can be
periodically broken and its condition observed and torque rechecked. Excessive
breakout torque may indicate abnormal downhole torque conditions. A check should be
made for damage due to excessive torque.
Standing back
When standing the pipe back, be sure set back area is clean. If the desired position of
the stand is not achieved, do not use wrench jaw or other sharp-edged tool to jack into
position.
WARNING:
When laying down the drillstring, install thread protectors before swinging through the "V"
door and onto the walk. Keep the walk clear - do not allow the joint coming down to hit
another joint or other objects on the walk. Be sure thread protectors are installed tightly
on boxes and pins.
5.2.4 Accessories
Drillstring accessories consist of:
Crossovers
Sufficient crossovers will be available on the rig to assemble normal drilling bottom- hole
assemblies. These crossovers shall be of the same quality as the drill collars. All threads
must have stress relief grooves.
Stabilisers and Reamers
Stabilisers and reamers are not an internal part of the rig package. These items will be
rented from specialised contractors. The requirements for thread design and quality are
identical to the requirements for the rig owned components.
Jars
Drilling/Fishing jars are also rented from specialised companies. Weir Houston jars have
a good performance record in North Sea drilling.
Mudmotors
Mudmotors are supplied as a rental item by highly specialised companies. Mudmotors
will be used for performance drilling and for directional drilling purposes.
Fishing tools
Some basic fishing tools are available on the rig such as overshots, used for all
drillpipes, tool joint sizes, and drill collars. This way the first fishing attempt can be done
by the rig itself when necessary. More complex fishing will be advised by specialised
fishing companies (Tristate, Red Baron etc.). The fishing companies will supply a fitting
fishing kit for all relevant circumstances.
5.4.1 General
The inspection of drillpipe and collars is intended to reduce the cost of unnecessary failures and their
resulting fishing costs. The frequency of the inspections must be based on economics and
practicality. If drilling is being performed in a region where failures are very rare due to non-severe
loading conditions, and the cost of a failure is not excessive, then no inspections are required (i.e.
shallow gas). High-cost regions such as the North Sea require higher inspection frequencies.
NOTE: All defects which are discovered during the inspection process must be
investigated. This process generally involves grinding cracks. Any size of a crack is
a reject, so normally the suspect area is grind probed only enough to prove that the
indication is in fact a crack; a couple of thousandths of an inch is normally quite
sufficient. Defects should not be ground any deeper than the classification (i.e.,
Premium) allows as a minimum standard. If the defect is ground deep enough to
determine that the joint will fail the inspection criteria, then it should be rejected and
set aside for further shop investigation.
API RP 7G: Recommended Practice for Drill Stem Design and Operating Limits.
API RP 5A5: Recommended Practice for Field Inspection of New Casing, Tubing and
Plain-End Drillpipe.
Under normal circumstances a one year or 30 000 m drilling inspection interval has proven to be
successful in North Sea operations. Abnormal use and occurrences require tailor made inspection
programs.
Tool joints
1. Visual check thread profile and shoulder.
2. Check thread profile with thread gauge (API-7).
3. Check OD for wear (API-7).
End area
1. Ends are electromagnetically inspected according to API-RP 5 A5.
Pipe body
1. Electromagnetic Inspection of the whole tube (API-RP7G).
2. Check pipe body OD over full length.
3. Check slip area on slipmarks.
Under normal circumstances a 300 rotary hour inspection interval has proven to be successful in
drilling operations.
Tool joints
1. Visual check of shoulders and thread profile.
2. Check thread profile with thread gauge.
3. Measure tool joint OD.
4. Magnetic- Particle- Inspection for threads and relief grooves.
Pipe body
1. Magnetic particle inspection for end areas.
5.5 Corrosion
All drillpipe must be internally coated with plastic to protect the pipe body against
corrosion.
Whilst laying down a drillstring, each joint must be flushed with fresh water to remove
harmful chemicals.
All tool joint threads must be cleaned and properly doped.
All drillpipe bodies must be cleaned and preserved with a proper inhibitor before storing
for a longer period of time.
1. The downward motion of the drillpipe must be stopped with the brakes, not the slips.
2. Do not let the slips ride the pipe. This not only damages the slips by reducing the
configuration of the gripping elements, but in the event a tight spot is encountered while
coming out of the hole, the slips will automatically be set and greatly complicate freeing
of the pipe.
3. Do not use slips designed for one specific size of pipe on any other size of pipe.
4. Under no circumstance is the use of re-sharpened gripping elements permitted.
5. Immediately repair all damages to rotary slips.
6. If pipe will not hold in the rotary slips due to worn gripping elements, the gripping
elements must be replaced immediately. Slippage of pipe through the slips due to worn
inserts can result in dropping the pipe.
7. When running in the hole, be sure that slips do not accidentally catch the drillpipe tool
joint.
Contents
5. OPERATIONS ......................................................................................................................i
5.1 Introduction ...................................................................................................................i
5.2 Drilling ...........................................................................................................................i
5.2.1 Bit selection......................................................................................................... ii
5.2.2 Bit pulling guide.................................................................................................. vi
5.2.3 Concurrent Operations...................................................................................... vii
5.3 Drill Off Tests ............................................................................................................. vii
5.4 Plugging and Abandonment...................................................................................... viii
5.5 Emergency Procedures............................................................................................. viii
Forms
6.1 Introduction
This section contains information on factors that need to be taken into account during the
safe operation of wells during the drilling phase in offshore operations.
6.2 Drilling
The following is an outline of several general drilling practices which are based on Company and other
operators experiences with drilling. These practices may not have an application to a particular situation.
However, they should be seen as general guidelines to assist in improving the overall drilling
performance.
When it is necessary to put heavy loads on a derrick or mast, it must be remembered that hook load and
derrick or mast loads are not the same. Derrick or mast loads can be approximated as follows:
This does not take into consideration friction factors or the position of either the dead or fast line. A good
general rule to follow is to not load the derrick or mast more than fifty percent of the Gross Nominal
Capacity.
Bit types are selected and specified by the current IADC coded bit classification.
The IADC code consists of three numbers classifying different features as follows:
The first digit designates the series of roller cone bit: Number 1 to 3 indicate milled tooth
bits and 4 to 8 indicate insert bits. The higher the number within each series indicates the
harder formations a bit can drill.
The second digit indicates the sub-classification of formation hardness. Numbers range
from 1 to 4 for each series, designating from softest to hardest.
The third digit indicates the following features:
1. Standard.
2. Air Bit.
3. Gauge Protection.
4. Sealed Bearing.
5. Sealed Bearing and Gauge.
6. Friction Seal Bearing.
7. Friction Seal Bearing and Gauge.
8. Directional.
9. Special Features, i.e., bits with a centre nozzle.
For example an IADC designation of 5-1-7 would be an insert bit designed to drill soft formations (5). In
this case, the bit is best suited to drill the softer formations in the soft range (1), and the bit has a journal
bearing and gauge inserts (7).
The following codes are to be used to identify the original manufacturer of a specific bit type:
American Coldset AC
Christensen CR
Diamant Boart DB
Experimental EX
Hughes (Western Rock Bit) HU
KanDrill KD
Reed RD
Security SE
Smith SM
Bits run from manufacturers other than those listed above must have prior approval by both the
Operations and Engineering Groups to ensure adequate performance documentation is completed. If
performance proves economically viable, then the manufacturer's name will be added to the above listing.
The following procedure is to be followed to provide consistency in reported information on bit records.
Surface Hole:
1. Surface hole bits are to be designated with a sequential number commencing with
one (1) and followed by the letter "A".
2. A pilot bit number should be followed by the letter "B".
3. The bit used after the pilot bit to ream or open the hole is recorded on two lines to
specify reaming time and meterage, as well as drilling time and meterage. The
reaming time on the "A" bit is shown, but not included in the cumulative hours.
Rerun Bits:
1. Bits that are rerun should be prefixed with the abbreviation "RR". In the same hole
the bit retains its original sequential number. Meterage must be drilled by another bit
prior to calling a bit a rerun. For example, a bit run before a drillstem test (DST) is not
a rerun when drilling proceeds after the DST.
2. The numbering sequence if bit number 2 was rerun after bit number 3, is as follows:
2, 3, RR2, not 2, 3, RR4.
3. Bits that are rerun form another well should be numbered sequentially from the last
bit run in the current well and the number prefixed by "*RR". The asterisk would refer
to a footnote containing the previous history of the bit, including meterage, hours and
condition.
Coring:
1. Core bits are to be numbered sequentially starting at "1C".
2. "RR1C" would indicate a rerun with bit "1C". The next bit (if a different one) would be
"2C".
3. If "RR1C" is used for another core, the number would remain "RR1C".
4. Core bit metres and hours are recorded on the appropriate line in the bit record but
are put in brackets and are not included in the cumulative totals.
5. The reaming time on the drill bit following the core is added to the cumulative total.
6. The drill bit run after the core should be recorded on two lines to specify reaming time
and meterage on one line and drilling time and meterage on another.
Bit Grading:
The condition of a bit when it comes out of the hole is an extremely important parameter
in:
Selecting the next bit to go in the hole.
Selecting bits to drill the same interval in future wells.
Bit grading was standardized in 1963 on milled tooth bits, and in 1971 on insert bits. A
summary of the IADC standard follows and is to be applied to all bits run by Coparex.
Bits are graded on "TBG" Tooth, Bearing, Gauge. The grading indicates the life of the bit
used.
Tooth dullness for milled tooth bits is reported in eighths (1/8) of the original tooth
height, and is prefixed by a T. (e.g., a grading of T3 means that the tooth height is
worn by 3/8 of its original height).
Tooth dullness for insert bits is reported in eighths (1/8) of the total number of inserts
lost or broken (i.e., a grading of T5 would mean that 5/8 of the total number of inserts
were lost or broken). As a guide for the potential rerunning of an insert tooth bit, the
penetration rate is approximately cut in half for every 1/8 of the total amount of inserts
lost or broken. Thus, if a large amount of meterage (greater than 200 m) is to be
drilled with any bit rated lower than a T1, a new bit should be run. Refer to the
following:
Bearing condition. Bearing life used is reported in eights (1/8) as shown in the following:
Bearing Condition
Bit Grade Bearing Life Used
1
B1 /8
1
B2 /4 (tight)
3
B3 /8
1
B4 /2 (medium)
5
B5 /8
3
B6 /4 (loose)
7
B7 /8
B8 (locked or lost)
Bit Gauge:
When drill bits are under gauge, they should be recorded by the number of millimetres
(mm) which the bit is under the original bit diameter. Zero (0) indicates that the bit is still
in gauge.
Drag Bit Evaluation:
Drag bits include diamond, PDC, fishtail and any other bit which has no bearings and
which relies principally on shearing and ploughing action to remove rock from the bottom
of the hole.
Grading of drag bits must be performed by the Company Representative and shall be
reported on the tour sheet, the bit record and the service order for the bit.
The decision process in grading a drag bit should generally proceed as follows:
The remainder of the bit record is to be filled out in detail using average data of any given bit run for WOB,
RPM, and pump data. All bits must be accounted for at the end of the well. Ensure proper material
transfers are completed for ALL bits.
This analysis is based on the fact that the drilling cost/metre will decrease to a minimum point sometime
during the bit run and then begin to increase again. The bit should be pulled after reaching the minimum
point. Of course, pulling a bit is subject to field conditions such as leaving a bit in longer in order to drill a
few more metres to core point or total depth.
This method is primarily applicable to milled tooth bits, or to soft insert bits drilling into progressively harder
formations. In both of these situations as the rate of penetration (ROP) gradually decreases, the
cost/metre will fall to a minimum and begin to rise again. In some cases, such as harder insert bits drilling
through homogeneous formations, the ROP may not decrease significantly. In this instance, bit bearing
life (i.e., rotating hours) should determine when to pull the bit.
By plotting the cost/metre against the penetration of the bit, formation changes can often be seen as a
definite change in the slope of the line. If such a change occurs where the formation is known to remain
constant, then the bit may be wearing out and may have to be pulled.
C = (B + RP(TR + TT))
P
The round trip time is a function of rig size and capacity, hole conditions and formation stability as well as
depth. An average rate for medium depth wells (1 500m) is 500m/hr. Refer to the Bit Pulling Guide
Worksheet page 5.10.
6.2.3 Concurrent Operations
Concurrent Operations are operations which require simultaneous drilling, production or engineering
activities to be carried out simultaneously at one location. To ensure safety, when a jack-up is drilling
on a producing platform, certain rig modifications are required for protection of the platform equipment
from accidentally dropped equipment/pipe, and specialised communication and emergency
procedures. The link up of the telephone, fire alarm, and ESD system, will be detailed for each
specific rig/platform accordingly, as each may be slightly different. This will be detailed in the
Concurrent Operations Script.
When the Emergency Response Plan is prepared, the following should be considered:
Ensure compliance with local/international regulations/legislation
Include government interfaces.
Emergency planning zone.
Evacuation plans.
Medical aid.
Environmental considerations.
Shutdown procedures for ignition sources.
Disconnecting procedures for MODU's.
Closing procedures for watertight doors and hatches.
Survey accuracy.
Relief well drilling.
BOP equipment stockpile (fire fighting/mud mixing/pumping equipment, kill manifold,
capping equipment).
Subsurface safety valves and emergency shutdown systems.
Contingency plans shall be prepared and regular emergency response exercises shall be carried out to
ensure that the required emergency actions are familiar to all parties that may be involved, and to test
logistics and equipment.
Form 6.1 Bit pulling guide worksheet
Contents
6. DRILLING FLUIDS ...............................................................................................................i
6.1 Introduction ...................................................................................................................i
6.2 Mud Properties..............................................................................................................i
6.3 General Mud Programme for North Sea Drilling ......................................................... iii
6.4 Spud Mud.................................................................................................................... iii
6.4.1 Freshwater/Polymer, Seawater/CMC................................................................. iv
6.4.2 KCI/Gypsum (KCI/Gyp) ...................................................................................... iv
6.4.3 Salt saturated mud (SSM) .................................................................................. iv
6.4.4 Super saturated mud (K/Mg). ..............................................................................v
6.4.5 Salt dolomite mud (SDM) ....................................................................................v
6.5 Oil-Based Mud (VCM) ..................................................................................................v
6.5.1 General ...............................................................................................................v
6.5.2 Safety measures ................................................................................................ vi
6.5.3 Coparex regulations ........................................................................................... vi
6.5.4 Spacer design - high-density VCM..................................................................... vi
6.5.5 Sampling procedures for average oil on cuttings analysis ................................ vii
6.5.6 Hydrogen sulphide ............................................................................................ vii
6.5.7 Drillstring corrosion ............................................................................................ ix
6.6 Handling and Storage ............................................................................................... xix
6.6.1 Handling ........................................................................................................... xix
6.6.2 Storage............................................................................................................. xix
6.6.3 Solids Control................................................................................................... xxi
6.6.4 Solids control guidelines by interval ................................................................. xxi
6.6.5 Spudding In ...................................................................................................... xxi
6.6.6 Chalk formations ............................................................................................. xxii
6.6.7 Clay and shale formations...............................................................................xxiii
6.6.8 Salt and other formations ................................................................................xxiii
6.6.9 Operating guidelines for solids control equipment ......................................... xxiv
6.6.10 Hydrocyclones............................................................................................... xxv
6.6.11 Centrifuges................................................................................................... xxvi
6.7 Lost Circulation ....................................................................................................... xxvi
Illustrations
Tables
Table 6.1 General mud programme for North Sea drilling ...................................................... iii
Table 6.2 Corrosion trouble shooting table .......................................................................... xvii
Table 6.3 Minimum chemical stocks (mud maintenance only) .............................................. xx
Table 6.4 Geological layout .................................................................................................. xxi
THIS PAGE IS INTENTIONALLY LEFT BLANK
7. DRILLING FLUIDS
7.1 Introduction
Numerous drilling problems in the North Sea area have lead to the development of a large
number of diverse drilling fluids. For environmental reasons water-based muds are the
preferred system. Versa Clean Muds (VCM/oil-based) must only be used as a last resort to
overcome specific drilling/hole problems.
SD: <1.15
Viscosity: 60-100sec.Mf
Fluid loss: <10.
7.5.1 General
VCMs are designed to minimise the transfer of water from the mud to the formation
(osmosis), by balancing the salinity of the mud to that of the formation, generally by the
addition of calcium chloride. The reduction of fluid loss stabilises problem shales and
protects sandstones which have reactive clays in the pores. In addition to these benefits
there are several others which have reactive clays in the pores. Unfortunately there is a high
environmental penalty attached to the use of VCMs.
The VCM policy states:
The use of VCM is confined to the smaller hole sizes, i.e., 12 1/4" hole and smaller.
For offshore operations all VCM cuttings are transported to shore.
VCM will be used only if a suitable WBM cannot be found to drill the well, from a
technical standpoint:
If the use of WBM may create formation impairment.
In horizontal hole sections.
In unstable hole sections.
The proposed usage of VCM must be submitted to SodM prior to the well
commencement, and approval granted before it may be used.
Cost and time savings alone are not sufficient reason to justify the use of VCM. They
must be supported by some of the above criteria.
Reference can be made to the M-I Drilling Fluids Versa Clean Manual for detailed
preparation and maintenance instructions on the current VCM system.
If dry cuttings are being produced over the shakers, an effort should be made to feed the
cuttings directly into the cuttings container.
The cuttings container should be periodically inspected as it is sometimes possible to
recover VCM using the mud vacuum.
Personal protection:
Appropriate gloves, glasses, filters, face masks, eyewash stations, and foot wash
stations must be available.
Rig modifications:
Exposure to VCM vapours and aerosols must be restricted by:
Closed in shakers (sheeting, etc.).
An extractor fan installed above the shakers.
Mudpits closed off as far as possible.
All drains/discharge points are to be controlled with fluid content measurements taken
prior to discharge.
All enclosed areas must be fitted with air circulation systems capable of keeping the air purity at an
acceptable level. The critical factor is the maximum allowable concentration (MAC) valve of mud
components (i.e., oil vapour etc.) in the air.
The following information and warning notes must be displayed on notice boards and on
special warning signs at strategic places on the rig while using VCM.
VCM will be in use during the present drilling programme.
VCM contains substances that, under certain circumstances, can be dangerous to
your health.
All drilling personnel must take the following precautions:
Avoid skin contact. This can cause irritation of the skin, (or in the longer term
inflammation or eczema).
Avoid inhaling excessive quantities of vapour or oil mist over a prolonged period.
Modifications have been made on this rig to ensure a safe and healthy operation.
Ventilation is adequate at places where vapours are created.
All drilling personnel will follow the safety rules associated with VCM:
Wear the prescribed protective clothing and equipment.
Take the necessary precautions when using materials and equipment to decrease the
risk to drilling personnel.
Contact medical services if you have any health problems.
Testing for average oil on cuttings is to be performed periodically to ensure that the wash
system is operating effectively. To determine the average oil content the following sampling
procedure is used. The procedure ensures that a representative sample of the total disposal
flow is taken for analysis.
1. When a cuttings treatment system is used with one central/combined exit* point, then
only sampling at this exit point is needed.
2. If more exit points exist, then sampling at each exit point must take place.
3. The frequency of sampling while drilling is every hour and the quantity shall be
approximately one-quarter of a litre or half a kilo.
4. After 12 samples have been taken, the samples are homogeneously mixed to
approximately 6kg. From this mixture a sample is taken for the retort analysis. If the bit is
pulled before 12 samples are reached, the mixture should be made of the available
samples.
5. Utilise lag time (of cuttings to surface) to determine the interval over which the samples
have been taken.
6. If samples have been taken from more than one sample point, the mixing of the samples
must be in proportion to the quantities produced by the different flows. In order to
determine this ratio it is required to measure the output of each contributory piece of
equipment over a period of 5, 10 or 15 minutes, depending on the rate of penetration.
7. Under no circumstances is whole mud allowed to be dumped.
* An exit point is a discharge point to the cuttings transport container. Samples should be
taken from the cuttings transport container, at regular intervals, for measuring the oil/mud
content of the cuttings. This is to maintain a full check on the mud volume balance.
Scavenger Pre-treatment
The decision to add a scavenger as a pre-treatment should be weighed carefully against the
following:
1. H2S Content
If only a small amount of H2S is anticipated, and no special detection equipment will be
available, then it may be desirable to scavenge the H2S immediately. In this case only a
small amount of scavenger will be required. When larger amounts of H2S are anticipated
and they are not being scavenged out with simply a pre-treatment, then no pre-treatment
should be used. It is much more efficient to treat out larger amounts of H2S with chelated
zinc which will not adversely affect the mud properties.
2. Cost
In most situations very little H2S will actually be drilled due to the hydrostatic overbalance of
the mud. In these situations there is no benefit to pre-treating the mud. The pre-treatment
may actually cause more mud problems than the benefit gained through pre-treatment.
Detection Capability
When H2S is expected in quantities that could be hazardous to either personnel or
equipment, it is not possible to pre-treat with enough scavenger to eliminate the problem
without causing major problems in mud rheology. In most instances it is usually better not to
pre-treat as the mud properties are not affected and the H2S can be readily detected by a
drop in pH at surface, and by the presence of soluble sulphides in the mud. Typically it is
better to know that a problem exists than to mask it until it becomes more severe. If pre-
treatment is desired then zinc carbonate is typically used due to its low cost. Typical pre-
treatment concentrations are 2-5kg/m3.
Cathode
During the corrosion process one material has the current flow toward it and thus has
material deposited upon it. The cathode is the pole which has material deposited upon it.
The rate of deposition is dependent upon the difference in electrical potential between the
anode and cathode. On steels the usual chemical reaction occurring at the cathode is as
follows:
No Oxygen
Steel
Steel used for drilling tubulars is composed primarily of iron and iron carbides. The iron
carbides give the strength to the steel and exist within the steel matrix as small micro-
islands. The iron carbides have a slightly lower potential than the surrounding matrix, thus
they act as a cathode and the steel matrix acts as the anode. It is this property of steel which
makes it susceptible to corrosion. If the steel is in contact with an electrolyte (water or mud)
then a current will be set up between the millions of cells located upon the surface of the
steel and corrosion will be possible.
Current Flow
The rate of corrosion is a function of the amount of current flowing between the anode and
the cathode. The strength of the current is primarily influenced by two factors:
1. Electrolyte Strength: The composition of the drilling mud plays a major role in the amount
of current that can flow between the anode and cathode. If there is a high concentration
of ions in the mud (i.e., salt-based mud), then the mud will be very conductive to
electricity.
2. Electrical Potential: The electrical potential between the anode and the cathode is the
greatest determinant of how fast a material will corrode. The difference between the iron
and iron carbides within the steel matrix is small when compared to the difference
between metals such as zinc and iron.
Microstructure Corrosion
Even when oxygen is not present in the mud, corrosion can occur due to current flows
between individual cells within the steel matrix. The iron carbides within the steel matrix
have a lower potential than the iron. This allows localised metal loss to occur on the surface
of the steel. The electrical potential of the steel can also be affected by the localised steel
properties such as hardness. Localised stress points such as slip deformations can act as
anodes which lose metal to the surrounding steel matrix. This type of stress can be typically
seen on a drillpipe in the slip areas and in the upset regions.
Types of Corrosion
The types of corrosion can be broken into several categories. Forms of corrosion which
are common in drilling operations include:
1. Erosion. Erosion corrosion is due to material loss from fluids passing the drill
tubulars at a significant velocity. This type of corrosion is usually limited to the inside
of the drillpipe due to the velocities experienced. Although the rate of corrosion will
be very small, time can cause the total erosion to be significant. Plastic coating of
drillpipe can help to reduce this type of corrosion significantly.
2. Oxidation. If the level of dissolved oxygen is not kept low in the mud, then oxidation
of the steel can occur. If a local corrosion cell is allowed to remain, severe pitting can
occur with this type of corrosion. This type of corrosion can cause local stress points
in the steel which may lead to crack initiation and propagation.
3. Electrochemical. Electrochemical corrosion is the most common type of corrosion
experienced in drilling operations. When the drilling mud has a large number of free
ions available (i.e., salt muds) then an electrolyte is available to allow current flow
between the anodes and cathodes on the surface of the drillpipe. Any tendency for
the drillpipe to corrode will be aggravated under these conditions. If any other
corrosive conditions are present, such as dissolved oxygen, CO2, etc., the corrosion
will be magnified even greater.
4. Carbon dioxide. Carbon dioxide (CO2) in the mud can cause severe corrosion. CO2
is soluble in water and causes the pH to drop. When the pH drops carbonic acid is
formed which attacks the surface of the steel. An additional problem with CO2 is that
calcium carbonate scale may be deposited on the drillpipe. When this occurs
corrosion may be accelerated in a process very similar to the oxidation process. If the
pH is maintained above 11 the solubility of CO2 is greatly reduced.
5. Hydrogen Sulphide. Hydrogen sulphide (H2S) may enter the mud from drilled
formations or from bacterial degradation of mud additives such as starch or
lignosulfonates. The H2S reacts with the steel to produce iron sulphide and atomic
hydrogen as follows:
H2S + Fe+2 -----> FeS + 2H+
The hydrogen is free to enter the steel matrix due to the small size of the atoms.
Once in the steel the atomic hydrogen combine with other atoms to form
hydrogen gas (H2). The hydrogen gas molecule is larger than the individual
hydrogen atoms and causes large stress concentrations within the steel. These
stress concentrations are frequently large enough to cause crack propagations
and catastrophic steel failure.
In addition to the hydrogen embrittlement, the iron sulphide (FeS) will also set up
a corrosion cell on the surface of the steel which may lead to severe pitting.
6. Stress. Localised stress points in a steel matrix often become areas of localised
corrosion. The differing metal hardness and strengths in high-stress regions tend to
have a slightly higher electrical potential than the surrounding steel matrix. If an
electrolyte is available a corrosion cell will be set up and localised pitting will occur.
This type of corrosion can typically be found in the following areas:
Slip region.
Drillpipe upset (internal and external).
Tong marks.
Dents and mashes from pipe stabbing.
7. Fatigue. Fatigue stress occurs when a large number of stress cycles occur in a steel.
This stress may be caused by drillstring vibrations, shock loading at the bit, etc.
During each stress cycle a small amount of residual stress may build up until a crack
is initiated. In addition, the continual stress cycles may lead to work hardening of the
steel. If the steel becomes too brittle it may fail more easily under downhole stress
conditions. If other forms of corrosion are associated with a higher stress point in the
steel, a point for crack initiation may occur. Fatigue stress can lead to catastrophic
failures.
Causes of Corrosion
The following are the primary sources of corrosion in drilling operations:
Soluble salts: When free ions are available in the mud a current flow can be readily
set up between anodes and cathodes on the steel surface.
CO2: When dissolved in water the CO2 forms carbonic acid and causes the pH to
drop. This will result in pitting.
Oxygen: Dissolving oxygen in water is the most corrosive condition encountered in
most drilling operations. Oxygen accelerates corrosion by depolarising the cathodes
and by directly attacking metal at the anodes.
H2S: This gas can cause catastrophic failure of steels through hydrogen
embrittlement and will also cause pitting.
pH: If the pH of the mud is too low (<10.0 - 11.0) several types of corrosion such as
salt, CO2 and H2S will be accelerated.
Corrosion Prevention
Although all of the sources of corrosion cannot be eliminated at the drill site, several
practices can be adopted to help prevent corrosion:
pH control: When the pH is kept above 11, the rate of corrosion is reduced dramatically.
Increasing the pH of the drilling mud will help to prevent several types of corrosion.
1. Electrolytes: At pH's above 10.5 the rate of corrosion is reduced dramatically.
2. CO2: At pH above 9.5 the solubility of CO2 is reduced dramatically, thus the ability to
form carbonic acid is reduced. The use of lime is recommended as it precipitates the
CO2 out as calcium carbonate. If caustic is used it forms a sodium carbonate which
may cause mud problems as the concentration rises.
3. H2S: At pH's above 10.0 the solubility of H2S is reduced. Lime is recommended for
pH control. Caustic should not be used by itself as it reacts with the H2S to form
sodium sulphide. The sodium sulphide is soluble in water and will release H2S gas if
the pH drops. The use of lime is recommended as it forms calcium sulphide which is
not as soluble and may precipitate out of the mud. An additional benefit of the lime is
the free hydroxyl ion which helps to maintain a high pH.
Oxygen: Reducing sources of oxygen to the mud system will help to reduce corrosion. If
the oxygen content is still too high or a salt-based mud is being used, then oxygen
scavengers will be required.
The following practices can be utilised to reduce sources of oxygen at the rig site:
1. Hoppers and mix pumps: These items are usually the largest sources of oxygen.
Do not leave these pieces of equipment running when they are not in use.
2. Mud guns: Do not use mud guns unless absolutely necessary. The use of mixing
paddles is recommended.
3. Solids equipment overflow: Equipment such as desilters and centrifuges should
have their discharge points below the surface of the mud tanks.
4. Mechanical degassers: If air entrainment in the mud is a problem then the use of
mechanical degassers should be considered.
5. Mud properties: High viscosities and gel strengths cause the mud to be unable to
release entrained air at surface. If thinning the mud will not cause hole cleaning or
stability problems, then it should be done.
Degasser Procedures:
When gas cutting of the mud is experienced, the blow-out preventers are immediately
closed and normal circulation maintained through the coke lines (choke wide open). The
mud gas flows into the side of the degasser. A vent line leads from the top of the
degasser to a safe distance from the mud stream and the gas can be vented out with
safety through the line. The mud containing residual gas then passes out the bottom and
is drawn into the degasser.
The degasser operates under a vacuum and by allowing the mud to flow over a series of
baffles, is capable of extracting virtually all the remaining gas. Vacuum in the degasser is
maintained by a jet on the discharge side of the degasser and by a vacuum pump
mounted on the top. The vacuum pump discharge should be vented at a safe distance
from the rig and flared if necessary. A partition in the mud tank between the intake and
the discharge of the degasser separates the gas cut mud from the degassed mud. The
jet is operated by the standby mud pump.
Normally, after circulating for a few hours with the blow-out preventers closed, the
amount of gas will decrease to the point where the BOP's can be opened and drilling
operations can be resumed. The degasser will continue to be employed until the mud is
gas-free. This may require up to one or two days of more or less continuous operation. If
the gas cutting exists for periods in excess of this, a small amount of weight material will
usually be added to the mud. This will normally eliminate the continuous type of gas
cutting, although trip gas may still persist. The trip gas is, of course, handled with the
degasser and, if severe, the BOP's are again closed and the flow turned through the
choke.
Prior to starting a round-trip, the mud weight in the bore-hole has to be sufficient to
create enough over balance onto the formation pressures.
Oxygen Scavengers
If the oxygen content in the mud cannot be eliminated with normal practices at the rig
site, then it must be removed chemically. The most effective method is through the use
of catalysed sodium sulphite. It is essential that excess sulphites (50-100 mg/l) be
maintained at the flowline. It is also essential that the catalysed sodium sulphite be
added with a chemical injection system directly into the pump suction line to prevent
oxygen contact with the product. The removal of oxygen alone will not completely
prevent corrosion. It is normally necessary to add a filming amine or other corrosion
inhibitor to properly protect the drillpipe.
Corrosion preventers
The addition of corrosion control agents may be necessary to keep the corrosion to an
acceptable level.
After all sources of oxygen contamination have been minimised, then a corrosion
inhibitor should be added to the mud. This is particularly important when drilling with salt-
based muds which are more prone to corrosion. The following corrosion preventers are
typically used:
1. Filming amines: These materials coat the entire drillpipe.
2. Phosphate esters: These materials only attack the anode sites, thus preventing
material loss. However, if the coating is not 100% complete the actual corrosion rate
at localised areas may increase.
3. Barrier layers: There are several products which prevent corrosion by forming a
corrosion product on the steel surface which prevents further contact between the
steel and the mud. However, the majority of these chemicals are no longer
environmentally acceptable.
Drilling conditions: As the depth of a well increases and the temperature and pressure
increase, the likelihood of corrosion occurring increases rapidly.
Corrosion rates are affected by both the temperature and the pressure:
Temperature: The rate of corrosion for all types of corrosion increases with increasing
temperature. As a rule-of-thumb each 30o C rise in temperature doubles the corrosion
rate. The most common cause of temperature increases in the circulating system is
increasing formation temperature with depth. Another source of temperature can be
circulating friction pressure. This pressure drop is converted to energy in the form of
temperature. High circulation rates and small nozzles can cause circulating temperatures
high enough to cause significant increases in the corrosion rate.
Pressure: Increasing pressure will reduce the solubility of acid gasses such as CO2 and
H2S, however if the gasses are present in the mud they will become soluble as they are
circulated to surface with the reducing hydrostatic pressure. For this reason pressure
should not be considered as an effective corrosion control device.
Corrosion Testing
Several techniques are available to test for various types of corrosion. The most
common techniques used are as follows:
General Corrosion
Corrosion rings - downhole measurement of corrosion.
Corrosion rings are typically placed in the crossover between the drill collars and
drillpipe, and in the saver sub to allow a downhole and surface corrosion rate to be read.
Ensure the grade of the corrosion ring matches the grade of pipe in the drillstring. The
rings should be left in the hole for a minimum of 40 hours. Normal drilling operations
require that the corrosion rate be kept below 50 mils per year (mpy). It is extremely
important the rings be handled carefully to ensure accurate readings. Handling
procedures are as follows:
1. Do not remove the ring from its packing until immediately before installation.
2. Clean the box end of the tool joint to remove all mud and dope. Place ring in the tool
joint recess with the bevelled edge facing down. Do not damage plastic coating.
3. Record the well location, depth in/out, date in/out, and time in/out on the packing slip.
4. Run the ring for a minimum of 40 hours and remove carefully. Clean the ring and
apply a light film of grease or oil to prevent any further corrosion on the ring. Place
the ring in a sealed container and ship immediately to the mud lab.
H2S Corrosion
HACH Test - Rig site test for soluble sulphides.
This test is a simple test for soluble sulphides which can be performed quickly at the rig
site. If sulphides are detected then there is H2S present in the mud. These tests are not
extremely accurate and should be backed up with a Garrett Gas Train measurement
when sulphides are detected.
CO2 Corrosion
pH Probe - Drop in pH without any sulphides present.
The pH of the mud can be measured manually or with electronic probes. If a drop in pH
is observed it may be due to CO2 in the mud. If this happens then the mud should be
checked with an alkalinity test for carbonates.
Oxygen
Oxygen is the most significant component in most types of corrosion and accelerates
many other types of corrosion such as attack by acid gasses or chlorides. Oxygen is
entrained in the mud by additions through mixing systems, solids control equipment, etc.
High viscosity muds will also cause air to become entrained in the mud.
Mineral Scaling
This type of corrosion can lead to premature drillpipe failure, high pumping pressures
and well control or fishing problems (i.e., inability to run wireline tools).
CO2
This type of acid gas can cause corrosion through both a pitting attack (acid) and
through scaling of calcium carbonate onto the drillpipe.
H2S
The primary concern with H2S is the sudden failure of drillpipe through hydrogen
embrittlement. However, this type of acid gas can also cause corrosion through long-
term acid attack causing severe pitting. In extreme cases corrosion may also be caused
by deposits of elemental sulphur scale.
Surface Mixing
The primary cause of oxygen corrosion is through air entrainment in the mud. The
majority of the air enters the mud through solids control and mixing equipment.
Formation (CO2)
Almost all natural gas contains trace to high percentages of CO2. This CO2 will form
carbonic acid which will cause severe pitting of the drillpipe if not treated promptly.
Formation (H2S)
The vast majority of H2S comes from drilled formations. Small amounts of H2S can also
be generated from the breakdown of certain temperature-sensitive mud products such as
starch and linosulfonates.
White Scale
The vast majority of scale deposits are due to calcium carbonate or salt. These deposits
are typically white and very hard.
Acid Soluble
Oxidised corrosion products are soluble in 15% HCl. However, the rate at which they
dissolve will be very slow.
Acid Soluble
The carbonate scale should be readily soluble in 15% HCl. An immediate effervescence
should occur.
Alkalinity
The alkalinity test will determine the amount of free carbonates in the mud. The usual
source of these carbonates is drilled CO2.
HACH
This simple test will indicate if there are any free sulphides in the mud. The typical
source of these is H2S. If free sulphides are detected they should be confirmed with a
Garrett Gas Train test for sulphides. H2S contamination can also be detected by
measuring the mud pH. If H2S is anticipated and a pH drop occurs, it could be caused by
an H2S intrusion.
Scale Inhibitor
If scale is forming inside the drillpipe while drilling then scale inhibitors can be added to
the mud to prevent scale crystal growth. The most common chemicals are phosphate
derivatives such as polyphosphates and organic phosphates.
Chelated Zinc
Although several products are available which are effective at scavenging H2S from
drilling fluids, chelated zinc is the preferred method. This is due to the fact that this
product has very little effect on the other mud properties. The more common additives
such as zinc carbonate will cause carbonate contamination of the mud if large amounts
are used. This can lead to increased viscosities and uncontrollable rheology. Typically,
1kg/m3 of chelated zinc will treat out 100mg/l of sulphides.
7.6.1 Handling
All mud products require a valid SHOC card.
Mud product containers must be correctly labelled.
SHOC cards for all products on location must be kept at the work site.
Mud products are to be handled in accordance with the safety regulations.
7.6.2 Storage
On-board the rig mud chemicals will be stored:
In the sack store.
In the watertight containers on the main deck.
In large bags on the main deck.
Special care must be taken when storing caustic soda. It must be stored in permanently closed steel
containers with clear warning signs painted on the outside. These containers shall be stored in a safe
place. See Table 6.3.
For detailed instructions, refer to manufacturers operations manuals for solids control
equipment. These notes are provided as a general guide only.
Shakers and centrifuges are the primary solids control equipment used for conditioning
drilling fluids.
Desanders and desilters should not be used to process any drilling fluid unless
absolutely necessary.
The centrifugal pumps feeding desanders and desilters break solids into smaller
particles, therefore making removal more difficult.
Cuttings washing systems are to be used to assist waste disposal control.
A polymer mixing and dosing unit is to be used to enhance solids control.
7.6.5 Spudding In
Shakers:
Always run screen sizes as fine as possible.
Clean the screens if they blind or change to another size.
Brandt: screen size S10/S20 (or S20/S40).
Thule VSM 100: screen size 10/25 (or/84,/105).
Derrick: screen sizes can range from 14 to 84, depending on hole size and capacity of
shakers.
Desanders:
Only run the desanders if necessary.
Calculate the optimum feed pressure.
Desilters:
Only run the desilters if necessary.
During spudding in, large amounts of solids are expected, and therefore the largest size
nozzles (17 mm) should be installed.
Calculate the optimum feed pressure.
Centrifuges:
For maximum solids removal.
High capacity (15 to 20m3/hour).
Weir plates for a low fluid level (no. 115 or 118 - for a maximum drying time).
The RPM should be low (1500 - sand is easy to remove).
The differential should be the maximum (mode III - to convey as many solids as possible
out of the machine).
Desilters:
Only run the desilters if necessary.
Centrifuges:
For maximum fines removal.
Low capacity (5 to10 m3/hour), increase residence time.
Weir plates for a high fluid level (no. 112 - for a maximum settling time).
The RPM should be maximum (3250 RPM).
The differential speed must be lowered to increase the residence time (dependant on
cuttings weight).
Desilters:
Only run if necessary.
Centrifuges:
Long drying time:
Clay formations de-water badly compared to chalk formations. The centrifuges should
be adjusted for a long drying time.
Medium capacity (10 to 15 m3/hour).
Low fluid level (weir plates 115).
Maximum speed is recommended for clay without sand, and claystone (3250 RPM).
The differential speed should be 50 or 70.
To convey a lot of solids out of the centrifuge the preferred mode is II or III.
7.6.8 Salt and other formations
These formations are generally encountered when drilling the smaller hole sizes.
Shale shakers:
Fine screens can be run, making sure the screen surface is appropriately covered with
fluid (Brandt I, 60/80 mesh; Thule VSM 100, 10/165 or mesh; Derrick, 50 to 84 mesh).
Desilters:
Only run if necessary.
Change the nozzles to the smallest size, except in the salt sections where it may be
necessary to install the largest nozzles.
Calculate the optimum feed pressure and adjust the pressure accordingly.
Centrifuges:
Normally not necessary to run all the time in these sections.
Low capacity (5 to 10m3/hour), increase residence time.
Weir plates for a low fluid level (no. 115).
The RPM should be maximum (3250 RPM).
The differential speed should be adjusted to the circumstances (weight of cuttings, flow
rate, etc.) to obtain 50 or 70 dry cuttings.
When operating properly, the shaker should have two-thirds of the screen area covered with
fluid.
Thule: the vibration speed is
fixed VSM 100 model
variable VSM 120 model
The pool height should be 0.5 high (up to 16 from the front discharge).
Derrick: the vibration speed should be 1800 RPM for 60 cycles, producing 4.6 G's.
The surface area covered by mud should be up to the middle of the second screen at an
angle of 3 to 5 degrees, unless stick clays are present and a flat deck maximises the
conveying speed and unloads the screen quickly.
The shale shaker screens are of the utmost importance. Efficient operation includes:
Screen selection.
Screen tensioning.
Screen area used.
Screen angle.
Regular screen cleaning.
Fluid not by passing the screens.
Brandt I: circular motion shaker with double decks, screen sizes vary from S (square
mesh) 8 to 120 or B (oblong mesh) 20 to 120.
Thule VSM 120: circular motion shaker with double decks. The screen sizes for the top
deck are S60 to 200, for the bottom deck S60 to 250, B60 to 200 and TBC (tensile
bolting cloth) 40 to 200. The bottom deck consists of four screens. The speed is variable
between 0 and 1800 RPM in 12 settings. The screen angle can vary for the top deck
from - 3 to + 3 degrees, for the bottom deck 0 to 5 degrees. The VSM 120 is designed to
operate with a shallow pool of mud over the rear of the lower screen.
The following shakers have new screen technology consisting of double screens with a
repair feature.
Derrick: linear motion shaker with a single deck. The mesh sizes for Derrick vary from
DC (double or layered) 14 to DX 250 for the SWG (sandwich screen panel) type of
screen and from DX 38 to DX 250 for the PWP (matrix flex flow screen panel) type of
screen. The single deck consists of three screens. The angle of this deck can be varied
between 0 and 6 degrees.
Thule VSM 110: linear motion shaker with a double deck. Screen sizes range from 10 to
30 mesh for the top deck. The lower deck consists of four screens with sizes ranging
from 52 to 200 TBC mesh. Screen sizes for the front two panels are 84, 105 and 145
mesh. The angle of the lower deck is fixed at 10 degrees. The angle of the upper deck is
fixed at 0 degrees.
7.6.10 Hydrocyclones
Desanders: to ensure optimum performance of the desanders.
The optimum feed pressure at the inlet can be estimated by:
P (bar) = 2.21* x S.G. of the feed.
Note: * Based on 22.5m (+/-2m) of head. This will suffice for the majority of desanders and
desilters. Check manufacturers' recommended head if in doubt. The pump impeller
size should be adjusted to acquire the appropriate feed pressure. COMPANY
practice is to adjust a valve in the feed line which results in increased impeller wear.
Troubleshooting:
If the underflow is too small, the possible reasons are:
The underflow nozzles are blocked (i.e., solids overloading), and the nozzles have to
be unplugged.
The underflow nozzles are adjusted too small. (The nozzles have to be adjusted for a
conical spray).
Overflow header extends far below the bottoms of the hydrocyclones (results in a
"slurp" discharge, due to high vacuum in overflow header). Fit siphon breaker-nipple
extending half-way into suction header with +/-6" stick-up.
If the underflow is too large, the possible reasons are:
Low feed head, mud emerges from base of all cones as a smooth cone of mud.
Check motor speed, impeller size/wear.
Underflow nozzles adjusted too far open.
Not enough air entering underflow nozzles, and the solids choke-off nozzle which
closes off air resulting in a rope discharge. (Fit siphon breaker.) If vacuum is large
enough this will lead to "slurping" and no discharge.
Worn out vortex finder.
Visual Check:
The desilter is working optimally if the underflow leaves the cones in a conical shaped
spray. If the solids load is too high, it is often impossible to get this conical discharge,
and the underflow will leave the cones as a thick stream called roping.
7.6.11 Centrifuges
To ensure optimum performance of the centrifuges, three adjustments can be made:
Capacity (flow rate).
With increasing amount of fluid being fed to the centrifuge, the residence time decreases
and the cuttings being discharged will be very wet.
Fluid level (pool volume).
Dictates the length of the drying beach in the conical part of the centrifuge. A long beach
means a longer drying time for the cuttings. However, a low fluid level also means less
time for the solids to settle out. With the fluid level one can balance the settling and
drying times.
Differential speed.
Is the difference between the scroll and the bowl speed. The scroll will always turn faster
to convey the solids out of the machine. The difference is usually between 10 to 100
RPM. A low differential gives the solids more time to settle, but the capacity is then very
low.
Each adjustment made, affects the other two parameters. Usually an engineer must be
called for making adjustments on fluid level and maximum speed; pump capacity and
differential speed can be adjusted by the crew.
Set one centrifuge on maximum solids removal for mud weight reduction.
Set one centrifuge on maximum fines removal for viscosity reduction.
To cure losses Lost Circulation Materials (LCM) are used. The selection of these materials is
governed by the applicable hole section/formation interval. In the pay-zone (productive
formation), acid soluble, lost circulation materials shall be exclusively used. For other
formations there are no restrictions on the choice of lost circulation materials.
Curing Losses:
The first consideration should always be: can the mud weight be lowered safely.?
Seepage mud losses will mostly be cured by the mud solids and cuttings whilst drilling.
Otherwise, a small LCM pill (ca. 5m3) can be circulated around whilst drilling.
NOTE: When selecting a LCM to be used, remember the minimum opening size (i.e.,
bit nozzles) through which the LCM has to pass.
Mud losses greater than 10m3/hr. cannot be cured whilst drilling. A firm LCM pill (10 -
15m3) has to be spotted on bottom, and subsequently, the bit has to be pulled above the
spotted pill. Try to keep the hole full by pumping mud into the annulus. Pump through the
drillstring at intervals to prevent plugging up. This procedure of spotted pills has to be
repeated until the losses are cured or other remedies have to be applied.
Total mud losses. In this case the mud volume in the mud tanks is lost very quickly and
making enough fresh mud on board the rig is not possible. The well shall be kept as full
as possible by pumping the available mud, and thereafter seawater into the annulus.
Firm LCM pills (15m3 or more) have to be spotted on bottom frequently. Pumping of
cement to bridge off the zone creating mud losses shall have to be considered.
Therefore, an emergency stock of 30 tons bulk cement, along with the required additives,
shall be kept on board whilst drilling.
On board the drilling rig there shall always be a stock of LCM (see Table 6.2 Minimum
chemical stock). Different muds require different lost circulation materials.
Composition of LCM pills:
10 - 15m3 viscosified mud (100 MF seconds).
A mixture of fine + medium + coarse LCM mixed up to the practical maximum the mud
can accept. The mud engineer will advise further (acid soluble LCM might be
required).
When it is known that weak formations have to be drilled, it is good policy to have LCM
pills readily available on board. Volumes will depend on available tank space.
THIS PAGE IS INTENTIONALLY LEFT BLANK
Contents
Tables
Forms
6. Introduction
Evaluation of a well is required to:
7. Determine if hydrocarbons are present.
8. Provide correlation with seismic and off-set well information.
9. Determine geological characteristics of the drilled formations.
10. Enable a proper reservoir evaluation.
11. Comply with the government regulations.
The Company Representative has the responsibility for the quality of all information obtained
from the evaluation operations. These responsibilities include:
16. Maintaining an up to date cuttings log.
17. Ensuring that the evaluation contractors arrive safely and are on site with sufficient time
to carry out checks before commencing work.
18. Ensuring that the evaluation contractor(s) perform their tasks in a timely and safe
manner.
19. Ensuring that quality standards are complied with such as mud logging and petrophysical
logging. Quality includes the method of data acquisition, the resulting information, and
the supporting activities.
20. Collection of all geological data and sample handling on the wellsite (e.g., sample
catching, sample and core descriptions).
21. Ensuring the evaluation requirements specified in the well proposal/drilling programme
are satisfied.
22. Ensuring that the relevant equipment quality checks are performed before commencing
work.
23. Ensuring that recommended practices are followed by the evaluation contractors.
24. Monitoring contractors on their operational performance and reporting as appropriate.
25. Reporting all quality aspects of evaluation operations.
26. Coring Procedures
27. Planning
Core planning procedures are:
Confirm the core point with the wellsite geologist.
Order the Coring Service by specifying the following:
4. Location.
5. Hole size.
6. Depth.
7. Formation to be cored.
8. Length of core to be cut.
9. Outside diameter of core to be cut.
10. Full or rathole core (full hole core is preferred).
11. Type of core bit.
12. Drillpipe/drill collar connections and drillpipe pup joints required.
13. Type of Core Barrel.
14. Special core preservation (wrapping) procedures and transport.
Condition mud
To prevent washing and invasion of the core mud should be conditioned to have a fluid
loss less than 6 cc/30 min. If core erosion is still a problem (particularly in unconsolidated
formations), consideration should be given to running a face discharge core bit.
Strap pipe out of hole
Drillpipe and drill collars should be measured on the last trip prior to commencing coring
operations. If strap out measurements are different from tally, strap in with the coring
assembly.
Check drill bit
Check the drill bit for abnormal wear such as undergauge hole and missing buttons. Run
a cleanout trip with a junk basket if necessary.
Run junk sub
A junk sub may be run on the last pit run prior to the core point to remove any junk from
the bottom of the hole.
Close blind rams
Close the blind rams and replace the hole cover to prevent anything from dropping down
the hole.
Check core bit
Check the core bit for wear and ring marks. Agree on the condition of the core bit with
the Core Company Representative prior to running in the hole.
Normal tripping speed is to be less than 0.25m/sec (greater than 40 sec./joint) because of the close
tolerance on the bit and the core barrel. Diamond or PDC core heads are easily damaged by running
into bridges and/or reaming through them.
NOTE: The daily coring time analysis will include the time from the moment the drilling bit
leaves the bottom until the time the drill bit is back on the bottom and drilling.
If a bridge is encountered, pick up and wash/ream through the bridge. Pump through the bit at a higher
rate (if possible higher than the section was drilled with) and slowly lower the bit down to the bridge. Flush
as many cuttings from the hole as is possible. If the bit begins to take weight, pick up and start the rotating
at 10 - 30RPM, and go back down gently. Ream through the bridge by fanning the core bit on the surface
of the bridge.
NOTE: DO NOT REAM FOR MORE THAN 30 MINUTES. Pull out of hole and make a
conditioning trip with a regular bit if reaming proceeds beyond 30 minutes.
The following guidelines also apply to cleaning the bottom. These are general guidelines and thus
experience in a particular area should take precedence:
40. The drillstring should be spaced out using drillpipe pups so that the kelly is highly
positioned and no connections or the least number of connections will have to be made
while cutting the core. A rig equipped with a top drive is preferred.
41. When the bottom is reached circulate the mud at a high rate to flush any junk above the
bit. Touch the bottom twice with this high-circulating rate and then go to the bottom
rotating slowly at 30rpm. Upon touching bottom reduce the circulating rate to normal.
After the bottom has been circulated clean, the ball is dropped prior to cutting core.
42. Start coring with a low bit weight (0.5-1.0T). After cutting approximately 1m, increase
weight to 2.0-2.5T and rotation to 70 to 90rpm. The core barrel operator will determine
the exact bit weight, mud circulating rate, and rotating speed.
43. When the core is cut, or when it is necessary to make a connection, pick up and break
off core. If the core will not break readily (less than 2.5T), take a strain on the drillpipe
and rock (DO NOT ROTATE) the rotary table until the core breaks. The core barrel
operator will determine the specific procedures for recovering core.
CAUTION:
ROCK THE ROTARY ONLY; DO NOT ROTATE
44. Upon recovering the core barrel at surface, lay out the core on the catwalk or deck in the
order that it is removed from the barrel. The wellsite geologist and COMPANY Company
Representative must be present when the core is removed from the barrel, cleaned and
packaged.
45. DO NOT WASH OR STEAM THE CORE. Wipe excess mud off as soon as possible with
a wet cloth soaked in the drilling fluid with all excess mud wrung out. Other methods may
be used upon approval of the wellsite geologist or Reservoir Engineer.
46. Measure the overall length of the core. Enter the core interval and recovery details on
the tour sheets.
47. Package the core in boxes, marking each box with well name, core number, interval cored,
amount of recovery, meterage represented in box, box number and total number of boxes.
25. The boxes are to be numbered in sequence with box number 1 containing core from
the top of the interval and the highest numbered box containing core from the bottom
of the interval. The wellsite geologist and Company Representative must ensure that
the core is properly placed in boxes to ensure the core does not become reversed.
26. Inside each box indicate the meterage and the top and bottom of the core section.
48. Ship the core directly to the appropriate laboratory as directed.
49. Special instructions on handling pressure, sponge, plastic sleeve, rubber sleeve and
oriented cores will be included with the particular drilling programme.
A standard service will include a Total Hydrocarbon Detector which does not discriminate the various
gases but gives a total magnitude of all hydrocarbons present within the sample stream. For proper
interpretation of results it is important to use the Gas Chromatograph and the Total Hydrocarbon
Detector.
The sample is taken from an agitator assembly (gas trap) which is positioned in the shaker box so as
to agitate and separate the gases from the drilling fluid as efficiently as possible. The sample then
passes through a drying unit and is pumped by way of a 1/4" diameter polyflow tubing into the gas
detector and gas chromatograph for analysis.
Mud logging companies routinely offer basic geologic sample evaluation as a standard feature of their
service.
Lag
Lag is the amount of time that elapses from the moment when the bit penetrates a new formation until
the moment when the downhole particles and/or traces of gas travel back up the wellbore to the
surface. A rate of penetration is measured instantly; as soon as the bit increases or decreases its
speed, the driller has input. However, samples from that particular formation may not be circulated up
for several minutes. The mud logger must keep this in mind as he correlates the data. Bit to surface
lag times are accurately timed by the mud logger using the carbide "bomb" technique. There is also a
lag in taking samples from mud at the shaker to running it through the gas detector in the lab
(depending on the distance it may be a few seconds to one or two minutes).
All calibration and raw data should be made available for examination upon request.
At the beginning of each mud logging job the Company Representative should discuss with the mud
logger what information is desired, and the time interval in which the information should be presented.
Proper interpretation of logging data is the responsibility of the service company, and the method that
each company uses to accomplish this is slightly different.
There are three basic types of detector elements used in mud logging gas detectors today. They are
as follows:
Thermal Conductivity is a balanced bridge assembly that detects variances in cooling of gases
contained within the sample stream as it crosses the elements. These variations, when amplified and
calibrated to known thermal responses of gases, give very reliable responses.
Catalytic Filament Detection is accomplished through the use of a balanced wheatstone bridge.
Half of the Wheatstone bridge is reading a reference air response. As gas is passed across the hot
filament of the other half of the bridge circuit, a resistance imbalance occurs. This imbalance is
amplified and recorded.
Flame Ionisation is a process whereby hydrogen fuel is burned between positive and negative
collector electrodes. As an outside sample source of hydrocarbon is introduced into the same flame,
an imbalance in the amount of ions collected on each electrode is set up. This imbalance is amplified
and recorded.
Total mud gas readings are recorded continuously with a recorder chart. The gas readings are
recorded for each logging interval and represent the gas response vs. depth. Since there is a lag
between the time when a formation is drilled and the time when the sample reaches the surface, gas
readings must be logged.
Total gas measurement can be applied in three ways. First, it evaluates hydrocarbon shows. If the
reading increases, hydrocarbons are present in a zone. The reading itself does not indicate
productivity; however, increased readings in a potentially permeable, high-porosity zone often indicate
the zone may be productive. Secondly, gas measurement detects pressure. Increasing background
gas usually indicates increasing formation pressures. Connection gas and abnormally high trip gas
usually indicate a nearly balanced mud system (hydrostatic pressure = formation pressure) or even
an underbalanced system. Finally, the total gas reading curve can be correlated with other
measurements, such as resistivity, ROP, spontaneous potential, and offset well curves. These
correlations can provide input on potentially productive zones.
60. Gas chromatograph
Analysis of hydrocarbon components is carried out with a gas chromatograph. Most service company
chromatographs are rapid sampling, batch processing instruments that provide accurate proportional
analysis of the paraffin series hydrocarbons from methane (C1) through pentane (C5).
The basic difference between a total hydrocarbon detector and a chromatograph is that the
chromatograph has a partition column that the sample is fed through and separates each gas by
molecular size. The methane will emerge first, followed by the ethane, the propane, etc. These gases
are then fed across a detector element and the magnitude of each gas is determined by comparing a
response to that of a known calibration gas response.
The Total Hydrocarbon detector has three basic element types used in the industry today.
Thermal Conductivity is a balanced bridge assembly that detects variances in cooling of gases
contained within the sample stream as it crosses the elements. These variations when amplified and
calibrated to known thermal responses of gases, gives very reliable responses.
Catalytic Filament Detection is accomplished through the use of a balanced wheatstone bridge.
Half of the wheatsone bridge is reading a reference air response. As gas is passed across the hot
filament of the other half of the bridge circuit, a resistance imbalance occurs. This imbalance is
amplified and recorded.
Flame Ionisation is a process where hydrogen fuel is burned between positive and negative collector
electrodes. As an outside sample source of hydrocarbon is introduced into the same flame, an
imbalance in the amount of ions collected on each electrode is set up.
This imbalance is amplified and recorded.
The SPWLA has set down standards of calibration for gas chromatographs. Calibration gas should be
comprised of a mixture of methane (1%), ethane (0.25%), Propane (0.25%), Iso-butane (0.25%), and
normal butane (0.25%) with a balance of air or nitrogen (98.0%).
The SPWLA has determined that calculation of gas peak response could be done by peak response
or peak area integration.
Reporting magnitude of constituent gases should be reported in volume to volume proportions and/or
any decimal multiple thereof.
For example: percent, parts-per-thousand, or parts-per-million by volume.
61. Definitions of types of gas responses
The following are basic types of gas responses that are recorded during drilling operations:
62. Background Gas
27. Liberated Gas is the gas which is mechanically liberated by the drill bit into the
drilling fluid as the bit penetrates the formation.
28. Produced Gas is the gas produced into the drilling fluid from a specific zone in
response to a formation pressure which exceeds the opposing effect of hydrostatic
pressure.
29. Contamination Gas comes from neither liberation or produced gas, but is from
outside agents. For example, oil added to the mud system.
30. Recycled Gas can be any of the above definitions and has been detected at least
once, and then cycled through the wellbore annulus for re-detection.
63. Connection Gas
31. Connection Gas represents gas entering the mud stream while the pumps are off.
When circulation is resumed, the gas will be depicted as a sharp peak on the
detection instrument charts and will usually be recorded one bottomhole lag time
later. This occurs since the portion of the hole just penetrated is least subject to filter
cake, and as it is very close to gauge it is easily swabbed. If a connection peak lags to
an interval uphole, or there are two peaks, then the formation pressure of the upper
interval is greater than the hydrostatic head.
Connection gas values are also very useful in adding weight material to prepare for an
approaching potentially overpressured, high-volume zone. The connection gas values
would be watched closely for any increase not associated with the pumps being down
for a longer than normal time, (i.e., running a survey, rig repairs, etc.). If this occurs,
particular attention should be paid to drilling and circulating background values
ensuring that neither increases. If there is a further relative increase in the following
gas value connection this increase may be the result of an upward migration of gas
from the underlying high-pressure formation. Mud density should now be increased to
a point where the next gas value connection is reduced. Since the gas connection can
be circulated up without drilling ahead, mud density can be increased as a function of
true formation pressure and maintained in a slightly overbalanced state by utilising the
available mud logging information.
This method of gradual and controlled mud density increases can be of particular
importance when there is a potential for lost circulation. If the mud weight required to
maintain constant background and connection gas values reaches a point where, if a
kick occurs, the added weight necessary to contain the kick would possibly result in
losing circulation to another zone. Consideration can then be given to running a liner
over the potential lost circulation zone.
64. Trip Gas
32. Trip Gas collects in the static wellbore during the tripping operation. While trip gas
can often provide valuable "static hole" information, gas values can vary considerably
due to swabbing. Like connection gas, trip gas is usually detected a full bottoms-up
lag time after breaking circulation, due mainly to the fact that filter cake is at a
minimum at the bottom of the hole. Excessive swabbing is indicated on the
instrument's chart paper as a gradual build up of trip gas appearing earlier than a
normal lag time.
NOTE: The sample procedure requirements are included in the drilling programme.
For example, the d exponent is derived from the fundamental drilling equation which relates
penetration rate to weight on bit, rotary speed, bit size and formation drillability:
P = k(W/D)d
N
The equation can be greatly simplified if assumptions are made that the formation drillability is
relatively constant and the rotary speed varies linearly with the penetration rate. When field unit
conversions are added, the equation becomes:
log__P__
18.3N
d=
6.8W
log
10000D
Further modification allows prediction of actual formation pore pressure rather than differential
pressure. The modification incorporates the normal fluid gradient and the actual mud density in use at
the time. This corrected d exponent, dc, is found by:
Then if the mud density in use is 1 180kg/m3 while the normal pressure gradient expressed as mud
density is 1 000kg/m3 the corrected d exponent is:
The d exponent can also be determined by using Figure 7.2. A better pictorial representation is seen
when dc is plotted versus depth rather than d versus depth.
So the d exponent can be used to estimate either deviations from normal pressure gradients or a
corrected d value can be used to predict actual formation pressures. The information needed to
calculate d is obtained while drilling. As more and more d values are calculated and plotted versus
depth, a normal pressure gradient trend is established. Then when d values start to deviate from this
trend line, a possible transition zone to abnormal pressure may have been encountered. So long as
all drilling parameters remain relatively unchanged, the prediction is acceptable. However, this
method does not take into consideration any mud properties, bit type, flow states, bit and annular
hydraulics, etc. Even so, this method does allow a good pictorial representation of pore pressures to
be seen while drilling progresses.
81. Introduction
Openhole logging is carried out to provide the petrophysical parameters required to evaluate the
formations surrounding a wellbore. Evaluation of log data can provide information on lithology,
temperature, pressure, hydrocarbon, water saturations, porosity, permeability, fluid type in porosity (oil,
gas, water), resistivity and water resistivity. This data is collected through running a variety of logging tools
in the wellbore.
The engineer and the geologist require information concerning the lithology of the formations, the
porosity and permeability of any potential reservoirs, as well as the type of fluid in the pore spaces. In
order to provide this information a number of logs have been developed:
82. Resistivity
To determine water saturation if shale volume and porosity is known.
83. Gamma Ray
To determine rock type; i.e., shale, sandstone limestone, or dolomite.
Figure 5.2 Nomogram for "d" exponent determination
normal mud density = normal pore pressure gradient converted into a mud density
actual mud density = mud density in use
The following guidelines should be considered when wireline logging. These are general
guidelines and thus any experience of a specific nature should take precedence:
93. Hole conditioning:
Run a wiper trip. Work any tight hole.
Circulate the cuttings from the hole with the drill bit just off bottom. Condition the mud
to run electric logs.
Use pipe spinner to come out of the hole.
Strap out of the hole prior to all logging jobs.
109.Formation Resistivity
Sedimentary rocks, when dry, will not conduct electricity. However, current will flow
through the interstitial water made conductive by salts in solution. The most common salt
ions are sodium (Na++), calcium (Ca++), Chlorine (Cl-) and sulphate (SO4-). If an
electric logging tool emits an electric field, these ions will move carrying the current
through the solution. If everything else is constant, the greater the concentration of ions
the lower the resistivity of the formation water, and of course the formation. The
presence of shale in the formation will also contribute to the electrical conductivity of the
formation. The conduction of electricity in shale is an ion exchange process between
charged particles of clay. The net effect of shale depends on the amount, type and
distribution of the shale, and the nature and relative amount of the formation water.
More than one resistivity measurement is needed because of the effects of invasion. The
flushed zone resistivity (Rxo) next to the borehole is higher than the resistivity of the
uninvaded zone (Ro), because the mud filtrate in the flushed zone usually has a higher
resistivity than the formation water resistivity (Rw) in the uninvaded portion of the
formation. Occasionally, mud filtrate resistivity is less than the formation water resistivity.
This may occur when a well is drilled with salt muds or at very shallow depths where the
formation water is more likely to be fresh (less salty, higher resistivity).Effects of invasion
cause the resistivity to vary close to the borehole. Sometimes it is high; at other times it
is low, depending on the resistivity of the mud filtrate, the formation water, the water
saturation, and the porosity. The farther the measurement is taken horizontally from the
borehole (into the formation) the more nearly it will match the true resistivity of the
formation.
The electrodes A and M, on the sonde of the logging tool, are separated by a distance
called the spacing. Common spacings are 16" for the short normal, 64" for the
medium normal, and 18'8" for the lateral log.
Usually the greater the distance between electrodes A and M the deeper the tool
investigates into the formation. The 16" normal has the shallowest depth of
investigation, while the 18'8" lateral log has the deepest depth of investigation.
These normal devices are used to read the formations apparent resistivity (Ra) or
true resistivity (Rt). These tools are especially useful in locating water-oil contacts,
water-gas contacts or gas-oil contacts. A lost circulation zone will also be apparent
from the reading of the normal device, provided the drilling fluid has a different
resistivity than the formation fluids.
50. Focused Electric Logs
The focusing electrode tools are better than the resistivity tools (such as the SP, 16"
Normal, 64" Normal or 18'18" Lateral device) in highly resistive formations, salt water
muds, and in adjacent beds with large resistivity contrasts between them. In addition,
they have a better resolution for thin to moderately thick beds. The focusing electrode
tools are available with deep, medium and shallow depths of investigation.
The focusing electrode tools include the spherically focused tools and the laterologs
(the dual laterolog being most common). These tools are used to determine the Rt
and Rxo.
Induction logs have much the same application as the conventional resistivity logs. A
standard induction log will consist of the SP curve, in the left-hand track, a deep
induction curve measuring the Rid, the medium induction curve, measuring the Rim,
and the spherically focused curve measuring the Rsfl. The Rsfl curve indicates the
resistiviy of the flushed zone. The Rim curve indicates the resistivity of the flushed
and invaded zones. The Rid curve indicates the resistivity of the uncontaminated
zone and can be corrected or adjusted to give the true resistivity or Rt.
The conductivity log is also useful in detecting abnormal pressures. As with the "d
exponent, the conductivity values of normally pressured sections develop a trend
which will be usually a straight or slightly curved line. This trend line is caused by the
conductivity values decreasing with depth. Shale compaction results in lower shale
porosity, which in turn results in less interstitial water to conduct the induced current.
The conductivity trend therefore, decreases with depth. Abnormally pressured shales
though, will retain more water and will therefore act as a better conductor. The
conductivity readings opposite abnormally pressured formations will increase.
Shut-down of rig generator distorts the SP curve. The Logging Engineer should be
informed of any changes in rig power generation.
111.Microresistivity Logs
Microresistivity tools are designed to read Rxo, the resistivity of the flushed zone. These
tools are all very shallow reading. The electrodes are mounted on flexible pads pressed
against the borehole wall, thereby eliminating most of the effects of the mud on the
measurement.
The MSFL is helpful for very thin beds not adequately displayed by normal resistivity
logs.
112.Sonic Log Interpretation
A sonic tool has transmitters and receivers. The transmitters are pulsed alternately
spherically outward in all directions. The mud column and the tool have slower travel
times (sonic velocities) than the formations. The first sound energy to arrive at the two
receivers is the compressional wave (P-wave), which travels through the formation near
the borehole. The difference in the times at which the signal reaches the two receivers is
divided by the spacing of the receivers. This time, recorded in microseconds per foot, is
called sonic interval transit time(t) for the difference in arrival times between the two
receivers. Sonic tools have multiple transmitters and receivers to compensate for sonde
tilt, washed-out hole, and alteration of the rock properties near the wellbore due to drilling
processes. The logs produced by these tools are called borehole compensated (BHC)
sonic logs.
If the interval transit time and the type of formation is known, and the porosity is
uniformly distributed (intergranular as opposed to vugular or fracture porosity),the
porosity can be determined. The lithology must be assumed to make an estimate.
Shale has a strong effect on the sonic log. In shaly formations (Vsh>5%) the sonic
porosity must be corrected for the presence of shale. Gas also has a strong effect on
the apparent sonic porosity: it raises the apparent porosity. If gas-bearing formations are
anticipated, at least one other porosity device, preferably a compensated neutron log, is
run. Finally, the sonic wave does not "see" the vugular and fractures porosity
(secondary) as well as it "sees" the intergranular (primary) porosity. This lowers the
apparent porosity in vugular and/or fractured formations.
The newest generation of density tools measures the photoelectric absorption cross-
section of the formations. The photoelectric effect is simply another way the formation
reacts to the bombarding gamma rays. This reaction occurs at a much lower energy
level than Compton scattering. By measuring the energy level of the formation
reactions, it is possible to separate photoelectric reactions from other reactions. The
photoelectric response is then used to help identify lithology.
61. Density Log Interpretation
The density determined by the density tool is called bulk volume. The rock structure
of minerals such as sandstone or limestone is called the matrix. The density of this
structure is called the matrix density. This is the density that the tool would read if the
formation had zero porosity. The bulk volume is equal to the sum of the matrix
volume and the fluid volume contained in the pore space.
The compensated neutron device uses two detectors to compensate for hole rugosity or
roughness. In addition, it measures the ratio of the detector responses and converts this
ratio to a linear porosity reading instead of the non-linear response of the single-detector
neutron tool.
115.Gamma Ray Log (GR)
The gamma rays that are measured with this tool are naturally occurring rays rather than
induced gamma rays from a source, as in the density tool. These "natural" gamma rays
emanate from radioactive potassium thorium, and uranium, the three elements that
account for most of the radiation in sedimentary formations. Potassium and thorium are
closely associated with shale (illite, kaolinite, montmorillonite), while uranium may be
found in sands, shales, and some carbonates.
The gamma ray curve is almost unaffected by porosity and is an excellent indicator of
shale. However, formations containing radioactive contaminants such as volcanic ash,
granite wash or have formation waters with a high level of dissolved potassium salts will
indicate a higher level of gamma ray similar to a shale or clay.
Gamma ray logs are also used as the substitute for the SP log in cased holes or in open
holes where the SP log is unsatisfactory.
The gamma ray log can be recorded through casing or drillpipe so is very useful for
correlation.
The gamma ray log is often used with the casing collar log (CCL) to correlate the location
of casing collars, packers, liner hangers, or other downhole equipment with the exact
depth on the open hole logs.
116.Natural Gamma Ray Spectroscopy Log (NGS)
The natural gamma ray curve has its source essentially in three radioactive isotopes:
uranium, thorium and potassium. Thorium and potassium are usually found in shales
and clays. Uranium compounds may be found in practically any formation. The natural
gamma ray measurement has long been used as a shaliness indicator, but it can be
misleading because uranium may be associated with both shale and reservoir rock. A
better shaliness determination may be made from the thorium and potassium
measurements. The clays (montmorillonite, illite, kaolinite) can also be identified with
these measurements because different clays have different ratios of thorium to
potassium.
Table 5.1 Characteristics of different callipers
Arms Phasing Max Dia Remarks
Sonic 3 120 406 mm 3 Arms Coupled
1 Reading
Microlaterolog 2 180 508 mm 2 Arms Coupled
Proximity 1 Reading
MicroSFL 4 90 558 mm 4 Arms Coupled
2x2
2 Pair Reading
Density 2 180 Short Arm 2 Arms Coupled
Long Arm 1 Reading
Dipmeter 4 90 D Type 4 Arms Coupled
E Type 2x2
2 Independent Readings
Borehole Geometry 4 90 Standard 4 Arms Coupled
Special Idependent Readings
Dual Axis 2 180 406 mm 2 Arms Coupled
1 Reading
117.Bottomhole Surveys
The hole diameter is usually recorded in conjunction with the following surveys:
62. Sonic log
63. Microresistivity log
64. Density log
65. Dipmeter log
66. Borehole geometry log
The readings given by different callipers, in the same hole, may be different depending
on the calliper design combined with the hole cross-section.
80. Outputs:
Cement volume in cubic metres.
Log indicating borehole area, bit size area and area of proposed casing (square
metres).
Integrated hole volume and cement volume (in depth track).
120.Dual Dipmeter
By measuring the dip (the angle that the formation makes below the horizontal) and the
azimuth (the direction in which the bed is dipping) of the formations, a great deal can be
inferred about the processes that moved the beds to their present positions.
The dip of a bedding plane is represented by two components. The stratigraphic dip is
the angle at which the sediment was originally deposited, and the structural dip is the
result of subsequent tilting or deformation.
The Dual Dipmeter tool features two side-by-side configured electrodes on each pad.
Highly accurate information on tool deviation and azimuth is obtained from a triaxial
accelerometer and three magnetometers. Borehole geometry and hole volume are
determined from two calliper measurements 90 degrees apart.
121.Fullbore Formation Microlmager (FMI)
In conductive muds, the FMI tool provides electrical images almost insensitive to
borehole conditions and offers quantitative information, particularly for fracture analysis.
The FMI provides complete fracture network evaluation.
Processed borehole images and dip data are provided in real time with the MAXIS 500
unit.
122.Wireline Formation Tester
An empty chamber is lowered until it is opposite the zone to be tested. The chamber has
an opening so fluids can flow into it. A valve controls the opening, and a pressure
transducer with a surface recorder measures the formation pressures. The opening in
the chamber is in the centre of a rubber pad that is pressed against the formation. This
pad seals out the mud in the wellbore and allows only formation fluids to enter the
chamber. Once the seal is made, the tool is opened and fluids flow in. The flowing
pressure is measured during this time. When the chamber is full, the pressure builds up
until it approaches reservoir pressure. The tool is closed, the seal to the formation is
broken, and the tool is pulled back to the surface. The contents of the sample chamber
are measured and analysed, and the pressure build-up curve is used to calculate
permeability and reservoir pressure.
The permeability that is measured is the permeability very close to the wellbore, which
may not be representative of conditions farther into the formation. However, the wireline
tester can be of great value when it is needed or when permeability is fairly high and a
full sample chamber is likely.
When the tool is set, the pre-tests are automatically and sequentially activated. The
lowflow rate pre-test withdraws 10cm3 of fluid from the formation by movement of a
piston in Chamber 1. The second pre-test follows immediately and withdraws 10cm3 at a
higher flow rate into Chamber 2. In permeable zones the two chambers are filled in
approximately 25 seconds. In some cases, the high flow rate pre-test may be
deactivated in low-permeability reservoirs to reduce the amount of fluid withdrawn and
speed up the tests. During the retract cycle, the pre-test chambers are pumped closed.
124.Modular Formation Dynamics Tester
The MDT tool performs a mini-DST on wireline. It can measure static pressure faster
than any other tool of its type and it can collect more, and better, formation fluid samples
in a single trip than any other sampling tool. Sampling pressure and pre-test flow rate
and volume can be controlled from the MAXIS 500 service unit. The MDT tool collects
formation fluid through a probe that is placed hydraulically against the borehole wall.
Thus, the formation can flow into the sample chamber until hydrocarbon enters
(determined by resistivity) and then the sample is taken. Controls from the MAXIS 500
service unit direct this fluid into any selected sample chamber. By equipping the tool
with additional sample chamber modules, a large number of fluid samples can be
collected in a single trip into the hole. This permits testing a number of different zones
on a trip, or collection of a number of samples from a single zone.
The MDT Tool can be many different tools, depending on what a particular test requires.
Individual modules, each with a specific purpose, can be assembled in a variety of ways,
right at the wellsite.
125.Casing Wear Evaluation Tools:
81. The multi-fingered callipers use 15 - 30 fingers to measure the I.D. of the casing for
wear. The resolution is +/- 1/16 inch.
82. The magnetic tools detect variations in the magnetic flux fields and thereby
determine wall thickness reduction. They are used for corrosion detection and leak
detection (holes).
83. The electromagnetic tools can detect the actual depth of the casing defect, whether it
is internal or external (pitting or grooves). This is accomplished by detecting flux
leakage or eddy currents.
84. The current flow tools can detect areas of metal loss and can be used in dry holes or
with dielectric fluids.
85. The acoustic tools use the strength of the returning signal to provide a qualitative
measure of wear.
86. The imager tools use high-frequency sound and provide excellent resolution of the
wall surface, but no thickness.
126.Sidewall Sampling
87. General
Sidewall samples (SWS) are mainly used for lithological and geochemical analysis.
Especially for the latter, unshattered samples are of particular importance as mud
infiltration may carry microfauna and flora of all ages into the sample.
The sidewall sample programme is prepared in the Main Office. In shales, samples
are usually selected at 10-25m intervals (depending upon shale interval length); in
sands, selection depends upon requirements. Upon receipt of the programme, the
Well Site Drilling Engineer should check the individual sample depths against the
sands and mark them on the GR log. The Logging Engineer must then choose charge
size (powder type), release ring and fastener length. Decision will be based on
lithology, hole size and previous experience with similar formation types.
88. For SWS guidelines refer to the SIPM Production Handbook, Volume I, Chapter
3.
89. Where guns are to be preloaded prior to transportation to the rig, a proposed
SWS programme should be provided to the logging company by the Company.
90. Samples should be taken from bottom to top.
91. Carrier wire and head ring should be checked before running in.
92. If the number of samples to be taken is less than a full gun (generally 30 shots),
the number may be made up by double shots over zones of particular interest.
93. If the number of samples to be taken exceeds one full gun but is not sufficient for
two full guns, the second run can be used to re-test the intervals of poor recovery
from the first run.
94. When shooting permeable formations sampling on the run may be used to
minimise the potential for differential sticking.
95. SWS should be closely supervised by the wellsite geologist or engineer to ensure
samples are correctly numbered when cut loose from the gun, and that the
samples are correctly boxed.
96. Whenever possible the samples should not be touched as this contaminates the
sidewell core.
97. Samples should be intact and longer than 1/2 to be acceptable. If a double-shot
was performed on one zone and the two recoveries are less than 1/2 each, they
can be combined and accepted as one sample. If altering gun parameters does
not provide better than poor recoveries, a lower acceptance criteria may be
considered.
98. Reporting
99. During sampling and sample recovery a record should be kept giving shot
number, depth recovery, accepted (yes/no), lost, misfire, empty or broken
samples and a short sample description. One copy of this list is to be boxed with
the samples, one copy to the Company and another retained at well-site for
reference.
100.Sample jars should state well number, shot number and sample depth. Depth of
sample must also be scratched on the lid with a sharp instrument.
101.Samples are to be transported to a Geological Laboratory specified by the
Company Representative as soon as possible following recovery and packaging.
102.Lost SWS Bullets
103.If bullets are not recovered and a wiper trip is required, run in with a rockbit and
junksub. Rotate and circulate past depths where the sampling was attempted.
104.On the bottom drill +/- 1 meter, if there is no significant torque, continue as per
programme.
105.If torque indicates junk on bottom make a basket run and fish for the junk.
106.If bullets are not recovered, further sampling runs may be made without wiper
trips but the guns must not be lowered below the point where bullets were lost.
127.Drill System Testing
A properly conducted and interpreted Drill Stem Test (DST) is the best diagnostic tool other than a
production test for the evaluation of a prospective zone. The reservoir information derived from a DST
is based on the actual insite, flowing conditions and represent average values for the depth or radius
of investigation. Thus, a DST will provide superior information to other reservoir data obtained from a
core or log analysis.
The following vital reservoir information can be derived from a DST:
128.Initial reservoir pressure.
129.Average permeability (for the radius of investigation).
130.Radius of investigation.
131.Formation damage by drilling fluids and whether stimulation may have application.
132.The location and effect of nearby reservoir heterogeneities such as faults, fractures,
permeability changes, or fluid contact.
133.An estimate of deliverability.
134.Nature of reservoir fluids.
135.Potential future production problems, i.e., sand production, sulphur deposition, hydrate
formation, etc.
136.DST results
137.All original charts will be delivered to the testing company for detailed reading and
preparation of the final test report.
138.A copy of the charts and test results will be immediately forwarded to Exploration
Services by the testing company.
139.Drillstem test (DST) methods
There are generally three DST methods:
Open hole testing on the bottom of the hole.
This method is used as the well is drilled. The prospective zone is tested immediately
after penetration by landing the test tools on the bottom, thus expanding the packers in
compression. Two packers can be run in tandem for increased reliability.
Straddle testing in open hole.
This method can be used to test any interval in the open hole by hydraulically expanding
a packer on each side of a prospective zone and testing the interval.
Cased-hole testing through perforations.
This is the most reliable method of testing a prospective zone, however, it is also the
most costly as it requires setting and cementing the casing and perforating. Well control
is safer during cased-hole testing, and allows higher differential packer pressures. This is
the only method used in offshore exploration drilling.
There are several variations of the above methods, e.g., testing an open hole section below casing with
the packers set in the casing.
The following points should be considered when conducting and planning a DST:
140.Service Company Selection
In some situations, such as deep hazardous wells, consideration must be given to testing
companies with special tools, experienced personnel, and experience in the area, etc.
Often these factors will influence the selection of the testing company to be used.
141.Amount of Open Hole to be Tested
In general, a more conclusive test is obtained by testing the shortest interval which is
practical, e.g., if water is produced in the testing of a long interval, it is sometimes difficult
to locate the portion of the interval which is producing water. It is usually best to limit the
interval to be tested to less than 20 metres. Another factor is that in testing deep gas
wells, the test interval should be minimised to keep the gas influx left below the packer
as small as possible. Gas influx below packers is just as dangerous on shallow wells.
142.Packer Type and Size
Packer size is governed by the size of the hole to be tested. Packer type is determined
by the well depth and hole conditions. A harder packer rubber is required for deeper
wells which exhibit high temperatures.
143.Location of Packer Seat
Open-hole packer seats should be selected in hard non-plastic formations such as hard
sands, hard sandy shales, non-fractured lime or dolomite, or hard, dense non-fractured
shales. Core and calliper log data, if available, will provide information on where to select
a packer seat. Otherwise, cutting data must be used. A packer should never be set in an
incompetent or sloughing shale zone above a prospective formation.
144.Top and Bottom Chokes
Normally, bottomhole chokes are run on all wells. On very high production wells larger
than normal bottomhole chokes and tool internal diameters are required to obtain a draw
down.
The choke is normally 3/8 to 1/2 which is small enough to achieve the above, but large
enough to avoid tool plugging.
The top choke should be initially fully open and reduced as flow, pressure, unloading of
the water cushion, and safety dictate. The pressure upstream of the surface choke
should be recorded throughout the test together with the choke size.
145.Probable Length of Flow and Shut-In Periods.
Where no guidelines are given the following times are suggested: Pre-flow - 5min., Initial
Shut-in-90min., Final Flow -60min., Final Shut-In-180-min. Total time: 335min. (5.5 hrs.).
Normal time requirements are 5-60-60-120. Normally two flow periods and two shut-in
periods are required on a DST.
The initial flow or pre-flow should be five to ten minutes in duration. This can be
shortened if the air blow indicates a highly productive formation or lengthened if the air
blow indicates a very tight formation. If there is no initial blow, attempt to reset the
packers.
The initial build-up period is normally six to ten times the pre-flow period. Usually a sixty
minute initial shut-in is adequate. If a weak air blow indicated a tight formation and the
pre-flow period was extended to more than ten minutes, the initial shut-in period should
be extended to ninety minutes.
A minimum of a 60-minute final flow period is used unless gas or fluid is flowed to
surface. If gas is flowed to surface, the flow period is extended until a stable flow rate is
attained. If fluid is flowed to surface, the tool should be shut-in immediately unless
provision has been made for tankage to contain the fluid. If the pre-flow and initial shut-in
are extended, the flow period should be extended to two hours. When sour gas is flowed
to surface, the tool must be shut in immediately. In testing a deep well, it may be
necessary to shut the well in as soon as the water cushion reaches the surface so that
there is no danger of drillpipe collapse.
The final shut-in period for highly permeable wells should be equal to the final flow period
plus the initial shut-in period. For medium and low permeable wells, the final shut-in
period should be one and a half to two times the final flow period.
146.Pressure Recorders
The pressure gauges should have a range equal to one-and-a-half times the expected
hydrostatic pressure. There should be enough spare range to cover any shock pressures
that may occur. A rough check on the gauge hydrostatic pressure can be made by
comparing the pressure with the hydrostatic pressure calculated from the mud weight. If
there is any doubt, then the gauges should be recalibrated and supplied with a revised
set of calibration charts. The pressures from each recorder should also be compared
carefully.
The data sheet accompanying each pressure chart should be marked with the position of
the gauge, the pressure gauge serial number, the clock serial number, the on and off
time for the clock, as well as other pertinent well data. Each clock run should have a
range approximately equal to one-and-a-half to two times the maximum reasonable time
the tools are to be in the hole. A temperature recorder should be run with each DST. The
calibration and recording of the thermometer should be checked.
147.Reverse Circulating Sub
A reverse circulating sub should be run on all tests. It should be run at least nine metres
above the top of the test tools. Care should be taken that it is not located opposite a gas
sand. The hole should not be reversed out until such time as the packers have been
unseated.
148.Safety Joint
A safety joint should be run with the test tools on all tests.
149.Jars
Jars should be run on all DST's regardless of depth.
150.Water Cushion
On tests of wells with depths greater than 2 750 metres, a water or nitrogen cushion
must be run. However, if high pressure or high volumes are anticipated on a shallower
well, a cushion may also be run. The main purpose of a cushion is to minimise:
110.Caving of the formation and sticking of the anchor pipe,
111.Plugging of anchor perforations and the bottomhole choke,
112.Packer failure, and
113.Drillpipe collapse on deep wells.
Enough water or nitrogen cushion should be run so that the differential pressure across
the packer is in the range of 200 - 280bar.
For a deep well, the collapse rating of the drillpipe is also to be considered when
selecting the amount of water cushion. It should be remembered that the collapse rating
of pipe varies considerably with the amount of tension in the pipe.
151.Surface Equipment
The working pressure of the surface equipment should be at least equal to the expected
formation pressure.
A remote safety valve should be installed on the drillpipe at surface. On deep wells,
consider provisions for a high-pressure pumping unit to be able to pump down the
drillpipe.
The flare line should be drillpipe with a minimum 21/2 inside diameter (ID) and a burst
rating in excess of 200bar. All surface equipment and flare line connections should be
thoroughly checked and tested before running a test.
The annulus should be continuously monitored during a test. The trip tank should be
used for this purpose instead of visually watching the annulus.
152.Drillpipe Collapse and Burst
The collapse pressure rating normally quoted for drillpipe is with no tension. As tension
increases, the collapse rating decreases. Burst pressure rating does not decrease with
tension. However, the burst rating which is usually quoted for new drillpipe must be
reduced to allow a safety factor for pipe condition and other unknowns.
In testing a deep gas well, it may be necessary to close the tool in before the water
cushion is unloaded or, if not, to hold a backpressure on the drillpipe at surface to guard
against collapse.
It should also be noted that when testing a deep gas well, if the well is shut in at the
surface before it is shut in down-hole, then extremely high pressures could be
encountered at the surface. A bottomhole choke will only limit surface pressure under
flowing conditions.
Consideration should be given to running an outside recorder below the bottom packer to check on
the communication from below the packer if there is a possibility of by-pass plugging. Other
equipment, such as multi-flow equipment, tight hole subs, etc., is to be run only at the request of the
head office. A separator and related surface equipment may be used if requested by the head office.
Always run two shut-in tools, one hydraulic and one mechanical.
Always request that the testing company be equipped with a centrifuge to evaluate oil recovery, and has a
means of determining the salt content of recovered water.
NOTE: The salinity of the mud should be determined from a representative mud sample
from the shale shaker tank prior to testing.
For tests run on the bottom, also check pipe tally as follows:
Before starting out of the hole, mark the kelly as it is with the bit on the bottom.
Measure all the pipe not used for the test, i.e., the part of the kelly in the hole, drill collars,
etc.
Measure all tools and pipe picked up.
The difference between that laid down and that picked up should give the correct spot on the last single to
find the bottom with the test tools.
For tests to be run off the bottom, pipe should be measured while running in the hole.
155.Ensure the correct tools have been delivered to the location and that they are in good
condition. Check floor manifold and chicksans prior to running the test. Pressure test to
at least the maximum anticipated bottomhole pressure. The flare line should also be
checked and pressure tested to ensure no connections are leaking.
156.After the test tools have been made up, a sketch should be drawn showing the
component parts, their lengths, and diameters. In addition, record details of the fishing
necks, positions of the bombs, reverse circulating sub, and packer.
Run the tools in slowly to prevent pressure surges on the formation. Running speed should be one minute
or more per 27.5 metre stand.
When making up the tool and pipe, measurements should be taken to ensure correct packer location and
to permit the last joint of pipe added to be marked at the point where it should be flush with the rotary
when the packers are correctly in position. This allows the tools to be eased into contact with the bottom
of the hole and provides a check on the weight indicator (weight indicators alone may give a false
indication). A similar procedure should be used for testing inside casing or straddle testing in the open
hole. The mark should be positioned so that test tools will be correctly located and the surface control
head is conveniently accessible on the derrick floor.
The weight of the testing tool assembly should be recorded before running drill collars and drillpipe to
ensure that the correct allowances are made when setting packers and for tool opening.
On wells where deviation is a problem, "hole drag" should be checked before setting packers or opening
the tool.
When the bottom is reached, check the measurements to determine the amount of hole fill.
Prior to running the test, make sure that the flare line is properly connected, secured, and free of
obstructions.
While running in, the drillpipe should be checked for leaks by observing whether or not air is flowing from
the pipe. Test string displacement should be closely monitored in a trip tank as the tools are run in.
158.Obtaining the test
If necessary, the annulus should be filled prior to opening the tool. A close watch on the annulus should
be maintained when opening the tool. A sudden drop in fluid level indicates that the packer is not holding
and an attempt to reset the packers should be made. A very slow loss of fluid is not serious since it is
usually caused by loss of mud or filtrate to a fractured or porous zone above the packers. A constant
watch should be maintained throughout the test and the mud level must be in sight at all times using the
trip tank for filling the annulus.
In the event that sour gas is flowed to surface, the tool must be shut-in immediately.
Short duration, non-flowing, open-hole tests should not be permitted to exhaust gas or air to the
atmosphere within the derrick floor. In the event of an emergency, flow lines should go to the flare boom
and sufficient chicksans should be connected to the control head to permit the pipe to be picked up with
minimum delay to close the hydraulic tool. A steel cable is attached to the control head, clamped to each
chicksan, and onto the floor manifold.
All electrical wiring must be in good condition. Drawwork engines should be at idle in order that hoisting
power be available without delay.
Gas flow rates should be measured and recorded at least every 15 minutes. A recording chart should be
used with an orifice well tester.
Obtain two samples of gas on every test. One sample is to be obtained shortly after the gas reaches the
surface, and a second sample taken near the end of the flow period.
The initial puff and air blow during pre-flow and flow periods should fall into one of the following
categories:
159.Weak - steady, slow stream of bubbles on surface of water pail.
160.Fair - steady stream of bubbles from four inches or less below water surface.
161.Good - steady blow up to 30cm below water surface.
162.Strong - steady blow to bottom of bucket, and is usually turned down to flare line.
163.Very Strong - steady blow that lifts water out of the bucket. (Normally diverted to flare
line.)
Always record the number of minutes for gas or fluid to reach the surface, and whether it was on pre-flow
or final flow.
If a small steady flare appears and does not die shortly after shutting in the tool, the drillstring may contain
oil. Use plugs when tripping out.
When pulling a test, pay particular attention to hole filling procedures. Do not run the pump continuously.
Stop every few stands to fill the hole. Ensure the mud level in the tanks is dropping proportionately to the
amount of pipe pulled. Always use a trip tank when pulling a test. If a fairly long interval is tested, you
should suspect a gassified mud column in the annulus. Extra care must be taken that the hole is properly
filled.
Catch samples at the top, middle, and bottom of the recovered fluid column. Samples of recovered
formation water must be sent to a laboratory for analysis and must be accompanied by a completed
Standard Sample Identification Sheet. Oil samples are to be sent for analysis only if requested by the
head office.
Check the charts as soon as they are available. If the hydrostatic pressures are only slightly higher than
the shut-in pressures, a well kick may be imminent, therefore start running the pipe in the hole
immediately.
If a long column (greater than 150 metres) is recovered, if oil flows to surface, or if it is necessary to pull a
test containing liquid hydrocarbon at night, the hydrocarbon must be reverse circulated out of the drillpipe.
Lay line to tank to receive fluid being circulated out.
Run the pump slowly, prior to dropping the bar, to open the pump-out sub. DO NOT CLOSE THE
BLOWOUT PREVENTER (BOP).
Record the time required for fluid in the drillpipe to reach the surface. Calculate the fluid level in the
drillpipe using the recorded time, the displacement of the drillpipe and the pump output.
Total fluid recovery (m) equals depth of test minus fluid level.
Monitor fluid return and record pumping time to changes in fluid-type to calculate number of barrels of
recovery of each fluid (oil, mud, water, etc.).
NOTE: If pump rate is too fast, some of the pump output will divert out of the flow tee
instead of downhole.
The initial and final hydrostatic pressures should be equal to (depth x mud weight x 0.0098).
The final flowing pressure if the air blow has died to nil during the flow period, should be
approximately equal to the sum of (metres of salt water recovered x 10.2) + (metres of oil recovered x
7.9) + (metres of mud recovered x 11.3).
When a recorder has been run below the lower packer on a straddle test with a by-pass assembly,
check the chart to ensure that the bottom packer was holding. If the bottom packer was holding, only
hydrostatic pressure is measured; if the bottom packer was not holding, the chart will resemble other
charts in the test string.
Centrifuge a sample of oil recovery to determine basic sediment and water (BS&W) content. Obtain
resistivity and salt content of water recovery. Weigh a sample of mud recovered and check it against the
weight of the mud in the hole to determine if it has been diluted by formation water.
Operators shall hold a pre-test safety meeting with all personnel that may be involved with the drillstem
test. This meeting shall review the testing plan, testing procedures, test prognosis, operation of surface
equipment, designation of essential personnel, and responsibility of the personnel.
NOTE: The pre-test safety meeting shall be recorded, along with a record of those who
attended the meeting. The pre-test safety meeting will include a discussion of the
emergency response plan where applicable, including any revisions or
recommendations to accommodate the specific well environment.
173.Mud should be checked to ensure mud properties are correct.
174.Fill-up lines will be installed on the drilling nipple above the blow-out preventer (BOP) to
keep the casing full of mud. Provisions for the kill line should be made separately. The
trip tank should be used for measuring displacement and recovery.
175.The BOP's should be checked prior to running in the hole and before tripping out.
176.On electric rigs, make sure the blowers are operating properly and that all electrical
wiring is in good condition.
177.Water connections to exhausts are to be checked for proper spray.
178.Make sure all high-pressure swings are snubbed or anchored down.
179.All fire fighting equipment is to be inspected before starting the test. Fire fighting
equipment should be positioned so that it can be used on the rig floor if necessary.
180.All personnel on location should be alerted that cigarettes and matches should be left in
the accommodation area.
181.One person should be designated to make sure that the casing is kept full at all times
while tripping out-of-hole and should also watch carefully for swabbing actions. The
Driller would normally watch the trip tank.
182.Never remove kelly hose for the purpose of flowing through the kelly and goose neck.
183.DST's must not be conducted during storms when excessive static electricity may be
present.
184.When turning drillpipe with tongs to open the DST tool, under no circumstances should
more than one tong be used. If more power is needed, use a long-handled wrench.
185.Derrick Man should check his safety slide, line, and exit for operation and accessibility.
186.Check the test line for temperature decreases. A decrease in temperature often
indicates downhole hydration, and consideration shall be given to stopping the test at
this time since a hydrate plug could form. If a hydrate or sulphur plug is suspected in
drillpipe, exercise caution prior to disconnecting any of the pipeline: pull up to and close
kelly cock before removing testing head.
187.If sour oil or gas is recovered, the drillpipe should be reversed out.
188.Regulate the valves on the surface manifold and attach the manifold to the last joint in
the string while it is in the V-door or mousehole.
189.If it becomes necessary to do any work above the floor, a stabbing board should be
erected.
190.The number of people on the floor during the test should be kept to a minimum. Only the
Tester, the Driller, the Company Representative, and the Toolpusher should be on the
floor. There is a tendency during a DST for spectators to accumulate in the doghouse
and on the floor which results in congestion and confusion. This should be discouraged.
It is not the test itself that is dangerous to personnel and equipment, but it is during the
trip out of the hole following the test that the risk of fire and blow-out is the greatest.
Personnel and supervisors tend to relax after the test tool has been opened and the
contents of the formations being tested becomes known. It is at this time and during the
trip out that caution should prevail, especially when gas and oil have been recovered.
After the DST, run in hole with the drillstring to recondition hole and circulate out any gas
that may have entered well bore.
All rigs must be equipped with a portable H2S Detector, such as a Drager or a Gastec testing
kit which detects H2S concentrations that are harmful to personnel.
The kit should be used for testing the gas drawn by the gas analyser when drilling into new
gas zones. This is a simple test that detects H2S at low concentrations. It is recommended
that this kit be used only as a means of detection, and if H2S is detected then a service
company should be contracted to supply H2S safety equipment and expertise for personnel
safety.
The pH of the mud should also be carefully monitored if H2S is suspected. H2S will react with
the mud and severely reduce pH. If H2S is present in the formation drilled, the drillpipe is
likely to turn black as the H2S reacts with the steel.
The most accurate determination of whether H2S is present in the formation is from a gas
analysis of a sample from a DST.
By using the H2S detector, monitoring the pH of the mud, and observing the drillpipe, a
reasonable idea as to whether the formation contains any H2S should be obtained. If H2S is
suspected, then the following precautions and procedures should be followed:
Procedures for coming out of the hole when reverse circulation is not possible:
Use the following procedures for tripping pipe containing sour formation fluids:
If H2S has been encountered during the test:
The crew will complete the trip under mask using test plugs and mud can.
125.Use breathing apparatus when the test head is removed.
126.If aqua-ammonia is used, conduct tests to determine the presence of toxic and /or
flammable gases. If present, mask-up all personnel until the tool is broken down and
the area is determined safe. Add a mixture of aqua ammonia and water immediately
after removing the test head.
127.Prior to applying the test plug on the stand, displace some fluid in the pipe with the
dope brush. Pour approximately one cup of ammonia in the stand and when the fluid
is drained out of the stand the ammonia works on any gas left in the pipe.
Prior to breaking off the test head, check the area to ensure that there are no sources of
ignition. For example, the derrick and doghouse lights are off.
Inform personnel as to evacuation and shut-down procedures should the pipe unload its
contents.
If the pipe unloads, break out slowly, continuously monitoring joints for pressure release. If
pressure is releasing, bleed off the pressure before continuing the break out.
Have the mud can ready and properly directed to ensure proper disposal of contaminants.
Caution all personnel about the dangers of positioning any part of the body over the open
box area of the drillstem.
Use test plugs if any oil or sour gases are contained in the drillstem.
Before pulling every stand, test for toxic and/or flammable atmosphere.
Rap every stand with a hammer to determine whether it is wet or dry. Wet stands require
extra caution as they tend to be pressurised.
When reverse circulation has been achieved, and if H2S is known or anticipated to be
present, mask-up the crew for pulling the assembly below the pump-out sub.
Purging Information
Fires and explosions are avoided by eliminating air entrainment inside the equipment. The
following guidelines can minimise the possibility of fires and explosions in enclosed vessels
and the piping system:
Use clean tanks, particularly if a combustible purge gas is used. Tanks should be free from
sulphide or pyrite build-ups.
Tanks must have proper hatch seals and pre-set pressure thief hatches. Ensure that the
thief hatch has a minimum 8oz. pressure rating and that the seal is in good condition.
All system elements must be electrically bonded to each other, with the wellhead or ground
rods as "ground".
Where production tanks are vented to flare, the configuration must be:
128.Install a manual block valve on the vent line. The vent line to flare stack must be
31/2 minimum.
129.Install a pressure/vacuum device (pressure measurement tap and low pressure
measurement device e.g., U tube manometer) on the tank or vent line before the
block valve.
130.Use approved flame arrestors between the block valve and the flare stack.
131.A regulated or manually valved tank top blanket line.
NOTE: It must be recognised that flame arrestors do not guarantee the prevention of
flash-backs, and therefore the elimination of initial air and subsequent air
entrainment is required.
The purge medium should be manifolded to a control purging/measurement point, i.e., the
test separator.
All pilots, or open flame within 50m of the equipment to be purged must be extinguished.
Purge with positive pressure sweet gas, propane or N2 before lighting the flare.
The purge vapour should be measured. Liquid volume to vapour or mass to vapour
conversions are allowed if the liquid volume or mass vaporised is measured accurately,
and if it is ensured that all of the liquid is vaporised. Numerous measurement devices
are available.
The volume to be purged must be calculated prior to purging. For purge mediums heavier
than air, purging should be a minimum of 1.5 times calculated volume , and purging
should be from the bottom up. For purge mediums lighter than air, purging should be a
minimum of 2.5 times the calculated volume, and purging should be from the top down.
Top down purging is impractical in some situations. If bottom up purging is employed
with purge mediums lighter than air, a minimum of 5 times calculated volume should be
displaced. Small lines and vessels may be purged for a the number of minutes instead of
rigorous calculations, if it is certain that the time chosen would exceed the overpurge
guidelines.
Measuring the purge gas flow rate with the separator meter run is recommended.
Check residual oxygen with an explosion or oxygen monitoring device. The sensing should
be performed at points other than the purge exit of the component (in case of air
bypassing instead of displacement). Oxygen content must be such that the gas mixture
is below its lower explosive limit.
Following pre-start purging, a constant positive pressure shall be maintained on the tanks to
avoid the introduction of air due to the flare stack Venturi effect or the loading of liquids
from the tank. Vessels/tanks should be re-purged whenever air is accidentally or
operationally introduced during the test.
Upon completion of a sour test, the tanks should be emptied and purged with sweet gas,
propane, or N2.
When this procedure is followed properly, H2S is neutralised allowing the trip into the hole to be safely
made without gas masks. Personnel must be on guard against pockets of H2S not neutralised.
CAUTION:
There is a danger that personnel will become casual toward the hazard of H2S. Aqua
ammonia reduces H2S danger, but certainly does not eliminate it.
Corrosion Inhibition
A corrosion inhibitor is designed to prevent hydrogen embrittlement occurring in the
drillstring. It is imperative that the chemical is added prior to the drillstring coming into
contact with the H2S gas/fluid.
Inhibit water-based drilling fluids by maintaining a pH above 10. Inhibit VCMuds with the
addition of commercially available scavengers.
Use a filming amine inhibitor to protect the interior of the test string when running a sour
drillstem test. Both water-soluble and oil-soluble inhibitors are available from safety service
companies.
If no water cushion is used, the inhibitor should be dumped down the test string. If a water
cushion is used, mix the inhibitor with the cushion, and also put inhibitor on top of the
cushion.
NOTE: Ensure inhibitor is mixed in dope pails prior to making up tools and drillstring.
Corrosion inhibitors of this type do not completely eliminate the effects of H2S corrosion. During and
after exposure to H2S, reduce hook load as much as possible. Weathering in warm air helps to
reduce the amount of hydrogen in the steel and aids in preventing hydrogen stress cracks.
Weathering for only a few hours on a warm day will reduce the incidence of hydrogen stress cracking.
NOTE: When H2S is suspected, notify testing company and ensure that their tools have
been magnafluxed and all tools are designed for an H2S environment. Also ensure
that they have been pressure tested to maximum rating.
To fill drillpipe:
151.0.045m3 of Corban for each 1 000 metres of 127.0mm drillpipe.
Run the packer nearly to the bottom.
Prepare a solution of 0.0714m3 of Corban 302 to 1.0m3 of water. Place one 0.0714m3 of this
solution inside the drillpipe for each 1 000 metres of pipe above the water cushion.
Proceed with the test in the normal manner.
This example may be an abnormal case, but it illustrates the importance of water
cushion requirements from the packer differential and the drillpipe collapse point of view.
Several conditions can change the above assumed limitations. These are:
152.Testing in a "rat hole" can increase packer differential limitation due to smaller hole
size.
153.Use of drillpipe of higher grades can increase collapse limit.
154.Prior knowledge of formation productivity may allow a reduction in water cushion.
Where special analysis work is required (if known in advance of drilling the well), the type of analysis will
be indicated on the Well Prognosis.
When samples are sent to the laboratory for analysis, the following information should be included on the
label/tag:
226.Complete well name and location.
227.Date and time of sampling.
228.Name of person and company who obtained sample.
229.Location of sample, i.e. surface, top, middle, bottom of drillstring, etc.
230.Specific data such as temperature, DST number, pressure, etc., relating to sample, if
applicable.
231.Name of Company Representative to be contacted.
232.Attach the Field Service Order with the sample when it is sent to the laboratory. On the
Field Service Order, instruct the laboratory to call the appropriate person in the Coparex
Office.
Contents
8. FISHING ........................................................................................................................xlviii
8.1 Introduction .............................................................................................................xlviii
8.2 Common Causes of Fishing....................................................................................xlviii
8.3 Freeing Stuck Pipe........................................................................................................l
8.3.1 Free-Point ............................................................................................................l
8.3.2 Wireline free-point determination ........................................................................ li
8.3.3 Back-off procedure.............................................................................................. li
8.3.4 Jarring ................................................................................................................ lii
8.3.5 Stuck in squeezing salt ..................................................................................... liii
8.3.6 Differentially stuck pipe ..................................................................................... liii
8.3.7 Stuck logging cable or logging tool ................................................................... liii
8.4 Fishing Tools.............................................................................................................. liv
8.4.1 Overshots.......................................................................................................... liv
8.4.2 Spears............................................................................................................... liv
8.4.3 Junk baskets and subs....................................................................................... lv
8.4.4 Magnets ............................................................................................................. lv
8.4.5 Bumper subs ...................................................................................................... lv
8.4.6 Jars .................................................................................................................... lv
8.4.7 Milling tools ....................................................................................................... lvi
8.4.8 Extension subs.................................................................................................. lvi
Illustrations
237.Introduction
Fishing is any operation to release, remove, or recover a fish or junk that has fallen to the bottom of a well
or is stuck in the well.
One of the most common fishing tasks occurs when the drillstring is twisted into two parts. After a twist-off
occurs, always circulate the hole clean and condition the mud before tripping out. The following actions
should be taken to reduce the chances of becoming stuck prior to drilling into high-pressure zones or
weighting up:
238.Stabilisers should be added to reduce wall contact.
239.Consideration should be given to substituting drill collars with HWDP as much as
possible.
240.Consideration should be given to running the drilling jars between drill collars and
HWDP.
By carefully measuring the pipe removed from the hole, the operator can determine the depth at which he
may engage the fish. By examining the end piece brought from the hole, the operator can determine the
characteristics of the fishing neck to be engaged. The size of hole being drilled will dictate the type of
fishing tools to be run. If there is sufficient clearance, a tool that will engage the fish externally is
preferable. The minimum size overshot should be run to allow subsequent washover operations (if
required). If there is not sufficient clearance, an internal catching tool should be run. It is good practice to
calliper the drillstring nearest to the fish to be sure whether or not the pipe or drill collars have been worn
to a smaller size than their original outside diameter.
NOTE: The most important information of any fishing job is to know exactly what the fish
consists of and to know exactly where the top of the fish is. Make a sketch of each
BHA prior to running in the hole. It is very important to check OD's and ID's in the
pin and boxes of every piece of the BHA. The ID, OD, and fishing neck should be
recorded. Mandrel specifications on jars and shock subs should also be recorded.
Have accurate count and measurement of all pipe, collars and subs on the
installation.
242.Twist-off
A twist-off results from fatigue of the drillstring. Fatigue is caused by damage due to
rough handling, scarring from tong dies, incorrect heat treatment, and slip wear. The
constant axial loads and torque transmitted to the drillstring causes damaged tool joints
and eventual failure. This fatigue opens a traverse crack in the pipe, enlarging to a point
of failure. This sometimes appears as a long tear, however, this is helpful because the
tear is a mirror image of the top of the fish.
If the pipe cannot be worked free without exceeding tension limits then the hydrostatic
pressure at the stuck point must be reduced or the filter cake must be reduced and
softened.
247.Wireline breakage
Wireline cable logging, perforating, and surveying may sometimes break. This is often
the result of trying to pull a stuck tool free, or running out of the hole too fast and
"hanging" up. The cable below the break will fall and pile up.
249.Free-Point
NOTE: Wireline free-point should be run before attempting to back-off.
The following is the field method to estimate the free-point (stretch pipe-field estimate).
Note the weight of the string, including blocks (TSW).
Pick the pipe up to this weight (mark pipe at rotary).
Pull additional 10 000 - 15 000daN and mark the pipe at the rotary table. (Do not exceed the
allowable tension limits).
Measure the distance from the original mark.
Repeat the procedure.
L = 2.6355 (e x W)
Pull over string weight, (1 000daN)
where:
L = Length of free drillpipe, m
e = Average elongation or stretch, mm
W = Weight of drillpipe, kg/m
Pull over string weight, 1 000daN
166.Ensure that the true weight down to the stuck point has been picked up and is in
tension (none of the pipe down to the stuck point is in compression).
167.The pipe should return to its original position when the tension is removed. The
Stretch Technique should not cause permanent elongation of the pipe.
The free-point indicator can be run in either drillpipe, tubing or casing and can be used simultaneously
with the string shot. This allows the drillstring to be backed off in a single run.
The results of the free-point indicator are presented as "a percentage of free pipe" versus depth; for easier
interpretation. Readings above 85% "free" in both stretch and torque are good indications of free pipe.
Back-off should not be attempted if the "percentage of free pipe" signal for tension and stretch equals 85%
or less.
Before running the free-point indicator, the following precautions must be taken:
254.Determine the maximum applicable overpull and torque to the string. Pay special
attention to tapered strings.
255.In order to be able to use the top drive as a "lubricator" during the running of wireline
tools, make up one joint of drillpipe and a kelly cock below the top drive. This will allow
pulling the logging tools above the kelly cock and closing in the well if necessary.
256.When not using the kelly or the top drive, always install a kelly cock on the string in case
a reservoir has been penetrated. Also, install a wireline circulating head on the string.
257.Back-off procedure
A string shot consists of an explosive detonating cord that produces a vibratory shockwave to loosen or
unscrew a predetermined thread. Left-hand torque is applied with neutral weight applied at the back-off
point. For the proper sizing of the shot certain factors should be known:
258.Pipe size and weight.
259.Depth of stuck pipe.
260.Mud or fluid weight.
261.Temperature of the well.
Back-off point
The string shot strength should be sufficient to back-off the pipe without causing major damage to the pipe
or the connection. The size of the shot depends on the back-off and whether the back-off is in the drillpipe
or drill collars:
The drillstring should be backed off one or two joints above the stuck point. Jars are more
effective if positioned close to the stuck point.
Attempt to back-off in straight or gauge hole sections if possible.
Drillstring parted near a casing shoe should be backed-off in the casing or below a washed
out section.
271.Jarring
Prior to jarring always mark the string position at the rotary table. The proper jarring method is to allow the
jar to trip with the required overpull before further overpull is applied.
Heavy pulling and jarring shall be carried out using the kelly or top drive. Where this is not possible, the
elevator latch shall be secured by means of a rope or chain. If possible, the kelly spinner, elevator and
bales should be removed. Avoid jarring with an overshot if possible. It is preferred to screw back onto the
fish with a jarring assembly. A safety joint may be incorporated. During jarring procedures all personnel
must be cleared from around the drill floor.
When the string is free pull it up several meters and commence circulating slowly.
When jarring for an extended period, the drill line, derrick and travelling equipment, should be visually
inspected at regular intervals.
276.As soon as differential sticking is suspected the first attempt to free the pipe is jarring.
Another technique often used to free differentially stuck pipe is to reduce the mud weight
in steps. This is only allowed if well control is not a factor.
277.If jarring does not free the string, and reducing the mud weight is not feasible or not
effective, consider spotting a pill. The type of pill is dependent on the formation and the
mud type in use.
Approved fluids for stuck pipe should be spotted to cover all of the bottomhole assembly
and have enough left in the pipe to move 0.15m3 an hour for 48 hours. This will keep the
bit open, prevent the setting of solids, and expose the formation to new oil and
surfactants. After 24 hours of soaking, a free-point should be run. If only the collars are
stuck, consideration should be given to back-off and going in with jars and a fishing
string. If the drillpipe is stuck a washover pipe should be used.
278.Another method is the Drillstem Test Tool to alleviate hydrostatic pressure. Some
precautions for its use are necessary:
168.The hole should be in gauge.
169.There is danger of sloughing when the tool is open.
170.Take precaution for any high-pressure zones below the packer seat.
279.Nitrogen spotting to free differentially stuck pipe can be used. The purpose of this
procedure is to lower the hydrostatic pressure by lowering the fluid in the hole. Displace
the drillstring to N2. The N2 is then is bled off and the annular fluid level will fall. Care
should be taken to ensure that the reduction in hydrostatic pressure does not create a
kick. This method will not work with a float in the drillstring.
The Company Representative is responsible for ensuring that the logging companies/contractors have a
complete set of fishing equipment on site.
NOTE: Stuck logging tools with radioactive sources must be fished using the strip
over/reverse strip technique. The weak point must not be broken.
WARNING:
If a radioactive source becomes stuck, it must be treated as an incident, refer to the
Company Health, Safety and Environmental Management System. All attempts must be
made to recover the source. If the source cannot be covered it must be covered by 30-10
m of cement..
283.Fishing Tools
284.Overshots
The most effective fishing tool to engage the fish externally is the Bowen Overshot. It can be used with a
rubber packer moulded lip. When the overshot is lowered over a fish, the lip will seal completely around
the fish and the fluid will be directed through the fish. Circulation under pressure up and around the
outside of a stuck fish is a very important factor in loosening it.
Right-hand rotation is normally used to engage the fish, thus preventing back-off of the string at an
undesirable connection. If the fish is plugged, or a potential well control problem exists, do not run a pack-
off. Instead run a circulating sub just above the overshot. It should be the type of circulating sub that
requires a ball dropped from the surface.
Run as small a guide as the hole conditions will permit. The fishing bumper sub should be installed in
fishing strings immediately above the fishing tool or safety joint. It assures the operator of the ability to
release the fishing tool when it becomes impossible to pull the fish.
285.Spears
Spears are used when not enough outside clearance is available to run an overshot. It can usually be
released if the bumper sub is run above the spear. Always consider running a stop ring with a spear.
Washover spears
Hole conditions should be taken into consideration before running these tools. The advantage of using
washover spears is that the washover operation and the retrieval of the fish can be done on one run. A
back-off shot can be run and the portion that is washed over can be backed-off and retrieved. This helps
prevent the fish from resticking while making a trip for an overshot, and helps to prevent the fish that are
stuck off bottom from falling.
The disadvantage is the risk of backing-off the wash pipe during the back-off operation. The movement of
the wash pipe may be restricted and problems will arise to release the spear if the back-off is
unsuccessful. The length of the drill collars in the stuck string is a limiting factor when the weight of the fish
is transferred to the wash pipe and may part the wash pipe.
Washover pipe
For washover operations it is advisable to run the minimum size wash pipe that will cover the fish and will
give room for circulation. In soft formations 12mm is recommended, while six mm may be used in hard
rock formations. The length of the wash pipe depends on the hole conditions. Approximately 90m is a rule
of thumb in a good hole. Keep the wash pipe moving at all times because it gets differentially stuck very
easily. Wash pipe joints are weak and therefore should be monitored for any torque build-up. Do not leave
the rig controls unattended and monitor torque and pressure build-up; this may indicate that the washover
shoe is worn out. Continuing to drill with a worn out shoe may cause the wash pipe to back off.
Washing over
When washing over it is recommended that oil jars should be run with enough drill collars above them to
allow the jars to be effective. A safety joint should be used on top of the wash pipe. The wash pipe with a
drill collar spear should be considered when washing over collars or tools which are stuck off bottom.
Washover shoes
When using washover shoes short tooth mills are recommended for medium to hard formations. Flat
bottom shoes are used for cutting over reamers, stabilisers, tool joints, etc. They will not cut through the
formation very fast. Check the previous shoe to help in selecting the next shoe.
Coring type junk catchers are used for recovering any type of junk that can be cored over. Formations
must be soft enough to allow for coring and breaking off the core.
287.Magnets
Fishing magnets, when run on tubing or drillpipe, are good for recovering cones and small junk. Magnets
run on wirelines are not recommended for use in an open hole. Ensure the magnet is fully charged before
running it.
288.Bumper subs
Bumper subs are run in fishing strings along with jars. They can be run above or below the jars, although
it is preferable to run them below.
A bumper sub provides free travel to jar loose the slips of a spear or overshot. It can also bump down on a
fish. Two bumper subs are sometimes run in deep or deviated holes to provide necessary travel which
can then be observed at the surface.
289.Jars
Jars are designed to impact a sudden upward or downward blow on the tools below it.
When jarring, always run enough drill collars above the jars to make the jars effective. Jars should never
be used below tools with a greater diameter than that of the jar; if the tools above the jar become stuck,
the jar is useless.
When fishing jars are run with fishing tools it is recommended to place drill collars on top of the jars
instead of heavyweight drillpipe. This will yield a more effective blow when bumping down.
If the jar is to be used in tension, an additional 15-20% of the desired weight on the bottom should be
below the jar. If the jar is to be used in compression, 15-20% of the desired weight on the bottom should
be above the jar.
Jar intensifiers
Jar intensifiers are accessories to intensify the jarring impact force. They are run to utilise all the energy
that is stored in the stretched drillpipe, resulting in greatly increased jar force. It is recommended to install
intensifiers immediately above the drill collars.
Surface jars
Surface jars are designed to deliver a heavy downward blow against a stuck fish. They perform ideally
where key seating is the problem. A surface jar has a 48" stroke. They also could be used to disengage a
fish. The effective depth is usually limited to less than 1000 m.
290.Milling tools
Types of milling tools are:
291.Pilot mills
These are used for milling up tubular equipment. The nose holds the mill straight and the
upper body does the milling. The pilot should be near the TD of the fish. Over- milling will
cause cuttings to ball up around the tools. Therefore, pick the mill up frequently and
pump out the hole.
292.Tapered mills
These are used for milling inside casing, dressing a liner, and cutting out burrs. A
tapered mill should not be run in collapsed casing except as a last resort.
293.Section mills
Are for cutting out sections of casing. The casing should be cemented and the casing
centralisers will determine the milling operations.
294.Inside fluted mills
These are used to dress off the top of the pipe or the fish to the desired size.
295.Concave mills
These are used to dress off the top of the fish when a torn or ragged neck is present.
296.Mill guides
These are used in the bottom of an overshot to dress off the top of a fish and enable the
grapple to slip over. Run a mill guide when available.
Any mill run inside a casing should be well stabilised and not have any hard facing on the side. Carefully
select the type of mill to prevent them from walking. Use extreme caution when milling inside the casing to
prevent cutting through it. Removing cuttings is essential. When water is used milling is difficult; therefore
reverse circulate if possible. Running a junk sub when milling and putting a magnet at the end of the
flowline will help remove fine metal cuttings.
After finishing milling operations the BOP stack and wellhead should be cleaned from steel
cuttings/shavings. Install magnets in the flowline to collect steel cuttings out of the mud. Steel cuttings left
in the BOP cavities can create damage to packers, wellhead seal assemblies, etc., if they fall into the
wellbore after operation.
297.Extension subs
The upper end of the fish can be split or distorted. In this situation an extension should be run so it can be
lowered far enough to allow the grapple to engage with an undamaged section of the fish.
THIS PAGE IS INTENTIONALLY LEFT BLANK
Contents
9. DIRECTIONAL DRILLING....................................................................................................i
9.1 General .........................................................................................................................i
9.1.1 Definitions ............................................................................................................i
9.2 Conventional Directional Drilling .................................................................................. ii
9.2.1 Kicking off............................................................................................................ ii
9.2.2 Angle building..................................................................................................... iii
9.2.3 Angle holding ..................................................................................................... iii
9.2.4 Angle dropping ................................................................................................... iii
9.2.5 Factors which affect the directional behaviour of rotary assemblies in directional
rotary assemblies .................................................................................................. iii
9.2.6 Dogleg and dogleg severity.................................................................................v
9.2.7 Directional control with rotary assemblies...........................................................v
9.2.8 Non-magnetic Drill Collars ................................................................................ vii
9.2.9 Short drill collars, extension subs...................................................................... vii
9.2.10 Bottomhole assemblies with responses under ideal conditions ..................... viii
9.2.11 Selection of stabiliser type ............................................................................. viii
9.2.12 Types of directional patterns ............................................................................ ix
9.2.13 Kick-off point and build-up rate .........................................................................x
9.2.14 Factors affecting trajectory control of rotary assemblies.................................. xi
9.2.15 Deviation control on vertical holes ................................................................... xi
9.2.16 Kicking off........................................................................................................ xii
9.2.17 Using the mud motor for drilling and trajectory change................................... xii
9.2.18 Adjustable bent housing................................................................................. xiv
9.2.19 Reaming.......................................................................................................... xv
9.2.20 Fatigue in directional drilling............................................................................ xv
9.2.21 Fishing in directional drilling ............................................................................ xv
9.2.22 Tool face orientation........................................................................................ xv
9.3 Horizontal Drilling ..................................................................................................... xvii
9.3.1 Horizontal drilling pattern ................................................................................ xvii
9.3.2 BHA weight and weight on bit ......................................................................... xvii
9.4 Survey Equipment and Procedures ......................................................................... xvii
9.4.1 Drift surveys ....................................................................................................xviii
9.4.2 Magnetic surveys ............................................................................................xviii
9.4.3 Magnetic single-shot surveys - unloading, developing and reading the
film xx
9.4.4 Azimuth reference systems ............................................................................. xxii
9.4.5 Gyroscopic surveys ......................................................................................... xxv
9.4.6 Measurement while drilling (MWD) ................................................................. xxv
9.4.7 Directional survey calculations....................................................................... xxvi
9.4.8 Magnetic declination correction......................................................................xxvii
9.4.9 Magnetic interference and instrument spacing .............................................xxviii
9.4.10 Surveying inaccuracy .................................................................................... xxx
9.5 Recommended Bottomhole Assemblies ............................................................ xxx
9.5.1 General ........................................................................................................... xxx
9.5.2 Drill collar size election.................................................................................... xxx
9.5.3 String weights................................................................................................. xxxi
9.5.4 Problem Holes................................................................................................ xxxi
9.5.5 Deviated hole ................................................................................................. xxxi
9.5.6 Key Seating.................................................................................................... xxxi
9.5.7 Float subs....................................................................................................... xxxi
9.5.8 Static method .................................................................................................xxxii
9.5.9 Dynamic method ............................................................................................xxxii
9.5.10 Circulating Subs ...........................................................................................xxxii
9.5.11 Vibration control (shock subs)......................................................................xxxii
9.5.12 Drilling Jars ..................................................................................................xxxii
9.5.13 Drillpipe strainers...........................................................................................xxxii
9.5.14 Straight hole BHA's .....................................................................................xxxiii
9.5.15 Stiff (packed hole) assembly .......................................................................xxxiii
9.5.16 Kick-off and deviation assemblies...............................................................xxxiv
9.5.17 Bottomhole assemblies tangent assemblies (Navri-drill System/DTU) .......xxxiv
9.5.18 Angle-build rotary assembly........................................................................ xxxv
9.5.19 Tangent rotary assembly.............................................................................xxxvi
9.5.20 Check trips assemblies ...............................................................................xxxvi
9.5.21 Check trip assemblies for after DTU runs ..................................................xxxvii
9.5.22 Accelerator position................................................................................... xxxviii
9.6 Sidetracking ......................................................................................................... xxxviii
9.6.1 Reasons for Sidetracking in open hole ....................................................... xxxviii
9.6.2 Sidetracking procedures in open hole...........................................................xxxix
Illustrations
299.General
The following deals with drilling wells which are substantially deviated from vertical. These situations will
normally arise because of:
300.Strong deviation tendencies in the area (i.e., severely dipped formations) or,
301.Surface problems which will not allow rig placement directly above the bottom hole
target.
The former case involves controlling natural deviation tendencies by the use of various bottom hole
assemblies in order to hit the desired target area.
The latter case involves planning a well bore trajectory which is intentionally "kicked off" from the vertical,
taking the smoothest possible path to the target.
The following provides only general comments on directional drilling. Well specific, and more detailed
information will be given in the directional drilling programme.
Directional drilling operations in the North Sea will be performed by a qualified directional drilling
contractor. The contractor will supply the specific plot for the well. Normally the contractor will also
deliver the directional drilling tools as part of the package.
302.Definitions
Average Angle: The average between drift angles taken from any two consecutive survey points.
Azimuth: The azimuth of a borehole at a point is the direction of the borehole on the horizontal plane,
measured as a clockwise angle ( 0 to 360 degrees).
BHO Sub: Bottom hole orienting sub - any sub designated to force the survey instrument into a
predetermined relationship with the Bottom Hole Assembly. Example: Mule Shoe Orienting sub.
Course Deviation: Distance horizontally between the surface location and target location, along a
straight line in a specified direction.
Directional Drilling: The science of directing a wellbore along a predetermined trajectory to intersect
a subsurface target.
Direction of Closure: The direction or azimuth of a line drawn from the surface location to the
downhole target or survey station.
Dogleg Severity: A measure of the amount of change in inclination and/or direction of a wellbore,
expressed in 30 degrees/metre.
Intentionally deflected wells: Those that increase the hole angle by one of several means in order
to reach a subsurface target that could not be intersected through natural deviation.
Measured Depth: The actual length of the borehole from the ORT (pipe tally depth) to any specified
station.
Mule Shoe: A cam in the shape of a mule shoe which converts downward motion to rotation and
downward motion. It is used to align a single shot survey tool to the high side of a mud motor.
Mule Shoe Orienting Sub: A sub bored out to accept a mule shoe sleeve.
Mule Shoe Method of Orientation: A means of orienting tools, after they have been run into the hole
in any random direction. In this method, a Mule Shoe Assembly is attached to the protective barrel of
a survey instrument in such a way that a known relationship exists between the mule shoe slot and a
scribe line on the survey record. When the instrument is lowered into the drill string, the key of the
mule shoe sub forces the mule shoe assembly to rotate until the mule shoe slot locks on the key. The
key has a known relationship to the BHA allowing the survey instrument to record its orientation.
Naturally Deviated Wells: Those which build angle due to the presence of dipped formation bedding
planes. The approximate hole angle versus depth that is expected from the formation dip can be used
to determine the expected distance that the well bore will terminate laterally from the wellbore at
surface. This distance is known as the horizontal displacement. If the direction of natural deviation is
known, the surface location for the rig can then be selected in the opposite direction at a distance
roughly equivalent to the anticipated horizontal displacement. Normal drift direction is updip to
bedding planes.
Subsurface targets: The target is specified by the geologist, who will define a certain point as the
target and also specify the acceptable tolerance having the target as its centre. Subsurface targets
may be circular, rectangular or virtually any other shape.
Target Location: A predetermined position at a specified distance and direction from the surface
location.
Telltale: A lead plug held in the upper end of the mule shoe slot. When the mule shoe seats over the
key, the telltale is mashed by the key.
Tool Face: The direction the drillstem will face is the tool face direction. The orientation of the high
side of the motor. Always measured in degrees to the left or to the right of high side of the bent
housing on the motor.
Tool Face Orientation: The rotational position of a downhole motor relative to the high side.
Vertical Section: The distance on the horizontal plane from one station to the next station.
304.Kicking off
Getting "kicked off" from vertical can be achieved in a number of ways but is most efficiently done with the
use of a mud motor and a bent sub or motor with a bent housing. Adjustable bent housings are most
efficient because they can be readily changed from 0 to 2 in 1/4 increments.
Choices of positive displacement type mud motors will vary from low speed/high torque types to high
speed/low torque types. The exact type of motor used should be chosen while programming, considering
the type of formation to be drilled and motor performance history in the area. Turbines have very limited
application as they are very high speed and must be used with diamond bits.
At the beginning of the kick-off the motor/bent sub combination can be used to build the desired inclination
and azimuth. Very often, left hand lead must be built into the starting azimuth to compensate for right hand
bit walk expected later while rotary drilling. The desired starting azimuth should be achieved as soon after
kick off as possible. Simultaneous change of azimuth and inclination should be minimised. This can lead
to severe doglegs.
305.Angle building
It is very often most efficient to continue drilling after kick-off with the motor/bent sub combination until the
bit must be pulled. This point may be in the build section, the hold section, or possibly TD in the case of
very shallow wells. Economics may, however, dictate that a conventional rotary assembly be used to
complete the angle building portion of the hole. In either case angle building should not be planned in
excess of 3/30 meters. Doglegs should not exceed 5/30 meters in shallow wells (less than 1500 m) or
as specified in the programme on deeper wells.
306.Angle holding
Angle holding is usually more difficult than changing angle. Most assemblies will have a tendency to either
build or drop angle. The purpose of holding angle is to minimise the curvature effects and spread them
over as long an interval as possible.
If a desirable trajectory has been achieved, change drilling parameters as little as possible. Weight
changes are most significant in the directional tendency of a particular bottom hole assembly. If weight
changes must be made, make them slowly. Abrupt weight changes can cause severe doglegs. The
following applies for the range of directionally drilled wells; not all apply to a given well.
Problem Solution
Bits should not be run to a very dull condition as this may increase dogleg tendencies. Bits chosen for
angle holding should not have a high degree of offset. Bits with high offset may increase bit walk or
deviation tendencies. PDC bits are recommended. It is very important when trying to hold angle or
controlling deviation, not to overreact. Apply only minimum changes necessary to correct a problem, but
react in time and check the actual performance on the plot immediately.
307.Angle dropping
Angle dropping can also be achieved by means of conventional rotary assemblies using stabiliser
placement. This is generally achieved by the pendulum effect of the drill collars below one or more
stabilisers. Dropping angle is usually more easily achieved when drilling at high inclination angles than
when the inclination is low. Attempts should not be made to drop angle at rates faster than 1-1/2/30
metres. The slowest change possible to achieve the objective is usually the best.
Increase in distance from near-bit stabiliser to the first string stabiliser - is the main
design feature of a fulcrum assembly affecting the build rate. The build rate increases as
this distance is increased because a longer fulcrum section will bend more which will
increase the fulcrum effect and the side force on high side. There is a limit, however.
Once the upper stabiliser is more than 40 metres from the near-bit stabiliser (depending
on hole size, collar OD, etc.), the collars are contacting the low side of the hole and any
further increase in this distance will have no additional effect on the build rate.
Increase in hole inclination - the build rate of a fulcrum assembly increases as the
inclination increases because there is a larger component of the collars own weight,
causing them to bend.
Reduction of drill collar diameter - A small reduction in the OD of the drill collars used in
the fulcrum section considerably increases their limberness, and hence the build rate.
There is a tendency to bend the drill string near the bottom of the hole due to the weight
on the bit. In harder formations, this can cause deviation problems or unwanted
directional tendencies. The stiffer the collars, the more deviation control. The stiffness is
a non-linear function of diameter, e.g., a 7 drill collar is approximately twice as stiff as a
6 drill collar.
Increase in weight on bit - Increasing the weight on bit will bend the drill collars behind the
near-bit stabiliser more, so the build rate will increase.
Reduction in rotary speed - A higher rotary speed will tend to straighten the drill collars
and reduce the build rate. Low rotary speeds (70-100RPM) are generally used with
fulcrum assemblies.
Reduction in flow rate ( in soft formations) - In soft formations, a high flow rate can lead
to washing out the formation ahead of the bit which reduces the build tendency.
Formation Dip - The effective dip angle is the angle at which the bit strikes the bedding
planes. At formation dips less than 45 degrees, the bit will tend to build angle to become
perpendicular to the bedding planes of the formation. At dips greater than 45 degrees,
the bit will tend to slide along the strike or drop down the dip. The effect of formation dip
is normally not serious, except in areas where the beds are hard, lay at significant
angles, and are of different composition from layer to layer.
Bit Types - The longer the tooth or inset on a bit, the more responsive it is to a formation.
Dulled bits can reduce drilling assembly response. Bits with the least offset or skew
should be used on wells experiencing deviation control problems. Bits with enhanced
gauge protection are normally recommended for directional/horizontal drilling work.
Conventional three-cone rock bits cause right-hand walk in normal rotary drilling. Long
tooth bits drilling soft to medium hardness formation give a greater right walk tendency
than short tooth bits drilling a hard formation. The gouging/scraping action of soft
formation bits creates a tendency to change direction to the right; also, long-toothed soft
formation bits have a greater cone offset which increases the effect. When rotary drilling
with PDC bits, it has been found that almost no "walk" occurs. The gauge length of a
PDC bit may significantly affect the build rate in a rotary assembly. A PDC with a short
gauge length may result in a build rate greater than that which would be expected with a
tri-cone bit. A longer gauge stabilises the bit, tending to reduce the build rate. The low
WOB used with PDC bits may also reduce the build rate, as collar flexure decreases with
decreasing WOB. When used with packed assemblies in tangent section drilling, longer
gauged PDC bits seem to aid in maintaining inclination and direction due to the
increased stabilisation at the bit. When used with angle drop assemblies, PDC bits may
reduce the drop rate previously obtained with a tri-cone bit. The longer the gauge length
of the PDC bit, the lower the drop rate obtained because the bit gauge acts similar to a
full gauge near-bit stabiliser. Short gauge length PDCs can be used effectively for
dropping angle. When such a suitable PDC bit is used in a rotary pendulum assembly,
the low WOB and high RPM, typical PDC bit applications, should assist in dropping
angle.
Formation Hardness - In soft to medium soft formations, the rock has little influence on
directional response. In medium to hard sedimentary rocks which have dissimilar
properties in all directions, directional tendencies can be significantly affected by the
formation. In very soft formations, the formation may be eroded by the drilling mud
exiting from the bit nozzles creating an overgauge hole. This can make it hard to build
angle, even with a strong build assembly. If this problem is anticipated, then fairly large
nozzles should be used. If it occurs while drilling, then the pump rate should be reduced,
and prior to making each connection, increase the flow rate to clean the hole with the bit
one joint off bottom. Hole washing or enlargement in soft formations may also cause
packed assemblies to give a dropping tendency at high inclinations. This may be
counteracted by increasing WOB and reducing flow rate. If anticipated beforehand, a
possible solution would be to run a mild build assembly. The main directional problem
encountered in hard formations is getting a pendulum assembly to drop angle. The
harder the formation, the longer it takes a dropping assembly to respond. There may
also be a conflict between the need to reduce WOB to get the dropping trend
established, and the need for high WOB to maintain an acceptable penetration rate.
When a drop section must be drilled in hard formation, the use of large diameter, heavy
collars is recommended.
When orientating a deflection tool, it is necessary to estimate the expected dogleg value for the
section about to be drilled. The expected DLS will depend on the angle of the bent component within
the motor. Other factors such as motor size, formations drilled, and length and hole size greatly effect
DLS.
The worst complication of a dogleg is the creation of a key seat. This is a continuous hazard that has
to be avoided or eliminated whenever it occurs.
Stabilised assemblies can be used to directionally drill wells. The trajectory is controlled by a side
force imposed at the bit. This side force is accomplished with combinations of drill collars and
stabilisers, varying the points of tangency (where the assembly touches the wellbore) along the
assembly.
Placement of some MWD systems between the near bit stabiliser and the first string
stabiliser could result in the increased possibility of MWD failure. This is because some
collar mounted MWD systems have a lower equivalent bending stiffness than drill collars
with the ID, and as a result may be the most flexible part of the BHA. Proper placement
of such MWD systems above the first string stabiliser can reduce the frequency of
stress-related failure.
This principle is that if there are three stabilisers in quick succession behind the bit,
separated by short, stiff drill collar sections, then the three stabilisers will resist going
round a curve and force the bit to drill a reasonably straight path. The first of the three
stabilisers should be immediately behind the bit (a near-bit stabiliser), and should be full
gauge.
Stiff or packed hole assemblies are used to drill the tangent sections of directional wells,
maintaining angle and direction. The sizes of the top stabilisers are not necessarily full
gauge, but in some cases must be undergauged to counteract the pendulum effect which
is intended to drop the angle.
313.Pendulum Effect
The pendulum effect provides controlled drop-off of the vertical angle. The portion of the
assembly from the bit to the first string stabiliser "hangs like a pendulum" and because of
its own weight, presses the bit to the low side of the hole. The major design feature of a
pendulum assembly is that here there is either no near-bit stabiliser or an undergauge
near-bit stabiliser. The length of collars from the bit to the first string stabiliser must not
be allowed to bend too much towards the low side of the hole. See Figure 9.2.
The length of a non-magnetic drill collar required to avoid interference from the drilling string
is a function of both the direction and inclination of the hole. More non-magnetic material
may be required for wells which have more inclination or bearings which deviate much from
North or South. Stabilisers placed between non-magnetic drill collars must be made of non-
magnetic material. The direction drilling program should specify the amount and placement
of non-magnetic material in the bottom hole assembly.
A single Monel drill collar may be used when directionally monitoring a vertical well.
Use only integral blade stabilisers. Long blades provide better stiffness in packed hole assemblies.
Avoid cross-over subs whenever possible. Any connection makes an assembly more limber and adds
a potential failure area.
Reamers should not replace stabilisers except in very hard formations, or when stabiliser torque
becomes excessive.
Hole angles much less than 10 degrees are undesirable as angle holding assemblies are relatively
unpredictable at this angle. Hole angles much greater than 30 degrees are undesirable due to the
increased risk of hole problems. Maximum build is generally 2.5/30 metres.
Deviation control can be costly due to slow penetration rates and extra trip time. The
following methods may be used to control deviation:
Controlled Weight on Bit. By reducing the WOB, the bending characteristics of the drillstring
are changed and the hole will tend to drill straighter. The downside of using this method
is that penetration rates are usually significantly reduced. The amount of WOB reduction
required will vary for any given area.
Pendulum Assembly. Another method to reduce deviation is to use a single stabiliser, placed
9 - 18m from the bit. This will impact a negative side force at the bit, and the hole will
tend to drop angle.
Stiff Assembly. The simplest stiff assembly is to increase the size of the drill collars being
used, which is especially applicable for the surface hole. Stabilised packed hole
assemblies are a solution for deviation problems in the main hole. Although this
assembly may prevent the angle from continuing to build, it will have a tendency to
maintain the angle already in the well.
If uphole deviation has been a problem and a considerable amount of hole is being drilled
below the problem area, consideration should be given to running a key seat wiper in the
drill string to reduce the chance of developing and getting stuck in a key seated area.
328.Kicking off
The typical directional well is first drilled vertically, then "kicked off" with a deflection device
(i.e., a bent housing and mud motor) to initiate a build inhole inclination. Once sufficient
angle is attained, the desired well path is drilled using the following types of rotary
assemblies:
329.Fulcrum.
330.Packed hole.
331.Pendulum.
Getting "kicked off" from vertical can be achieved in a number of ways, but is most efficiently
done using a mud motor with a bent housing. Adjustable bent housing can be readily
changed from 0 to 2 degrees in 1/4 degree increments.
Choices of positive displacement type mud motors will vary from low speed/high torque
types to high speed/low torque types. The exact type of motor used should be chosen while
programming, considering the type of formation to be drilled and motor performance history
in the area.
At the beginning of the kick-off the motor with bent housing can be used to build the desired
inclination and azimuth. Very often left hand lead must be built into the starting azimuth to
compensate for right hand bit walk expected later while rotary drilling. The desired starting
azimuth should be achieved as soon after kick-off as possible. Simultaneous change of
azimuth and inclination should be minimised. This can lead to severe doglegs.
The PDM consists of helicoid motor section, a dump valve, a connecting rod assembly
and a bearing and shaft assembly. The helicoid motor has a rubber-lined spiral cavity
with an elliptical cross-section which houses a sinusoidal steel rotor. As the mud is
pumped under pressure from above, it is force downwards between the rotor and stator.
In order for the drilling mud to progress through the motor section, it must force the rotor
to turn. The bottom of the rotor moves in an ellipse and this eccentric motion is converted
to true concentric drive shaft rotation by the connecting rod assembly.
334.By-pass valve
The by-pass valve allows fluid to fill the drill string while tripping in the hole and drain
while tripping out or making a connection. While mud is being pumped, the valve closes
to cause fluid to move through the tool. The valve consists of a sliding piston, or throat,
a coilspring, a sleeve seat and external ports. When there is no fluid circulation, the
spring holds the piston in the up position. This opens the external ports and allows fluid
entry and exit through the sides of the valve body. When fluid is pumped through the drill
string, the piston is forced down, which closes the external ports. This directs all fluid
into the motor. When pumping ceases, the spring returns the piston to the up position.
335.Motor section
The motor section consists of a rubber stator and coated steel rotor.
The stator tube forms the outer body of the motor assembly. When the motor is
assembled, there is a continuous seal along its length between the rubber stator and the
matching contact points on the spiral rotor shaft. As drilling fluid is pumped through the
cavities between the rotor and stator, the hydraulic pressure causes the shaft to rotate
within the stator. As mud is pumped through the motor, it fills the cavities between the
dissimilar shapes of the rotor and stator. The rotor is forced to give way by turning. It is
the rotation of the rotor shaft which is eventually transmitted to the bit.
336.Connecting rod assemblies
Since the rotor is spiral shaped it does not rotate concentrically, rather it traces a back
and forth motion. This motion must be converted back to concentric motion to be
transmitted to the bit via the drive sub. A flexible connecting rod, attached to the lower
end of the rotor, transmits the torque to the drive shaft assembly. The connecting rod
converts the eccentric rotary motion of the rotor to true concentric drive shaft rotation.
Flexibility in the connecting rod assembly is achieved with two opposing lobes which act
as universal joints.
337.Bearing section
A bearing-supported drive shaft transmits the motor's rotational and thrust power to the
drilling bit. The assembly has three main bearing sub-assemblies. The only externally
rotating portion of the motor is the bit sub, which is actually the lower part of the drive
shaft.
The output drive shaft is supported by radial roller bearings and three spherical roller
thrust bearings. The axial compressive force of the bit is evenly distributed over two of
the thrust bearings, while the third thrust bearing carries the axial extension forces.
The adjustable bent housing is located between the bearing and motor assemblies which
places the bend point close to the bit. This provides easier control of angle build and allows
the motor to be rotated in the hole to continue drilling the tangent section until a directional
correction is required. Rotation of the drillstring is then stopped, the tool face is oriented in
the required direction, and the correction is made using the motor only. Following the
correction, rotation of the drillstring is resumed and drilling continues.
For medium and short radius drilling, a second adjustable bent housing can be fitted
between the motor section and the by-pass sub. This housing also includes an orientation
sub which can be easily adjusted to align the bends of the upper and lower bent housings.
To adjust housing:
Back off lock nut and disengage dog clutch.
Rotate to match numbers of desired angle.
Re-engage dog clutch and torque lock nut.
340.Reaming
When it is necessary to ream the directional hole the reaming BHA must be stabilised properly, not
too stiff on the bottom, and the string reamers and stabilisers should be placed properly, in order to
ream the minimum possible. The biggest danger in reaming is to undercut the well and sidetrack it at
the low side of the hole.
High tension on the drillpipe, because of a heavy BHA, is the factor that should be checked when a
drillpipe failure occurs. The BHA should not normally contain more than 10 or 15% more weight than
the drilling weight required. Fatigue failures are bound to be present, especially when a heavy drilling
set-up is used for reaming. This is because reaming is done without weight on the bit and tension on
the drillpipe is at its maximum.
In a directional well, it is good practice to work the pipe whenever the drilling is stopped and
keep the hole filled. Due to the inclination of the hole, the danger of differential sticking is
higher than in a vertical well.
All settings are to high side or to the left or right of high side. They are called "high side tool
face" settings (see Figure 9.8).
Whatever the inclination of the well, the effect of setting tool face on high side, i.e., in hole
direction, is to build angle and keep direction constant; conversely, setting the tool face on
low side will always give the maximum possible drop rate while holding direction.
There are several methods available for remotely aiming the direction of the bent-housing
motor during directional drilling operations.
A key, located in the drilling assembly, is locked into exact alignment with the true face
direction of the deflection device. The lower end of the survey instrument assembly has a
complimentary keyway (shaped like a mule's shoe) that slides onto the key and aligns the
single-shot survey instrument with the tool face. A survey picture taken with this system
provides hole direction and inclination angle, as well as the tool face or orientation.
344.Horizontal Drilling
In highly deviated wells, when high WOB is required, then a long and expensive BHA is
required for the drillpipe to be in compression because only the along-hole component of
the weight of BHA elements contributes to the weight on bit. Drillpipe is run in compression
because researchers have shown that it can tolerate significant levels of compression in
small-diameter, high-angle holes because of the support provided by the low side of the
hole. When drilling horizontal wells drillpipe is commonly run in compression, apparently
without causing damage to the pipe.
348.Drift surveys
The inclination of a borehole is the angle between the borehole axis and the vertical axis.
Drift surveys provide only inclination information with no indication of wellbore direction. Drift
surveys are used frequently in the vertical section of the hole above the kick off point.
As the direction of deviation is not known, uncertainty is created which can be calculated by
assuming the deviation is an all-in-one direction, and then rotating this potential horizontal
displacement versus depth around the well bore axis to create the uncertainty limits in any
direction.
This tool is run on wireline and needs approximately one to two minutes of stopped rotation
and circulation to obtain a survey. It is Coparex company practice to take surveys every 30
m on surface hole, and every 100m on main hole.
349.Magnetic surveys
Magnetic surveys can only be run in open hole. This is due to the disruption of the magnetic
signal that would occur if the survey were run inside the casing. Magnetic surveys are
usually run in the drillstring and must be located adjacent to non-magnetic drill collars. These
types of collars are required to allow the survey instrument compass to locate magnetic
north.
The azimuth of a borehole at a point is the direction of the borehole on the horizontal plane,
measured as a clockwise angle (0 - 360 degrees).
Hole direction is measured with respect to magnetic north. The correction to true north must
be made for the specific area. The size of the correction depends on the location of the well,
and may be only a few degrees to 45 degrees or more in northerly areas.
The normal procedure for magnetic single shots taken is to drop the tool to "free fall"
through the mud to bottom prior to a bit trip. The tool is usually recovered with an
overshot after all the drillpipe has been tripped out. Single shot magnetic surveying is
slow, but is the least expensive system. However, MWD systems can be more economic
if very frequent surveys are required, such as during angle building or when penetration
rates are high.
All these angle units contain a magnetic compass card which aligns itself to magnetic North
and provides the direction reference. The low ranges have a plumb bob unit which hangs
above the compass card from a single suspension point. The plumb bob will always hang
vertically, regardless of the inclination angle to which the instrument is tilted. When the
instruments are vertical, the point of intersection of the cross hairs on the plumb bob is
directly above the centre of the compass card. If the angle unit is tilted over at an angle, the
intersection of the cross hairs will be vertically above some point displaced outwards from
the centre of the compass card. The compass card is calibrated with concentric rings which
represent increments in inclination. Since the plumb bob always hangs vertically, a straight
line through the centre of the compass card and the point of intersection of the cross hairs
will indicate hole direction on the compass scale. The only correction which has to be
applied to the single shot reading is the magnetic declination correction.
Figure 298.10 Angle unit
The electronic magnetic multi-shot (EMS) uses a sensor array of accelerometers and
magnetometers housed in an electronics probe. The data is recorded downhole on a
memory chip and then transferred to a computer disc for processing when the tool is
retrieved at surface.
Magnetic type tools initially give an azimuth (hole direction) reading referenced to magnetic
north. The final calculated co-ordinates are always referenced to either true north or grid
north.
True (geographic north) is the direction of the geographic north pole which lies on the axis of
rotation of the earth. This direction is shown on maps by the meridians of longitude.
Survey tools measure the direction of the wellbore on the horizontal plane with respect to the
north reference, whether it be true or grid north. There are two systems used:
Azimuth - In the azimuth system, directions are expressed as a clockwise angle form 0 to
359.99 degrees, with north being 0 degrees (see Figure 9.14).
Quadrant Bearings - In the quadrant system, the directions are expressed as angles from 0 -
90 degrees, measured from north in the northern quadrants and from south in the
southern quadrants (see Figure 9.15). Figure 9.16 illustrates how to convert between the
azimuth and quadrant bearing system.
Different MWD systems now available offer a growing selection of downhole sensor
packages able to monitor various downhole parameters. These parameters can be sorted
into three broad categories of information. Directional information comprises wellbore
inclination, azimuth and tool face orientation. Formation evaluation MWD initially included
only gamma ray and receptivity. More recently, neutron and density measurements are
possible. Engineering information can include true downhole weight and torque at the bit,
annular temperature and pressure.
Collar mounted systems can usually withstand greater stresses from shock and
vibration, and can be more easily configured for high flow environments.
361.Formation Evaluation (Logging While Drilling - LWD)
The object of resistivity measurements is to examine the properties of the formations
natural fluids and determine the content. Oil, water and salt water all have different
abilities to conduct electricity. Since drilling fluids tend to permeate out into the formation,
measuring the resistivity beyond the zone invaded by the drilling fluids is necessary.
Formation evaluation MWD has the advantage of measuring resistivity soon after the
formation is drilled, and prior to full invasion of the drilling fluids into the formation.
Trajectory path surveys are taken at stations. At each station, inclination and direction
angles are measured, as well as the course length between stations. Each direction angle
obtained by a magnetic type of survey must be corrected to true north, and each gyroscopic
must be corrected for drift prior to calculating. MWD readings are corrected for magnetic
declination by computer at surface.
The following are the three most popular methods of calculating directional survey
information:
Average Angle - Most popular calculation for hand held calculators.
Radius of Curvature
Minimum Curvature.
363.Magnetic declination correction
The amount of correction required can be found on the directional plan provided by the
directional company. See Figure 9.17 for adding or subtracting this correction from each and
every survey.
When magnetic north lies to the west of true north, this gives a WEST DECLINATION
CORRECTION. Since any magnetic survey is referenced to magnetic north, the observed
azimuth is greater than the true azimuth. Therefore, the declination correction is subtracted
from the observed azimuth.
If magnetic north lies to the east of true north, this gives an EAST DECLINATION
CORRECTION (see Figure 9.18). The observed azimuth is less than the true azimuth.
Therefore, the declination correction is added to the observed azimuth.
Figure 298.18 East magnetic declination correction
The number of Monels required depends on various factors: the horizontal component of the earths
magnetic field, the inclination and the azimuth of the well. For example, high angle wells require more
Monels in general, and more Monels are required when drilling east. Figure 9.20 is a guideline to the
length of non-magnetic collars required for the different directional scenarios. Care should be taken to
ensure that all crossovers, stabilisers, etc., placed within the non-magnetic collar string are also non-
magnetic.
199.Do not position the compasses within 3 metres of any tool joint.
200.Do not position the compasses within 1.5 metres of a non-magnetic stabiliser.
Figure 298.20 Magnetic interference and instrument spacing
372.Surveying inaccuracy
Both magnetic and gyroscopic survey instruments can be inaccurate. Magnetic compasses
are subject to magnetic interference by the surrounding drillstring, and are effected by the
earth position of the survey. The conventional gyroscope has a drift error because of the
earth spin, and the earth position of the survey. Along with the major measuring problems
there may be errors caused by magnetic storms (which can change the north reading),
declination variation, hot spots on the non-magnetic collars, or inaccurate readings.
All the inaccuracies can be shown to be systematic and can be related to five major
categories: compass reference, compass instrument, inclination, misalignment, and depth
errors.
374.General
The assemblies provided in the following sections are based upon North Sea experience.
The assemblies are a general guide only. BHA characteristics will change with varying
formation characteristics.
The use of 9 1/2" drill collars should be considered for larger hole sizes, when practical.
376.String weights
Drill collar string weights (in mud) should exceed the required weight on bit by at least 10
percent.
Drillpipe, jar and heavy weight drillpipe should be run in tension wherever possible.
In vertical holes where the hole diameter exceeds the heavy weight drillpipe tool joint
diameter by more than 4", the heavy weight pipe must always be run in tension.
377.Problem Holes
If the potential for stuck pipe exists, run the minimum number of drill collars possible.
If the potential for differential sticking exists, run a short, well stabilised BHA with
spiral drill collars.
Increase the number of heavy weight drill pipe to give the required weight on bit, if practical.
378.Deviated hole
If deviated hole is to be drilled, the deviation contractor will generally advise what BHA
structure is the most appropriate.
379.Key Seating
If key seats develop (or may develop), an under gauge stabiliser or key seat wiper should be run between
the top drill collar and the heavy weight drill pipe.
The difference between key seat wiper size and drill collar size should be substantial in larger hole sizes.
A full gauge stabiliser is generally run for an 8-1/2" hole and smaller.
380.Float subs
A float sub should be considered when drilling a 24/26 diameter hole. It should be positioned above the
near bit stabiliser. This will avoid the possibility of bit plugging and to allow surveys to be taken without
backflow.
After making up the BHA, fill up the string and break circulation to check that the float is operating
satisfactorily.
Run in the hole slowly to avoid pressure surges and fill the string at least every 5 stands to reduce the
pressure differential across the float.
The float must not be held in the open position when tripping.
CAUTION:
If the well kicks with a float sub in the string, the shut-in drillpipe pressure may be wrong.
Several methods can be utilised to open the float so that the shut-in drill pipe pressure (SIDPP) can be
determined. The two most widely applied methods are described in 9.5.8 and 9.5.9.
381.Static method
Pump slowly down the drillpipe with the annulus shut-in. Closely monitor the shut-in casing
pressure (SICP).
When the casing pressure begins to rise shut off the pumps and record the drillpipe
pressure. This will be equivalent to the SIDPP.
382.Dynamic method
Pump down the drillpipe slowly bringing pump rate up to kill speed while holding casing
pressure constant (subtract choke line friction loss if known). When kill speed has been
reached, read the DP circulating pressure.
Subtract slow circulation rate pressure from DP circulating pressure. This will be equivalent
to the SIDPP.
383.Circulating Subs
They are generally used when drilling smaller diameter holes (8-1/2" or less) but may be advantageous, in
some cases, in larger hole sizes. It is activated by dropping a ball down the string and pressuring up. If
one is to be run, ensure that the ball will pass through all string components.
385.Drilling Jars
Although drilling jars are included in the recommended drilling assemblies, consideration should be given
to omitting them from the BHA in 24" and 16" hole sizes, if hole problems are not anticipated:
386.Offshore rigs are to have at least one jar on board from spud.
387.When harsh drilling conditions are expected (e.g., long chalk intervals) the larger and
more robust drilling jars should be considered, such as the 8.5" heavy duty jars, rather
than the normal 8" size.
388.When drilling through formations which generate sever string vibrations (e.g., chalk) 8-
1/2 " heavy duty jars should be used.
389.Where practical, the use of 9-1/2" jars should be considered for larger hole sizes.
390.Rotating and jarring hours are to be recorded and the details provided to the service
company.
391.The service company should be consulted for advice on jar (and accelerator)
placement.
392.If jars are used in KMg mud they have to be ordered with a special coating on the
mandels.
393.Drillpipe strainers
Drillpipe strainers are not to be used.
394.Straight hole BHA's
Pendulum Assemblies (Rotary)
395.Care should be exercised when using PDC bits on pendulum BHA's. The low weight on
bit values may not be sufficient to overcome formation walk tendencies and the longer
gauge of the bit may act as a near bit stabiliser. Packed hole assemblies should be
considered.
BIT BIT
3 x DC 2-3 x DC
STAB STAB
2 x DC 1-2 x DC
STAB STAB
DCs DCs
Jar Jar
1 x DC 1 x DC
HWDP HWDP
BIT BIT
2 x DC 1 x DC
STAB STAB
1 x DC SDC
STAB STAB
DCs DCs
Jar Jar
1 x DC 1 x DC
HWDP HWDP
Bit
NBSTAB
SDC
STAB
1 x DC
STAB
1 x DC
STAB
DC's
Jar
1 x DC
HWDP
397.Kick-off and deviation assemblies
Kick-off and Side Track (with bent-sub)
5-7/8" Hole
Bit
4 3/4 MM
BS (1 deg)
2 x NMDC
DCs
Jar
1 x DC
HWDP
NOTE: These assemblies can be used for correcting hole direction. The choice of
bent sub angle will be effected by various factors. Choice can be influenced
by formation type, length of side track window, top of hole obstructions, size
of hole and the need to move quickly away from the old course. Past failures
have shown that it may be better to select a higher angle bent sub and aim to
achieve a short, positive kick-off. This should then be followed by a reaming
trip then a DTU or drilling assembly.
5-7/8" Hole
Bit
4-3/4 DTU
UGSTAB (5-1/2, 5-3/4)
2 x NMDC
UGSTAB (5-1/4, 5-1/2)
DCs
Jar
1 x DC
HWDP
399.Recommended stabiliser sizes are shown. The first mentioned size is for tangent or
build-up sections, the seconds mentioned will change the BHA's into angle dropping
assemblies.
400.The AKO (adjustable kick-off) sub can be considered as a replacement for the above
mentioned systems. The AKO is a motor with a variable angle sub attached to the
bottom. At low angles (angle dependent on AKO size), the drillstring can be rotated and
the BHA used as a steerable system.
401.Include the angle of the DTU housing on the BHA Sheet.
Bit
NBSTAB
2 x DC
STAB
2 x DC
Jar
1 x DC
HWDP
406.For the larger hole size (16" and 24") and in problematic holes (sloughing shales,
ledges), the following check trip assembly should be considered:
Bit
NBSTAB
DC
STAB
2 x DC
STAB
2 x DC
JAR
1 x DC
HWDP
407.The following check trip assembly should be considered for holes with numerous
doglegs or course corrections, (particularly in softer formations). A check trip, using the
standard check trip assembly, should be made first, to avoid beginning a new hole. This
assembly is also recommended for hole sections in which "tighter" casing schemes will
be run:
Bit
NBSTAB
SDC (3-5m)
STAB
2XDC
STAB
2XDC
JAR
1XDC
HWDP
408.As particular circumstances dictate, the use of undergauge stabilisers may be
considered.
If it is necessary to follow a DTU/mud motor, run in 12-1/4" hole or smaller with a stiff BHA or casing. A
wiper trip should first be made with the BHA described in 9.6.20 (standard check trip assembly).
410.Surface Deviated Holes
With kick-off points as shallow as +/- 150m, inclination of up to 50 deg and dogleg
severitys of up to 2 de/10m in the build-up section, a check trip may be necessary prior
to running casing. The BHA described in 9.6.20 (standard check trip assembly) should
be used.
411.Intermediate Deviated Section
If the deviated section is to be drilled (with DTU) and then followed by a tangent section
using a rotary, a check trip should be made using the BHA described in 9.6.20 (standard
check trip assembly prior to RIH with the tangent assembly. This is to smoothen the well
bore prior to the stiff BHA run.
As long reaming runs are often required when running through shale or soft clay
sections, the inclusion of an MWD collar in the BHA should be considered to avoid
inadvertently sidetracking the hole.
If an MWD collar is not included in the BHA, use low WOB, RPM and pump rates.
412.Accelerator position
413.During Drilling
An accelerator is recommended when difficult drilling conditions are foreseen, and it is
felt that the jar will not sufficiently impact by themselves. Generally, optimum placement
is 3 drill collars above the jar (Hydra Jar/ Magnum Accelerator combination), but the
service company should be consulted for advice.
An alternative to this assembly is to place the accelerator 1 drill collar, plus heavy weight
drill pipe (sufficient to be equivalent in weight to 2 drill collars) above the jar.
The recommended accelerator is the dual acting type for difficult conditions. It is
available in 8.5" and 9.5" sizes.
414.During Fishing
Dependent on the length and nature of the fish. Fishing contractor should be consulted
for advice on optimum placement of the accelerator.
415.Sidetracking
Sidetracking is also known as "whipstocking" or "kicking off", and can be defined as the
operation of purposely drilling a new hole beginning at some predetermined point in an
existing wellbore which by-passes the original hole. It is normally done after a wellbore has
been plugged back. Sidetracking can be done in open hole or out of casing. Sidetracking out
of casing involves either:
Milling a section out of the casing and then kicking off a cement plug, or
Setting a permanent whipstock in the casing and then milling a "window" out of the casing.
Sidetracking in open hole basically involves abandoning a length of hole and setting a
cement whipstock plug across the area in which the old wellbore is to be departed from. A
kick-off assembly is then used to deviate from the plug and the old wellbore in much the
same way as kicking off any directionally drilled well.
Change in target - A change in target area of a well can occur while drilling a well or after the
well has reached total depth. A possible occurrence is that after the planned total depth
has been achieved, geological evaluation indicates that the prospective formation has
either been missed or has not been penetrated at an acceptable structural location. In
this case, it is often economical to plug back and kick-off the well rather than re-drill it.
Fish in the Hole - Perhaps the most common cause of having to plug back and sidetrack a
well is the loss of down-hole equipment in the hole which cannot be recovered or for
which economics dictate that it is more economical to plug back and sidetrack than
attempting to recover the fish.
Hole Conditions - Hole conditions may sometimes be solved by a plug back and sidetracking
operation. Where a bad dogleg or key seat has occurred, it may not be possible to drill
ahead without risking getting stuck or twisting off, and a plug back and sidetrack may be
required. Sometimes where lost circulation or high pressure has been encountered, the
well may be plugged back, additional casing run, and the well sidetracked to avoid
possible problems in the old hole.
417.Sidetracking procedures in open hole
The following outline is a guideline in preparing and undertaking a sidetracking operation.
Abandon any lower zones as may be necessary in the usual fashion. After the hole and mud
are conditioned, trip out of the hole with drillpipe.
Select a section of the hole, if possible, for sidetracking that is in gauge or near gauge and
which does not contain any doglegs or key seats.
Trip in the hole open-ended to the point of the bottom of the plug. It is usually desirable to
run a stinger on the bottom of the drillpipe, i.e, an 31/2 stinger on 5 drillpipe. Enough
stinger should be run such that the top of the stinger is above the calculated top of the
cement after the cement has been displaced.
A minimum of 60 metres cement plug should be set. A typical plug consists of the following:
201.water wash - usually 3m3
202.a lead slurry of neat cement
Pull out of cement a minimum of 150 metres above cement and circulate out any excess
cement. Continue circulating and WOC.
WOC depends on the recipe of the cement. Remember that the hydrostatic head gets lost
over the hardening cement section.
Trip in the hole with bit, drill collars, and drillpipe and clean out excess cement. The
penetration rate must be carefully monitored when drilling the cement above the
sidetrack point. If the cement has not reached adequate strength, it may be necessary
to stop drilling and WOC. Trip in the hole slowly to avoid excessive hydraulic surges.
As a guideline, the cement is near enough if the penetration rate is about two minutes per 30
centimetres, with 5 tons of weight on bit (WOB) and 50 revolutions per minute (rpm)
table speed. The directional driller should monitor the drilling rate.
After the plug has been polished off, trip out of the hole with the drilling assembly and trip in
the hole with the sidetrack assembly. Usually the sidetrack assembly consists of mud
motor with bent housing.
418.Precautions
The crews should be cautioned to slow down while going into the hole or coming out of
the hole through the kick off point. If trouble is encountered in getting into the
sidetrack hole on a normal trip, do not permit the crew to drill or rotate in an attempt
to get into the sidetrack hole. If this occurs, picking up and turning the drillstring a
quarter of a turn at a time should enable you to get back into the sidetracked hole
with very little difficulty. A crippled bit has often proved successful in locating the
sidetracked hole.
If difficulty is encountered on trips while pulling out through the kick-off point, it may
desirable to run a string reamer through this section periodically. While working the
reamer through the kick-off point, ensure the bit is in the sidetrack hole.
Caution should be observed while surveying or making connections, and the pipe
should be kept moving as much as possible, because a deviated hole is more
conducive to wall sticking than a straight hole.
If a key seat wiper is run on top of the drill collars, the cutters should be a maximum of
1
/4 to a minimum of 1/8 larger than the top drill collar. For a tapered string, a
stabiliser can be run at the drill collar size and change position as well.
It is usually better and easier to get away from the old hole, by making the turn
between 90 and 120 degrees from the direction of the old hole.
Running procedure for wireline set whipstock packer and milling operations.
Prior to any wireline operations it is highly recommended that a casing scraper is run
with several passes across packer setting depth.
Run gauge ring ensuring gauge ring is maximum OD of packer and junk basket.
Make up adapter kit and packer on setting tool. Check oil level in setting tool reservoir.
Run in hole with CCL and packer (set on wireline).
Correlate casing collars with production logs.
Set packer approximately 1m above the collar.
RIH with mule shoe and gyro survey tool .
Make up orientation stinger to packer type whipstock and orientate using compass
card. Compass card numerals are viewed looking up hole from the end of the stinger.
Attach starting mill to whipstock weight shear bolt. Use double lock nut or method to
ensure the nut cannot back off.
RIH with whipstock assembly slowly. Do not rotate string while running in the hole.
One to two metres above the packer work the string and check drag.
Lower stinger into the packer. Alignment of anchor and packer alignment lug will occur
automatically.
Lower drill string and set down 2.5T to latch anchor assembly.
To ensure anchor is latched pull 3.0T dan above string weight and drag.
Shear the bolt on the starting mill with 6-8T overpull.
Contents
Tables
422.Introduction
Cement is used in offshore operations to:
423.Cement casing, providing a seal between casing and formation and giving support.
424.Set cement plugs to enable plug backs and abandonments and/or side tracks.
425.Cure severe mud losses and other hole problems.
Depending on hole temperatures, required strength, etc., a variety of cement compositions are
available. Cement is supplied in bulk for offshore operations.
Highly specialised contractors perform the actual cementing job. Offshore rigs are equipped with a
permanently installed cement unit, normally owned by the appointed cementing contractor.
Job designed cement slurries are advised by cementing contractors who has laboratory facilities
available.
Specialised cementing contractors also supply cement chemicals, additives to the slurries.
426.Cement Types
The various types of cements used in drilling operations are discussed briefly in the following sections.
These cements form the basis of the cement slurries used for cementing casings, liners, abandonment
plugs and kick-off plugs.
The final recipe for each cementing operation will be supplied to the rig prior to each cementation. The
recipe will be based upon tests performed in the cementing contractors laboratory.
The final recipe will provide the concentrations of chemical additives required to give the cement slurry the
desired rheological, thickening time and fluid loss properties. Due to the great variety of types and
concentrations of additives required for different cement recipes, it is not possible to provide standard
slurry recipes.
427.Pozmix 8000
428.A blend of ordinary portland cement and small quantities of bentonite and fly ash, which
act as a slurry extender and weight reducer, respectively.
429.Used for top hole cementations to a maximum depth of 2 300 m and a maximum bottom
hole static temperature (BHST) of 85C.
430.Properties:
203.slurry yield: 108litres/100kg
204.specific gravity: 1.58sg 24hr
205.compressive strength: 50bar at 38C
441.Class "G" cement dry blended with 35% silica flour by weight of cement. The silica flour
is added to prevent strength retrogression at higher temperatures.
442.Used for cementing casing, liners and abandonment and kick off plugs. Used in wells
with BHST's greater than 110C.
443.Properties
213.slurry yield: 80.5litres/100kg of blend
214.specific gravity: 1.90sg 24hr
215.compressive strength: 240bar at 35C.
444.Class "G" cement plus 35% silica flour and 10% diatomaceous earth
445.Class "G" cement dry blended with 35% silica flour and 10% diatomaceous earth are
added to increase resistance to strength retrogression and associated permeability for
wells drilled in steam flood areas.
446.Used for cementing casing liners and abandonment and kick-off plugs. Used in wells,
with BHST's between 120C and 150C.
447.Properties
216.slurry yield: 98.3litres/100kg of blend
217.specific gravity: 1.68sg 24hr
218.compressive strength: 60bar at 45C
449.These slurries should be used if there are any potentially problematic gas zones. They
contain small silica spheres (3 microns) which block the pore spaces in the setting
cement, preventing gas migration.
450.The use of a minimum length cement column is recommended. Apply back pressure
during the curing process, where possible. The pressure must be continuously
monitored, as an increase will probably occur as the cement cures.
451.The cement properties should be adjusted for each job, as required by the actual hole
conditions.
455.Casing Running
Running list:
The running list should be made after the casing has been entirely checked and the exact
setting depth is known. The running list should be ready several hours prior to running. To
prepare it consider:
468.Cementing depth and length of the pocket.
469.Position of the float collar, MSC collar, (when used).
470.Position of the different weights, grades and threads of the casing (if applicable).
471.Position of the bottom flange on conductor string.
472.Position of mud-line suspension (MLS).
473.Use of hangers.
474.Position of casing collars/running string with relation to the BOP stack.
475.Landing joints, crossover nipples, pup joints, overstand, marker joints.
476.Position of centralisers in hole.
477.Required makeup torque for casing to be run.
478.List of unused casing and accessories that should remain on deck.
479.Depths at which casing shoe enters open hole or areas with poor hole conditions
(washouts, tight spots, loss zones etc.).
480.Running casing
While running casing ensure that:
481.Correct makeup torque is applied.
482.Once the float collar is made up it does not allow backflow.
483.After the float equipment is made up to the string, check that circulation is possible.
484.Displaced mud is diverted to the trip tank.
485.The fill-up hose is to be used between connections, stop and completely fill the string
every 5-10 joints.
486.Install short joints as required for correlation purposes.
487.Specified running speeds are not exceeded.
488.Installation of centralisers, MSC collars, short joints, etc., is performed as per
specifications and programme.
489.Positive centralisers above MSC to ensure standoff in critical applications.
490.Losses are minimised by reducing running speed, breaking circulation etc. (check
cumulative returns).
491.Spiders are used for running casing in open hole.
492.No joints are removed from the rig site prior to the end of the job.
493.The circulations head is installed on the last joint prior to lowering. If resistance occurs
circulate down.
504.Check condition of all four 'o' rings on stab-in tool. Have spare set on site.
505.Make up stab-in tool drillpipe prior to running casing. With shoe track in slips, P/U stab-
in tool and stab-in and confirm circulation.
506.Install a bow centraliser in the middle of the first drillpipe joint above the stab-in tool.
507.If tool does not stab-in, slowly rotate string with chain tongs.
508.After stab-in, check drillpipe-casing annulus for possible leakage of stab-in seals. If so,
pull out the drillpipe and check the condition of the 'o' rings, and replace/repair if
necessary.
509.Casing Cement
510.General
511.Ensure that correct type and quantity of cement and additives are on site, include dead
tank volumes in calculations.
512.Have compatible defoamer on site.
513.Ensure cement and water samples from the rig have been tested and approved.
514.Check that cement slurry thickening time was measured at bottom hole static
temperature less bottomhole circulating temperature. Check and report temperature
recorded during wireline logging.
515.Care should be taken if only MWD temperature figures are available. MWD
temperatures can be considerable higher than static due to pumping and drilling friction.
516.Thickening time to 40 BC should be +/- 1 hour greater than estimated mixing +
displacement time. Thickening times given by the laboratory are only valid for an
uninterrupted movement/pumping of the slurry. Any stoppages after mixing has started
will reduce final thickening times. Laboratory tests have shown that thickening time can
be reduced from over 6 hours to 2.5 hours when movement was stopped after 1.75
hours of simulated slurry pumping.
517.Pressurised balance as well as contractor densiometer have been calibrated.
518.Abnormally high or low air temperatures will effect job execution.
519.Ensure mud pits and lines for mix water and spaces have been cleaned (dedicated mix
water tanks should be used if possible).
520.Enough storage is available on surface for displaced fluids.
521.Ensure enough fluid is held on surface if losses are anticipated.
522.Check the cementers hook-up. Pressure test and flush the lines.
523.Check rig pump efficiency (check fluid-ends of pumps).
524.Where possible, the cementing head will be a quick latch type that can be loaded with
two plugs (i.e., no part of the head has to be broken out to install a second plug).
525.Ensure that the correct plugs are installed in the cementing head in the correct order.
526.Ensure that cementing head has a 'plug away' indicator.
527.Hole is circulated clean. Record pressures at 1/3 and 2/3 of maximum planned circulating
rate.
528.While circulating, the annular velocity is to be limited such that the ECD at the previous
casing shoe is no more than the leak-off pressure.
529.Do not attempt to cement until the well is completely static.
530.Be sure the hydrostatic head reduction caused by the spacer will not allow the well to
flow.
531.Check displacement volume, pump strokes and pumping times:
223.at which the displacement rate should be reduced prior to bumping the plug
224.for cement to reach shoe
225.for equalisation point
226.displacement volume
227.expected pressure differential prior to bumping plug.
532.Use rig pumps for displacement during casing cementations, and cement pumps for
displacement of liners and stinger cementations.
533.Rig up lines so that job can be completed without breaking/making up lines.
534.Never bump plugs with the casing suspended in the slips.
535.Record all mixing, bumping, displacing, opening/closing MSC collars, etc., on charts.
Install a high-quality pressure gauge on cement head.
536.Hold pre-cementing meeting.
537.Does the spacer require pre-hydration time.
538.Prepare mix water 2-4 hours before job.
539.Ensure side outlet valves on CHS/CMS are fully open and that returns are routed back
to the flowline.
540.Take slurry samples during mixing and pumping.
547.Should be the same type of water as that used in the cement mix water.
548.Ensure enough spacer is used to stop rapid setting of cement with salt muds (i.e., KMg).
549.When cementing across salt section use a NaCl saturated brine spacer instead of a
fresh water spacer.
550.A minimum of 4 minutes of spacer/well bore contact is advised (10 minutes contact time
should be programmed).
551.The reduction in hydrostatic head due to the spacers must be checked. If the reduction
in hydrostatic head is too great then a weighted spacer must be used.
552.A minimum displacement rate of 1.3m/second = 78m/minute is recommended. If for
operational reasons this cannot be achieved, spacer volumes should be as large as
possible.
553.Since turbulent flow cannot be achieved in 26/24" and 17 /16" holes a viscous
spacer should be used to ensure good mud displacement. If the hole is washed out
consider using more spacer volume to attain a height of around 150m.
554.Scavenger slurries with an annular height of 150m are to be pumped in front of the main
slurry. The weight of the scavenger is to be half-way between the mud S.D. and the main
slurry S.D. The maximum scavenger density with class 'G' cement is 1.6sg. Scavenger
slurry volumes are not to be taken into account when making Top Of Cement
(TOC)/volume calculations.
555.The use of scavenger slurries with K/Mg muds is not recommended. A weighted spacer
should be used.
556.Weight of spacers
If S.D. mud < 1.35 unweighted spacers can be used.
If S.D. mud > 1.35 then in addition to the water spacer, a viscous, weighted spacer (XC
polymer/barites or similar service company spacer) must be pumped between the mud
and water spacer(s). The S.D. of this viscous spacer should be greater than the S.D. of
the mud being displaced.
557.Always calculate loss of hydrostatic head. In the case of unacceptable loss of
hydrostatic head use weighted spacers.
558.Surface/stab-in cementation
559.A latch down drillpipe wiper plug is to be used to displace the cement slurry.
560.After stab-in, circulate bottoms up. Check S.D., viscosity, and yield point of the mud.
561.See 11.4.2 for recommended excess cement volumes.
562.Pressure test cement lines.
563.Pump spacer.
564.For surface casing cementation.
It is advisable that 2 x 1.66" tubings are run and circulated clean before the cement job
proceeds. This can be accomplished while circulating the casing, however, sufficient
time has to be allowed for this procedure (possibly more than 2 hours). Run the tubing to
10m below sea bed or +/- 5m below MLS.
These tubing strings can be used to flush the casing-conductor annulus, or perform a top
fill job if necessary.
Pumping should continue until cement returns are seen at surface, total losses occur, or
until surface cement reserves in silos are reduced to 10 tons (for top fill cementation). If
possible, as soon as the spacer is seen in the returns, the density of the slurry can be
increased to tail-in. This is to be within the guidelines as specified in the cementing
programme. At least 100% excess should be available on site. This is to be discussed
prior to job commencement.
Drop pumpdown plug, displace with spacers as specified in section 11.4.3 or in the
cementing programme, and enough mud to land plug. Test plug landed by applying
50bar above differential pressure. Bleed off pressure and check for backflow.
If no backflow pressure up to casing test pressure (80% burst strength) and hold for 15
minutes.
POOH cementing string.
Circulate down the 1.66" tubing and check if returns are cement contaminated. If
positive, circulate clean and POOH.
If no cement contaminated returns are present then continue RIH with 1.66" tubing to
base of conductor, HUD (hold up depth) and carry out top-fill cementation. Mix and pump
sufficient cement into the annulus to fill to +/- 10m below MLS or sea bed. Pull back to
10m below sea bed and circulate clean. POOH.
This also applies for shut-off baffles for 95/8" BDS and 7" VAM which are furnished in a baffle
adapter.
596.Record how much fluid is required to reach test pressure. Hold pressure for 15 minutes
and then bleed off slowly while measuring returns.
597.Drop MSC opening bomb and load MSC closing plug.
598.Do not attempt to surge the opening bomb with pump. Dropping speed of bomb is
approximately:
133/8" casing, mud SD 1.2, 70 sec MF = 45m/min
95/8" casing, mud SD 1.2, 70 sec MF = 67m/min
7" casing, mud SD 1.2, 70 sec MF = 95m/min.
604.Hold pressure for 15 minutes and then bleed off quickly while measuring returns.
616.Hold pressure for 15 minutes and then bleed off while measuring returns.
617.Multiple-stage cementing displacement
618.It is not acceptable to monitor the volume pumped with a 'barrel counter'.
619.Since pipe movement is not possible after first stage cement job, it is important that
turbulent flow displacement be achieved in the second stage cement slurry displacement
if possible.
Upon completion of cementation and displacement, the tool is closed when the closing
(displacement) plug lands on the closing sleeve seat and the required differential
pressure applied.
The MSICP can hold pressure form above or below. Check with the supplier as to the
maximum differential pressure which can be sustained.
Free fall or displacement type plug sets can be used and the running procedures are
identical to those laid out in sections 11.4.7 and 11.4.8, the only difference being the
application of the MSC opening pressure in two stages. Pressures required to open and
close the ports are given in Table 11.2.
Check the maximum possible packer setting size versus the inner diameter of the casing
to ensure the MSIPC is used within its design limits.
* The pressure marked with an asterisk is the pressure applied internally across the
secondary sleeve to open the outer ports. If there is a differential pressure across the
sleeve due to a heavier fluid in the annulus versus the casing fluid, the pressure
required to open the outer ports will be the SECONDARY OPENING PRESSURE
PLUS THE DIFFERENTIAL PRESSURE.
Upon completion of cementation and displacement, the tool is closed when the closing
plug lands on the closing sleeve seat, and the required differential pressure applied.
Maximum differential pressure across the packer is 70bar. Due to the packer design (cup
type), this pressure can only be held from above.
As clearance between maximum and minimum hole size in which packer can be properly
set is relatively small, it is not recommended to set the MSMPC in open hole.
Free fall or displacement type plug sets can be used and the running procedures are
identical to those laid out in sections 11.4.7 and 11.4.8, the only difference being the
application of the MSC opening pressure in two stages. Pressures required to open and
close the ports are given in Table 11.3.
Check the maximum possible packer setting size versus the inner diameter of the casing
to ensure the MSMPC is used within its design limits.
624.General
A pre-job meeting is to be held with the suppliers representative to ensure full agreement of procedures to
be followed. Any changes should be confirmed. Changes are to be included in the on-site instructions.
Maximum circulation pressure at any stage prior to setting the liner hanger must be less than 2/3 of the
hanger setting pressure. Setting pressure is dependent on the size of hanger being run and the type of
shear pins installed. Maximum circulating rates (for Baker hanger integrity) See 11.5.3.
It is recommended that:
625.The liner lap should be a minimum length of 50 metres.
626.Preferably, the top of the polished bore receptacle (PBR) should be spaced out such
that the sealing elements of a tie-back packer will not be within 1 metre of a casing
connection.
627.Liners should be set as close to bottom as is practical.
628.Shoe track composition and centraliser placement should be specified in the drilling
programme.
629.Rotating Liner
228.Procedures for rotating liners (See 11.5.2). Generally they are identical to those for a
non-rotating liner. Where they differ, an additional note has been included.
229.Surface torque while rotating should be limited to the cased hole torque test value
(See 11.5.2) plus 80% of the make-up torque of the liner thread connection.
NOTE: The maximum allowable surface torque shall be 80% of the torsion strength of
the weakest component of the running string.
634.Cased Hole Torque Test Value shall be the value obtained during the torque test
performed at the previous casing shoe when pulling out to run the linear.
635.Strap out of the hole on the last trip if there is a significant difference between loggers
and drillers depths.
636.Drop a drillpipe drift on last trip out of hole. The drift used shall allow circulation through
the drillstring.
235.Ensure that the drift is retrieved.
236.Ensure all components to be used in the liner running/handling string are also
drifted. Check connections for debris, etc.
237.31/2" running string : 21/4" DP drift
238.5" running string : 21/2" DP drift
637.Check all connections of float shoe, collar, plug landing collar, liner hanger, tie-back
assembly, etc.
638.Calculate surge and swab pressures (using Drill-Calc).
639.Ensure a circulating head for each casing and drillpipe connection is available on the
drillfloor. Also ensure that a crossover from drillpipe to liner is available.
640.Ensure a Co-flexip cementing hose, or approximately 10 metres of Chiksan line (already
made up), is available on the rig floor.
641.The following operations should be performed at the most opportune time prior to
running the liner:
239.Top Drive: Make up plug dropping head assembly onto a (pup) joint and lay down a
catwalk.
240.Rotary Table, with rotating liner: Make up plug, dropping head assembly onto
cementing kelly and lay down on catwalk.
643.Make up the shoetrack. Check that the floating equipment is functioning properly.
644.Make up and run in hole with the liner, maximum running speed; 60 seconds per stand
of drillpipe.
645.The fill-up hose, or casing packer, should be used between connections. Stop and
completely fill the string every 5 to 10 joints, as required.
646.Pup joints should be positioned as per programme.
647.Make up liner hanger assembly and running tool, ensuring that the block is unlocked
and that the string does not rotate while running in hole.
648.Centralisers should be installed as specified in the drilling programme.
649.Install the kelly/top drive and break circulation. Check for leaks between running tools
and liner top. Record string weights up, down and neutral.
650.Install the drillpipe wiper to prevent anything falling down the hole.
651.Maximum circulation rates shall be confirmed with the equipment supplier prior to
commencing circulation.
652.The following rates are only a guide:
7" liner : 1 000ltr/min
7" liner with integral tie back packer : 750ltr/min
5" liner : 700ltr/min
1
4 /2" liner : 500ltr/min
NOTE: Maximum circulation pressure is to be less than 2/3 of the hanger setting
pressure, to avoid premature setting.
653.Rotating Liner
241.Perform surface rotational torque check.
654.Continue running liner on drillpipe filling every stand. Maximum running speed; 60
seconds per stand of drillpipe.
655.Ensure that no left-hand rotation of the string occurs while making up or running in the
liner, as this may activate the emergency release of the hanger running tool.
656.Break circulation at the last casing shoe, maximum circulation pressure to be no more
than 2/3 of the liner setting pressure.
657.Rotating Liner
242.While circulating, perform a rotating torque test at 10 to 12rpm. Record results in
daily drilling report and in the cementing report.
658.Rotating Liner
243.The running tool allows the liner to be washed through open hole. See 11.5.6 for
procedures relating to the washing of rotating liners through tight hole.
659.Space out string so that the liner shoe is at the required depth and:
244.There are no drillpipe tool joints positioned in the BOP.
245.The plug dropping head is approximately 1 metre above the rotary table.
246.Liner shoe should be set as close to bottom as is practical.
660.Circulate a minimum of the last joint down. Maximum circulation pressure to be no more
than 2/3 of the hanger setting pressure. Maximum circulating rates as mentioned above.
NOTE: If the pressure required to break circulation is greater than 2/3 of the hanger
setting pressure, ensure the liner is at the required setting depth prior to
exceeding it.
661.Perform a circulating test. As a basis use the annular velocity while drilling. If no losses
are observed, increase the pump rate until the desired pump rate is reached. If losses
are observed, decrease the pump rate until losses stop. Record the test results in the
daily drilling report and in the cementing report.
662.Circulate 120% string and annulus contents; if required circulate a hi-vis pill. Wherever
possible reciprocate the string slowly, for as long as possible.
663.Rotating Liner
247.While circulating, start rotating at 10 to 12rpm and compare with the torque recorded
before pulling out to run the liner and when the liner was at the previous casing shoe.
248.Surface torque while rotating should be limited to the cased hole torque test value
(See 11.5.2) plus 80% of the makeup torque of the liner thread connection.
NOTE: The maximum allowable surface torque shall be 80% of the torsion strength of
the weakest component of the running string.
NOTE: Hanger setting pressure is dependent on the size of hanger and the type of
shear pins installed.
672.Non-Rotating Liner
249.Increase the pressure to above the pre-set shear value of the running tool. The
required pressure will depend on the number and type of shear pins installed.
Maximum allowable pressure is 80% of the ball seat shear-out pressure, until the
setting tool has been checked for release. Repeat the release procedure if necessary.
250.Pick up 1/2 a metre to ensure the running tool has been released from the hanger.
251.Once set, shear out the ball seat with approximately 180bar.
673.Rotating Liner
674.Check that the string will rotate, then stop rotation and increase the pressure to above
the shear value of the running tool. The required pressure will depend on the number
and type of shear pins installed. Maximum pressure is 80% of the ball seat shear-out
pressure until the setting tool has been checked for release, repeat release procedure if
necessary.
675.Pick up 1/2 a metre to ensure that the running tool has been released form the hanger.
676.Once set, shear out the ball seat with approximately 180bar.
677.Perform cased hole torque test 1/2 a metre above the liner. Rotate the drillstring slowly at
10 to 12rpm and record the torque. While rotating slowly set down 10 to 15 tonnes on the
hanger and establish circulation. The initial torque may be high, but should reduce once
the entire liner string is turning.
678.Surface torque while rotating should be limited to the cased hole torque test value (See
11.5.2) plus 80% of the makeup torque of the liner thread connection.
NOTE: The maximum allowable surface torque shall be 80% of the torsion strength of
the weakest component of the running string.
NOTE: The setting tool will only release if the total liner weight has been released
from the tool. Hole conditions may require movement of the drillpipe to "work"
the set-down weight to the setting tool.
690.Ensure that the circulating pressure does not exceed 2/3 of the liner hanger setting
pressure.
691.When rotation is required, proceed with the following steps:
Pick up pipe.
Start circulation and check up, down and neutral weight of string.
When exact down weight is known, start rotating slowly. Watch pressure carefully.
When rotation and circulation are stabilised, slowly lower pipe into the tight spot.
Ensure circulating pressure remains below 2/3 of the hanger setting pressure. A
maximum set down weight of 5 tonnes is to be observed. Maximum allowable torque
shall be 80% of the torsion strength of the weakest component of the running string,
or 80% of the liner connection strength, or whichever is weakest.
If 5 tonnes of weight is reached, work pipe up and down through the tight spot.
692.Liner Cementation
693.General
704.Thickening times given by the laboratory are only valid for an uninterrupted
movement/pumping of the slurry. Any stoppages after mixing has started will reduce final
thickening times. Laboratory tests have shown that thickening time can be reduced from
over 6 hours to 2.5 hours when movement is stopped after 1.75 hours of simulated slurry
pumping.
705.Cement volumes
Cement volumes for all liners sizes should be based upon the following:
706.openhole calliper volume* + liner lap volume + 100 to 150m of cased hole volume above
the liner hanger.
NOTE: Each liner cementation should be considered on its own merits. * Based on field
experience a percentage excess may be required.
Table 421.5 Pre-flush spacers for liner cementations (Water based mud)
OH Liners Spacer Ahead Spacer Behind
(in) (in) Volume (m3) Height (m) ** Volume (m3) Height (m) **
83/8 7 2.0 MW* 150 4.0 MW 300
2.0 SC 150
5/8 41/2 1.2 MW 150 1.5 MW 300
1.2 SC 150
* If SD mud > 1.35 unweighed spacers can be used. If mud > 1.35 then in addition to the
water spacer, a viscous weighted spacer (XC polymer, barites) must be pumped
between the mud and water spacer(s). The S.D. of this viscous spacer should be greater
then the S.D. of the mud being displaced.
** Based on volume specified inside, gauge hole to casing annulus.
709.If KMg mud was used to drill the hole section pump a viscous (fresh) water spacer after
the spacer behind. The viscous spacer should have a volume of liner contents plus the
volume of 200m drillpipe. This will prevent any risk of flash setting should the mud and
cement come into contact when stinging out of liner. Check the bottomhole pressure and
if underbalanced, then pump a weighted spacer.
710.With less critical cementations water can be considered for use as "spacer behind"
rather than mixwater.
711.For holes drilled with oil based mud
Table 421.6 Pre-flush spacers for liner cementations (VCM)
OH Liners Spacer Ahead Spacer Behind
(in) (in) Volume (m3) Height (m) ** Volume (m3) Height (m) **
83/8 7 2.0 BO 150 2.0 MW 100
2.0 SC 150 2.0 BO 100
57/8 41/2 1.2 BO 125 1.0 MW 120
1.2 SC 150 1.0 BO 120
** Based on volume specified inside gauge hole to casing annulus.
719.Close the bottom valve on the plug dropping head and flush lines if necessary. Check
the indicator flag has been reset. Wind out the plug holding spindle (if no flag sub is
used, hold 40bar against the top valve) and open the top valve, checking flag to ensure
the plug has left the head.
720.Pump post flush and displace cement.
The maximum displacement rate is generally the fastest possible rate at which no
losses occur. The circulation test data can be entered into in-house computer
programmes to help predict maximum circulation rates with cement slurry. Refer to
the cementing program.
When the capacity of the drillpipe has been pumped, the upper pump down plug will
latch into the upper liner wiper plug. Slow down to 250ltrs/min +/- 1m3 before this
point. A pressure increase of +/- 150bar will shear the liner wiper plug free. Complete
displacement.
With this hanger running design the slick stinger so that it is spaced out into the liner
wiper plug holding system. If it is necessary to exceed 150bar above circulation
pressure to shear the plug, bleed off pressure, pick up the string +/- 50cm and
pressure up again. This will expose the plug more, allowing the pressure to act over
a greater area. Shear the plug, then set back down and continue the displacement.
Do not apply more than 150bar plus circulating pressure to the system.
721.If no shear is observed, pump 2m3 past the expected shear point and return to original
displacement rate. Use the theoretical displacement volume only (do not over displace
by more than half the shoe track volume).
722.Reduce rate +/- 0.5m3 before expected plug bump. Bump plug with +/- 50bar above the
calculated static differential pressure and hold for 5 minutes.
723.Bleed off and check for backflow.
724.Apply +/- 50bar to the liner and pick up on the drillstring. When the slick stinger comes
out of the flapper valve "O" ring (approximately 4m), the pressure will drop, although
there may still be some pressure if sufficient excess cement is above the liner.
725.Wait for the cement to equalise between drillpipe and annulus (to reduce contamination)
and POOH.
726.Circulate out excess cement if programmed. Reciprocate pipe while circulating.
737.Squeeze Cementation
738.Applications
745.Slurry Design
272.Fluid loss control agents ensure that no premature bridging of cement occurs due to
dehydration of cement.
273.Friction reducers facilitate good penetration of the slurry.
274.Retarders are necessary for long squeeze jobs, particularly hesitation squeezes.
746.Injectivity test
751.Pressures
752.All surface pressures are to be recorded and immediately related to their bottom- hole
pressure.
753.It is good practice to hold back pressure on the annulus above the cement retainer.
754.It is important not to exceed the formation fracture pressure.
755.Squeeze methods
757.Circulation Squeeze
Used on primary cementation repair jobs where circulation cannot be established with
one set of perforations to surface.
282.Perforate above top and below bottom of zone to be cemented.
283.R.I.H. with bridge plug on drillpipe.
284.Set bridge plug between perforations.
285.Circulate casing/hole annulus, clean (calculate casing collapse pressure).
286.Unsting from bridge plug and circulate hole clean. Spot a high vis pill.
287.Sting into bridge plug. Circulate/squeeze cement around perforations as per
programme.
288.Unsting from bridge plus and pull back to above theoretical T.O.C. and reverse
circulate out any cement.
289.If enough cement has been pumped, it is possible to Bradenhead squeeze a volume
of cement into top perforations (do not over-displace perforations).
290.If unable to establish circulation, block squeeze lower perforations and Bradenhead
top perforations.
758.Block Squeeze
291.Used on long primary cementation repairs where it is difficult to establish proper
circulation over the whole section.
292.The repair is split into a number of squeezes through cement retainers with only one
set of perforations below.
759.Hesitation squeeze
293.Used to obtain a more uniform fill when squeezing off perforations.
294.Performed in the same way as the Block squeeze except that the squeeze period is
split into alternate squeeze and shut-in periods.
295.Different perforations (in the same zone) will have different injectivities. On the first
squeeze the perforations with the highest injectivity will accept cement. Further
squeezes will begin to fill perforations with less injectivity until the zone becomes
plugged-off. Do not initially exceed formation breakdown pressure during squeezing.
296.R.I.H. to bottom of required squeeze zone.
297.Circulate and ensure well is static.
298.Set balanced cement plug as per programme.
299.P.O.H. until stinger is +/- 100m above theoretical T.O.C.
300.Reverse circulate well clean.
301.Close BOP's on drillpipe.
302.Squeeze via string as follows:
Increase drillpipe pressure until a leak-off is observed (It is not the intention to fracture
the formation or inject the pumping fluid).
Hold for a minimum of 5 minutes, or until a leak-off is observed.
Repeat pressure build-up and hold phases until 20% of original plug volume remains in
the casing, or the maximum allowable surface pressure (to be set by the Rig
Manager) has been achieved.
Hold 85% of initial leak-off pressure on drillpipe for a minimum two times the tested
slurry setting time. While holding back pressure circulate at 0.2m3/min for 2
minutes every half-hour to ensure string remains free.
760.Cement plug setting procedure
A cement plug shall be set as a balanced plug. Once the required volume of the cement slurry is in
place, the well pressures in annulus and drillpipe string should be zero. This can be obtained by using
the proper amounts and weights of spacers and mud.
Always realise the reduction of hydrostatic head due to lighter spacers and whilst the cement slurry is
setting.
Cement plugs can be set via open-ended drillpipe. It is good practice is to use a tubing stinger of at
least the same length of the cement plug on the drillpipe string.
Smaller cement plugs of 5m3 or less shall be made out of a pre-mixed slurry (pre-mix tank to be
available.)
Contents
12. SURVEYING......................................................................................................................ii
12.1 Introduction ................................................................................................................ ii
12.2 Co-ordinate Systems.................................................................................................. ii
12.3 Reference Definitions................................................................................................. ii
12.4 Surveying During Drilling........................................................................................... iv
12.4.1 Surveying tools..................................................................................................v
12.4.2 Survey frequency during drilling........................................................................v
12.4.3 Definitive surveying/verification surveying ....................................................... vi
12.4.4 Survey requirements ....................................................................................... vii
12.4.5 Definitive survey frequency (verification survey) ............................................. vii
12.4.6 Tie-on and overlap surveys ............................................................................. vii
12.5 Survey Instrument Positioning/Running Procedures................................................ vii
12.5.1 Magnetic single and multi-shot........................................................................ vii
12.5.2 Electronic magnetic single-shot ..................................................................... viii
12.5.3 Electronic magnetic multi-shot ....................................................................... viii
12.5.4 Measurement while drilling............................................................................. viii
12.5.5 Gyroscopic tools............................................................................................... ix
12.6 Side track .................................................................................................................. ix
12.7 Collision Monitoring................................................................................................... ix
Illustrations
Tables
762.Introduction
This section provides information on the surveying methods and the equipment used in drilling
operations.
The drilling programme shall highlight the exact wellhead position co-ordinates. Together with the
drilling programme a detailed deviation plot shall be issued for directional drilled wells.
A qualified directional drilling contractor will be contracted for directional drilling. The survey
equipment, together with the adequate directional drilling tools, will be available as rental
items.
763.Co-ordinate Systems
Offshore exploration applies two positioning systems. These are used for the location of the wellhead, and
the trajectory of the borehole.
The Transverse Mercator (TM) grid system is used to give the wellhead a position. This system is based
on a transverse mercator projection of the earth's surface on a map with a central meridian at 5o East.
Further information on this system can be found in the International Association of Drilling Contractors
report (SPC 17212 Directional Drilling Azimuth Reference Systems).
The borehole trajectory is plotted with an orthogonal co-ordinate system with the origin at the wellhead.
The X and Y directions are parallel to the corresponding axes of the grid co-ordination system and the Z-
axis correspondents to the direction of the earth's gravity field (true vertical). Most surveying tools,
however, provide an inclination and an azimuth of the hole for a given alonghole (AH) depth rather than
the X, Y, Z co-ordinates. The borehole trajectory in terms of X, Y, Z co-ordinates is computed from the
survey data. Many drilling contractors prefer the minimum curvature method.
764.Reference Definitions
To ensure consistency in plotting the position and trajectory of a borehole, it is vital that all the personnel
involved in the operation use the same reference points; thereby providing the surveying tools with the
same starting points every time a further position is plotted. The basis for these reference points is defined
in the following paragraphs.
The alonghole depth reference point is the original rotary table elevation (ORT) for the borehole. The
Mean Sea Level (MSL) can also be used as the reference point for offshore wells. When surveying during
a re-entry or after jacking-up a platform, a correction has to be applied to the measured alonghole depth to
correct for the difference between the original and the current rotary table elevation.
Inclination: The inclination reference point is the true vertical direction, which corresponds to the direction
of the earth's gravity field.
Declination: The azimuth reference point is the Y-axis pointing to grid North. The azimuth readings of
magnetic surveying tools are referenced to Magnetic North (MN) and have to be corrected in two steps
for:
765.Magnetic declination. In company operations Magnetic North is West of True North
(TN).
766.Convergence of meridians; grid correction. In the grid co-ordinate system Grid North
(GN) is West of TN, West of the central meridian, East of TN, and East of the central
meridian.
Conventional gyroscopic surveying tools are oriented using a foresight which is measured with reference
to GN. No corrections are required if foresight is used to process the survey data. North-seeking
gyroscopic surveying tools measure azimuth with reference to TN, therefore the grid correction has to be
made.
In companies operations magnetic declination from MN to GN and grid correction from TN to GN are
defined positive in a clockwise direction. So the GN-azimuth data is obtained from the instrument readings
by subtracting the corrections:
767.Magnetic tools: Az (GN) = Az (tool) - declination - grid correction.
768.North seeking tools: Az (GN) = Az (tool) - grid correction.
To ensure that it is possible to easily monitor the borehole trajectory, it is vital to define the reference
points before commencing work on the drilling programme. It is the responsibility of the Company
Representative to check the following:
769.Ensure that the rig is in the correct location and is using the correct slot if positioned
over a platform.
770.Check that the wellhead, the target co-ordinates, and all deviation parameters on the
well plot are in accordance with the drilling programme.
771.Check that the azimuth reference on the well plot is Grid North (GN).
772.Ensure the following survey reference information is available on board:
303.Longitude and latitude of the wellhead (used for north-seeking gyro tools).
304.The original rotary table elevation (ORT) and the correction values for the current
rotary elevation (CRT).
773.That Grid correction is used to convert True North (TN) referenced values into Grid
North (GN) referenced values.
774.That magnetic declination is used to convert magnetic azimuth readings into True North
referenced values.
775.That, when running a magnetic surveying tool corrected with the magnetic interference
algorithm, the dip angle and the total strength of the local earth magnetic field is used as
input.
Figure 761.1 Correction for grid and declination
NOTE: In operations involving a multiple well plot, ensure all are depth-referenced to the
well being drilled using the same datum level.
2. MWD data might be acceptable as definitive on vertical wells where the inclination is
less than 2 degrees.
3. The accuracy of the EMMS depends on the magnetic storm activity, which is
monitored by the survey contractor. If the magnetic storm activity during the EMMS
has been too high, a gyro survey can be taken.
4. The survey contractor should be responsible for presenting the final survey to the
Company office.
787.Survey requirements
See Table 12.3. The information in this table is only applicable if the survey requirements during
drilling have been complied with.
793.Openhole magnetic multi-shot surveys should be taken into the last casing shoe to
provide a depth check in the survey.
794.There should be a minimum overlap of 300m with the previous survey when gyro
surveys are not made from the surface. When the previous survey is also used as an
azimuth reference for the next survey, the tie-in point should be chosen such that there is
a straight hole section with minimum changes in azimuth and inclination. This is to
prevent wireline depth errors/azimuth errors.
NOTES: 1. The first intermediate casing shall be surveyed from surface to TD if the surface
casing has been exempted from a definitive survey.
2. The Enhanced Magnetic Multi-Shot (EMMS) Survey shall include a rotational shot at
TD.
3. If the straight hole section is abandoned, the MWD readings, if available, are
accepted as the definitive survey.
Prior to the survey, a rotational shot similar to that for the electronic magnetic single-shot survey has to be
taken. The size of the TOTCO ring and survey barrel shoe should be compatible.
The Company Representative is to ensure these checks and tests are performed.
804.Ensure the survey engineer has the following information from the drilling programme:
305.Well name/identifier.
306.Wellhead co-ordinates.
307.Interval to be surveyed and distance between surveys.
308.Position of last casing shoe plus size and weight.
309.Tie-in station survey data and all previous survey data.
310.Target azimuth; grid North.
311.Depth reference for surveys.
312.Directional drilling programme.
313.Information on BHA.
314.Mud data.
315.Intended hydraulic programme.
316.The dip angle and field strength of the local earth magnetic field.
805.Ensure that the correct cross-overs are available.
806.Ensure standpipe has a suitable pressure transducer connection (1502 WECO).
807.Ensure the pressure rating of the surveying equipment is adequate.
808.Ensure that appropriate rig utilities are available.
809.Gyroscopic tools
North-seeking gyro tools are used for final surveys in cased hole sections. For detailed descriptions,
running procedures and quality control criteria refer to the manufacturer(s) documentation.
810.Side track
811.Sidetracks in open hole sections can be oriented and surveyed using magnetic
surveying instruments or gyro surveying instruments.
812.Sidetracks out of cased hole sections shall be governed by gyroscopic instruments.
813.Collision Monitoring
All surveys have a tolerance. Knowing this, the borehole has a cone of uncertainty. Two or more adjacent
boreholes all have cones of uncertainty. Accurate plots shall be made. A fair chance of collision is
present as soon as the cones of uncertainty start hitting or overlapping each other. If this criteria is met,
drilling must be stopped immediately. Corrective actions shall be discussed with the Drilling Manager. The
end result might be a plug-back operation.
Contents
Illustrations
Tables
815.Introduction
The following guidelines should be considered when preparing completion fluids:
816.The first consideration should always be to ship ready-mixed brines to the offshore rig.
Brines can be obtained from mud companies. The mixing of brines on board the rig is
often more expensive than ordering them from a mud company.
817.Ensure sufficient quantities of completion fluids, chemical additives and sack material
are at the rig site to maintain the required completion fluid quality.
818.Ensure that sufficient pit space is available and that it is thoroughly cleaned out before
receiving 'clear' fluids.
819.Due to the fact that harmful chemicals are used, ensure all personnel are aware of the
hazards, and that they are provided with the correct safety clothing. Personnel shall be
aware of the necessary remedial action to be taken, should spillages occur.
820.Proper storage and handling of both chemicals and sack material is the key to
minimising accidental damage, spillage and wastage.
821.Check the completion fluid filtration requirements and ascertain the most suitable rig-up.
822.The annulus is to be protected against corrosion using inhibitors, e.g., coat B1900.
823.Base Fluid
In Company operations two broad types of fluid are used:
824.Solids-free brines (solutions of salts in water).
825.Solids containing muds.
Brines are always preferred with respect to maintenance, limiting formation damage and
overall stability at higher densities (> 1.35 sg). The types of brines required present handling,
safety and environmental problems, and are substantially more expensive when compared
to muds.
826.Fluid density
Fluid density is usually selected to provide a minimum overbalance. This is to ensure that
formations are killed but minimises fluid invasion, thereby minimising formation damage.
Viscous pills are used in conjunction with clear fluids, such as brine, to prevent whole brine
fluid loss, minimising formation damage.
In fully cased holes where casing integrity is absolutely assured, it may be possible to save
money and ease handling by using cheap fluids such as seawater/brine, even though they
provide no overbalance to the formation.
The density ranges of the commonly employed fluids are listed in Table 13.1.
Table 814.1 Completion fluid density ranges
Type Fluid Density range
Brines Seawater 1.03
Potassium Chloride (KCl) 1.00 - 1.17
Potassium Carbonate (K2CO3) 1.00 - 1.56
Sodium Chloride (NaCl) 1.00 - 1.19
Calcium Chloride (CaCl2) 1.00 - 1.36
Calcium Chloride/Calcium Bromide (CaBr2) 1.36 - 1.70
Calcium Bromide/Zinc Bromide (ZnBr2) 1.70 - 2.30
Muds Salt Saturated Dolomite Mud 1.22 - 1.80
VCM (packer fluid) 1.15 - 2.50
The density of clear brines changes with the temperature due to thermal expansion. The rate
of expansion increases with brine density. When calculating required brine densities at the
surface, an allowance must be made for downhole temperature conditions as follows:
When virgin pressure zones are perforated, a viscous pill may be placed across the lower
pressure zones to minimise fluid-loss into depleted zones.
Figure 814.1 Correction factor for thermal expansion
Control of particle size and concentration is determined during the well clean-up procedures
adopted prior to completion. Where this factor is of concern, filtration will be employed.
The use of potassium as a completion fluid is, however, problematic due to its incompatibility
with formation waters containing calcium or magnesium.
Calcium Bromide degrades conventional elastomeric materials such as nitriles, so that the
use of these fluids demands expensive premium seals to be used both downhole and in the
wellhead.
833.Brine Formulations
834.Seawater
Free fluid, available offshore at a density of 1.03sg, is used where formation damage
considerations are not foremost, and where overbalance is not required or the reservoir is
depleted.
To make seawater more formation 'friendly', a 2% KCl is usually added and the pH raised to
9-10, with KOH to provide some corrosion inhibition.
Figure 814.2 Material requirements for preparation of sodium chloride solutions
835.Sodium chloride
839.Potassium chloride
843.Potassium carbonate
844.Used in conjunction with chromium alloy completions at high temperatures, when a kill
weight fluid is required in the annulus. The presence of chlorides in solutions in contact
with chromium alloy materials induces pitting corrosion and stress corrosion cracking.
845.Densities of up to 1.56sg are achievable.
846.Potassium carbonate will form insoluble precipitates when mixed with water containing
divalent cations such as calcium or magnesium. The fluid is therefore not suitable for use
as a completion fluid which will come into contact with formation water, as severe
formation damage can result. Similarly, mixing with seawater should be carefully
avoided.
847.Material requirements for preparation of potassium carbonate are presented in Figure
13.4.
848.Use potash (KOH) for pH control (0.5kg/m3).
849.Calcium chloride
855.Calcium bromide
A mixture of calcium chloride and calcium bromide brines used to achieve fluid densities in
the range 1.36 to 1.70sg. The fraction of calcium bromide increases with density.
It is most economic to compose a brine of required weight using the maximum possible ratio
of CaCl2:CaBr2. The maximum CaCl2 content is dictated by the allowable crystallisation
temperature, as the crystallisation temperature also increases with the ratio of CaCl2:CaBr2.
856.Use lime (Ca(OH)2) to adjust pH (1 kg/m3).
857.Zinc bromide
858.A mixture of zinc bromide and calcium bromide brines used to achieve fluid densities in
the range 1.70 to 2.30sg. The fraction of zinc bromide increases with density.
859.Zinc bromide containing brines are usually mixed from 2 standard solutions or 'liquors'
with respective densities of 1.70sg (CaBr2) and 2.30sg (CaBr2/ZnBr2). The volumes of
the 2 liquors required to prepare a brine of the required density are calculated as follows:
1 - [CaBr2] = [ZnBr2]
Where:
860.Zinc bromides are acidic due to the presence of the zinc ion. The pH of the fluid cannot
be raised chemically as an insoluble precipitate of zinc hydroxide would form.
Figure 814.4 Material requirements for preparation of potassium carbonate
brines
861.To combat the increased corrosiveness of zinc bromide, manufacturers should supply
ZnBr2 liquors with a suitable corrosion inhibitor and oxygen scavenger already
incorporated in solution.
Figure 814.5 Material requirements for preparation of calcium chloride brines
using pure CaCl2
862.Winter Conditions
Figure 814.6 Freezing and crystallisation temperatures of KCI and NaCI brines
Figure 814.7 Freezing and crystallisation temperatures of CaCI2 brines
870.Mud Formulations
872.A cheaper alternative to high calcium and zinc-based brines when a high-density fluid is
required and formation damage is not a great concern.
873.Can be used at densities up to 1.80, but the ease of use and maintenance decreases
with increasing density as the solids content and viscosity increase.
874.Ensure microdol is used as the weighting material. Dolomite is readily treatable with
acid if significant formation damage should occur.
875.Composition per m3 of NaCl saturated water:
317.+/- 40 kg bentonite.
318.+/- kg caustic soda.
319.+/- 20 kg Flocgel LV.
320.+/- kg XC Polymer.
321.Microdol to achieve correct density.
876.Fluid Analysis
877.Brine analyses
Routine tests for brines should include:
878.Density using a pressurised balance.
879.Total suspended solids (TSS).
880.pH.
881.Chloride content.
882.Calcium content (usually only for calcium-based brines).
883.Potassium content (usually only for potassium-based brines).
891.Mud analysis
Routine tests for muds should include:
892.Density using a pressurised balance.
893.Viscosity (PV/YP) and gel properties.
894.Fluid Loss (room temperature).
895.pH.
896.Alkalinity.
897.Chloride content.
898.Calcium content.
909.Hydroxy Ethyl Cellulose (HEC) is a polymer which generates a shear thinning fluid in
solution form, i.e., the apparent viscosity decreases with increasing shear rate.
Practically, this means that brines viscosified with HEC can be easily circulated into
place, but have a good carrying capacity for removing debris from the hole, and very low
leak-off rates when spotted across a formation.
The characteristic feature of HEC is its excellent degradability. Brines viscosified with
HEC lose their viscosity by temperature degradation, or they can be broken using acid
(usually hydrochloric or sulphuric acid) or a suitable oxidant (usually sodium or
ammonium persulphate). HEC leaves a minimum amount of potentially damaging
residue after breaking, meaning that formation impairment induced by the viscosity of the
fluid is fully reversible.
HEC can be mixed as a powder into low-density brines and pre-slurred for use in higher
density brines.
Because of its temperature sensitivity, the upper workable temperature for HEC
viscosified brines is around 100C,
910.XC Polymer is a xanthan gum which creates even more pronounced shear-thinning
fluids than HEC when in solution form. This means that XC polymer performs better than
HEC , as far as carrying capacity and fluid loss control is concerned, and a lower
concentration is required to provide a similar viscosity.
XC polymer displays a resistance to thermal degradation and can only be broken with
suitable oxidants. Furthermore, some potentially formation damaging insoluble residue is
left over.
XC polymer is limited in use to low-density brines, because at high salt concentrations
there is not sufficient free water to allow proper hydration.
911.Flocgel is a starch which does not display the shear thinning characteristics of HEC or
XC polymer when in solution form, and requires high concentrations to build sufficient
viscosity. It does, however, have excellent fluid loss control characteristics due to the fact
that the solution contains some undissolved gelatinous matter which deposits a low
permeability layer or 'filter cake' on the formation face.
Brines viscosified with Flocgel can be broken using an enzyme (e.g., Dexlo-P ex Gist
Brocades). However, large amounts of formation damaging residue are left.
Flocgel is unstable above 100C. It can be substituted with Stabilose which is a higher
temperature starch, up to 130C.
912.Final Selection
The ready degradability of HEC, coupled with the shear-thinning properties of HEC
viscosified brines, makes it the most suitable polymer for any application where the fluid
will be exposed to a formation susceptible to formation damage.
Where the formation is not open or formation damage is not a concern, XC polymer is
preferred due to its superior carrying capacity and fluid loss control.
In the absence of XC polymer, or when it proves substantially more economic, starches
such as Flocgel can be used where the formation is not open. Starches also have an
application where extreme fluid losses require a filter cake to be formed, for instance
when under-reaming prior to an external gravel pack.
At high temperatures (> 100C), XC polymer will always be preferred over HEC due to its
thermal stability.
HEC is always preferred for use in higher density brines.
913.Polymer mixing
Due to the shear-thinning nature of viscosified brine rheology, the 'apparent viscosity' (AV) is
the best 'field' measurement of viscosity. The AV is defined as the dial reading of a FANN
viscometer at 600rpm divided by two.
In high-density brines, the initial viscosity of the base fluid is higher than in low-density
brines due to the higher concentration of slats. Consequently, less polymer will be required
to develop a certain viscosity. The effect of brine density on HEC required (which is the only
polymer recommended for use in high-density brines) to develop an AV of 35-45 cP is
shown in Table 13.2.
914.Mixing procedures
All mixing equipment should be thoroughly cleaned before taking in clean base brine.
Avoid air entrainment during polymer mixing and pumping. Trapped air can cause foaming (leading to
erroneous density measurements), enhanced corrosion and accelerated polymer degradation. Lines and
mud guns should, therefore, discharge below the fluid surface, and seals on the suction sides of pumps
should be checked to ensure no air is being taken in when circulating.
To aid dispersion and full hydration and to obtain properly viscosified brines, HEC or XC polymer should
be added no faster than 25kg per 20 minutes. Starch can be added at a faster rate. The formation of 'fish-
eyes', lumps of dry material trapped by a hard outer hydrated layer, and micro gels indicate that the mixing
was too quick. Fish-eyes can be detected visually after scooping with a fine sieve through the mixing tank.
Micro gels are difficult to spot and are sometimes only obvious under a microscope.
It is good practice to sieve the bag contents via a screen placed above the hopper, to avoid the larger
lumps and contaminants entering the system.
After polymer addition is complete, the fluid should be sheared, via mud guns if possible, for an absolute
minimum of half-an-hour to promote full hydration of the polymer.
When adding polymers to high-density brines, the time required for hydration is longer due to the higher
salinity (at high salinitys there is less free water available). To overcome this problem, polymers should be
pre-hydrated in a small batch of fresh water at a high concentration (12kg/m3).
Addition of HEC or XC polymer can be accelerated by first reducing the pH of the base fluid. The
manufacturers of HEC and XC polymer add a protective coating to the polymer grains which retards
hydration and thereby overcomes the problems of incomplete dispersion. This coating is, however, only
stable at pH values below 7. By reducing the pH of the brine to 5-6 before adding the polymer, grain
dispersion is enhanced and the chances of fish-eyes forming is reduced. The procedure is as follows:
Add 28% HCl to the base brine to reduce pH to 5-6.
Add polymer at a controlled rate as above. Stir and shear continuously for 1 hour.
Increase pH to 8-9 with the appropriate alkalinity agent for the base brine and shear fluid as
above to ensure full hydration.
If after following the above procedure the viscosity is not sufficient, do not add more HEC
directly to the blend. Rather, repeat the above procedure with the additional viscosifier in
a separate tank or drum and bleed it into the main blend.
The above procedure is not suitable for calcium-based brines, as their inherent alkalinity means large
quantities of acid have to be added to reduce pH.
When mixing pills for operations carried out with a potential for formation damage, for example mixing
gravel pack carrier fluids, it is essential that all fish-eyes and micro gels are removed from the fluid. The
most effective way to condition the fluids is by shearing them thoroughly followed by filtration through an
absolute-rated system.
If necessary, larger fish-eyes can be taken out by passing the fluid over fine mesh shale-shakers (300 or
400 API mesh). Micro gels can only be removed by filtering through a diatomaceous earth filter, and since
micro gels are difficult to detect, all viscous fluids mixed for gravelpack or similar operations must be
filtered if possible.
915.Lost Circulation
When working with clear base brines against open formations, fluid loss of some form is unavoidable as
there is nothing in the fluid to form a barrier to the overbalanced fluid flowing into the formation. This can
become unacceptable for the following reasons:
916.Lost returns when circulating preventing debris being carried out of the hole.
917.Excessive fluid invasion of the formation causing formation damage.
918.Uneconomical loss of expensive completion fluids.
Curing excessive fluid loss depends on the severity. The following potential solutions are available, in
order of preference (to limit formation damage) but in increasing effect:
Reduce hydrostatic head.
Viscous pill made up with HEC.
Viscous pill made up with XC Polymer.
Viscous pill made up with HEC and degradable LCM material.
Viscous pill made up with any polymer and non-degradable LCM.
Cement.
919.Viscous pills
Viscous pills work by drastically slowing down the rate of fluid loss to the formation to
acceptable levels, by greatly increasing the viscosity of the fluid. They should not plug the
formation.
920.HEC is the preferred polymer for use in fluid loss prevention viscous pills because of its
degradability. If it fails to solve the problem it is unlikely that pills made with other
polymer will be more successful.
921.Pill volume should take into account the time required to perform, as the pill will continue
to seep away at a slow rate into the formation. Whilst some trial and error may be
necessary, the volume should be sufficient to fill the casing volume covering the
perforations and, have an excess volume of 1m3 for every hour it is required to act, with
maximum volumes being limited to 10m3.
922.If the pill is required to act for a very long period of time, a new pill should be spotted
every 24 hours to avoid temperature degradation. At temperatures over 100C this
interval should be reduced to every 12 hours, and XC polymer used in place of HEC.
923.Thoroughly shearing and subsequent filtration of the pill will be required to avoid
formation damage due to excessive fluid losses.
924.Viscous pills meant for fluid loss control should not contain breakers. If required they
should be removed from the wellbore using 15% HCl for HEC pills in non-calcium based
brines or a suitable oxidant for other pills.
925.LCM pills
LCM material should be carried in a viscous pill. A pill of 5m3 should be used as a first attempt, possibly to
be increased if it results in little or no immediate effect.
Degradable particles such as calcium carbonate or graded salts should be used. The concentration of
LCM material should be 50kg/m3 for consolidated formations with permeabilitys up to 1000mD and
150kg/m3 for higher permeability or unconsolidated formations.
The LCM material should be graded such that the particle diameter is large enough to bridge on the
formation and not invade into it, thus damaging the formation. This is calculated by:
dLCM = (k) / 3
Where:
Account should be taken of the effect of adding any LCM pills to the overall hydrostatic head acting on the
formation. This is particularly true of graded salt pills, which by definition have to be saturated.
926.Packer Fluids
Packer fluids are the fluids left in the tubing-casing annulus above the packer during
production of, or injection into, the well.
933.Density requirements
Packer fluid densities can be underbalanced provided high quality tubing and casing is run.
934.Corrosion protection
In all completions protection against corrosion can be provided by:
935.A compulsory fluid pH of 9-10.
936.Optional addition of an oxygen scavenger (1000ppm sodium sulphite).
937.Optional addition of a film forming amine corrosion inhibitor (e.g., aquatec 0.5%).
Ideally, in chromium alloy completions, in addition to the above additives, the base fluid
should not contain chlorides.
938.Fluid stability
Fluid stability is best ensured by the use of only clean solids-free, polymer free fluids as packer fluids and
a high pH. This means there are no solids to settle or products that can degrade.
940.Wellbore cleaning
Ensure all surface equipment (tanks, lines, pumps, shale-shakers) to be used in the active
brine system, and fluids contained within, are clean before beginning to attempt to clean the
wellbore.
The BOP's should be cleaned using a jet sub, and the rams functioned to ensure no solids
are trapped in this area.
Circulation to completion fluid should be carried out from hold-up depth during the last trip
into the hole (usually the scraper trip).
The hole should be circulated to break any gel structure prior to displacing mud from it.
During any displacement, circulation rates should be sufficient to ensure turbulent flow of the
displacing completion fluid. Where possible, the string should be rotated and/or reciprocated
to aid the development of turbulence.
941.Displacement of water-based muds to brine
Displacement spacer sizes should be sufficient to give at least a 3 minute contact time at the circulation
rate to be used. Where the formation is open, pills should be suitably weighted to maintain hydrostatic
overbalance.
In an offshore environment, the second viscous brine spacer can be followed by seawater
under the following circumstances:
947.The well is fully cased off.
948.The pressure integrity of the casing is proven.
949.There are no restrictions on dumping.
When calcium chloride or potassium carbonate are used as the brine, a fresh water spacer
of at least 150m length should separate the brine from the seawater. Precipitation of calcium
sulphate or calcium carbonate could otherwise occur.
Unless filtered, brines used to displace VCM's will inevitably have a small oil content, which
prevents them from being dumped.
The string used to displace brine should include all downhole work string components to be
used in gravel packing operations. They should be clean, and where possible, free of rust,
loose scale or paint. Pipe dope should be applied sparingly and on the pin end only. Pipe
dope squeezed out of a made-up connection should be wiped-off.
The pumping schedule should be as follows:
WBM VCM
958.General
Where there is concern about formation damage, the completion fluid will be filtered to
provide a fluid whose maximum particle size is known.
Filtration requirements are determined by calculating the maximum allowable particle size.
This is taken as 1/7 the diameter of the maiden pore diameter:
dFIL = (k) / 7
Where;
dFIL = Maximum allowable particle size (mm)
k = Permeability (mD)
959.Filtration equipment
Filtration equipment and knowledge is readily available from specialised contractors i.e.,
Dowell-Schlumberger; Halliburton etc. Job-designed filtration techniques shall be followed.
Contents
14. PERFORATING ..................................................................................................................I
14.1 Introduction .................................................................................................................I
14.2 Preparation..................................................................................................................I
14.3 Explosives .................................................................................................................III
14.4 Perforating Guns ...................................................................................................... IV
14.4.1 Gun selection .................................................................................................. IV
14.4.2 Wireline perforating guns ................................................................................ VI
14.4.3 Tubing conveyed perforating (TCP) gun assemblies ..................................... VII
14.5 Tubing Conveyed Perforating (TCP)......................................................................XIV
14.5.1 Tubing conveyed procedure..........................................................................XIV
14.5.2 Gun preparation .............................................................................................XV
14.5.3 TCP accessory preparation............................................................................XV
14.5.4 TCP assembly make-up, arming and running ...............................................XVI
14.5.5 TCP depth control ........................................................................................XVII
14.5.6 Preparing to fire TCP guns...........................................................................XVII
14.5.7 TCP drop bar actuated firing procedures .....................................................XVII
14.5.8 TCP pressure activated time delay firing procedures ...................................XIX
14.5.9 Dropping the guns.........................................................................................XIX
14.5.10 Retrieving TCP guns to surface ..................................................................XIX
14.6 Retrievable TCP Assembly Procedures..................................................................XX
14.6.1 Equipment preparation...................................................................................XX
14.6.2 Downhole equipment procedures ..................................................................XX
14.6.3 Retrievable packer operations ......................................................................XXI
14.6.4 Surface equipment rig-up.............................................................................XXII
14.6.5 Well killing procedures ................................................................................XXIII
14.7 Wireline Perforating..............................................................................................XXIII
14.7.1 Preparation.................................................................................................. XXV
14.7.2 Arming the gun.......................................................................................... XXVII
14.7.3 Lubricator pressure testing........................................................................ XXVII
14.7.4 Running in hole ........................................................................................ XXVIII
14.7.5 Stuffing box pressure leaks...................................................................... XXVIII
14.7.6 Depth correlation........................................................................................ XXIX
14.7.7 Perforating.................................................................................................. XXIX
14.7.8 Pulling out of hole....................................................................................... XXIX
14.7.9 Gun retrieval................................................................................................ XXX
14.7.10 Stuck perforating guns .............................................................................. XXX
14.8 Correlation Logging............................................................................................. XXXI
14.9 Underbalance..................................................................................................... XXXII
Illustrations
Figure 14.1 Typical perforating gun, equipped with shaped charges ..................................... V
Figure 14.2 TCP assembly below a permanent packer .......................................................... X
Figure 14.3 Retrievable TCP assembly ................................................................................. XI
Figure 14.4 Typical equipment arrangement for lubricator pressure test ......................... XXVI
Tables
Table 14.1 Explosives used for perforating.............................................................................III
Table 14.2 Schlumberger recommended maximum strip gun lengths................................. VIII
Table 14.3 Atlas wireline recommended maximum strip gun lengths .................................... IX
Table 14.4 Running speeds for wireline perforating guns............................................... XXVIII
960.PERFORATING
961.Introduction
Perforating has the following objectives:
962.To gain access to the reservoir through the wellbore.
963.To provide an opening in the tubing and/or casing to circulate fluids.
964.To provide a pathway to squeeze or circulate cement.
This section describes two methods of perforation: tubing conveyed perforating and wireline perforating.
965.Preparation
In all perforating operations the following procedures must be followed:
966.A stand-by boat must be present.
967.The Company Representative is the 'Designated Supervisor' with overall control of the
operation, including all safety aspects.
968.Only a qualified operator from the service Company is allowed to handle explosives.
969.Perforating operations, including gun loading, can only take place half-an-hour before
sunrise to half-an-hour after sunset, although activities that have begun may be finished
after sunset if sufficient artificial lighting is available. The only exception to this is if the
first shot is in an unknown pressure regime.
970.Perforation of a new geological formation must always be carried out in such a way that
first gas or oil comes to surface in daylight.
971.Work may not be conducted when; the work area is not clearly visible (fog); an electrical
storm is likely; wind forces are greater than 8; the service Company representative
perceives the operation to be unsafe.
972.A safety meeting should be used to discuss all technical and safety aspects of the
forthcoming operations. As a minimum, the meeting should include:
322.Company Representative
323.Wellsite Drilling Engineer
324.Well Services Supervisor
325.Logging Engineer
326.Contractor Toolpusher/Rig Manager/Superintendent
327.Driller
328.Electrician
973.Radio silence restrictions must be observed before arming the guns, unless an
intrinsically safe blasting cap is used.
974.A qualified electrician must be present to de-energise areas designated by the service
company operator.
975.Lubricators must carry a stainless steel band specifying details of the most recent
pressure test.
976.The number of personnel authorised to work in the danger area (catwalk, rig floor)
should be kept to a minimum. All other personnel should be excluded from these areas
and appropriate warning signs positioned at all access routes. During assembly and
arming of the guns, no personnel are allowed in the area beneath the rotary table around
the wellhead, BOP's and riser. These restrictions can be relaxed once the entire gun
string is below the seabed.
977.Before running in hole ensure that a kill pump with access to one and a half times the
hole volume of kill fluid is connected to the X-mas tree, and is pressure tested and make
sure that the check valve is functional.
978.Ensure the rotary table is locked.
979.The lock-out cap of the hydraulically actuated master valve on the Xmas tree should be
installed when the gun passes through the tree valves (up or down) and should be
removed when the toolstring is 50m or more below the seabed.
980.Part used explosives, for example primacord, must not be left lying around on the rig
floor or catwalk area.
981.Tubing conveyed perforating (TCP) guns may not be retrieved to surface without first
retrieving the detonating device (drop bar).
Gun Loading:
982.The Company Representative, Rig Manager or Contract Toolpusher, crane divers and
deck pusher (head roustabout) should be informed about the area where explosives are
stored and handled.
983.No welding, smoking or heavy overhead lifts are permitted in the area where explosives
are stored and handled.
984.All spare and scrap explosives should be stored in the approved explosives stores.
Operational Checklist:
987.Ensure the explosives are the correct type for the downhole temperature conditions, and
are stored in an approved container in a suitably protected area, (approved explosives
stores).
988.Ensure radio silence is not only in force when arming the gun, but maintained during its
retrieval and is only relaxed once the guns have been confirmed fired or disarmed.
989.Identify any welding sockets and other sources of electrical power, and ensure that they
have been isolated to prevent stray currents from prematurely firing the guns.
990.Be aware of any approaching fog, adverse weather or lighting risk that could interfere
with perforating operations.
991.Keep the number of personnel on deck to a minimum in the area where the gun is being
armed.
992.Make up one and a half times the hole volume of kill weight fluid in the pits and line up
to the kill/cement pump.
993.Ensure any electric-line or wireline BOPs are tested prior to being rigged up.
994.For wireline perforating, ensure that the pressure control equipment is rigged up so that
if an unfired gun becomes stuck across the lubricator, due to a frayed cable jamming in
the grease injection tubes, the tree valves may be fully closed and not obstructed by the
toolstring. Otherwise the well may have to be killed.
995.Good communication is essential between the logging cab, the drillfloor, the central
control room (if on a production platform) and wellbay to avoid tree valves being
inadvertently opened or closed. Always count the turns when opening or closing these
valves.
996.Ensure sufficient toolstring weight is run to overcome wellhead pressure and to allow
the well to be flowed, if required, whilst perforating.
997.New formations must be perforated to bring hydrocarbons to surface in daylight.
998.Explosives
There are three techniques of well completions categorised under perforating. These are:
999.Shaped Charges.
1000.Bullet Charges.
1001.Sand Jetting.
Only the first method (Shaped Charges) will be discussed as the other two methods are seldom used in
Company operations.
Deep penetrating (DP) charges are used in all applications except gravel packing, where Big Hole (BH)
charges are considered to encourage a more efficient pack.
Shaped charges were developed during the Second World War to provide a method of penetrating metal
plating. In 1945 this method was adopted by the petroleum industry to penetrate casing, and was found to
be far superior to conventional bullet charges. A typical perforating gun equipped with shaped charges is
shown in Figure 14.1. The explosives used for perforating are shown in Table 14.1. The primary explosive
is lead azide and is used in the detonating cap, while the secondary explosive is most commonly RDX
and is found in the primacord and perforating charge.
1 2
) Primary Explosive ) Secondary Explosive
Secondary high explosives are categorised into five types: PETN, RDX, HMX, HNS, and PYX. The type of
explosive used is dependent upon the maximum anticipated time downhole before firing and the
downhole temperature.
Explosives degrade progressively both with time and increasing temperature. The maximum exposure
time at bottom hole temperature is generally taken as 100 hours. This means the ratings for the various
explosives are:
PETN: ???C
RDX: 115C
HMX: 155C
HNS: 230C
PYX: 260C
When used beyond the given ratings, the secondary explosives may either have a reduced performance,
or may fail to initiate or burn without exploding, producing high gas pressures but no jet.
1002.Perforating Guns
Perforating guns are run on wireline tubing or drillstring. Wireline guns are fired electronically, whereas the
tubing conveyed guns are fired by pressure from a drop bar. Figure 14.1 shows a typical perforating gun
equipped with shaped charges.
1003.Gun selection
TCP guns offer a superior perforating technique and are therefore first choice, in offshore locations. The
additional benefits of TCP perforating over wireline are:
1004.The use of TCP guns is less costly when perforating long intervals because of the
substantial savings in rig time as compared to multiple wireline runs. The completion and
perforating assembly can be run in the well on one trip (if the guns are to be left in the
well).
Figure 960.1 Typical perforating gun, equipped with shaped charges
NOTE: This method is generally not used for critical sour gas wells.
1006.Efficiency: Guns are available in sizes up to 184mm and charges up to 32g.
Through tubing guns are either semi-expendable strip carriers or hollow carriers, and are
made in sizes ranging from 111/16" to 21/8". These guns are so called as they are run
through production tubing or drillpipe on the wireline. Due to the smaller size of the hollow
carrier small charges must be used, and therefore the hole diameter and depth of
penetration of the perforations is not as great as with a casing gun. The guns are not
reusable as the ports are machined, not threaded. Phasings are generally limited to 0
and 180 and shot densities of up to 19 shots per meter can be installed.
The disadvantage of wire and strip carriers is that there is more debris left in the wellbore and, that
the charges loaded into the strip or wire carrier are more subject to environmental conditions such as
temperature, pressure and corrosive fluids.
Lubricators
The main components of an electric-line lubricator are identical to those used for braided wireline:
1022.Grease Injection Control Head.
1023.Ball Check Valve.
1024.Tool Catcher.
1025.3" or 3" ID Riser Sections.
1026.Twin hydraulically controlled BOP fitted with moulded rams.
Guns
1032.The threaded connections between gun sections are 6 pitch ACME incorporating at
least one O-ring seal. Ballistic connection to the detonator in the firing head is achieved
by self-aligning detonation transfer modules, whereby the primacord boosters are
automatically placed side-by-side when making up the guns.
1033.The last gun section is sealed off with a rounded end 'bull plug'.
1034.4" Liners are generally perforated using 33/8" TCP guns with 6 shots per foot phased
at 60.
1035.7" Liners are generally perforated using 5" TCP guns with 12 shots per foot phased at
60.
1036.The maximum length of TCP gun that can be run below a wireline set packer is
determined by the allowable weight on the cable used to set the packer and, therefore,
the weight of the total TCP assembly. The allowable weight must be confirmed with the
electric wireline contractor. In practice, around 25m of 33/8" guns or 15m of 5" guns can
normally be run.
Blank sections
1037.Blank sections are simply unloaded gun sections containing a primacord with self-
aligning detonation transfer boosters at each end.
Shock absorbers
1050.Both a vertical and radial shock absorber are included in a retrievable TCP assembly
to prevent the retrievable packer from becoming unseated. They are not considered
necessary below permanent packers in Company operations.
1051.Both shock absorbers are run below the packer. Ensure that the vertical shock
absorber is run above the radial shock absorber.
Retrievable packer
1052.The retrievable packer is used in TCP applications.
1053.Prior to running the packer, the Tooloperator will fill out a worksheet that calculates the
effect of internal and external pressure on the workstring. This will ensure that it is not
inadvertently unseated by the applied pressures.
1054.The calculation routine will provide the correct set-down weight required to prevent the
tension sleeve from prematurely shearing for the given conditions.
1055.The worksheet will also serve as a check to ensure that both the workstring and casing
are not mechanically damaged by the forces generated by the applied pressure.
Safety joint
1056.A safety joint is run above an RTTS packer to allow drillpipe removal should the
retrievable packer become stuck.
1057.In an emergency, the safety tension sleeve must first be parted by pulling on the
drillpipe. The safety joint is completely released by holding right hand torque on the
drillpipe whilst working it up and down (stroking) to back out the nut, which requires 10
turns to fully back out. Three strokes per turn are generally required.
Jar
1058.A jar is included in a retrievable TCP assembly to aid in removal of tools if they
become stuck.
1059.The jar provides this function by temporarily resisting a pull on the toolstring caused by
a hydraulic time delay in the jar. Resistance is released when the metering sleeve inside
the jar moves into the bypass section of the outer case, allowing the special hydraulic oil
to bypass rapidly. As many impacts as needed may be delivered by setting down weight
to re-cock the jar and repeating the above procedure.
Circulating valve
1060.A circulating valve is included in the gun assembly to allow circulation above the
packer between drillpipe and annulus, and additionally to act as a shut-in for the
assembly.
1061.The tool should be designed so that it is impossible to unintentionally expose the
annulus to flowing formation fluids.
Choke manifold
1067.The flow line from the hydraulically actuated wing valve is connected to a choke
manifold to allow full control of flow from the well after perforating.
1068.A five-fold configuration is used to allow a full bore flow path through the manifold and
total bypass of choke control. On one side of the bypass, an adjustable choke is used,
allowing more flexible control for wellbore flow-back. The other side of the bypass
contains a fixed choke.
Tubing Conveyed Perforating - TCP is used primarily to provide a high underbalance pressure at the time
of perforating. The large pressure differential created provides a method of clearing perforation tunnels of
debris that is a product of perforating. Well control is the secondary consideration in utilising TCP.
1071.Gun preparation
Due to the fact that TCP guns contain only secondary explosives, they can be loaded either
on the rig or at the service company base prior to usage.
On arrival at the rig site, the guns should be visually inspected for signs of damage incurred
during transit. Calliper all OD's to ensure compatibility with the casing/liner ID.
Cross-check the perforating intervals by requesting to see a copy of the original document
requesting the perforation. Mark the perforation intervals in the reference log to be used
for perforating.
Measure the length of each individual gun and blank section and ensure the perforating
intervals, shot density and shot phasing are consistent with the perforation programme.
All TCP accessories should undergo the same inspection and preparation routine applied to
tubulars which consists of:
346.Thread inspection and cleaning.
347.Drifting.
348.Length measurement.
Some relaxation of the acceptance criteria may be sensibly applied to any components
expected to be dropped after firing.
When using a drop-bar actuated hydraulic firing head, confirm with the TCP service engineer
the minimum hydrostatic head required to fire. Check that this will be available downhole,
taking into account the required underbalance.
Ensure the drop bar has an upper fishing neck and a lower impression block. Ensure the
correct fishing tool is on site of retrieval.
When using an hydraulic time delay firing head, confirm with the TCP service engineer that
the firing head has been pinned to begin its countdown at the required absolute
pressure, and that the orifice has been sized to give the required time delay before firing.
Ensure the activation pressure is less than the completion test pressure. Ensure
downhole temperature has been taken into account.
Ensure that the length of the firing head itself is not included in the total TCP assembly
running length, as it is entirely enclosed by the fill joint.
Ensure a mechanical release sub is installed, this should be drifted with a dummy shifting
tool to ensure compatibility.
When an automatic release sub is used, check with the TCP service engineer that the
release sleeve has been pinned such that the downhole pressure remaining after firing
will be sufficient to shear out the release sleeve.
Check that the glass disc in the ported pressure equalising sub is whole.
Since TCP guns utilise a one-piece steel loading strip to secure the charges and boosters, the gun
assembly is fairly resistant to damage during RIH. Normally, the running speed will be dictated by some
other equipment item in the gun string, such as the packer. However, sudden jarring motions from
stopping or restarting should be avoided.
Special care should be taken when running through a liner top or when tagging packers or plugs.
1074.TCP depth control
Three methods are used to ensure that the guns are at the correct perforating depth:
1075.Running a through-tubing GR/CCL to tie a reference point in the string into open hole
reference logs before setting the packer. This is the method most used.
1076.Running the guns below a wireline set packer. This is restricted to short TCP guns
only.
1077.Calculate the exact position of the completion/drillstring with respect to the formation
and the distance to be moved up or down to get exactly on depth.
When placing TCP's on depth, always pick up to the final depth. If tagging a plug to determine the position
of the packer, ensure full string weight up is regained before beginning to measure the distance to be
moved.
If twice the estimated time required for the bar to reach the firing head has been exceeded and there is no
indication of firing, proceed as follows:
Bleed down THP and open up the flowline to the separator and see if the well will flow.
If the well does not flow, depressurise and break out the lubricator and check that the drop
bar has dropped.
If the drop bar has dropped, slowly increase the tubing pressure until the pressure below the
packer is just above the formation pressure and observe for leak-off to confirm
perforations. If leak-off is observed it can be concluded that the reservoir is too poor to
produce.
If no leak-off is observed, rig up and pressure test the lubricator containing the appropriate
fishing tool for the fishing neck of the drop bar.
Run in hole slowly until the drop bar is located. The problem can usually be ascertained from
the position that the drop bar is located. Examples include:
349.Drop bar at firing head level implies excessive debris on top of the firing head,
flooded guns or a poor reservoir that will not produce (mechanical release sub).
350.Drop bar at ported equalising sub level implies excessive debris on the glass disc.
351.Drop bar at landing nipple level implies that the drop bar is standing up on an
internal shoulder.
Gently set down the fishing tool and pick up to ascertain whether the bar has been fished by
observing the line weight. If embedded in debris it may be necessary to jar upwards to
release the drop bar.
Pick up approximately 10m and go down fast in an attempt to pass the obstruction and/or
activate the firing pin. If necessary, jar down to get through debris.
If all attempts to reach the firing head fail or the guns will not fire, pull out of hole and inspect
the brass impression block at the base of the bar to decide further action:
352.A clear indication of contact with the firing pin implies that either the guns did fire
and the reservoir would not produce, or the guns failed to go off. In the latter case the
guns will have to be either retrieved and rerun, or alternatively dropped off and the
well perforated with through-tubing wireline guns.
353.An indication that the firing pin has not been contacted implies debris is preventing
access to the firing pin. In this case, in addition to the options to drop or retrieve the
guns, the debris can be cleaned out utilising coiled tubing or wireline bailers.
In wells with high deviation (between 30 and 60) or where debris is expected to be a problem, it is
recommended to run the drop bar on wireline in the first place. In this case proceed as follows:
Adjust THP to create the required drawdown.
Rig up wireline lubricator on Xmas tree or surface test tree with the drop bar installed on the
wireline toolstring. Pressure test the lubricator.
Equalise pressures over the swab valve and run in hole to gently tag the glass disc. If
excessive debris is suspected on top of the disc, jar down through the debris.
Pick up about 5m then go down fast to break the glass disc and carry on to impact the firing
head.
Observe for indications of firing mentioned above. When satisfied that the guns have fired,
retrieve the drop sub on the wireline.
After dropping the guns, tag the top of the resulting fish with the shifting tool to confirm that the guns have
dropped to the correct depth. Do not pass the top of the fish and risk jamming the wireline tool.
When using a mechanical release sub, it is normal to produce the well clean through the perforated pup
joint before dropping the guns, in order to maximise the benefits of perforating under drawdown.
When using an automatic release sub, it is still good practice to determine the top of the resulting fish with
a wireline dummy shifting tool before proceeding with any operations below the resulting tubing tailpipe
such as production logging.
Due to the safety features of the firing heads (neither type can fire without the presence of a
certain minimum hydrostatic pressure), gun retrieval does not represent a special safety
hazard. However, the safety procedures (See 14.2) should continue to be observed.
1096.Equipment preparation
The following equipment preparation guidelines should be considered:
1097.Retrievable TCP assembly accessories do not require the extensive inspection
procedures applied to permanent completion components. A general visual inspection
for obvious transit damage and length measurement is normally the only requirement.
Retrievable TCP assembly accessories are generally threaded 31/2" IF connections for
repeated make up and break out.
1098.Ensure running OD's of all equipment are consistent with the casing/liner ID, but note
that the blocks on the radial shock absorber are meant to be slightly larger than the
casing ID. Ensure that the blocks on the radial shock collapse easily.
1099.Ensure the correct size and type of retrievable has been delivered. Ensure the packing
elements are undamaged and the slips are sharp.
1100.In consultation with the test tool service engineer, ensure the force required to part the
tension sleeve in the safety joint is less than the yield value of any other components in
the string.
1101.In consultation with the test tool service engineer, ensure the nitrogen charge in the
circulating valve is correct for the required annular cycling pressure of the circulating
valve (usually 1 500psi [103.5bar]). Ensure the downhole pressure and temperature
have been taken into account. Verify that the valve has been functionally tested through
all positions in the contractors's shop. Ensure the circulating valve is in the blank position
when installed in the assembly.
1102.In consultation with the test tool service engineer, ensure the safety circulating valve
has been pinned to shear at least 1 000psi (69bar) over the cycling pressure of the
circulating valve.
1103.Check surface test tree and choke manifold valve function.
Care should be taken to avoid setting slips or rig tongs directly on the body of any test tools if it can be
avoided. Use a safety clamp above slips when no external upset is present on the pipe body.
Ensure external circulating ports are free before running in hole.
The circulating valve is run in the blank position. This allows the string to be internally pressure tested at
intervals and when ready to set the packer. Additionally it allows the string to be filled with brine only until
the correct underbalance is obtained. Thereafter, the string is not filled but run with an air 'cushion'.
The flowhead assembly is tested to the programmed test pressure prior to running the TCP guns, as
follows:
1114.Through the kelly cock against the underside of the closed master valve.
1115.Through the kelly cock and open master valve against the closed swab, kill wing and
flow wing valves with the low torque valves open.
1116.Through the kelly cock, open master valve and open kill and flow wing valves against
the closed low torque valves in the lines.
1117.Through the kill wing valve and master valve against the closed kelly cock.
Following a successful pressure test, no connections should be broken until all perforating operations are
complete.
After the packer is set, the flowhead assembly is made up to the top drillpipe joint. The kill line is
connected to the pump unit and the flow line to the choke manifold. Pressure testing continues as follows:
1118.The kill line is tested against the closed kill wing valve.
1119.The flow line is tested against the close choke manifold through the open kill and flow
wing valves.
1120.The choke manifold valves are selectively tested through the open kill and flow wing
valves.
The test pressure has to be maintained for a period of at least 10 minutes. Leakage depends on time
because the tortuous path fluids may follow through voids between threads and/or because of the slow
displacement of viscous but non-sealing thread compound.
A pressure drop of up to 10% of the initially applied pressure is acceptable as long as the pressure
remains constant for a period of at least 10 minutes.
All pressure tests should be recorded on a chart and signed by the Drilling Supervisor or Company
Representative supervising the test. Original charts must be readily available for scrutiny upon request.
1121.Well killing procedures
After perforation and inflow is complete, the following well killing procedures should be performed:
Retrieve the drop bar on slickline using a lubricator to enter the well against well pressure.
Cycle the circulating valve to the circulating position by applying the required annulus
pressure (circulating ports closed and ball valve open).
Bleed of any drillpipe pressure and reverse circulate out any hydrocarbons from the string
with fluid, taking returns via the choke manifold. Any oil contaminated returns should be
diverted to a separate storage tank.
Shut-in the drillpipe and cycle the circulating valve to the well test position (circulating ports
and ball valve open). Open the drillpipe.
Open the pipe rams, take the weight of the assembly on the blocks via the flowhead lifting
sub and pull the slips. Unseat the packer (See 14.6.3) by straight pull.
Reverse circulate twice the hole volume, taking returns via the choke manifold. Any oil
contaminated returns should be diverted to a separate storage tank for disposal.
NOTE: At this stage the newly perforated formation is exposed to a full column of
overbalanced fluid and losses may ensue. The packer should be unseated and lost
circulation pills should be circulated into position if possible. If the packer cannot be
unseated due to high differential pressures across the packer, lost circulation pills
should be bullheaded down the drillpipe.
When an acceptable level of losses has been achieved, break out the flowhead assembly
and retrieve the TCP assembly, pulling out slowly to avoid swabbing. Take the
precautions (See 14.5.10) when retrieving the guns to surface.
If the circulating valve fails to cycle into the circulating position to kill the well, pressure up further and
activate the safety circulating valve. In this case, the tubing will remain plugged below the safety
circulating valve circulating ports and there is no circulating route below the packer. On unseating the
packer, any losses have to be dealt with by bullheading down the annulus.
1122.Wireline Perforating
The following procedures should be followed when conducting wireline perforating. For more detailed
instructions see the corresponding paragraphs in this section:
Contact the specified perforating company to notify them as to the time that they are
required to be on location, interval to be shot, gun type and size, charge size, phasing
shot density and expected temperature and pressure.
NOTE: Under no circumstances is the detonator to be loaded into the perforating gun prior to
arrival on location.
When the perforating company arrives on location check to ensure that the requested gun
has been supplied.
NOTE: If there is the possibility of electrical storms occurring during the perforating phase,
then operations should be suspended until the weather clears.
If the perforator is not in use, store it in a convenient place away from the current operation.
Place the gun on the catwalk. Check the OD of the gun to ensure that it will pass through all
downhole profiles. Check the OD of the collar locator to ensure that it will pass through
all profiles as well.
NOTE: Do not approach the perforating gun from the side, but from either end.
Pressure test the lubricator with the wireline installed. The required pressure will be specified
in the program. A typical equipment arrangement is shown in Figure 14.4.
A GR or neutron correlation log can be run at this time. Unless a gun gamma arrangement is
used, the guns will be placed on depth with the CCL.
If pip tags are installed for depth correlation, check the response by placing the GR tool
adjacent to the tags and check for a response.
Check to ensure that the casing to rig is properly grounded. The maximum voltage
measured in the grounding circuit should not exceed 25V. Do not proceed until the circuit
is properly grounded. The resistance of the gun circuit should also be checked prior to
installing the cable head. This will ensure that the gun will conduct the voltage required
to fire the detonator.
Shut off all radio transmitters and generators prior to installing the detonator and making up
the CCL/casing gun assembly. Any perforating track panels not in use should be
disconnected.
Make sure that only authorised personnel are present at the catwalk and wellhead areas.
When the detonator is installed and the perforating assembly is complete a final check of the
CCL to top shot measurement should be made.
The Company Representative may stand at the end of the perforating gun while the
measurement is made. The CCL should have a measuring point marked on it.
WARNING:
Do not approach an armed gun from the side.
Zero the odometer relative to the KB elevation prior to RIH. Running speed should be 40 -
50m/min.
The wireline should be coated with a corrosion inhibitor while RIH in a sour environment
(7 500ppm H2S).
WARNING:
If the tool circuitry is malfunctioning and the gun is returned to the surface, the detonator must
be disconnected prior to locating the electrical problem.
Run a CCL strip to pick up at least five collars which will cover the zone of interest. Make
note of the correction required to place the CCL on depth. The gun is always to be
placed on depth by logging into the zone.
Make one last check of the correlation log to ensure that the collars match. Check that the
odometer(s) reflect the measured distance (as per Step 13) from the CCL to top shot.
The top odometer is usually the CCL while the bottom odometer will be the top shot.
Detonate the perforating gun.
Look for indications that the gun has fired.
When the perforating assembly has been returned to the lubricator, the odometer should
zero at the same point as it did prior to RIH. If it does not, the following checks should be
made:
378.Was the running speed in excess of 50m/min, as this will cause odometer slippage.
379.Is the odometer wheel worn down to a reduced diameter. This will result in a higher
measured depth than the actual depth recorded at the zone of interest.
Once it is ready to rig out, watch for trapped pressure. The lubricator pressure should be
fully bled off.
Once the perforating operation has been completed, all explosive remnants and debris
should be removed from the wellsite by the perforating company.
1123.Preparation
The following guidelines for wireline perforation should be considered:
1124.The logging service company should be provided with the following data:
380.A complete sketch of the well, including location of tubing tails, liner tops, packers
and nipples, etc.
381.The required perforating intervals.
382.The reference log to be used for perforating.
383.The cased hole logging report.
1125.Ensure that the correlation log to be used for perforating, usually the CCL/GR on the
cement bond log is on depth with the log used to select the perforation intervals. Mark
the perforation intervals on the reference log to be used for perforating.
1126.Cross-check the perforating intervals by requesting to see a copy of the original
document requesting the perforation.
1127.Check the perforating string OD and ensure it will pass through the completion string.
A wireline dummy run to below the bottom perforation should be carried out prior to
running perforating guns.
Figure 960.4 Typical equipment arrangement for lubricator pressure test
1128.Calculate, in consultation with the logging engineer, the number of sinker bars required
in the perforating string.
1129.Visually inspect the gun before the detonator is connected ensuring:
384.The number of shots and overall length of the guns and spacers is consistent with
the required intervals to be perforated.
385.All screws are properly tightened.
386.All shoulders on the gun assembly should be chamfered to prevent hanging up on
nipple profiles, etc.
1130.Measure the distance CCL measure point to top shot and confirm this with an
independent measurement taken by the logging engineer.
1131.Calibrate the CCL, and GR if used.
WARNING:
All personnel must be out of the line of fire at this stage.
1134.Ensure the detonator is placed in a detonator safety tube before untwisting the lead wires
and connecting to the gun.
NOTE: Ensure that the riser has the correct dimensions to contain the largest and longest tool
expected to be used.
NOTE: No connections on the lubricator should be broken following a successful test. When rigged
up on a well with SITHP, the BOP's and lubricator should be fully tested at the
commencement of each series of wireline runs, and not necessarily before every run.
The test procedure for wells with no tubing head pressure is as follows:
With the upper master valve open and the swab valve closed, install the dual wireline BOP's
on top of the Xmas tree.
Close the lower BOP's around the polished test rod appropriate to the cable size to be used.
Ensure that the test rod is chained down to prevent movement during application of
pressure.
Fill the body of the BOP's with water and close the upper rams.
Slowly apply pressure between the rams, bleeding off air until the system is full, then test
between the rams to the maximum anticipated tubing head pressure for 15 minutes. If
the test is unsatisfactory, visually inspect the BOP's to determine the leak path.
Bleed off the pressure, partially open the rams, remove the polished test rod, close the
upper master valve and open the swab valve and kill wing valve.
Assemble the riser and hydraulic grease tube with the cable head and perforating string.
Make up to the BOP's and pull up to within 0.5m of the tool catcher.
Fill the lubricator and hydraulic grease tube with completion fluid very slowly, until all air has
been evacuated. Keep the stuffing box closed to prevent the tool being lifted into the tool
catcher. The lubricator is full when test fluid is observed coming from the exhaust hose
on the hydraulic grease tube.
Once a seal has been established, slowly crack open the swab valve to equalise the
pressure in the lubricator to the available tubing head pressure. Observe for leakage for
15 minutes. Fully open the BOP rams and run in hole.
When filling up the lubricator with liquid, this should be done very slowly to avoid 'burning' the cable due to
air being expelled at high rates between the cable and the flow tube walls of the stuffing box. The fill rate is
generally kept low enough to keep the pressure less than 69bar.
In gas filled wells, gas from the wellhead is used to pressure test the lubricator to prevent the formation of
hydrates in the lubricator. In the presence of wet gas, glycol is always injected during the operation to
prevent hydrate formation.
The BOP rams are kept closed to act as a tool trap until ready to run in hole.
1136.Running in hole
Check the cable magnetic marks near surface and add extra marks for close control when pulling out.
Mark the position of the last cable layer on the drum when the gun is positioned below the wireline BOP
by a metal pointer attached above the drum so that the exact position of the gun is known when pulling
back into the lubricator.
Stop the tool in the tubing every 500m and check the hanging weight, allowing any slack caused by cable
friction to be taken up.
Check periodically that the grease seal is holding the well pressure.
Take extreme care when passing through tubing downhole accessories, such as landing nipples and
tailpipes, and also when going through the liquid levels.
Running in speeds should not exceed 1 000m/hr when reaching and operating below the lower
completion accessories.
1138.Depth correlation
All correlation runs using the CCL and/or GR should be made logging up and the gun put in position for
firing with the gun moving in the same direction.
When shooting multiple intervals with strip guns it is preferred to shoot the lowest interval first and
progressively work up the hole. This minimises the possibility of debris from blocking intervals not yet
perforated. This procedure usually applies to carrier guns too, but is less critical since less debris is
generated.
Log up over the interval to be perforated. Where present, use any pup joints or joints of distinctive length
to correlate the CCL on the perforating string to the CCL on the field reference log as long as the distance
between the perforating interval and the distinctive joint is not more than 30m.
Ensure the field reference log, usually the CCL from the cement bond log, is on depth with the reference
log used to select the perforation interval, usually the neutron-density log. If not make the appropriate
corrections.
It is possible to feed the depths of the casing collars from the reference log into the on board computer in
the logging unit and allow depth correlation to be carried out automatically.
After depth correction, always relog the interval to prove that the perforating string is now on depth with
the field reference log.
1139.Perforating
When perforating for the first time in a new reservoir, have the cementer unit standing by.
When perforating underbalanced, check that the THP is consistent with the required underbalance prior to
perforating.
When firing look for indications that the gun has fired. These can include:
1140.A reduction in cable tension.
1141.Ammeter (current) readings.
1142.A pressure fluctuation (can be up or down) when perforating underbalanced.
1143.A slight change in depth recorded by the CCL.
When picking up, record the 'after firing' CCL as a final record of perforating depth. A slight discrepancy
between the before and after firing log is an indication that the gun has fired.
Due to the possibility of the guns becoming distorted during firing and the possibility of cable armour
balling, extreme care should be taken when:
1145.First picking up the gun after firing.
1146.Entering the tailpipe.
1147.Passing through any restrictions such as nipples and SSSV's.
1148.Gun retrieval
Regardless of any indications to the contrary, always assume that the guns have not fired when retrieving
to the surface. For this reason, radio silence restrictions must be in force before pulling the gun string
above 50m below the seabed level, unless an intrinsically safe detonator is in use. Radio silence should
be maintained and all personnel kept out of the direct line of fire until the gun has been confirmed by the
logging engineer to be completely fired.
At 50m below the seabed, re-install the lock-out cap on the hydraulic master valve. When near surface,
observe for the multiple magnetic marks and the cable layer on the drum to indicate the position of the
gun.
When the tool head is beginning to enter the lubricator, which on some lubricators is indicated by the
activation of a mechanical flag, the logging crew should pull the cable by hand until the perforating head
makes a positive engagement in the tool catcher at the top of the riser. If this is impractical due to the
weight of the tool, the winch should be used with extreme caution. A positive engagement in the tool
catcher is indicated by applying a little more hand pull on the line which should have a 'play' of about an
inch.
When the gun is confirmed to be completely in the lubricator the gun should be retrieved via the following
procedure:
Close the swab valve on the tree counting the number of turns to ensure nothing is trapped
over the valve.
Close the hydraulic master valve and re-open the swab valve.
Vent the lubricator via the choke manifold.
Close the flowline valve and bleed off any remaining pressure in the lubricator with the
pressure release needle valve. Confirm there are no trapped pressures with the back-up
needle valve.
Close the swab valve and disconnect the lubricator from the wireline BOP's. If the
connection is difficult to break it could be indicative of residual pressure in the lubricator.
After retrieving the gun from the lubricator, lay the gun on the catwalk and disconnect the perforating head
and blasting cap from the shaped charges by cutting through the prima cord. Remove the blasting cap
and render safe by twisting the leg wires together.
Before carrying out the next run inspect the gun for any unfired charges and, if present, ascertain the
reason why they did not fire. Check the insulation and continuity of the cable.
If any of the charges did not fire it may be necessary to reperforate over the same interval.
If the tool remains stuck, work on the cable gradually, increasing tension slowly until it breaks at the weak
point. If the cable does not part with a tension of weak point rating plus 25%, it may be necessary to use a
cable cutter to cut the cable at the cable head.
After breaking the cable, consideration should be given to killing the well to facilitate retrieval of the cable.
If the well is pressured and the decision is taken not to kill the well, retrieving a cable to surface under
pressure requires a higher than normal risk and requires specific procedures and extra safety
precautions:
Hold a safety meeting with all personnel involved to discuss the procedure to be followed.
All personnel not essential to the operation shall be cleared from the wellhead rig floor area.
Ensure that the proper means of communication between the operator at the lubricator and
the winch operator are available and in use.
Lower the top logging sheave as much as possible to reduce the free length of cable above
the lubricator.
Retrieve the cable slowly and with extreme caution near the surface to prevent the cable
being ejected out of control from the lubricator. Increase and manipulate the grease
injection pressure to control the cable speed. Do not use the wireline BOP's to apply
friction.
Observe for the multiple magnetic marks which indicate that the end of the cable is nearing
the surface. Close the swab valve as soon as the end of the cable is in the lubricator,
counting the number of turns to ensure nothing is trapped across the valve.
Bleed off lubricator pressure, see 14.7.9.
After recovering the cable, make a wireline run with a lead impression block to ascertain the gun's
position. If the gun has fallen to the bottom of the hole, it will frequently be left there if it does not hinder
any other operations. If the gun was not fired, explosives will degrade and will not self detonate.
1158.Correlation Logging
Correlation logs can be run prior to the perforating run, with the perforating gun (gun gamma tool) or when
the CBL (Cement Bond Log) is run. In any case, the following procedures should be followed:
The correlation log will consist of a GR-CCL combination or a neutron-CCL combination. It is
of utmost importance that this log be placed on depth correctly. Otherwise the guns may
be detonated off depth.
Check the running speed of the open hole log. The correlation log should be run at the exact
same speed. This will eliminate shifting of the gamma ray log due to differences in the
tool response lag.
If the reference point (measuring point to top shot) of the CCL is not clearly marked on the
outside of the tool, then check the reference point by passing a metal object past the tool
and record the position at which a response is measured.
The CCL response can be used to check casing weight. An increase in casing weight will be
presented on the log as an increase in the magnitude of the signal.
This can be used to correlate log depth to the casing tally and may also be used to indicate
a reduction in the internal diameter of the wellbore.
1159.Underbalance
The procedure for circulating to underbalance through a Side Pocket Mandrel (SPM) is as follows:
Rig up and pressure test a wireline lubricator with a kickover and pulling tool for the SPM
dummy valve.
Retrieve the SPM dummy valve leaving the SPM ports open.
Straight circulate the well to the required volume of underbalance fluid (diesel or nitrogen)
via the kill wing valve, taking returns from the annulus to an Expro measuring tank to
monitor the liquid level inside the tubing. The liquid level must not be allowed to fall
below 100m above the SPM in order to avoid contaminating the annular fluid. Restrict
flowrates to 300l/m to avoid washing out the SPM pocket.
NOTE: Calculate the hydrostatic head of nitrogen required due to its compressibility.
Run a SPM dummy valve, tag liquid level and latch the dummy into the SPM.
Prior to perforating, adjust THP according to the measured liquid level to create correct
underbalance at the formation.
Contents
Illustrations
1161.Introduction
Stimulation and acidising are non-routine operations. Prior to starting these operations a pre-job safety meeting
shall be held. The functional responsibilities of the well site staff/supervisory personnel shall be reviewed at the
safety meeting. All safety precautions shall be discussed in detail.
Both stimulation techniques require accurate, tailor-made programmes. These programmes shall be designed by
experienced and specialised engineers/contractors.
WARNING:
Spent acid and acid contaminated water cannot be dumped into the sea. Also proper
arrangements shall be made in advance to handle this waste stream (offshore and
onshore).
1169.Stimulation fluids
1170.Acid types
The acids most commonly used in well stimulation treatments are:
1171.Hydrochloric (HCl) - dissolves carbonates.
1172.Hydrofluoric (HF) - dissolves both carbonates and silicates.
The acids are used, in combination (mud acid) but HCl can be used alone. They are normally stored by service
companies at 36% (wt), then diluted with fresh water for field use to various strengths as follows:
1173.Sandstone:
387.15% HCl
388.12% / 3% HCl/HF (Full-strength acid mud)
389.12% / 1.5% HCl/HF (Half-strength acid mud)
390.7.5% HCl
391.6% / 1.5% HCl/HF
1174.Carbonate:
392.28% HCl
393.15% HCl
The amounts of acids used varies from 0.1 to 1.0m3/m perfs, dependent on the required treating radius, porosity,
field experience and type of damage to be treated.
1175.Acid additives
All acids are combined with chemical additives. These are used to prevent additional formation damage
occurring through the interaction of stimulation fluids with formation fluids. All acid formulations include:
1176.Corrosion inhibitor.
1177.Silt suspending/anti-sludge agent.
1178.Iron sequestering agent.
1179.Surfactant/alcohol.
1180.Diverting agent.
1181.Pre-flush, post-flush and displacement fluids.
1182.Fracture fluids
The most common carrier fluid types are:
1183.Water-based gel.
1184.Water/oil emulsion.
1185.Gelled diesel oil.
1186.Foam.
1194.Fracture proppants
Proppant is used to maintain the opening in the fracture, thus providing a permeable flow path. Usually sand or
sintered bauxite is used as a proppant because these materials are spherical and of uniform size to maximise
permeability. It is pumped into the well with the carrier fluid. Sintered bauxite is more expensive than sand, but
it is stronger and is used to withstand closure pressure that would crush other proppants.
1195.Stimulation equipment
Only approved 'frac' iron is to be used for rigging up temporary high-pressure lines. Screw-type Weco
connections are outlawed because of the potential for the threads to strip under high pressure.
Acid will be transported to the rig in 1 500gal. fibreglass lined transport tanks. It is generally transported in neat
form (36% conc) and diluted to the job strength requirements at the wellsite. Additives are transported as
sacks/drums for mixing on site.
Storage/Mix Tank:
1197.Acid will be placed in a storage/mix tank.
Blender:
1198.The blender is used to treat the acid to the job specifications. It has either a 50 or
100bbl. tank for batch mixing and a centrifugal pump. Acid is circulated from the storage
tank, treated and returned until the required volume has been prepared.
1199.During the job the blender pump is used to precharge the main pump.
Figure 1160.1 Schematic rig-up for stimulation
Pump:
1200.The main pump consists of a Horizontal Triplex type pump with either a V8 or V16
power unit.
1201.Rated at 800HP with a 4" Fluid End, to a maximum pressure of 1 035bars.
Lines:
1202.Acid will be directed from the pump to the wellhead via 2" high-pressure chicksan lines.
1203.The storage/mix tank, blender and main pump are connected using low-pressure
hoses, either 2" or 4".
1204.The high-pressure line from the pump to the well will contain a flowmeter (to monitor
volumes) and one or more check valves (flapper type valve).
The boat is connected via a Coflexip hose and quick release to a "Saddle" on the rig side. The "quick release" is
needed for cases where the boat suddenly has to break away from the rig.
1206.Preparation procedures
Before commencing stimulation operations the following should be complied with:
1207.Ensure monitoring equipment (pressure / pump rate / cum. volume) work properly and
back up is available.
1208.All equipment that requires pressure testing is to be given a 15-min. test to a pressure
higher than the expected fracturing or injection pressure. This pressure shall not exceed
the safe working pressure.
1209.Mixing tanks and lines must be clean.
1210.Check volume of freshwater for acid mixing, and additive concentrations. Take
samples of acid for quality control.
1211.Ensure well equipment (surface and downhole) is adequate for the maximum injection
pressure:
394.Ensure the X-mas tree rating is adequate.
395.Ensure the tubing, casing and liner lap are pressure-tested. At high pump rates it
may be necessary to apply annulus pressure to reduce pressure differential across
the tubing.
396.Ensure the tension, burst, and collapse rating of the tubing will not be exceeded.
397.Ensure the downhole equipment (packers, sleeves, safety devices, side pocket
mandrels) is in proper operational condition and all materials are compatible with the
fluids to be pumped.
1212.Check that the treatment interval (perforations, open hole) is in a proper condition for
the planned treatment.
1213.Estimate the length of the job based on the expected pump rate and volumes to be
pumped. The pumping schedule should allow flowback of spent acid the same day.
1214.Calculate relevant volumes (tubing, pockets) to estimate when fluids are at the
perforations.
1215.Calculate the required hydraulic horsepower of pumps by:
HHP (Effective) = Pump pressure (bar) x Pump rate (m3/min) x 2.24
1216.Operational checklist
1217.Quality control all stimulation fluids and materials to be pumped (i.e., acid strength,
proppant size/sphericity/strength, freshwater purity, corrosion inhibitor, etc.).
1218.Confirm acid tanks are top-discharge, pump or compressed air displaced, properly
lined type vessels.
1219.Verify that all frac/stimulation iron is suitability rated for the job in hand. Ensure no
threaded-type connections are used.
1220.When pumping acids, ensure all the required safety equipment is available, and that
spillage containment teams and procedures have been set up. Specify the correct
neutralising agents for each acid type.
1221.Stimulation work may only be carried out during daylight hours. Ensure that the job
pumping time is finished with sufficient time to produce spent acids the same day.
1222.Verify maximum pumping pressure.
1223.Ensure mixing tanks and lines are clean prior to pumping.
1224.Check that the mechanical status of the well is adequate for the maximum anticipated
test pressures.
1225.Ensure all measuring equipment is calibrated, functional and that back-ups have been
provided.
1226.Safety
1240.Acidising
1241.General
Acid may be squeezed to the formation by 'bullheading' or by using coiled tubing.
The amount of fluids used are calculated as a volume per metre of perforated intervals. Normally, the
stimulation consists of sequentially squeezing fluids into the formation:
1242.Pre-flush: 15% or 7.5% HCl
Displaces water from and near the wellbore, dissolves calcareous formation material -
prevents the forming of insoluble calcium fluoride during the main treatment.
1243.Main flush: 12%/3% or 6%/1.5% HCl/HF
HF reacts with clays, sand, mud and cement to improve permeability. HCl reduces HF
precipitates.
1244.Post-flush: 2% NH4Cl, Methanol or Nitrogen
Isolates main flush from brine, removes acid precipitates from near the wellbore, and
restores the wettability of the formation.
1245.Pump pressure and rates
Maximum pump pressure is defined as the maximum surface pressure prior to formation breakdown.
It is a function of: fracture gradient, true vertical depth, fluid density, and tubular friction loss where:
Max. Pump Press. = FG x TVD/10 - HH + FL - SF
Where: FG = fracture gradient (bar/10)
TVD = true vertical depth of interval (m)
HH = hydrostatic head of fluids (bar)
FL = friction loss in tubing (bar)
SF = safety margin(bar)
The fracture gradient of the formation is often unknown. In practice, an estimate from previous area experience
is used.
The friction loss is derived from computer programmes or charts. A viscosity of 1cp is generally assumed for
acids.
The safety margin is an arbitrary pressure to assure the reservoir will not be fractured. Generally, it is in the
order of 20bar.
Maximum pump pressure dictates the maximum pump rate.
1246.Displacement
In general, the main flush is either pumped +/- 1m from the wellbore or produced back immediately.
A common problem in matrix acidisation is the inability to inject fluid - the maximum pump pressure being
reached with no injectivity. See Figure 15.2 for optional procedures.
1247.Post-acidisation clean-up
Open the well and flow back spent acid at the maximum attainable flow rate.
Take samples of spent acid. Continuously monitor the pH of the returns and store any returns with a pH < 5 in a
separate tank.
Figure 1160.2 Decision tree (low injectivity)
1248.Fracturing
The purpose of hydraulic fracturing is to create a highly permeable flow channel into the formation through.
Either near wellbore formation damage or low reservoir permeability determines the frac length. Frac length
determines the amount of proppant required and the volume of fluid required to carry the proppant. Typically,
wells with near wellbore damage require short frac lengths and wells with low formation permeability require
larger frac lengths.
In most instances oil or water are the base fluids used as a proppant transport medium. Where water is the
principal base fluid, verify water purity with a turbidity meter.
Where hydrocarbon fluids are to be used, pilot testing is of the utmost importance as contamination may destroy
the ability of the fluid to gel properly.
1249.Fracturing procedures
Micro-Fracturing:
1250.Initially an Injectivity Test may be carried out to determine the ISIP (instantaneous
shut-in pressure): the pressure observed immediately following shut-in. During this test
the formation is fractured and pumping continues for a short period. The pumps are then
stopped and the leak-off pressure observed. ISIP is equal to the bottom hole fracture
pressure less than the hydrostatic pressure of the fluid column.
1251.The information obtained may be used to adjust the fracture programme.
1252.Prior to completion of an entire zone, selected areas may be perforated over a short
interval for the purpose of injectivity tests.
Mini-Fracturing:
1253.A small frac conducted with frac fluid and proppant prior to the main frac.
1254.The formation is fractured and frac fluid is pumped for 10 minutes. The pumps are
then stopped and leak-off examined for ISIP, closure pressure, and leak-off rate.
1255.Based on these parameters the fracture programme may be adjusted.
Main Fracturing:
1256.A large volume (40-70% of the total fluid volume) is pumped before any proppant is
added to the base fluid. Its purpose is to open the fracture and propagate the fracture tip
away from the wellbore.
1257.If too small a volume is pumped there is a risk of 'sand out' due to proppant reaching
the tip of the fracture and preventing further propagation.
1258.Proppant is added in various stages increasing proppant concentrations. The
concentration is increased as the fracture is propagating outwards. Too high a proppant
concentration may cause screen-out within the fracture or at the perforations.
1259.Under-displace the flush leaving proppant at the perforations.
1260.The fracture should begin to close at the time when pumping terminates.
Post-Fracture Procedures:
1261.In order for any fracture treatment to be successful, fracture closure must occur prior to
the gel breaking. If closure does not occur prior to gel breaking the closure must be
induced. Closure is induced by bleeding the well of at a very low rate.
1262.Monitor and record the wellhead pressure accurately.
1263.Following the shut-in period, the free depth of the well is checked with a wireline.
1264.Explosive proppant remaining in the frac string shall be cleaned out.
Contents
16. WELL EVALUATION AND PRODUCTION TESTING ..............................................XLVIII
16.1 Introduction ........................................................................................................XLVIII
16.1.1 Proof of minerals .........................................................................................XLIX
16.2 Production Testing Equipment .............................................................................XLIX
16.2.1 Equipment overview ....................................................................................XLIX
16.3 Equipment Description ...............................................................................................L
16.3.1 Xmas tree..........................................................................................................L
16.3.2 Surface safety valve..........................................................................................L
16.3.3 Data header .....................................................................................................LI
16.3.4 Choke manifold ................................................................................................LI
16.3.5 Heater ..............................................................................................................LI
16.3.6 Separator .........................................................................................................LI
16.3.7 Gauge tank......................................................................................................LII
16.3.8 Burner booms and burner heads ....................................................................LII
16.3.9 Surface piping .................................................................................................LII
16.3.10 Emergency Shut-Down (ESD) system ..........................................................LII
16.3.11 Sand filters ...................................................................................................LIII
16.4 Production Testing General Safety .........................................................................LIII
16.5 Potential Problems During Production Testing ...................................................... LIV
16.5.1 Liquid loading of gas wells ............................................................................ LIV
16.5.2 Hydrate formation.......................................................................................... LIV
16.5.3 Hydrate suppression .................................................................................... LVII
16.5.4 Treatment of hydrate plugs ......................................................................... LVIII
16.5.5 Hydrogen sulphide ...................................................................................... LVIII
16.6 Production Logging (Cased Hole Logging) ............................................................. LX
16.6.1 Introduction .................................................................................................... LX
16.6.2 Flowmeter spinner....................................................................................... LXIII
16.6.3 Continuous flowmeter tool (Schlumberger - CFS, Atlas - FMCS) ............... LXIII
16.6.4 Full bore spinner tool (Schlumberger - FBS, Atlas - FMFI) ......................... LXIII
16.6.5 Inflatable diverter tool (Schlumberger - IDT, Atlas - FMBK) ........................ LXIII
16.6.6 Fluid density tools ....................................................................................... LXIII
16.6.7 Gradiomanometer (Schlumberger - GMS) .................................................. LXIII
16.6.8 Pressure temperature sonde (Schlumberger - PTS, Atlas - FDDP)............LXIV
16.6.9 Nuclear fluid density tool (Schlumberger - NFD, Atlas - NFL).....................LXIV
16.6.10 Temperature tools (Schlumberger/Atlas - TEMP) .....................................LXIV
16.6.11 Manometer tools (Schlumberger - MTS/HMS, Atlas - SRPL) ...................LXIV
16.6.12 Strain gauges .............................................................................................LXV
16.6.13 Quartz gauges............................................................................................LXV
16.6.14 Water hold-up log (Schlumberger - HUM, Atlas - WHI)..............................LXV
16.6.15 Gamma ray (Schlumberger/Atlas - GR) .....................................................LXV
16.6.16 Casing collar locator (Schlumberger/Atlas - CCL) .....................................LXV
16.6.17 Compact production logging tool (Schlumberger)......................................LXV
16.6.18 Memory production logging tool ................................................................LXVI
16.6.19 Preparation procedures.............................................................................LXVI
16.6.20 Thermal decay time (Schlumberger - TDT, Atlas - PDK) .........................LXVII
16.6.21 Logging procedures .................................................................................LXVII
Figures
1266.Introduction
A well is production-tested to determine the production and reservoir characteristics of oil
and gas. The objective of the test is to determine:
1267.Formation parameters; reservoir geometry, reservoir pressure and temperature.
1268.Formation performance parameters; production rate at 50bar drawdown, and skin
factors.
1269.Fluid parameters; PVT fluid samples are taken for laboratory analysis.
1270.Well performance parameters; wellhead pressures versus flow rates to calculate
deliverabilities.
1271.Flow contributions; production logging.
All of the above parameters rely on the interpretation of pressures and flow rates. For this
reason, it is essential that every effort is made to ensure that measurements are taken and
recorded in as accurate a manner as possible.
1274.Equipment overview
The basic process train for production testing is as follows (see Figure 16.1):
The formation fluids exit the well via the flow wing valve of the Xmas tree. The kill wing valve
is connected to the kill pump. A check valve is installed in the 2" line.
The fluids flow through the 3" surface piping to the choke manifold, passing through an
emergency shut-down valve and the data header. At the data header, pressure and
temperature parameters are collected and inhibitive chemicals can be injected.
The fluid pressure at the choke manifold is allowed to drop in a controlled manner.
Passing through the choke manifold causes cooling of gases. The fluids can be passed
through a heater if hydrates are anticipated. An additional choke is incorporated in the
heater for dropping the pressure in stages when hydrate formation is a real problem.
The fluids are separated into gas, oil/condensate, and water at the separator.
The gas is allowed to flow to the burner booms via an orifice meter. The gas can be directed
to either boom at the gas manifold.
Oil/Condensate flows to the oil manifold where it can be either directed to a gauge tank or
flowed directly to the burner booms. The oil can be metered at the separator.
Water is allowed to flow directly to the gauge tank.
Fluids in the gauge tank can be transferred to the burner booms or a separate storage
vessel via the oil manifold using a transfer pump.
To optimise the burning mixture at the burner boom, the hydrocarbons can be mixed with air,
from a dedicated compressor, and water from the rig pump.
Figure 1265.1 Production testing process train
1275.Equipment Description
1276.Xmas tree
The solid block Xmas tree shall be used.
Casing and tubing annulus pressure can be bled off to the process train via a T-piece
connection on the flowline. Likewise, the well can be killed either by straight or reverse
circulating through an identical T-piece connection on the kill side.
The kill wing valve must always be left open during production testing in case of an
emergency kill operation. The valves at the cement or kill pump unit are kept closed.
A check valve is installed upstream of the kill side of the tree to prevent flowback from the
well to the cement or kill pump unit, during kill operations.
Pressure gauges should be fitted to the instrument manifold with double valve isolation.
1279.Choke manifold
A 4-valve choke manifold (no central bypass) is used in Coparex operations. It comprises
four gate valves with a positive, fixed bean choke between two of the valves and a variable
multi-orifice or needle, and a seat type choke between the other two valves. Bleed off valves
are located up and downstream from both chokes.
The choke manifold must be rated to the maximum anticipated surface pressure, usually
690bars.
1280.Heater
The heater serves to re-heat the produced fluids after a temperature decrease caused by
the pressure drop over the choke. In gas wells this is most likely to prevent the formation of
hydrates.
Steam is ideally provided from a rig source, but can be provided by a stand-alone diesel-
electric steam generator if required.
The process coils are rated to 345bars minimum; steam coils and pressure vessel to only
150-200bars. A pressure relief valve and bursting disc are provided on the pressure vessel
to vent off pressure in the event of process coil rupture.
The heater incorporates a bypass manifold if there is no requirement to heat the produced
fluids.
1281.Separator
A horizontal 3-phase test separator can be used to separate the gas, oil/condensate and
water phases from the produced fluids.
Gas is metered by a senior orifice fitting on the discharge line. Ensure the gas meter is
properly bypassed and vented when changing the orifice plate size during well flow.
Oil/condensate and water are discharged by separate lines and metered by positive
displacement turbines which can be bypassed. Oil/condensate is routed via an oil manifold
either directly to the burner booms or to the gauge tank. Water is routed directly to the gauge
tank.
The maximum working pressure of the separator is 100bar. A safety relief valve set at
100bar and a rupture disc set at 110bar ensure that this pressure is never exceeded. The
separator is normally the 'bottle-neck' in the processing train, determining the maximum
throughput of the system, The capacity depends on where the liquid level is operating:
1282.High-level: up to 7 000 000m3/day gas and 2 070m3/ day liquids.
1283.Low-level: up to 1, 700 000m3/day gas and 795m3/day liquids.
1284.Gauge tank
The gauge tank is open to the atmosphere and consists of two compartments, either 50bbl
or 100bbl.
When full, the contents are transferred by pump via the oil manifold to the burner booms.
The transfer pump is an electrically-driven, explosion-proof centrifugal pump.
Any additional gas, produced by the oil/condensate after the separator, is vented via the top
of the gauge tank and a vent line hung overboard. The vent line contains a flame arrestor to
prevent accidental combustion.
The air is provided by a dedicated compressor supplied by the test contractor. Water is
provided from a rig pump, which also provides water to a T-piece located some 5m behind
the burner head to provide an additional water shield against heat radiation.
For safety, the oil, air, gas and water shall be supplied through check valves.
1286.Surface piping
The pressure rating of the surface piping should be compatible with the rating of the
downstream item of process equipment. The ID should be sufficient to maintain non-
restrictive flow of the process fluids, and should certainly never have an ID less than the
largest choke size.
The flowline from the Xmas tree to the cantilever deck ( for Jack-up rigs) shall be a 3"
coflexip hose. This is connected to the test contractor's hard pipe at this point. All
connections should be metal-metal Weco" type, compatible with the pressure rating of the
pipe and with the connections welded rather than threaded to the pipe sections.
Temporary high-pressure pipework, such as Chicksans (3" 1502) is allowed for production-
testing applications.
Each of the hydraulically activated, fail-safe valves above are controlled by an individual
control panel. The control panels are powered from the rig air supply and they in turn hold
the safety valves open by hydraulic pressure applied via an oil-based hydraulic fluid. The
valves are fail-safe to ensure closure when air is bled off. The fail safe valve activates with:
1292.A manual bleed off of air at the main control panels.
1293.A manual bleed off of air from the remote ESD stations.
1294.A leak or breakage of either the air supply or hydraulic lines.
1295.A tripping of the hi-pilot between the heater and the separator (stand-alone surface
safety valve only).
A double control panel is used for the combination of the master safety valve and the kill
wing safety valve. This double control panel has two remote ESD stations, normally placed
at the escape routes from the cantilever deck.
The standalone surface safety valve has a single control panel with 3 remote ESD stations.
Two are normally placed at the escape routes from the cantilever deck and a further one on
the rig floor in the driller's doghouse.
1296.Sand filters
Sand filters are recommended to be included in the flowline when excessive sand is
expected or when cleaning up after hydraulic fracturing operations. They are rigged in
upstream from the standalone surface safety valve and the choke manifold to prevent
erosion.
1307.Hydrate formation
Gas hydrates are crystalline solids formed by the chemical combination of natural gas and
free water which can occur at temperatures significantly above the freezing point of water.
Figure 16.2 shows that hydrates are dependent on the pressure, temperature and
composition of the gas stream. Free water must be present for hydrates to occur. Hydrates
do not occur in gas wells producing above the dew point.
The formation of hydrates may choke or even block downhole equipment, surface lines, or
surface test equipment. This can render equipment inoperable and can cause pressure to
become trapped inside tools or lines, creating a potentially dangerous situation and often
invalidating the test data.
The most common areas for hydrate formation are downstream of chokes, control valves,
orifice plates and needle valves used as sample points, which cause a sudden temperature
drop along with a sudden pressure drop and the condensation of equilibrium water. The
water content of natural gases and the temperature drop accompanying a given pressure
drop are shown graphically in Figures 16.3 and 16.4, respectively.
A secondary cause of hydrate formation is the introduction of water into the system when the
surface temperature is relatively cold. This can occur during initial clean-up operations and
when wireline lubricators are tested with water. For this reason it is recommended wireline
lubricators are always tested with the available gas THP.
Figure 1265.2 Hydrate formation prediction
Figure 1265.3 Water content of natural gases
Figure 1265.4 Temperature drop accompanying a pressure drop
1308.Hydrate suppression
The best way to prevent the possibility of hydrate formation is to keep the temperature of the
gas stream above the temperature at which hydrates are expected to form. This is the
primary function of the heater in the well test package. The
possibility of hydrates can be minimised by allowing the major system pressure drop to occur
over the choke between the primary and secondary coils of the heater. Alternatively, where a
severe hydrate problem exists, the heater can be placed upstream from the choke manifold.
If insufficient heat can be maintained in the process system to avoid hydrate formation, the
process stream has to be treated with an inhibitor, usually methanol or glycol. The inhibitor
can be injected either at the Xmas tree or at the data header, upstream from the choke
manifold (test contractor's pump).
Inhibitor injection at the Xmas tree may continue for a short time after shutting in the well,
thus allowing the inhibitor to fall down the tubing and prevent the formation of hydrates
between the sea bed and the Xmas tree.
If the plug will not dislodge through pressure reduction. Methanol or glycol should be
injected.
The cause of hydrate formation should be analysed and remedial action taken, either in the
form of additional heat or additional inhibition.
1310.Hydrogen sulphide
1311.General
If unanticipated H2S is found to be present in a gas stream, the test should be terminated
immediately. The Company Drilling Manager must be notified immediately.
1312.Test Equipment
If H2S is present in a gas stream, it is essential to check that downhole and surface test
equipment are sour service rated.
All metals must meet the specifications in NACE MR-01-75 (latest edition). All
elastomers must be compatible with H2S. No specific standards exist for elastometers.
Where equipment cannot be positively identified as sour service, it must be treated as
non-sour service.
All safety relief lines will be routed to an area where discharge will present no hazards.
A constant positive pressure (3.5bar) shall be maintained on the surge tank, and the vent
line run to an area where the vented gas will not prove hazardous.
1313.Operational safety procedures
The following precautions should be followed when H2S is known to be present:
Prior to commencing the test, ensure all test contractor personnel have received training in
H2S testing procedures.
Warnings signs should be posted and the testing area roped off.
NOTE: When H2S concentrations exceed 10ppm, only essential personnel should be out on deck, the
remainder should remain within the accommodation, with doors sealed.
Testing personnel will adhere to the rig operators safety procedures.
The testing area and other areas where a potential danger of H2S exists will be monitored
with continuous gas monitoring equipment, using either fixed or portable monitors, with
audible and visual alarms. The set point of these alarms should be 10ppm. Well test
operators should also wear personal H2S monitors (e.g., Compur). There should be an
adequate supply of H2S detector tubes (various ranges) on hand, to accurately measure
the H2S concentration should a leak occur.
Prior to commencing the well test, a safety meeting will be held to discuss operating
procedures to establish hazardous areas, safe areas, escape routes, etc.
Breathing Apparatus sets should be worn when venting H2S gas at concentrations greater
than 10ppm. B.A. sets should be worn continuously for H2S concentration greater than
50ppm.
If the concentration of H2S in the wellstream exceeds 100ppm, flaring should only take place
during daylight hours.
If the concentration of H2S exceeds 10 000ppm in the wellstream or 50ppm in air, the test
shall be terminated immediately.
Where the concentration of H2S in the wellstream exceeds 50ppm, the buddy system
should be implemented.
No H2S should be vented where it can accumulate. The wind direction should be monitored
constantly.
If a leak occurs, every effort should be made to eliminate the problem immediately.
While flowing, all effluent should be sent to the burners. Flow periods should be limited to
when the wind direction is suitable for carrying the gasses away from the selected burner
and the installation. If there is no wind, then flaring should not be considered. If in doubt
as to whether the well should be shut in, check H2S concentration around the boom;
greater than 10ppm the well should be shut in.
Every effort should be made to keep the flare alight at all times during flow periods. This can
be done by leaving the propane pilot system running continuously.
Any shrinkage measurements must be performed with the shrinkage tester in a well
ventilated position, and B.A. sets must be used.
1314.Emergency procedures
When an H2S alarm is activated, the following procedures should be followed by all
personnel in the vicinity of the test package:
Obtain a B.A. set/escape mask and mask up immediately. Warn other personnel in the area
and leave immediately to a safe area, generally upwind and in an elevated position from
the hazardous area.
In the event of surface equipment failure the well shall be closed in immediately via the
safety shut down system and surface process equipment shall be vented to zero
pressure via the flare boom.
The rig floor and the radio room should be informed of the situation and an announcement
made over the loudspeaker system warning all personnel to stay inside the
accommodation block.
Never enter an enclosed space or area where H2S may have accumulated without wearing
B.A. sets. If a worker is over an arms length away, a safety belt should be secured to a
life line and held by a responsible person in a safe area.
Two test contractor personnel with air masks and B.A. sets (properly fitted and checked and
air sufficient for 30 minutes) should investigate the source of the leak. One of these
testers should be of a senior status. Lifelines should be worn and held by a responsible
person in a safe area.
The H2S levels should be checked with a Drger tester while the investigation is ongoing.
Once the source of the leak has been identified the appropriate remedial action shall be
taken (shutting in the well if required).
If the source of the leak cannot be identified, and the H2S concentration remains at a level
which is considered unsafe for testing operations to continue, the test should be
terminated. Bleed down surface process equipment to zero pressure via the flare. The
system should be flushed, then filled with water and checked for the leaks.
This problem is especially prevalent where there is a high CO2 content in the well gas
stream. If this is the case, ED may occur at relatively low pressures due to the ability of
the CO2 to permeate the elastomers. The CO2 has no chemical affect on the elastomer,
it is a purely physical phenomenon.
The hardness of the elastomer and the level of fluorine in the elastomer have a major
effect on the solubility of gas in the seal, and thus resistance to ED. The harder the
elastomer seal the greater the resistance to gases permeating into it. The downside of
this is that the harder the seal, the worse the sealing properties. Materials above 85
IRHD generally give greater resistance to ED.
If ED is possible a great help in overcoming it is to bleed down slowly (if possible), as quite
small differences in time to bleed off have a marked effect on the possibility of ED occurring.
1317.Introduction
Production logging should ideally give information on both the production and reservoir
engineering aspects of a well. Production logging provides downhole measurements of fluid
parameters on a zone-by-zone basis yielding information on the type of fluid movement
within and near the borehole.
Production logging tools (sensors), designed to measure the performance of production and
injection wells is available. These sensors include:
1318.Flowmeter spinners (continuous, fullbore, diverter).
1319.Fluid density (gradiomanometer, nuclear).
1320.Thermometer.
1321.Manometer (strain gauge, quartz gauge).
1322.Radioactive tracer.
1323.Hold-up meter.
These sensors can be run individually, or more commonly are run in combination. Recording
is both real-time and simultaneous, measuring primarily:
1324.Fluid entries and exits.
1325.Standing liquid levels.
1326.Bottomhole flowing and shut-in pressures.
1327.Pressure losses in the tubing.
1328.Integrity of the gravel packs and hardware assemblies.
Figure 16.5 shows a schematic of the sensors in a typical production logging tool string. The
tool string also includes a casing collar locator and a gamma ray tool for correlation and
depth control.
A production logging survey can be recorded with the tool moving up or down. With the tool
stationary measurements can be made versus time. Usually in a production well the down
logs are most relevant. Conversely, with injection wells the up logs generally show the
features most clearly.
Figure 1265.5 Production logging tool combinations
For every flow rate and at shut-in conditions several passes are made, generally three
passes in each direction at three different cable speeds. During each pass all parameters
are measured simultaneously and the CSU system puts the reading on depth by
compensating for the different positions of the sensors.
1329.Flowmeter spinner
Flowmeter spinner tools are used to measure flow velocity. The spinner incorporates an
impeller that is rotated by fluid moving relative to it. Size and pitch of the impeller selected
will depend on flow rates expected.
The accuracy and resolution of both the continuous and full bore spinners are very similar.
However, the full bore tool can operate at lower velocities and is normally the preferred
option.
Applications are:
1334.To provide accurate depth determination of pressure gradient changes.
1335.To locate gas entries in oil wells.
1336.To locate condensate entry in gas wells.
1337.To locate water entry in oil or gas wells.
1338.To define fluid contacts.
1339.To assist continuous flowmeter interpretation.
A density measurement is made by a strain gauge pressure transducer which measures the
pressure differential between two ports. Wellbore pressure is transmitted to the differential
pressure sensor via tubes filled with silicon oil. The tool also provides absolute
measurements of temperature and pressure without having to use separate detectors.
The temperature log has many applications, particularly when run in combination with other
sensors. Some of these applications are:
1344.Detection of gas production via the cooling effect of expanding gas (in or behind
casing).
1345.Qualitative evaluation of fluid flow as indicated by departures from the geothermal
gradient.
1346.Temperature information for PVT equations and charts.
1347.Evaluation of fracture treatments.
1348.Evaluation of the mechanical integrity of a completion.
1349.To locate fluid entries.
1350.To define lowest depth of production or injection.
1351.To determine bubble point depths.
1352.To check gas lift valves.
1353.To locate gas leaks in tubing.
1354.To define geothermal gradients.
1355.To locate fluid flow behind pipe.
1357.Strain gauges
A strain gauge is included as part of either the temperature-manometer sonde or the PTS.
This type of gauge is less prone to shock or vibration but can be subject to calibration drifts.
1358.Quartz gauges
A separate quartz gauge can be included in a PLT string for more accurate pressure
measurements.
The disadvantage of the quartz type gauges is their temperature stability. Pressure
stabilisation can take up to half an hour after a significant temperature change. They are
also more sensitive to excessive vibration.
When oil and water densities are similar, the log may yield far more definition than
conventional fluid density measurements.
Up to two flowmeters can be run simultaneously. CFS can be run anywhere in the tool string,
where FBS has to be run at the bottom. If both are run CFS is placed close to FBS to take
advantage of its centralisation.
The sensors run are a bi-directional spinner flowmeter, scintillation gamma detector, fast
response external temperature sensor, and an optional high-resolution crystal or gap
capacitance pressure gauge.
Readings are taken every 2 seconds with a 32 000 data point memory capacity.
Data is downloaded to a computer at the surface and analysis is then available within one
hour.
1367.Preparation procedures
General
The following guidelines should be met prior to logging:
1368.A production logging programme with final well completion diagram and deviation
survey should be on site.
1369.Check tool size against ID of the nipples, and check the liner size of the basket
spinner.
1370.Ensure the selected spinner is appropriate for the flow rates expected.
1371.The logging engineer plus winchman should have a well sketch with relevant depths
and ID restrictions indicated.
1372.All production logging surveys should be preceded by a wireline dummy connected to
HUD.
1373.Make sure well is clean before running a production survey (if necessary run a junk-
basket). Flowmeters have been clogged by bits of wire, remnants of ceramic capsules or
congealed mud.
1374.Ensure enough lubricator riser is on-site for the length of tool string.
1375.Ensure all pre-survey tool calibrations have been carried out and are within the
allowable limits.
1376.Hold a safety meeting with all relevant personnel prior to rigging up.
In consultation with the logging engineer calculate the weights required to avoid tool lifting
based on expected flow rates, pressures and produced fluids (use appropriate charts or
computer programme). Ensure sufficient sinker bars are available.
1377.Thermal decay time (Schlumberger - TDT, Atlas - PDK)
The thermal decay time-log records the thermal neutron capture cross section of the
formation by repeatedly emitting pulses of high-energy neutrons and measuring the thermal
neutron rate of decay.
Since chlorine is the strongest neutron absorber, the response of the TDT log is determined
primarily by the chlorine present, i.e., sodium chloride in the formation (Cl- concentration
being zero in gas and high in formation water).
TDT logging identifies the presence of hydrocarbons in formations which have been cased
and detect changes in water saturation during the production life of the well. The TDT log is
useful for the evaluation of old wells, for diagnosing production problems, and for monitoring
reservoir performance.
1382.Logging procedures
The detector is calibrated using a special low power neutron source jig. The tools miniature
neutron generator is not activated when at surface.
When logging through tubing, care must be taken whilst running through nipples, etc.
Record the HUD, do not run tool to this depth.
Carry out main log and repeat section as per the logging programme. Check repeatability,
ensuring they are basically identical, being aware that the formation can show the effects of
bombardment from the main log.
Ensure the correlation log (normally resistivity) and previous TDT logs are available on site.
The shape of the decay time survey follows the shape of the open-hole deep resistivity log.
When correlating with GR, tie in with neutron source in off position to avoid unnecessary
irradiation. The logging speed is normally 900ft/hr.
Contents
1384.Introduction
Remedial cementing applications:
1385.If primary cementation has failed.
1386.To eliminate water/gas intrusion.
1387.Repairing of casing leaks.
1388.Abandoning of old perforations or plugging off depleted zones.
1389.Curing lost circulations.
1390.Sealing off of formations giving well control problems.
1391.Squeeze Cementing
For cement products and main slurry design, see Section 11, Cementing of this manual.
The reduction of the hydrostatic head whilst hardening of cement should be kept in mind.
1393.Fluid loss control agents ensure that no bridging of cement occurs due to dehydration
of cement.
1394.Friction reducers facilitate good penetration of the slurry.
1395.Retarders are necessary for long squeeze jobs, particularly hesitation squeezes.
1396.Injectivity test
1401.Pressures
1414.Circulation squeeze
Used on primary cement repair jobs where circulation cannot be established.
1415.Perforate above and below the zone to be cemented.
1416.R.I.H. with bridge plug on drillpipe.
1417.Set bridge plug between perforations.
1418.Circulate casing/hole annulus, clean (calculate casing collapse pressure).
1419.Unsting from bridge plug and circulate hole clean. Spot a high vis pill.
Sting into bridge plug. Circulate/squeeze cement around perforations as per programme.
1420.P.O.H. until stinger is above theoretical T.O.C. and reverse circulate out any cement.
1421.Bradenhead squeeze cement into top perforations (do not over-displace).
1422.If unable to establish circulation block squeeze lower perforations and Bradenhead top
perforations.
1423.Block squeeze
1426.Hesitation squeeze
NOTE: The recommended fluid loss for squeeze cementing should be between 50 and 150cc/30 min. at
a differential pressure of 70bar through a 325 mesh screen.
Ensure that all mixing and displacing equipment is clean. Chloride and/or magnesium
contamination of the cement may result in very short thickening times.
The following parameters should be checked prior to pumping the slurry:
409.Measure the required mix water into a tank. The required volume of slurry will be
specified in the completion programme.
410.Add the required amount of fluid loss polymer and/or retarder to the water and mix
thoroughly.
411.Obtain samples of the mix water and dry blend and retain until the well operations
have been terminated.
412.Re-check displacement calculations prior to pumping.
413.Once the slurry has been pumped and the lock-up pressure has been achieved,
the well is to be shut in while WOC.
414.The WOC time should be as programmed. Compressive strength of the cement
is not an overly critical parameter in squeeze cementing, as the cement acts
more as a plugging agent.
Testing the Squeeze
415.Apply pressure over the squeezed perforations. The test pressure will be specified in
the drilling programme.
Contents
Illustrations
1448.Introduction
The basic guidelines for suspension and/or abandonment of boreholes are provided by
company policy.
1449.Well Termination
1450.General
The two methods of plugging back are:
1451.Abandonment.
1452.Suspension (Temporary Abandonment).
Improper abandonment may result in gas migration to surface, influxes into depleted pay
zones, supercharging formation pressures, etc. which can necessitate re-abandonment or
relief well drilling.
1456.Abandonment
The following are reasons to abandon a well:
1457.Drilled as a dry hole.
1458.Depleted, or uneconomic to produce.
1459.Mechanically unacceptable (badly corroded wellheads, collapsed pipe, unrepairable
leaks, etc.).
1460.Uncommercial quantities of hydrocarbons or water found.
1461.Unexpected pressure regimes exceed the casing design.
1462.Unacceptable annulus pressures due to gas ingression.
1463.Suspension
Well suspensions are a result of:
1464.TD not being reached due to environmental reasons, seasonal restrictions,
abandonment pressure, installation repair, etc.
1465.The well has been successfully drilled but has not been fully tested for commercial,
budgetary or strategic reasons, etc.
1466.The well has been drilled, tested, and may possibly be required in the future as part of
a field development (i.e., temporarily abandoned).
1467.The well has been pre-drilled through a template to be tied back at a later stage as part
of an offshore platform development.
1468.The well was found to be a dry but a potential candidate for side-tracking.
1469.Re-entry is planned, to recover downhole gauges (hung-off for long-term build-up
analysis, or interference testing).
1470.Temporary suspension of a platform development well or subsea template well to skid
rig over and kill a problematic producer.
1471.The well has been drilled with an MLS system and suspended, to be re-entered later
for subsequent production as a single well jacket/installation; or possibly to become part
of a template development, from which further directional production wells can be drilled.
1472.Abandonment Techniques
1473.Shut-offs
Cement
Cement is the preferred means of abandonment since it can withstand high differential
pressures and does not corrode or deteriorate with time.
Mechanical
Mechanical plugs are used below cement plugs:
1474.To support the cement plug.
1475.To prevent gas migration while cementing.
1479.Fluids
Abandonment fluids, either mud or brine, are complementary to the mechanical plug, see
18.3.1.
In special cases, squeezing salts or settled solids may be accepted as shut-offs. In such
cases in-flow testing or a long observation period would be mandatory
1480.Abandonment Guidelines
1481.General
The following are general abandonment guidelines:
1482.Fluids left in the hole should be a high enough SG to withstand any expected pressure,
plus a 0.05SG safety margin.
1483.Fluids left in the casing annuli are to be treated with biocide and corrosion inhibitor.
Any fluids left across potential productive zones must be non-damaging. Oil-based mud
systems are exempt.
1484.Permeable formations of different geological ages are normally isolated by cement
plugs.
1485.Formations having different pressure regimes are isolated from each other.
1486.Silica blend cement is used where temperature effects may cause long-term
degradation of neat, class G cement.
1487.If the well has been tested, the test intervals will be isolated by using cement or bridge
plugs, or a combination of both.
1488.Should a mechanical plug be exposed to fluids containing H2S or CO2, then a 50m
cement plug must be placed directly on top.
1489.When cutting casing, the shoe strength must be high enough to withstand the mud
hydrostatic. The mud weight in the hole should have a minimum 15bars overbalance
over the formation pressure with the riser removed.
1490.It is company policy that all casing strings are cut a minimum distance below their
datum point, i.e., 3.0m below mud-line.
1491.For temporarily abandoned wells, a corrosion cap must be installed.
1492.Integrity tests
All cement or mechanical isolation plugs, excluding plug at surface, should be weight-tested
to 10-15 T and/or pressure-tested to 50bars/15mins.
It may be necessary to perform an inflow test. This may entail displacing the well partially to
nitrogen to achieve sufficient underbalance.
If a plug has been set in stages not separating different zones, locate only the top of the last
stage.
Do not set more than 2 x 150m cement plugs without tagging TOC and establishing
presence of plugs.
1496.Liner shut-off
If a cemented liner has been run, a shut-off must be placed on top to isolate the liner lap.
1505.Permanent packer
Mill the packer, run a tubing stinger below the lowest perforation and plug back over the
perforated interval using the hesitation squeeze method.
Run a stinger through the packer below the lowest perforation and plug back over the
perforations, and hesitation squeeze away cement. This method should be considered only
when the bore of the packer will allow a generous flow area for circulating and cementing.
Run an EZSV, or equivalent, on wireline and set 50m above top perforation. Run an EZSV
stinger, stab in, and squeeze away the cement, leaving the TOC 15m below the EZSV. This
method shall be considered only if a good injection rate was established while killing the
well.
1506.Retrievable packer
Pull the packer out of the hole, run a tubing stinger below the lowest perforation and
circulate cement over the perforations and perform a hesitation squeeze.
1510.Annular spaces
Where a potentially productive formation exists behind casing which is not cemented off, it
will be necessary to isolate the interval, by squeezing or circulating cement behind the
casing. A minimum 100m cement column should be placed as close as possible to the
previous casing shoe.
If the formation is known to be at normal gradient and has no hydrocarbon content then this
will generally not be required.
Alternatively, the casing string may be cut deep and a cement plug set across the cut, see
18.4.4.
1511.Accepted practices
Use a calliper log to calculate the required volume of cement slurry for each plug. If a calliper
is not available, then use the open-hole volume, plus 20% excess.
Gauge hole sections are preferable when setting cement plugs. Experience shows that
when a cement plug is set in washed out sections, the cement bypasses the mud, resulting
in an extended cement column giving rise to heavy back-flow, and the plug is likely to be of
poor quality.
If it is necessary to set a plug in a washed-out interval, then it is recommended that two short
plugs be used rather than one long, large-volume plug.
When setting abandonment plugs in potential loss zones, it is best to set the plug in two
stages - i.e., a small plug first, which after hardening acts as a support base for the
remaining length of the plug.
Use 23/8" or 27/8" tubing stinger to set critical cement plugs in 81/2" hole.
Where small amounts of cement are required the slurry should be batch mixed tank prior to
displacement to ensure that it is homogeneous, and set by the running method.
Never stab the stinger back into a plug after displacement as the setting cement may plug
the stinger.
Whenever possible, neat slurries without additives, shall be used for plugging back.
It is good practice to use mix water spacers ahead and behind the slurry. Adequate volume
should provide a 50m spacer inside the displacement behind the cement string and 50m in
the annulus.
Always calculate the loss of hydrostatic head when using water ahead of a plug and reduce
the water spacer as required, but retain approximately 50m of water as a minimum spacer.
1512.Cutting Techniques
There are two basic methods available to cut casing, mechanical or explosive. The choice
will largely depend on water depth and past experience. Recently, mechanical cutting has
become more reliable due to improved cutter technology and to Quality Assurance
inspection, resulting in fewer equipment failures.
Either of these two methods is acceptable. At intermediate depths, modern cutting methods
have a high probability of success and will be the preferred option. From a safety and
environmental aspect, the mechanical method is the preferred method.
1513.Casing cutting
Recovery of intermediate and smaller diameter casing strings is usually straightforward.
Recovery of the 30" and 20" pipe is somewhat problematic.
If 7" is tied back to surface, the cut is approximately 1 000m below the mud-line using a flash
cutter on wireline or mechanical cutter on D.P.
The 95/8" casing is normally mechanically cut 500m below the mud-line.
The 133/8" casing shall be cut mechanically 150m below the mud-line.
If using explosive or chemical cutters, ensure that safety precautions are strictly adhered to.
1514.Conductor cutting
Care should be exercised in all aspects of the operation. The recovered, undamaged
wellhead can be reused resulting in substantial savings.
The overriding consideration is to minimise external or internal damage of the wellhead joint,
for re-use with minimal refurbishment costs. If damage to the wellhead is severe, its
pressure rating may be downgraded following repairs or scrapped.
Care should be exercised when cutting. An unsuccessful cut can jeopardise abandonment
operations, leading to increased costs.
To prevent excessive wellhead damage, abandonment tools and techniques have been
developed to reduce contact between the wellhead, its internal profiles, and the
cutting/pulling assemblies.
The 20" and 30" casing pipe shall be cut a minimum 3m below the mud-line.
1515.Stabilisation
When the casing cutter is stabilised above and below the cutting knives the possibility of off-
centre cutting is reduced resulting in faster cuts. Drift-sized stabilisers should be utilised.
If the casing design includes a swaged diameter below the wellhead, a stabiliser should be
included in the reduced diameter section. Measure the minimum diameter of the wellhead
when gauging stabilisers for the cutting assembly.
Stabiliser blades should be of the non-rotating type, tapered at the top and bottom. Blades
can have a thin "skin" of brass or similar material brazed onto their leading edges. This acts
as a sacrificial layer when the stabiliser is passed through the sealing bore areas of the
wellhead reducing contact damage.
1516.Equipment
The main components of wellhead cutting/pulling string are, top down:
1517.HWDP (to surface)
1518.DCs (6 x 8")
1519.Bumper Sub (optional)
1520.Catch Assembly (usually rotating spear)
1521.Stabiliser (17")
1522.Pipe Cutter (usually 4 bladed 113/4")
1523.Stabiliser (17")
1524.Bullnose (with circ ports).
1525.Problems with cutting
If casing removal is unsuccessful:
1526.Trip the cutting assembly and inspect the knives to ensure they have been cutting at
their maximum diameter.
1527.If both casings have been cut satisfactorily but the wellhead cannot be removed,
consider running a fishing assembly to jar the wellhead and casing free.
1528.Economics may dictate the running of an explosive charge rather than a fishing
assembly.
Poorly cemented or uncentralised 20" will have a tendency to move when cutting the 30".
Off-centre cutting may occur, resulting in the 30" being partially cut on one side only. If
pulling and cutting is unsuccessful unlatch the spear and pull the cutting assembly for
inspection.
If any special 20/30" casing centralisers were run, the cut must be at least 2m above or
below the centraliser.
If both casings have been cut, a cement sheath around the conductor may prevent the
casing from coming free. Before running a spear to retrieve the casings (wellhead and guide
bases) an explosive charge may be run to fracture the cement sheath.
Cutters can be run with a flo-tel device which indicates a pressure decrease when the
knives have reached their maximum cutting diameter. The decision to stop cutting should
not be made on the basis of a pressure drop alone.
Problems can occur when attempting to release the spear or grappling mechanism. Knives
can become jammed in the cut pipe, making it difficult to release the spear. A bumper sub
can be run in the assembly between the pipe cutter and spear, allowing the spear to travel
down the length of the bumper sub stroke, releasing it. However, a bumper sub placed in
this position introduces a weak point in the assembly.
Uncemented casing can be problematic with right-hand cutting action inducing left-hand
torque into the joints above causing possible back off. Having a cement sheath is
advantageaus but if not uniform cutting performance and efficiency can be affected.
1536.Abandonment
If a well is to be abandoned, as shown in Figure 18.5, cement plugs will be set in
accordance with the guidelines, see 18.4, and the 30" is cut a minimum of 3m below the
mud-line.
1537.Suspension
If a well is to be suspended, see Figure 18.6, TA caps will be installed on all successive
casing strings. TA caps can be either the threaded type or stab-in type.
The inner-most cap contains a backpressure valve for containing well pressure, with
monitoring and release through D.P.
All TA caps utilise the running threads in the hanger (i.e., installed with LH rotation, retrieved
with RH rotation), protecting the tie-back threads.
Figure 1447.5 Well abandonment
Figure 1447.6 Well suspension
The conductor will be cut 1-1.5m above the mud-line and a dome placed on top with
reflectors for positioning purposes on re-entry. Gravel may be judiciously dumped around
the suspended wellhead, without burying it, as protection against scourings.
1538.Tie-back phase
Threaded Tie-back Tools
Where a well has been identified or designated for tying-back, two methods are available.
The first option utilises the tie-back threads, the second relies on stab-in technology.
The threaded tie-back option is RH (6 turns) to make-up, and uses a metal-to-metal seal
plus two resilient seals to contain internal pressure. Two additional resilient seals contain
external pressure.
The threads are a self-aligning square form design on the DrilQuip tie-back tool, to prevent
cross-threading for remote make-up.
The same sealing arrangement is used on the stab-in tool, as that used on the tie-back tool.
An internal landing prep and torque slot is incorporated so that a torque tool, run on drill
collars or drillpipe, can be used to energise the m-t-m seal, eliminating torque on the tie-back
riser connections.
The stab-in tool is weight-set for make-up and rotated (1/2-1 RH turn) to energise the metal
seal.
1540.Temporary abandonment
Check all annuli for pressure before nipping down the BOP stack.
Starting with the last casing string, remove the slip-and-seal assembly and latch onto the
casing with the spear. Pull sufficiently to achieve neutral weight at the mud-line, then back
out the running tool by turning to the right.
Repeat the above for each casing string in turn. After recovering the 20" running string, a
corrosion cap should be installed in the 20" hanger.
Install the extended stinger below the corrosion cap and engage the J-slot running tool.
Check that the stinger in the running tool opens the check valve in the corrosion cap by
pouring water through the assembly.
Figure 1447.7 Conductor protection dome
Land in the hanger and make-up with LH turns. Check that the string moves down 1" per
turn.
Release the running tool from the corrosion cap, and unseat the check valve for recovery
allowing the hose to break.
Disconnect the 30" conductor at the mud-line and recover. Run and latch the 30" dome cap
onto the well, using either a hydraulic-operated or J-slot running tool.
Dome shapes are usually round but can be hexagonal (see Figure 18.7).
NOTE: The free water depth above the dome shall be in accordance with the approved abandonment
programme.
The above information shall also be filed in the Company Well Data File.