The document contains a daily activity list for Boiler and Auxiliary Unit-7 for the month of August 2016. It includes 9 categories of activities - pressure parts & trim piping, insulation and refractory, fuel system, duct, rotary parts, critical piping, structure, ESP, and auxiliary boiler - with planned activities on each of the 31 days of the month.

Uploaded by

ChhotanBag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views4 pages

Daily Activity List For Unit-7

The document contains a daily activity list for Boiler and Auxiliary Unit-7 for the month of August 2016. It includes 9 categories of activities - pressure parts & trim piping, insulation and refractory, fuel system, duct, rotary parts, critical piping, structure, ESP, and auxiliary boiler - with planned activities on each of the 31 days of the month.

Uploaded by

ChhotanBag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Daily activity list for Boiler and Auxiliary Unit-7

August'2016
SL NO Activity Description 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21
A Pressure parts & Trim piping
1
2
3
4
5
B Insulation and refractry
1
2
3
4
5
C Fuel system
1
2
3
4
5
D Duct
1
2
3
4
5
E Rotary Parts
1
2
3
4
5
F Critical Piping
1
2
3
4
5
G structure
1
2
3
4
5
H ESP
1
2
3
4
5
I Auxiliary Boiler
1
2
3
4
5
-7