0% found this document useful (0 votes)
22 views5 pages

Excentrica 1 C

1) The document provides information to dimension the foundation and first floor column of a building, including soil properties, load values, and calculation steps. 2) The foundation is dimensioned to be 1.55m x 1.85m with a height of 0.70m. 3) The first floor column is initially sized at 0.70m x 1.05m with a height of 0.70m, and reinforced with 17 #5/8" bars at 0.17m spacing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views5 pages

Excentrica 1 C

1) The document provides information to dimension the foundation and first floor column of a building, including soil properties, load values, and calculation steps. 2) The foundation is dimensioned to be 1.55m x 1.85m with a height of 0.70m. 3) The first floor column is initially sized at 0.70m x 1.05m with a height of 0.70m, and reinforced with 17 #5/8" bars at 0.17m spacing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

ZAPATA EXCNTRICA 1-C

VP-104 0.45

L.P s/c NPT


_ 4.75 m

_= 1.65 m

_= 1.9 /^3 /_(() ) = 350 /^2


_= 17 /^3 (coef. De reaccion del terreno) = 350 /^3
_= 6 /^2 _= 4200 /^2

: :
_= 220.45 _= 1.76 _= 0.16
_= 50.56 _= 0.70 _= 0.04

A. ESFUERZO NETO DEL TERRENO:

_=_-__/ _= 56.515 /^2

B. DIMENSIONAMIENTO EN PLANTA DE LA CIMENTACIN:


L.P
S= (2.0 - 2.5)T
Tomando: S=2T
_=/_ =(_+_)/_ =
4.7954 ^2
b S
2= 4.7954 T= 1.548 = 1.55 m
D
USAR TxS= 1.85 x 2.85 ^2

T
=_+_= ### + 51 = 271.01 tn
_=_+_= 2 + 0.7 = 2.46 tn (. )
_=_+_= 0.2 + 0 = 0.20 tn (. )

_=_/= /6
0.001 m 0.0045 m = 0.80 m
_=_/= /6
0.009 m S 0.0545 m S= 0.55 m

_=/+(6_)/(^2 )+(6_)/(^2 )_=


56.515 ^2
_=/(6_)/(^2 )(6_)/(^2 )
0 ^2

C. PREDIMENSIONAMIENTO DE LA ALTURA "HZ" DE LA ZAPATA:


Criterio del Dr Yamashiro:
_=2.1((_ )/_ )
expresion de predimensionamiento
recomendado por el Dr. Yamashiro.

_( ): Altura de la zapata
: Dimension de la zapata en la direccion de la exentricidad.
_ : Coeficiente de reaccion del terreno (BALASTO)
_ : 15000
() (kg/ ^2)

h= 0.69 m
h= 0.70 m

Criterio de longitud de desarrollo:

_ _=0.08/()
_ = 3/4

_= 0.34 m
= 0.44 m
= 0.45 m

USAR _= 0.70 m.
D. PREDIMENSIONAMIENTO DE LA COLUMNA DEL 1ER PISO (TIPO C2):

=_/()=1.25/(0.25)=(1.25(_+_))/(0.25)

= 3871.6
^2
0.62 x 0.62 = 3871.57 ^2 tomamos:
De las combinaciones: 0.70 x 0.70 = 4900 ^2 0.70 x 1.05 m2


^2
0.70 x 1.05 = 7350

^2
Elegir el que tiene mayor peralte en el sentido de excentricidad.
E. CONDICION DE DIMENSIONAMIENTO: P

Del caso 1: (e<T/6)

_2=/(6_)/(^2
_1=/+(6_)/(^2 ) )

e
_1_2=12/(^2 ) =/

_=

_1_2=12(/)1/ _1_2=12 /

T/2 T/2
=_1_2=12 /1 2
Dr. Yamashiro:
= . .

=(_ _)/(_0 _ )
_=((^3)/12)/_
_=(^3)/12
(,)
=_/_

:
. _1_21 2,
_, (_3 2)
b. .
(6)

En el problema:

1ER. TANTEO: Columna bxD = 0.70 x 1.05 m2 Hz= 0.70 m

= 2.08 =1/(1+2[2(13)^2/(+2)+6(+6)])
= 0.102
= 0.14
0.0745
= -9.93561 2
= 9.93561 CONFORME

:Col= 0.70 x 1.05 m2


Hz= 0.70 m
d= 0.61 m
E. TRANSFERENCIA DE ESFUERZOS EN LA INTERFASE COLUMNA CIMENTACION:
Resistencia al aplastamiento sobre la columna:
_=_/=
602.404 tn
__ CONFORME
_=0.85= 2186.63 tn

Resistencia al aplastamiento en el concreto a la cimentacion:

_=_/=
602.404 tn _0= 0.53
0=(_2/_1 ) _2_ _2= 0.43
_=0.850
_0= 0.83
(_2/_1 )= _2= 0.46
0.7619 0= 5.6
_=0.850= 1666 tn CONFORME
F. DISEO POR FLEXION:
F.1. En la direccion de la excentricidad:
_=_/=
227.94 tn/m
Pu= _=_(_^2)/2
= 72.94 tn.m
=0.85(0.7225(1.70)/(^2 ))

1.05 lv= 0.80 m


= 0.0224
= 0.0018689
= 32.27 ^2 = 32.27 ^2
_= 31.08 ^2 = 5/8
= 16.31
_= 227.94 tn/m = 17.00
1.85 m s= 0.17

: 17 5/8 @ 0.17 m

F.1. En la direccion transversal:


_=_/=
147.96 tn/m
Pu= _=_(_^2)/2
= 85.493 tn.m
=0.85(0.7225(1.70)/(^2 ))

lv= 1.08 0.70 1.08 m


= 0.0775
= 0.0064549
= 72.35 ^2 = 72.35
^2
_= 20.18 ^2 = 1
= 14.28
_= 147.96 tn/m = 15.00
2.85 m s= 0.12

: 15 1 @ 0.12 m

G. CONDICION ADICIONAL DE DISEO:


G.1 Caso de la viga: "se le debe aadir el refuerzo adicional"
_=(_ )/
_=_/0.90 = 35.51 tn

_= 9.39422 cm2
= 1/2
= 7.42
= 8.00

G.2 Caso de la columna: "se debe verificar la condicion adicional"

_= 421.68 tn =
_=143.82 tn-m = ^2 Se debe comparar
= _/_0.3411
= m = 3/4 esta cuantia con el
determinado por
= 0.00 analisis de portico
= 0.00 correspondiente.