0% found this document useful (0 votes)
70 views3 pages

Idle Time Reason: 2 Hour Operator Study

The document summarizes an operator study that was conducted over 2 hours. It tracks the idle time reasons and durations in seconds for the operator. The total idle time was 853 seconds or 14 minutes and 13 seconds. Based on the study, the estimated loss in pieces due to idle time was calculated to be 21 pieces.

Uploaded by

RAHUL16398
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views3 pages

Idle Time Reason: 2 Hour Operator Study

The document summarizes an operator study that was conducted over 2 hours. It tracks the idle time reasons and durations in seconds for the operator. The total idle time was 853 seconds or 14 minutes and 13 seconds. Based on the study, the estimated loss in pieces due to idle time was calculated to be 21 pieces.

Uploaded by

RAHUL16398
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

2 HOUR OPERATOR STUDY

IDLE TIME REASON


3:10:03- 3:10:21 Ready piece movement
3:15:06- 3:15:52 bobbin change
3:35-15-:3:36:03 talking
3:36:55- 3:37:35 idle sitting
3:38:12- 3:39: 15 rework
3:40:03-3:44:05 washroom
3:51:32-3:53:10 talking+ bobbin thread problem
4:05:16- 4:06:17 Rework
4:20:14- 4:21 :20 talking+ idle sitting
4:31:32- 4:32:20 rework
4:45:03:- 4:45:25 bobbin change
4:46:05- 4:47: 03 rework
4:56:19- 4:57:02 Ready piece movement

Total loss in sec = 853


Total loss in min = 14.2

According to sam loss in piece = 21


STUDY
TOTAL LOSS OF TIME (in Sec)
18
46
48
40
63
242
98
61
66
48
22
58
43

53
4.2

iece = 21
21.87179

You might also like