Conceptual approach for

Integrated Project Delivery (IPD)


& Building Information Modeling (BIM)

Workshop #2
Architecture
Academic Resource Center, IIT
Traditional Processes

Design Bid Build: contracts separately Traditional processes

Design-Bid-traditional approach owner with all


parties. Occassionaly referred to as Design-Bid-ReDesign-ReBid-Build.

Design-Build: One entity performs both architectural\engineering design and


construction under one contract. Either an architect-led or contractor-led
approach.

CM-at Risk, or GMP: Construction Manager is a consultant to the owner


during design phases, and acts as general contractor during construction with
a commitment to deliver the project within a guaranteed maximum price.

Turnkey Project Delivery: frequently used in power plants, manufacturing


facilities, a method to provide an owner with a complete facility, ready to
operate and turn out product.
Waste in the construction is, at a minimum, a 399Billion dollar annually
What can a project team do to eliminate
waste & build better buildings?

1. Use better tools:


BIM improves communication within a project team, by simulating to a higher
degree project design and construction

2. Lean Construction :
Maximize value and to reduce waste at the project delivery level.
Improving total project performance
No tradeoff between time, cost, and quality

3. Integrated Project Delivery:


(Continue in next page)
What is a Building Information Model(BIM)?

A set of information and work collaboration tools

A shared database of information

A 3D CAD model with added information

A use of 3D geometry models coupled with analy


sis and simulation tools to prototype the building o
n the computerto simulate the building, its perfo
rmance, and its construction before breaking grou
nd.
Revit
WHO IS USING BIM AND WH RAMSteel
Innovaya

AT TOOLS ARE THEY USING? MagiCAD


FINEhvac
ArchiCAD
SolibriModelChecker
CATIA
GreenBuildingStudio
BentleyArchitecture
RevitStructure
ARCHITECTS VectorWorksArchitect
DigitalProject
AutoCAD3D
MECHANICALENGINEERS Ecotect
Constructor
TeklaStructures
STRUCTURALENGINEERS Timberline
RAMSteel Bentley
CONTRACTORS ABS
AutoCADMEP
VICO
FABRICATORS RevitMEP
CADPipe
FINEhvac
OWNERS IES
Innovaya
EnergyPlus(DOE2)
NavisWorks
AutodeskDesignReview
What does Integrated mean to a building
project?

Integrated practice is a holistic approach to building in


which all project stakeholders and participants work in
highly collaborative relationships throughout the
complete facility life cycle to achieve effective and
efficient buildings.
George Elvin, AIA Integrated Practice in Architecture
IPD a process evolution
More information:

AIA IPD guide: http: //www.aia.org/contractdocs/AIAS077630

AIA Integrated Practice Website: http://aia.org/ip.default

Whole Building Design Guide: http://ww.wbdg.org/index.php