All new and existing air conditioned buildings must be mechanically or mixed mode
ventilated and must comply with the minimum requirements of ASHRAE Standard
62-2007.
Occupancy density for each space is determined based on its activity in accordance
with the requirements of Dubai Municipality if available or using the default occupancy
density values in ASHRAE 62-2007
For all buildings under construction or renovation, building occupant and systems
must be protected from airborne contaminants which are generated or spread
during construction or renovation inside the buildings. Including toxic substances
or substances harmful to the human body, such as asbestos, lead, pesticides, heavy
metals, mold, dust, fumes, paint, ...etc
Unless it is required to provide ventilation during construction, the supply and return
heating, ventilation, and air conditioning (HVAC) system openings must be closed and
protected from contamination. All duct and other related air distribution component
openings must be covered with tape, plastic, sheet metal or other methods to prevent
dust or debris from collecting in the system.
If the HVAC system is used during construction or renovation, temporary return
air filters must be installed with a Minimum Efficiency Reporting Value (MERV) in
accordance with ASHRAE Standard 52.2-2007 or an equivalent standard.
Immediately prior to occupancy, the temporary return air filters must be removed and
replaced with permanent filters having Minimum Efficiency Reporting Value (MERV) in
accordance with ASHRAE Standard 52.2-2007 or an equivalent standard.
pOH=?aCX=aT> p4 43
401.04 Isolation of Pollutant Sources
For all new and existing buildings, where activities produce hazardous fumes or
chemicals, spaces must be provided with separate air extraction systems to create
negative pressure and exhaust the fumes or chemicals to ensure they do not enter
adjacent rooms.
Dangerous Goods must be stored in accordance with Dubai Municipality
Requirements.
For all new buildings, opening windows must be provided in accordance with Dubai
Municipality Building Regulations unless there is safety requirements restricting
opening these windows.
Sampling Sampling
Type of Samples Maximum Acceptable
Schedule Duration
Pre-Occupancy Formaldehyde < 0.08 parts per million (ppm) 8- hour
continuous
Total Volatile Organic monitoring
< 300 micrograms/m3
Compound (TVOC) (8 hour time-
weighted
Suspended Particulates average
< 150 micrograms/m3
(<10 microns) [TWA])
B. Air Quality testing must be carried out by an air testing company or laboratory
accredited by Dubai Municipality (DM), and the Compliant test results must be
submitted to DM.
C. Air quality testing equipment must have initial and periodical calibration certificate
as per manufacturer requirement from an external calibration facility accredited by
DM or at least annual calibration certificate. The initial and periodical calibration
certificates must be saved in a special register to be checked by DM in order to
ensure the accuracy of the readings as condition of renewal the indoor air quality
certificate.
44 pOH=?aCX=aT>p4
401.07 Indoor Air Quality Compliance - Existing Buildings
For all existing hotels, shopping mall, educational, health and government buildings,
buildings which are used to provide health care, mosques and worship buildings,
theatres, cinemas or any other existing buildings to be determined by DM later, suitable
ventilation for the building occupants and ensure the air quality in accordance with
the technical guidelines issued by Dubai Municipality.
The buildings which optionally apply the following procedures will be awarded indoor
air quality certificate by Dubai municipality.
A.Indoor air testing for the contaminants listed in Table 401.7 (1) must be carried out
to ensure the air quality in a building is suitable for occupation, the maximum limit
for indoor air contaminants included in Table 401.7 (1) must not be exceeded.
Sampling Sampling
Type of Samples Maximum Acceptable
Schedule Duration
Initial test 8- hour continuous
Formaldehyde < 0.08 ppm
completed monitoring (8 hour
by 31 time-weighted
December Total Volatile Organic average [TWA])
< 300 micrograms/ m3
2011. Compound (TVOC)
Respirable Dust
Further < 150 micrograms/ m3
(<10 microns)
testing
within 5
years of last Ozone 0.06 ppm (120 micrograms/ m3)
compliant
test.
Carbon Dioxide 800 ppm (1440 microgram/ m3)
B. Air Quality testing must be carried out by an air testing company or laboratory
accredited by Dubai Municipality (DM) and the Compliant result must be
submitted to DM.
C. Air quality testing equipment must have initial and periodical calibration certificates
as per manufacturer requirement from an external calibration facility accredited by
DM or at least annual calibration certificate. The initial and periodical calibration
certificates must be saved in a special register to be checked by DM in order to
ensure the accuracy of the readings as condition of renewal the indoor air quality
certificate.
pOH=?aCX=aT> p4 45
401.08 Inspection and Cleaning of HVAC Equipment
For all new and existing buildings, the cleanness of HVAC equipment and
systems must be maintained and all its parts must be inspected and cleaned in
accordance with the standard specifications approved by Dubai Municipality and
in accordance with the technical guidelines issued by Dubai Municipality. While
specialized maintenance companies approved by Dubai Municipality must carry
out Inspection and cleaning or provide a proof that maintenance shall be done
by building operator if he has a qualified personnel and equipment to do the job.
46 pOH=?aCX=aT>p4
401.08 Environmental Tobacco Smoke
C.Smoking designated areas must be at least twenty five (25) feet away from the
building entrances of the building, doors and operable windows and ventilation
system outdoor air intakes
D.An annual permit is issued from the Public Health and Safety Department of
Dubai Municipality for all places in which smoking is permitted after providing
all required documents and drawings mentioned in the guide
For all new and existing buildings, the heating, ventilation and air conditioning
(HVAC) system must be capable of providing the following range of conditions for
ninety five percent (95%) of the year:
For occupant comfort, normal occupied spaces should have an average air velocity
between (0.2 0.3) m/s.
pOH=?aCX=aT> p4 47
403 Chapter 3: Acoustic Comfort
48 pOH=?aCX=aT>p4
404.02 Low Emitting Material: Adhesives and Sealants
For all buildings, including new applications in existing buildings, all adhesives,
adhesive bonding primers, adhesive primers, sealants and sealant primers used in
the building should not exceed allowed limits of Volatile Organic Compound (VOC),
these materials must be accredited/certified from Dubai Central Lab or any source
approved by Dubai Municipality.
405.02 Views
All new office, residential and public buildings must provide direct line of sight (views)
to the outdoor environment in accordance with Dubai municipality building regulation
and specification.
pOH=?aCX=aT> p4 49
406 Chapter 6: Water Quality
50 pOH=?aCX=aT>p4