UPK Development Process Flow

The UPK development process has two phases with a cool-off period in between. Phase I involves analyzing requirements, designing the UPK, developing content, and reviewing. Phase II focuses on improving based on feedback, developing assessment materials, and final reviews before implementation. The process aims to continuously improve UPKs through SME reviews and incorporating requested changes.

Uploaded by

Divya Madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views1 page

UPK Development Process Flow

The UPK development process has two phases with a cool-off period in between. Phase I involves analyzing requirements, designing the UPK, developing content, and reviewing. Phase II focuses on improving based on feedback, developing assessment materials, and final reviews before implementation. The process aims to continuously improve UPKs through SME reviews and incorporating requested changes.

Uploaded by

Divya Madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

UPK Development Process

PHASE I COOL-OFF PERIOD PHASE II

Analyze Design Develop Review Analyze Design Analyze Develop Review Implement Evaluate

30 min 60 min 30 min/ UPK 1d 60 min 1d 20 min 10 min/UPK 1d 1d

Kick-off meeting Identify terms for Provide Improve training Develop Identify changes Send UPKs to Continuous
Escalate Develop glossary Escalate
with SME glossary explanations structure assessment requested from publish on the web Improvement
materials SME Review server Process
NO NO

Receive UPK Identify learning Develop Attach infographics


Build placeholders Include test script objectives and infographics Publish UPKs to
project materials
information in the Response YES duration Response YES local drive
UPK Notes area within 24 within 24
hours hours
Ensure alignment
Identify training Update feedback to PMO training
structure standards Make final
form
changes to UPK
Edit UPKs
Send glossary and Send UPK players
Ensure access to training documents for final SME
Attach feedback
related application to SME for review Build placeholders review
form
and other
documents Record UPKs

Perform internal Implement SME Perform internal


review changes to training review
materials

October 15, 2014 Page 1