Inspection Checklist: Concrete Floor: Summary Card)

1. This document is an inspection checklist for concrete floors used by inspectors to ensure compliance with approved plans. 2. The checklist includes 26 items to inspect, such as confirming approved consent documents are on site, inspecting reinforcement, slab thickness, drainage membrane details, and underfloor heating installation. 3. For each item, the inspector indicates whether the item passes (P), fails (F), or is not applicable (NA), and provides comments explaining their decision. If any items fail, an instruction sheet number is recorded.

Uploaded by

MaestroColicus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views2 pages

Inspection Checklist: Concrete Floor: Summary Card)

1. This document is an inspection checklist for concrete floors used by inspectors to ensure compliance with approved plans. 2. The checklist includes 26 items to inspect, such as confirming approved consent documents are on site, inspecting reinforcement, slab thickness, drainage membrane details, and underfloor heating installation. 3. For each item, the inspector indicates whether the item passes (P), fails (F), or is not applicable (NA), and provides comments explaining their decision. If any items fail, an instruction sheet number is recorded.

Uploaded by

MaestroColicus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref: IC 04

Ver: 6
Inspection Checklist: Concrete Floor Issued: 21 Nov 2014
Doc No: IT-639936
Page 1 of 2

BC No: Contact on site (Name, licence no.- RBW, company & position)

Date:
Inspector: Area of work inspected:
Inspection Comments / Notes: (Include comment on any alternative solutions identified, site observation statements, warranties
or As Laids to be provided, if applicable)

If Inspection Result = PASS then Date Signature


date and sign here
If Inspection Result = FAIL then complete instruction sheet (record number here and on
summary card)
F= Fail = Non-compliance with approved plans & documentation
P= Pass = Compliance with approved plans & documentation.
N/A = Means that Building officer feels that this portion of the prompt sheet is not
relevant

Concrete Pre-floor B1, B2 Comments (reasons for decisions)


Approved Consent documents on site
1 P F NA

Previous comments, BC/PIM conditions


2 P F NA
and endorsements
3 Floor construction type (record type) P F NA

Specified datum height is achieved (record


4 P F NA
how verified)

Shrinkage control & construction joints


5 P F NA
formed where necessary
Floor height above finished ground level
6 (discuss with contractor ability to meet min P F NA
floor heights when project finished)

Hardfill compaction (binding layer protecting


7 P F NA
DPM)

DPM type (note lap & penetration details)


8 P F NA

Slab thickenings / pads


9 P F NA

Reinforcing type
10 P F NA

Slab thickness
11 P F NA
Reinforcing support
12 P F NA

Reinforcing side, top and bottom cover


13 P F NA

If SED, has Engineer inspected design?


14 (Confirm that engineer has inspected design if P F NA
conditioned. no inspection - no pour).
600mm max hard fill compaction only
15 NZS3604 Engineer PS4 for deeper back P F NA
fill
Steel laps
16 P F NA

Perimeter rod position ( under starters)


17 P F NA

Mesh is cut (for expansion joints if required)


18 P F NA

Bottom plate connectors spacing and


19 position in relation to slab edge. P F NA

Steel radius bends correct


20 P F NA

Cladding rebates been constructed


21 correctly?(50mm min) P F NA

22 Concrete strength. P F NA
Floor thickness is maintained under
23 showers P F NA

Underfloor heating systems are installed


24 to manufacturers specifications and P F NA
clearances
Thermal break required to isolate areas
25 of underfloor heating P F NA

Thermal resistance completed as per


26 consent P F NA

Ref: IC 04 Version: 6 2 of 2 Issued: 21 November 2014