Assignment Ecm 566 Construction Project Management: Conditions of This Assignment

The document discusses an assignment where students imagine managing the construction of a triple-storey luxury bungalow, including defining the project, allocating team tasks, creating a time plan, and other relevant tasks. Students are required to present their findings and discussions of these tasks in a group presentation using slides within the last week of lecture, with each group having 15 minutes and each of 5 team members presenting.

Uploaded by

Are Fiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views

Assignment Ecm 566 Construction Project Management: Conditions of This Assignment

The document discusses an assignment where students imagine managing the construction of a triple-storey luxury bungalow, including defining the project, allocating team tasks, creating a time plan, and other relevant tasks. Students are required to present their findings and discussions of these tasks in a group presentation using slides within the last week of lecture, with each group having 15 minutes and each of 5 team members presenting.

Uploaded by

Are Fiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ASSIGNMENT

ECM 566 CONSTRUCTION PROJECT MANAGEMENT

Imagine you are the project manager of a triple-storey luxurious bungalow. The client
requested for the project to be completed with the best quality and certain time frame.
You are responsible to oversee the project. As a project manager, you understand that
the project will involve the following basic work tasks:
Project definition
Team and allocation of work tasks
Time plan.
There may be some other tasks involved. You are required to expand on the above tasks
(plus others that you consider relevant). Discuss them in detail, with reasons and
justifications. As this is a mock project, the technical details are not important.

This assignment addresses CO1, CO2, CO3 and PO5, PO11.

Conditions of this assignment:


The outcome of this assignment will be in the form of presentation slides.
Students are required to present their findings within the last week of lecture.
Each group is given 15 minutes to present.
One group consist of 5 team members. Each team member is required to present.