Features of B2W
Centralized resources,
crews, tasks and item
databases
B2W have a system as storage to
keeps all the resource , task ,item
database of costing information .
this function preparing the newest
data is on the spot
Work breakdown
structure (WBS)
B2W have a system called Work
Breakdown Structure (WBS) , and
this function can let you to
compile the unlimited hierarchical
form .It gives you a list to show how does the costs are rolled up and the
detail of level at which costing part is done. And also can be figured out the
pay items, WBS levels
Synchronized mobile
estimating
B2W also provide a mobile
function to let the client using
at construction site with a
simply smart phone .This
function making a easy life for
those working at construction
Audit trail
B2W software
also have provide
auto calculation
function
Auto-save &
auto-
recalculate
DOT integration
B2W Estimate provides
integration with state DOT
electronic bidding system (EBS)
files.
Integrated vendor and
subcontractor RFQ
management
Error checking
wizard
B2W provide a
function Check
Wizard, it will
automatically scans
the task that may
dozens of common
estimating errors. If any problems are happened the system will show out the
problems step by step and let you review and resolve.
Advanced bid day
management with
flexible markup &
pricing schemes
B2W provide a single
percent that applies to
cost category and assign
different markup to labor
instead of equipment or
materials.
Customizable
private bid form
B2W provide a private
bid form , the form clearly
list down the detail of all
creating payment terms,
bid form notes,
subcontractor .
Cross-bid/cross-division
management reporting
B2W Management Reporting
show a diagram about the daily,
weekly, or monthly schedule.
Estimates average cost for
materials over the past year, see
the win-loss ratio of your
estimates and your margins over
time.
Compare your bids
against the competition
B2W provide a function that can
review or compare your bids to
the another competitors with the
market analysis. The total price
and break down is possible to be
compare to the bids item .