D1 Mobilisasi
D1 Mobilisasi
D1 Mobilisasi
2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 18.000.000,00
C. FASILITAS KONTRAKTOR
1 Base Camp M2 48,00 50.000,00 2.400.000,00
2 Kantor M2 - 75.000,00 -
3 Barak M2 - 45.000,00 -
4 Bengkel M2 - 25.000,00 -
5 Gudang, dan lain-lain M2 - 25.000,00 -
6 ...................... .... - - -
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 - 55.000,00 -
3 Bituminous Testing
Marshall Asphalt Test Set - 3.000.000,00 -
Extraction Test, Centrifuge/Refflux Method Set - 750.000,00 -
Specific Gravity for Coarse Aggregate Set - 750.000,00 -
Specific Gravity for Fine Aggregate Set - 750.000,00 -
Mix Air Viod Content (Accurate Method) Set - 2.500.000,00 -
Core Drill Set - 2.500.000,00 -
Metal Thermometer Set - 100.000,00 -
Accessories and Tolls Set - 500.000,00 -
Penetration Test Bln - 100.000,00 -
Softening Point Set - 600.000,00 -
Refusal Density Compactor Set - 1.500.000,00 -
4 Concrete Testing
Slump Cone Set - 500.000,00 -
Cylinder/Cube Mould for Compressive Strength Set - 1.000.000,00 -
Beam Mould for Flexural Strength (RIGID) Set - 1.000.000,00 -
Crushing Machine Set - 5.000.000,00 -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS - 10.000.000,00 -
2 Pemeliharaan Jalan Kerja / Samping LS - 10.000.000,00 -
3 ...................... .... -
4 ...................... .... -
5 ...................... .... -
6 ...................... .... -
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1,00 1.000.000,00 1.000.000,00
2 ...................... .... - - -
3 ...................... .... - - -
4 ...................... .... - - -
5 ...................... .... - - -
6 ...................... .... - - -
B. PERALATAN