DPR - Z Morh - 06 07 2017
DPR - Z Morh - 06 07 2017
DPR - Z Morh - 06 07 2017
DAILY PROGRESS
REPORT
PROGRESS SUMMARY
July 2017
PROGRESS SUMMARY
Monthly
Previou Current
(July 17) Total Progress Till Date
Jobsite s chain Daily Progress (m) chain
Progress (m)
age (m) age (m)
(m)
West Portal
Main
71.50 02.50 74.00 11.50 74.00 m
Tunnel
East
Egress to
-- -- -- -- --
East
Main to
-- -- -- -- --
west
Egress to
-- -- -- -- --
West
Main -- -- -- -- --
East
tunnel Egress -- -- -- -- --
EL-2638.70 S.D.R Drilling and grouting in progress, 100 numbers completed & 100 grouted.
Eastern Portal
Micro pile 126 COMPLETED AND 126 GROUTED, work is in progress.
Total SDR-100 Nos. grouting complete, Micro pile 126 Nos. completed & 126 nos Grouted.
Remarks: 1. Micro piles 126 Nos drilled and Grouted till date. (Up to 06-07-2017)
2. In Main Tunnel Support System changed from Ch: 71.50 M from S-II BIS to S-IV with
Cross Section S-IV
25< RMS (Bieniawski) < 35
0.1 < Q (Barton) < 0.4
3. Micro piling Machine breakdown from 09:00 am onwards, Work stopped at Eastern Portal.
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
06-07-2017 (GT-2) Panjajal 1-(UCS) GT2 Group Ventilation 308 7.00am 65 III Good
Trap 2-(RQD) , Mass Tunnel
Formation 3-(SPACING OF Metabasite of (Adite)
DISCONTINUITY) , Panjal Trap
4 (CONDITION OF
DISCONTINUITY0 ,
5-(GROUND
WATER)
-
West Tunnel
--
East Tunnel
Egress
--
V to E
--
Main
V to
W
--
Ventilation Tunnel
V to E
--
Egress
V to W
--
Ventilatio
--
32 - - - - - - - - - - -
Cartridge
40 24.2 kg - - - - 420.320 kg - - -
TOTAL - - - - - - - - - - -
Elect. 01 - - - - - 01 - - -
Detona
No 19 - - - - - 238.00 Nos - - -
tors
Elect.
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
By Blast By Blast
Operations Total
From To From To Total Hrs
in Hrs Remarks
Tunnel
Cycle-01 Cycle-02
RMR 19
REMARKS:
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
71.50 Mts 02.50 Mts 74.00 Mts 11.50 Mts Poor One blast Rock 74.00 Mts
Breaker
Western portal
(MAIN TUNNEL) LATTICE GIRDER S -IV (G T 4)
REMARKS:
A.) CROSS SECTION S IV MAIN TUNNEL
Cross Section S-IV
25< RMS (Bieniawski) < 35
0.1 < Q (Barton) < 0.4
10 Rib erection - - - - - - - - -
Swellex Rock
11 12.00
bolt 10.30 pm 1.30 - - - - - -
am
SN Rock Bolt
Lattice Girder
12 - - - - - - - - -
Installation
Final Layer 02.00
13 12.00 am 2.0 - - - - - -
Shotcrete. am
Total 16.00 Total Hrs
Hrs= Hrs Hrs=
14 RMR 65
VENTILATION
SVT 1 (G T- 2)
TUNNEL
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
1 Face Drilling - - - - - - -
2 Charging - - - - - - -
3 Blasting - - - - - - -
4 Defuming - - - - - - -
5 Mucking - - - - - - -
Scaling with - - - - - - -
6
bottom cleaning
7 Surveying - NO WORK STARTED FOR TUNNELING -
8 Face Mapping - - - - - - -
Initial Layer - - - - - - -
9
Shorcrete
Swellex Bolt - - - - - - -
10
drilling
11 SN Rock Bolt - - - - - - -
15 RMR -- -- --
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
Remarks
Excavation up to previous month -- NO WORKS STARTED
Excavated in current month (m) -- --
Total excavated Length (m) -- --
APCO start Chain age -- --
Previous Current
Daily Monthly No. Excavated Total Progress
Chain Chain Rock
Progress Progress of by Till Date
age age Class
Blast
(m) (m) (m) (m) (m) (m)
-- -- -- -- -- -- -- --
Remarks
Excavation up to previous month -- --
Excavated in current month (m) -- --
Total excavated Length (m) -- --
APCO start Chain age -- --
Previous Current
Daily Monthly Rock No. of Excavated Total Progress
Chain Chain
Progress Progress Class Blast by Till Date
age age
(m) (m) (m) (m) (m) (m)
-- -- -- -- -- -- -- --
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)
EASTERN PORTAL
(MICROPILING
SDRB WITH 20 MTS 2*2 STAGGERED PATTERN WITH DIA 76 MM BIT AND
32 MM INSTALLED 100 NOS AT AN ELEVATION 2436 MTS AT THE FRONTAL
WORKS)BENCH
SLOPE. Micro pile, total-126 Nos drilled and grouted at Top Bench R.L
2638.332.
1 and 2
SITE OBSERVATIONS:
4. THE GEOBURGG TEAM FOR CABLING AND TORQUING HAS TO BE DEPLOYED AT THE WESTERN PORTAL.
5. THE DITCH DRAIN ABOVE THE MAIN TUNNEL HAS TO BE CLEARED IMMEDIATELY.
6. THE INVERT AT THE VENTILATION TUNNEL NEEDS TO BE CLEANED AND HOUSE KEEPING JOB TO BE DONE.
8. THE MICROPILING WORKS EXECUTED AT THE EASTERN PORTAL NEEDS MORE EFFICIENCY AND MORE MAN
POWER TO BE DEPLOYED SO THAT THE 2ND SHIFT WORK CAN BE STARTED.
Prepared By Majid Imran(Tunnel Engineer) & Bapan Deb Barman (Asst. Tunnel
Excavation Expert)
16. ENVIRONMENTAL:
1. Gas Monitoring inside the Tunnel:
Prepared by: MR. BRIJESH PRATAP & MR. MANZOOR BHAT( SURVEY EXPERT)
DPR-July-06, 2017
EPTISA SERVICIOS DE INGENIERIA S.L
Z-MORH TUNNEL PROJECT (J&K)