Salient Features of Super Ankhu Khola

Hydropower Project 25.4 M.W

S. N. Description : As per Feasibility Study Report

1. Project Name : Super Ankhu Khola Hydropower Project (SAKHP)

2. Location of the Project

Administrative location : Lapa and Sertung VDCs (Dhading District)


o o o
Geographical co-ordinates : 85 0256E to 85 0445E longitudes and 28 1000N to
o
28 1144N latitudes

3. Type of project : Run-of-the-river (RoR)

4. Hydrology

Source river(s) : Tatopani (Ilep) Khola and Menchet (Bhabil) Khola

(named as Ankhu Khola after their confluence)


2
Catchment area at intake : 274.4 km
2
Catchment area at tailrace : 288.0 km
3
Mean annual flow : 22.71 m /s

5. Headworks

1. Tatopani (Permanent Type)

Type of weir : Conventional core wall ,boulder filled (gravity type)

Length of weir : 16.0 m

Weir crest elevation : 1388.10 masl

Weir foundation level : 1382.25 masl

2. Menchet Diversion (Temporary : Temporary divesrion with permanent intake and


Type-for dry season only) diversion canal to Tatopani Khola

Intake type : Side intake, orifice type

Intake opening : 3 Nos. x 4.2 m

Intake gate opening size : 4.2 m x 1.5 m (B x H)

Intake invert level : 1286.40 masl

6. Desilting basin

Type : Dufour, continuous flushing

Number of chambers : 2
S. N. Description : As per Feasibility Study Report

Particle size to be removed : 0.2 mm

Basin size : 98 m x 10.3 m x 6.9 m (L x B x H)

Flushing channel size : 0.6 m x 0.6 m (L x B)

U/S transition : 7.5 m

D/S transition : 16.5 m

7. Headpond

Section : oval

Size : 21 m x 15 m x 9 m (L x B x H)

Tunnel inlet invert level : 1378.68 masl

Operating water level : 1387.58 masl

Size : 15 m x 9 m (B x H)

8. Headrace tunnel

Type : Inverted D-shaped, pressure flow

Size : 3.6 m x 3.9 m (B x H)

Length : 3455 m

Slope : 1 in 600

Lining : Fibre shotcrete and steel rib

Number of adits : 1 Nos.

9. Penstock pipe

Material : steel,E490(Fe350)

Before bifurcation

Diameter : 2.6 m

Length : 237 m x 1 Nos.

After bifurcation

Diameter : 1.85 m

Length : 22m x 2 Nos.

10. Surge shaft

Section : Circular

Diameter : 8m
S. N. Description : As per Feasibility Study Report

11. Powerhouse and turbines

Type : Surface

Size : 34.5 m x 15.0 m x 27.5 m (L x B x H)

Type of turbine : Vertical francis

Installed capacity : 12,700 KW x 2 Nos.

Turbine axis elevation : 1187.25 masl

Tailrace Canal : 58 m

12. Turbine

Type : Pelton

Rated capacity : 2 x 12500 kW


3
Design discharge : 7.40 m /s (each unit)

13. Power and energy

Gross head : 202.86 m

Net head at full flow : 197.75 m

Installed capacity : 25.4 MW

Efficiency : 92%, 97% and 99% (turbine, generator and


transformer)

Minimum power output : 6700 kW (in March)

Net dry season energy : 21.56 GWh/ yr

Net wet season energy : 124.31 GWh/ yr

Net marketable energy : 145.88 GWh/ yr

Type of Generator : Synchronous 3 Phase

Capacity of Generator : 14.7 MVA, 11KV, 0.85 pf, 50 Hz

14. Transmission line

Connection (length) : Powerhouse to Trishuli 3B sub-station (28 km)

Voltage : 132 kV, single circuit

15. Access road

Existing : Earthen, fair-weather road from Dhaging Besi to Singang


(40 km)

Proposed : From Singang to headworks (15 km)


S. N. Description : As per Feasibility Study Report

16. Financial indicators

Reference year (exchange rate) : June 2015 (1 US$ NRs. 100)

Total cost (excluding IDC) : NRs. 3531.51 million (approx.)

Specific cost : 1413 US$ per kW

Total financial cost (including IDC) : NRs. 3968.95 million (approx.)

Specific cost (financial) : 1588 US$ per kW

Interest rate : 11%

FIRR : 16.62%

B/C ratio : 1.57

NPV : NRs. 1510.38 million

Payback period : 5.79 years

17. Construction period : 3 years