Project Spreadsheets to BS 8110 The Concrete Centre
Client BigBucks PLC Made by Date Page
Location Pilecap C10 Rod 24-Jul-17 28 6 Pile Cap PILECAP DESIGN to BS 8110:2005 Checked Revision Job No Originated from RCC82.xls v 4.1 on CD 2006 TCC - - P2000
Cap load = 101.2 kN OVERTURNING MOMENTS - kNm characteristic
1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk) My v of col 511.5 283.9 432.9 My ^ of col 557.5 312.4 476.5 (including tolerance) My < of col 400.5 222.3 339.9 My > of col 434.5 243.6 370.6
E-W STEEL BOTTOM TOP N-S STEE BOTTOM TOP
16 16 16 16 M = 434.5 0.0 M = 557.5 0.0 K' = 0.1558 b = 3300 3300 b = 2000 2000 min As = 0.13% d = 551.0 576.0 d = 567.0 592.0 K = 0.0124 0.0000 K = 0.0248 0.0000 z = 523.5 547.2 z = 538.7 562.4 As = 1909 0 As = 2380 0 Provide 2789 0 Provide 2380 0 No = 14 8 No = 12 5 As prov = 2815 1608 As prov = 2413 1005 fs = 226 8 H16 T2 fs = 329 5 H16 T1 Max clear S = 284.0 Max clear S = 284.0 Min clear S = 25.0 Min clear S = 25.0 Clear S = 227.1 Clear S = 153.1 14 H16 B2 12 H16 B1
BEAM SHEAR Critical section is 112.5 mm from pile centres
EW (NS plane) 12 links V = 695.3 v = 0.3824 As% = 0.155 . av = 362.5 1.5d/av = 0.8655 (v - vc)b = 1320.0 No of legs = 8 Spacing = 275 8 Legs H12 @ 275 LINKS NS (EW plane) V = 464.6 v = 0.4097 As% = 0.213 . av = 937.5 vc = 0.4221 (v - vc)b = 800.0 No of legs = 5 Spacing = 300 5 Legs H12 @ 300 LINKS
PUNCHING Column Face No other critical section
V= 1194.4 = 6504 d ave = 559 v= 1.257 v = 0.000 av = 537.5 v max = 4.733 ok 1.5d/av = 0.627 ok