20 TR Boom B26 FR
20 TR Boom B26 FR
20 TR Boom B26 FR
TRAINING MANUAL
PARALLELISM BOOMS
MOVEMENTS
MODULE 1) MOVEMENTS
FEED EXTENSION
EXTRA-TILT
FEED ROTATION
ROLL OVER
FEED TILT BOOM SWING
SIDE VIEW
BOOM LIFT
PUMP CYLINDER
BO
OM
EX
TE
NS
IO
N
FEED SWING
BOOM SWING
Booms B26 F and B26XL F are dedicate for face drilling application in mining as well as tunneling conditions.
The movements can be divided in two main types.
MOVEMENTS
After setting the original position of the drill feed according to the direction of the drift, the only use of the following
movements ensure a perfect parallelism of the holes regardless of the motion of the drill feed.
Boom movements:
boom lift.
boom swing.
boom extension.
drill feed movements:
feed rotation (full 360) around the roll over axis.
feed extension.
SCHEMATIC
MODULE 2) SCHEMATIC
A
9
B
300
270
270
A
8
B
A
7
B
250
1 1b 270
2 S1 300
A 250 270
6 3
300
S2
B
4 4b
7
8 C5
5
A
B
9 C6
270
C9 L2 10
300
7t 8b
270
11 9b
A 240
C8
4 12 12b
B
13 C1
14
15
5
C2
C3
15b
5b
A
100
3 6 6b
B C4
210
2
A
210
B
A
1
270
1
270
LS X
P2
P1
SCHEMATIC
BOOM NV
feed extension
feed swing
feed tilt
boom rollover
boom extension
boom lift
SCHEMATIC
1B 4B C3
5
C4 4
5B L1
C7 6
C5 7T
C1 C2 6B
1
8
C6 3
C9 8B C8 1
1 2
L1 9 10
9B 7
14
S1 S2
13
15
12B 15B
12
9
A
B
300
270
270
A
8
B
A
7
B
1 1b 270
250
2 S1 300
A 250 270
6 3
300
S2
B
4 4b
A
8
9
C5
C6
5
B 270
C9 L2 10
300
7t 8b
270
11 9b
A 240
C8
4 12 12b
B
13 C1
14
C2
15 15b
5 C3 5b
A
100
3 6 6b
B C4
210
A
2
SCHEMATIC
In parallelism mode the two rod end chamber of the boom lift and feed tilt cylinder are connected in closed circuit.
Therefore the area of the two chambers must be equal. This explain the large size of the rod of the boom lift
Parallelism pilot line:
from the rod end side oil is pushed out the lift cylinder.
it enters the safety block to port 7.
oil flows to the rod end side of the feed tilt cylinder through the piloted check valve C7. It gets out the block from
port 8b
Note: due to the large ratio between working area of the lift cylinder, this line is also connected to the safety
relief valve L2. It prevents to over pressurize this line.
That could happen:
1 1b
if the operator lifts the boom when the feed tilt
2 S1 300 cylinder has been fully retracted.
3
S2 300 ADJUSTING PROCEDURE
4 4b
6 6b
C4
RETURN CIRCUIT
From the large chamber of the tilt cylinder , oil flows through the safety valve C8. This valve is maintained
wide open by the pressure from the pilot line.
Finally, oil returns to the tank to port A of the spool .
Schematic shows the circuit when the boom lifts.
SCHEMATIC
9
A
300 270
B
270
A
8
B
1 1b 270
A
7 2 S1 300
B
270
3
300
250 S2
4 4b
6
A
B
250
7
8 C5
9 C6
270
C9 L2 10
300
A 7t 8b
5 270
B 11 9b
240
C8
12 12b
13 C1
14
C2
A 15 15b
4
B 5 C3 5b
100
6 6b
C4
9
A
300 270
B
270
A
8
B
1 1b 270
A
7 2 S1 300
B
270
3
300
250 S2
4 4b
6
A
B
250
7
8 C5
9 C6
270
C9 L2 10
300
A 7t 8b
5 270
B 11 9b
240
C8
12 12b
13 C1
14
C2
A 15 15b
4
B 5 C3 5b
100
6 6b
C4
SCHEMATIC
For specific application it is possible to use the feed tilt individually or during initial set up, by using the spool .
TOP SCHEMATIC
In the example shown, we consider that the boom lift has been operated just beforehand.
Note: if the boom lift movement has been used previously, the line 7t is maintained pressurized. It could keep the
safety valve C8 open.
Line 9 ---> 9t is vented to tank from port 11 through the spool to port A.
From the previous situation, the operator wants now to move the feed tilt cylinder (large chamber).
From the feed tilt control , oil is directed to safety block to port 9.
Oil flows to the large chamber of the feed tilt cylinder through the piloted check valve C6 into line 9B.
A trapped pressure keeps the safety valve C8 opened. Line 9B is therefore vented to tank to line 11 returning to
spool .
This valve releases the static pressure in line 7t, therefore valve C8 closes.
SCHEMATIC
9
A
300
270
B
270
A
8
B
A
7
B
1 1b 270
250
2 S1 300
A 250 270
6 3
300
S2
B
4 4b
7
8 C5
A 9 C6
5
B 270
C9 L2 10
300
7t 8b
270
11 9b
A 240
C8
4 12 12b
B
13 C1
14
C2
15 15b
5 C3 5b
A
100
3 6 6b
B C4
210
A
2 210
B
A
1 270
1
270
LS X
P2
SCHEMATIC
SCHEMATIC
9
A
300 270
B
270
A
8
B
A
7
B
250
1 1b
270
2 S1 300
A 250 270
6 3
300
S2
B
4 4b
7
8 C5
A 9 C6
5
B 270
C9 L2 10
300
7t 8b
270
11 9b
A 240
C8
4 12 12b
B
13 C1
14
C2
15 15b
5 C3 5b
A
100
3 6 6b
B C4
210
A
2 210
B
A
1 270
1
270
LS X
SCHEMATIC
NOTE: both cylinders are attached to the boom. When the boom swings, both cylinders are moving.
The operator moves the lever of spool Nb 8 sideways.
Main cylinder:
Oil pressurizes the large chamber of the swing cylinder.
from the rod side, oil returns to the tank through line B.
Pump cylinder:
from the rod side oil enters the safety block in port 4.
out of port 4b it pressurizes the rod side of the feed swing cylinder
large chambers of pump and feed swing cylinders are connected in closed loop through the safety block, line 1
<---> 1b
the two safety valves S1 and S2 prevent the oil to escape to the spool Nb 4 when using parallelism.
13 C1
14
C2
15 15b
5 C3 5b
100
6 6b
C4