D.M.1.1.4 Business Mathematics For Management: Assignment 01
D.M.1.1.4 Business Mathematics For Management: Assignment 01
D.M.1.1.4 Business Mathematics For Management: Assignment 01
4 Business Mathematics
for Management
Assignment 01
Discount 10%
Actual Profit
Labeled Price
A + 0.3A
1.3A
Discount
1.3A x (10/100)
0.13A
Sold Price
1.3A 0.13a
1.17A
Actual Profit
1.17A- A
0.17A
(0.17A/ A ) x 100%
17%
2|Page
Question: 02
A 4000 20
B 3200 25
No of kilometers = x
Total amount = y
So,
800 = 5x
x = 160 km
The no of kilometers which two companies have same total charge is 160
km.
3|Page
Question: 03
+1)
4|Page
Question: 04
No of units = x
a. Cost function
C = VC + FC
C = 30x + 8500
Total revenue
R = Px
R = (250 x ) x
R = 250 x x2
b.
I. The break even point
Revenue = Cost
x2 220 + 8500 = 0
5|Page
II. Maximum Production
III. The profit earned at the production level of 90 units
6|Page
Question: 05
Lets consider fastest machine produce x units and slowest machine produce
1000 x units ,
Then
.. (3)
If we consider about the situation that both machine are working, lets think
fastest machine take h time and slowest machine take h+ 180 time
So h= 36/2
18 min
& its equal to (1)
7|Page
by substitute to (3)
8|Page
Question: 06
Duration = 6years
Rate = 6%
9|Page
Question: 07
10 | P a g e
Question: 08
I. A = 5580000.00
r = 13.2%
t=12
i= 0.132/12
n=15 x12= 180
II. 8x12=96
]
3,897,997.044/=
III. total interest paid
nR-A
180x 71333.25- 5580000
12840705-5580000
7260705/=
11 | P a g e