Form Work
Form Work
Form Work
Calculation Sheet
Member /Location
Job Tilte:Contract No. TW98/02 Drg. Ref.
Route 5 Section between Shek Wai Kok and Chai Wan Kok
Falsework for Beam of Underpass R3 Made By PLW Date Jul-17 Chd.
Concrete Pressure
0. 5 0 . 5 0. 5
P1= D(C1 R +C 2 K ( HC 1 R ) )
Concrete Density, D = 24.5 kN/m3
Height, H = 1.7 m
Sharf Coef. C1 = 1.5 (1 for wall; 1.5 for column)
Conc. Coef. C2 = 0.3 (0.3 for Normal Conc.)
Concrete Temp, T = 32 o
C
k = (36/(T+16))^2 = 0.5625
Rising rate, R = 0.6 m/hr
P1 = N/A kN/m2
P2 = DxH = 41.7 kN/m2
Pmax = min {P1,P2} = 41.7 kN/m2
Loading Condition
Span, L = 200 mm
Support width, B = 50 mm
Concrete Pmax = 41.7 kN/m2
Moment Check
Max. Moment, M = 0.095wL^2 = 0.17 kNm
Bending Stress = M/Z = 2.76 N/mm2 <5.5 N/mm2, OK
Shear Check
Max. Shear = 0.525w(L-B-t) = 3.00 kN
Bending Stress, V = V/A = 0.16 N/mm2 <0.7 N/mm2, OK
Deflection Check
Allowable Limit = L/ 270
Allowable Deflection = 0.74 mm
Deflection = 0.0066wL^4/EI = 0.12 mm Deflection OK
Babtie Asia Job No. 2594 Sheet No. Rev.
Calculation Sheet
Member /Location
Job Tilte: Contract No. TW98/02 Drg. Ref.
Route 5 Section between Shek Wai Kok and Chai Wan Kok
Falsework for Beam of Underpass R3 Made By PLW Date Jul-17 Chd.
Section Property
Section Width = 50 mm
Section Depth = 100 mm
Nos. = 1 no.
Area, A = 5000 mm2
Moment of inertia, I = 4166666.7 mm4
Section Modulus, Z = 83333.3 mm3
Loading Condition
Span, L = 700 mm
Continuous Support
Moment Check
Max. Moment, M = 0.125wL^2 = 0.53 kNm
Bending Stress = M/Z = 6.42 N/mm2 <8.9 N/mm2, OK
Shear Check
Max. Shear = 0.5wL = 2.14 kN
Bending Stress, V = V/A = 0.43 N/mm2 <1.4 N/mm2, OK
Deflection Check
Allowable Limit = L/ 270
Allowable Deflection = 2.59 mm
Deflection = 0.013wL^4/EI = 0.76 mm Deflection OK
Babtie Asia Job No. 2594 Sheet No. Rev.
Calculation Sheet
Member /Location
Job Tilte: Contract No. TW98/02 Drg. Ref.
Route 5 Section between Shek Wai Kok and Chai Wan Kok
Falsework for Beam of Underpass R3 Made By PLW Date Jul-17 Chd.
Steel Material
Section Property
Loading Condition
Span, L = 1219 mm
Shared Width
kN/m2 (mm)
Concrete Pmax = 41.7 700
Live Load = 2 700
Additional Load 1 =
Additional Load 2 =
Continuous Support
Moment Check
Max. Moment, M = 0.1wL^2 = 4.54 kNm
Bending Stress = M/Z = 120.75 N/mm2 <150 N/mm2, OK
Shear Check
Max. Shear = 0.6wL = 27.24 kN
Bending Stress, V = V/A = 31.94 N/mm2 <92.5 N/mm2, OK
Deflection Check
Allowable Limit = L/ 270
Allowable Deflection = 4.51 mm
Deflection = 0.00541wL^4/EI = 0.97 mm Deflection OK
Babtie Asia Job No. 2594 Sheet No. Rev.
Calculation Sheet
Member /Location
Job Tilte: Contract No. TW98/02 Drg. Ref.
Route 5 Section between Shek Wai Kok and Chai Wan Kok
Falsework for Beam of Underpass R3 Made By PLW Date Jul-17 Chd.
Loading Condition
Horizontal spacing, s = 0.55 m
Vertical spacing, h = 1m
Concrete Pmax = 41.7 kN/m2
Calculation Sheet
Member /Location