PEMEX Exploración y Producción Paraiso - Tabasco Tg-2 Unit: Battery Charger Data Sheet
PEMEX Exploración y Producción Paraiso - Tabasco Tg-2 Unit: Battery Charger Data Sheet
PEMEX Exploración y Producción Paraiso - Tabasco Tg-2 Unit: Battery Charger Data Sheet
Paraiso - Tabasco
TG-2 UNIT
Supplier:
CEG S.p.A. Italy
2. SITE DATA
Not Applicable
3.2 Mechanical
Rectifier bridge
Continuous rated current ........................................................... 50 A
Max. repetitive reverse peak voltage......................................... 800 V
Max. junction temperature ......................................................... 130 C
Average forward current (180 conduction) ......... ..................... 50 A
SCR Manufacturer and type ...................................................... SKKT 63
Block diodes
max repetitive reverse voltage (VRRM) .................................... 800 V
average forward current (180 conduction) ......... ...................... 500
Transformer
ratio ............................................................................................ 400/110 V
rated power ................................................................................ 11 kVA
inrush current ............................................................................. 12 In A
AC side equipment 52-1
Circuit breaker rated current ...................................................... 100 A <2>
contactor rated current .............................................................. N/A
DC side equipment (downstream rectifier) 72-1 <2>
Circuit breaker rated current ...................................................... 70A <2>
bus-tie contactor rated current .................................................. N/A
DC side equipment (outcoming to distribution board) 72-3 <2>
Circuit breaker rated current ...................................................... 250A
Not Applicable (reference Electric Interface Signal List specified in para 1.1)
Applicable
5. ADDITIONAL REQUIREMENTS
5.1 The DC/UPS Panel base-frame shall be suitable for rolling to insert the panel inside the Local
Control Room / Control Cabin (in case that it is not possible to lift the board using the lifting
eyebolts)
5.2 All doors bottom part shall be at least 60mm above the panel Base in order to avoid
interference with floating floor tile thickness (if any).
5.4 The panel will acquire the signals from Hydrogen sensor H2Scan Mod. HYALERTA2600
(supplied by others) and installed inside battery compt; in particular:
5.5 The panel will fed the motor battery compartment air extractor fan (supplied by GENP) 88BAT
(125Vdc 0,7Hp). The feeder will be equipped with circuit breaker, contactor and thermal
relay adjustable type (suitable for the motor rated power above indicated).
Not applicable
Applicable
QUALIFICATIONS FORM
Ref. to Tech.
Spec./Document/ Exception to Supplier's NP
NP Comment to
International NP Techn. Alternative Accept/Reject NP Remarks
Qualification
Code and Requirement Proposal Qualification (6)
(4)
Paragraph (2) (3) (5)
(1)
Par. 7.2. Outline
drawing, one line
diagram : 3
weeks AOD (*).
Other Notes:
After the evaluation of the proposal, the Supplier shall be returned with the Qualification Form
completed by GE Oil&Gas.
Supplier, if required, shall resubmit the proposal taking into account to rejected points which shall be them
amended until they become acceptable by GE Oil&Gas
DESCRIPTION
DC Data sheet filled in
Preliminary Layout/ Outline drawing with overall dimensions
DC Panel preliminary Painting specification
DC Panel preliminary Single Line Diagram
BQF filled in with all deviations to applicable specifications
Detailed list of proposed equipment complete of technical data
Coordination table
The quotation, including all the related documentation, shall be submitted by Supplier/Manufacturer in
English language. Quotations not complete with above-mentioned documentation and not in English will
be considered NOT VALID and consequently rejected.
Legend:
AOD ............................................................... - After Order Date
BTD ............................................................... - Before Test Date
ATD ............................................................... - After Test Date
$..................................................................... - Subject to penalty for late delivery
All drawings shall be submitted in CAD and PDF file formats, for each issue.
All manuals shall be submitted in n2 prints + ele ctronic format on CD/DVD.
Documentation language.. English ___
Note: in case CE marking is applicable, Installation and Maintenance manuals and labels shall
be mandatory also translated in final user official language)
All documents shall comply with ITK28300.07 minimum documentation content for Battery
Charger, DC distribution & inverter panel. Documents not according to above mentioned
requirement will be rejected.
The minimum time for comments/approval of documentation for this project will be at least 6
weeks from receipt of acceptable drawing complete of all project labels and compliant with
ITK28300.07.
Critical drawings approval (if not commented/approved after 6 weeks) shall not stop
production.
If the 6 weeks are elapsed and one drawing is becoming critical for production, supplier shall
inform GE at least 1 week before.
GE will never accept any production delay for late document approval if not timely advised.
- For documents resubmission after official CUSTOMER/GE comments, the following two
steps maximum time shall be considered:
1) Comments analysis with reply/clarifications (if any): No more than 3 working days
2) Doc Resubmission after clarification closing: No more than 5 working days