100% found this document useful (1 vote)
199 views5 pages

C1-Deliverables and Milestones

The document provides details on deliverables and milestones for the NEXPReS project. It lists completed and remaining deliverables with their status and due dates. It also lists milestones and their associated work packages and means of verification.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
199 views5 pages

C1-Deliverables and Milestones

The document provides details on deliverables and milestones for the NEXPReS project. It lists completed and remaining deliverables with their status and due dates. It also lists milestones and their associated work packages and means of verification.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

NEXPReS: Novel Explorations Pushing Robust e-VLBI Services Period 1 Report

Deliverables and Milestones Tables


The following tables list the deliverables and milestones for the project as originally listed in
the DoW. The deliverables are split into two sections: completed and remaining. The
milestones are listed together.
Note that the status of the deliverables are categorized as:
x = Ongoing effort
4 = Deliverable completed and presented to Project Manager
3 = Deliverable in draft form
2 = Most work completed
1 = Some work started
0 = No work started
--> = Deliverable has been identified as actively delayed
Completed deliverables are available in several different formats. A physical copy of each has
been printed (as possible) for each and presented to the Commission with the Period Report.
The report is also provided in digital form with a simple HTML index which links completed
deliverables with digital copies of the final product. Additionally, all deliverables and
milestones are also linked in the project wiki:
http://www.jive.nl/nexpres/doku.php?id=nexpres:nexpres-deliv-table-1
http://www.jive.nl/nexpres/doku.php?id=nexpres:nexpres_p1_milestones

Table of completed deliverables


D# Title Partner Due (month) Status
D1.01 Appoint Programme Manager 1 1 4
D1.02 Appoint Project Assistant 1 1 4
D1.03 Form Board (protected due to email addresses) 1 1 4
D1.04 Create Project contact lists (multiple lists collected on 1 1 4
that page)
D1.06 Form Management Team 1 1 4
D1.07 Convene Advisory Board 1 3 4
D1.08 Convene Management Team 1 3 4
D2.01 EVN-NREN meeting 1 12 9 4
D4.01 Communications Manager Appoint 1 1 4
D4.02 Online Resources: website, wiki 1 1 4
D4.04 Display 1 3 4
D4.05 Visual Guide/Elements 1 6 4
D4.06 Publish Print Items 1 9 4
D4.08 Project Fact Sheet 1 1 4

FP7 Grant Agreement RI-261525 page C.1 of.5


NEXPReS: Novel Explorations Pushing Robust e-VLBI Services Period 1 Report

D5.01 Mixed e-VLBI/recorded-VLBI at stations jive5ab 1 3 4


D5.02 Metrics, selection criteria and user feedback 1 4 4
D5.03 Definitions of specifications monitoring and remote 14 4 4
control
D7.01 Workflow Manager requirements from telescope 6 4 4
operators
D7.02 Workflow Manager requirements from correlator 1 4 4
operators
D8.01 Interface design document of storage element API 13 6 4
D8.02 Hardware design document for simultaneous I/O storage 13 8 4
elements

Remaining deliverables
D# Title Partner Due (month) Status
D1.05 Conclude Consortium Agreement 1 17 1 3
D1.09 Period 1 Report to EC 1 12 3
D1.10 Period 2 Report to EC 1 24 0
D1.11 Period 3 Report to EC 1 36 0
D2.02 EVN-NREN meeting 2 12 22 0
D2.03 EVN-NREN meeting 3 12 32 0
D2.04 Presentation on regions of increasing interest to Radio 12 19 0
Astronomy and Networking
D3.01 eVSAG meeting 1 8 16 0
D3.02 eVSAG meeting 2 8 32 0
D4.03 Meeting Support 1 36 0
D4.07 Publish Print Items 1 23 0
D5.04 Automated job scheduling: Disk unit reservation system, 1 19 9 >
GUI for starting different correlator systems, 2011,
Merging domino into jive5ab
D5.05 VDIF Mark5 conversion software 1 15 2
D5.06 Control systems and scheduling mechanisms for 4-Gbps 1 18 1
recording equipment
D5.07 Unattended correlation 1 19 1
D5.08 Monitoring, remote control and client software including 14 22 1
the authorization and authentication layer

FP7 Grant Agreement RI-261525 page C.2 of.5


NEXPReS: Novel Explorations Pushing Robust e-VLBI Services Period 1 Report

D5.09 Control systems and scheduling mechanisms for 4-Gbps 1 23 x


at correlator: The EVN Experiment Database, The
Correlator Control System Database, JIVE NEXPReS
Network Upgrade
D5.10 Corner-turning platform 1 24 0
D5.11 FS-integrated remote control system 14 28 2
D5.12 Automated delayed correlation 1 29 0
D5.13 Real-time correlation with simultaneous recording at the 1 30 0
correlator
D5.14 Report on tests with Wettzell & Effelsberg stations 14 36 1
D5.15 Streamlined data reduction pipelines & user access 1 36 0
D6.01 Proof-of-concept system for reserving and provisioning 1 20 1
On-demand networking capacity
D6.02 Operational use of BoD on at least one e-VLBI 1 36 0
connection
D6.03 Configuration of 10 Gbps BoD for the LOFAR archive 1 24 0
network
D6.04 BoD scheduling interface for LTA 1 30 0
D6.05 Demonstration of BoD for an operational LTA 1 33 0
D6.06 Demonstration of integrated BoD testing and validation 1 30 1
D6.07 Demonstration of international BoD connectivity at 4 1 18 1
Gbps
D6.08 Demonstration of international BoD connectivity at 10 1 30 0
Gbps
D7.03 Workflow Manager implementation: initial reports (Web 11 18 1
Portal and Technology Overview, Workflow Languages
Overview)
D7.04 Demo of automated correlation 1 24 0
D7.05 Real-time middleware components 11 24 0
D7.06 Demo of real-time correlation 1 34 0
D7.07 Demo of global correlation 1 36 1
D8.03 Design document of storage element allocation methods 3 16 10 0
D8.04 Design document of transparent local/remote application 13 17 15 0
programming interface for storage elements
D8.05 Performance and integration test report of simultaneous 6 21 0
I/O storage elements
D8.06 Test report of storage element allocation methods 3 22 0

FP7 Grant Agreement RI-261525 page C.3 of.5


NEXPReS: Novel Explorations Pushing Robust e-VLBI Services Period 1 Report

D8.07 Test report of transparent local/remote application 5 22 0


programming interface for storage elements
D8.08 Design document of integration system of allocation 1 26 0
methods with transparent multi-Gbps access
D8.09 Integration test report of LTA and pipeline integration 2 32 0
D8.10 Demonstration tests of the integrated system 1 32 0
D8.11 Final report on Networked Storage on Demand 13 35 0

Milestones Table
Milestone # Name Work package(s) Due Means of
involved (month) verification
M1.01 Prepare Period 1 Report to EC all 11 D1.09
M1.02 Prepare Period 2 Report to EC all 23 D1.10
M1.03 Prepare Period 3 Report to EC all 25 D1.11
M2.02 Select location for EVN-NREN meeting 1 WP 2 6 D2.01
M2.02 Select location for EVN-NREN meeting 2 WP 2 19 D2.02
M2.03 Select location for EVN-NREN meeting 3 WP 2 29 D2.03
M3.01 Select location for eVSAG meeting 1 WP 3 13 D3.01
M3.02 Select location for eVSAG meeting 2 WP 3 29 D3.02
M4.01 Establish Online Resources WP 4 1 D4.02
M4.02 Design Display WP 4 1 D4.04
M4.03 Design Visual Guide/Elements WP 4 3 D4.05
M4.04 Design Print Items WP 4 6 D4.06
M4.05 Design Print Items WP 4 20 D4.07
M5.01 Definition of specifications monitoring and WP 5 4 D5.02
remote control
M5.02 Automated job scheduling WP 5 9 D5.03
M5.03 Unattended correlation WP 5 19 D5.06
M5.04 Control systems and scheduling mechanisms WP 5 23 D5.08
for 4-Gbps at correlator
M6.01 Overall BoD system architecture WP 6 20 4 D6.01
M6.01b Full architecture description WP 6 20 D6.01
M6.02 10 Gbps Bod for LOFAR/LTA WP 6 24 10 D6.03
M6.03 Demonstration of integrated BoD testing WP 6 30 18 D6.06
M6.04 Demonstration of international 4 Gbps BoD WP 6 18 20 D6.07

FP7 Grant Agreement RI-261525 page C.4 of.5


NEXPReS: Novel Explorations Pushing Robust e-VLBI Services Period 1 Report

M7.01 Workflow Requirements WP 7 4 D7.01/


D7.02
M7.02 This Milestone Number Does Not Exist n/a n/a n/a

M7.03 Workflow Manager WP7 18 D07.3

M7.04 Identify telescopes and compute clusters for WP7 21 D07.4


upcoming correlation demonstrations

M7.05 Real-time Middleware Components WP7 24 D07.5

M7.07 Identify elements that are mature enough for WP7 14 12 D07.7
integration into WFM

M7.08 Face-to-face meeting to start WP7 15 D07.6


preparation/integration for first demo of
automated integration

M7.09 Face-to-face meeting to start WP7 28 D07.7


preparation/integration for final demo

M8.01 Hardware decision for subsequent WP 8 8 D8.02


prototyping and integration tests (AALTO)
M8.02 Review of prototype test results, decision of WP 8 15 D8.08
the architecture and scope of subsequent
integration tests (JIVE)