WS Calculation
WS Calculation
:
Location : Jeddah Designed : SAK-EC
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Project : XXX Date
Location : Jeddah Designed
Assumed Data
Calculated data
Public Private
Cold Hot Total Cold Hot
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0.0 GPM 0.0 GPM 0.0 GPM
0.00 m3/h 0.00 m3/h 0.00 m3/h
Private
Total
6
3
1
1
1
1
2
2
2
2
1
2
1.5
10
5
3
Total
11th F 12th F 13th F 14th F
fixtures
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Project : XXX Date : August 31, 2009
Location : Jeddah Designed : SAK-EC
Pump Discharge
Q (GPM) = 1
Pump Head
T (Hr) = 4.64
Power
Pump Discharge
Q (L/s) = 0
Pump Head (m) = 11
Power
Accumulative Pressure
ID Pipe Inner diameter
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static head
1.0 discharge outlet
1.0 Multimedia filter
DH Total loss
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm GPM l/s 1/1 m m/s 1/1 1/1 m m m m m m
PUMP TO A 63 PVC 53.6 10 0.01 42 2.646 1 1 1 1 1 1 1 7.4 5 1.17266 62854.325 0.0206 2.69 0.3 0.519 0.79 5.79 5.788
A TO B 50 PVC 42.6 2.5 0.01 40 2.52 1 0.9 0 1.76804 75318.396 0.02011 7.52 0.2 0.143 0.33 0.33 6.119
B TO C 50 PVC 42.6 25 0.01 28 1.764 2 4 1 2.5 5 1.23763 52722.877 0.02148 3.94 1 0.195 1.18 6.18 12.3
C TO D 40 PVC 34 15 0.01 19 1.197 1 1 1 1 1.9 0 1.3184 44825.522 0.02236 5.83 0.9 0.168 1.04 1.04 7.161
D TO E 25 PVC 21.2 15 0.01 6 0.378 1 1 1 1 1.9 0 1.07085 22702.101 0.02614 7.21 1.1 0.111 1.19 1.19 8.353
E TO F 20 PVC 17 5 0.01 5 0.315 1 1 1 1 2.7 0 1.38779 23592.38 0.02619 15.1 0.8 0.265 1.02 1.02 9.374
J = l . V / ( 2 g D ) .... (3)
1 k 2.51
= - 2 x log [ + )
sqr(l) 3.7 x D Re x sqr( l )
RE = V x D / n . ( 5 )
V = Q /A .... ( 6 )
V = Q /A = 0.449 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.267 119991.2 x sqr( l )
l= 0.01754
HS2 = SUM ZE . V / ( 2 . g )
0.4487 X 0.4487
HS(2) = SUM ZE.x V / ( 2 g ) = 6.9 x = 0.0708 m
2 x 9.81
V = Q /A = 0.177 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.267 37694.6 x sqr( l )
HS2 = SUM ZE . V / ( 2 . G )
HS2 = SUM ZE . V / ( 2 . g )
0.1771 X 0.1771
HS(2) = SUM ZE.x V / ( 2 g ) = 0.9 x = 0.0018 m
HS(2) = SUM ZE.x V / ( 2 g ) = 0.9 x = 0.0018 m
2 x 9.81
V = Q /A = 0.307 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.302 47129.3 x sqr( l )
HS2 = SUM ZE . V / ( 2 . G )
HS2 = SUM ZE . V / ( 2 . g )
0.307 X 0.307
HS(2) = SUM ZE.x V / ( 2 g ) = 2.9 x = 0.0 m
2 x 9.81
V = Q /A = 0.177 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.213 0.0 x sqr( l )
l= 0.02241
HS2 = SUM ZE . V / ( 2 . g )
0.1771 X 0.1771
HS(2) = SUM ZE.x V / ( 2 g ) = 1.1 x = 0.0018 m
2 x 9.81
V = Q /A = 0.277 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.17 47129.3 x sqr( l )
l= 0.02137
HS2 = SUM ZE . V / ( 2 . g )
0.2769 X 0.2769
HS(2) = SUM ZE.x V / ( 2 g ) = 3.4 x = 0.0133 m
2 x 9.81
V = Q /A = 0.216 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.136 0.0 x sqr( l )
l= 0.02377
SUM ZE = 0 0 x 0.2 = 0
0 0 x 1 = 0
0 0 x 1 = 0
0 0 x 2 = 0
0 0 x 0.3 = 0
0 2 x 0.3 = 0.6
0 0 x 0.9 = 0
0 1 x 0.5 = 0.5
0 0 x 2 = 0
0 0 x 1 = 0
0 = 1.10
HS2 = SUM ZE . V / ( 2 . g )
0.2162 X 0.2162
HS(2) = SUM ZE.x V / ( 2 g ) = 1.1 x = 0.0026 m
2 x 9.81
V = Q /A = 1.396 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.054 0.0 x sqr( l )
l= 0.01993
SUM ZE = 0 0 x 0.2 = 0
0 0 x 1 = 0
0 0 x 1 = 0
0 0 x 2 = 0
0 0 x 0.3 = 0
0 1 x 0.3 = 0.3
0 0 x 0.9 = 0
0 1 x 0.5 = 0.5
0 0 x 2 = 0
0 1 x 1 = 1
0 = 1.80
HS2 = SUM ZE . V / ( 2 . g )
1.396 X 1.396
HS(2) = SUM ZE.x V / ( 2 g ) = 1.8 x = 0.1788 m
2 x 9.81
Given Data:
Number of persons = 1
Boiler Design
Q (m3/h) = 1
Q (l/s) = 1
Head (m) = 11
Pump Efficiency = 0.8
Power (Hp) = 1
Project : XXX Date : August 31, 2009
Location : Jeddah Designed : SAK-EC
Drain Sump
Sewer Drainage
No. of Drainage Fixtures = 0
Fixtures Flow Rate (L / min) = 0
Laundry Drainage
Laundry Demand (L / bed / day) = 130
No. of beds = 1
Laundry Drainage (L / min) = 1
Kitchen Drainage
Kitchen Demand (L / person / day) = 160
No. of persons = 1
Kitchen Drainage (L / min) = 1
Sump Dimension
Sump depth (m) = 2
Sump Length (m) = 2
Sump Width (m) = 2
Project : XXX Date : August 31, 2009
Location : Jeddah Designed : SAK-EC
Q (L/S) = 14
Q (m3/s) = 0.014
Main Pipe Velocity (m/s) = 1
Main Pipe Diameter (mm) = 140 * Take the larger Standard Size
Pump Head
Power
Q (m3/day) = 1
Q Sewer (m3/day) = 1
Sewerage Flow to Be Treated (m3/day) = 1
Assume
Filter Design
Filtration Pump
Capacity (m3) = 23
Pump working hours = 12
Working time (h) = 12.0
Qpump (L/S) = 1
Pump Head (m) = 11
Pump Efficiency = 0.8
Power (Hp) = 1