0% found this document useful (0 votes)
103 views1 page

Plumbing Notes

The plumbing notes specify that all sanitary works must comply with relevant codes and regulations. Any discrepancies found in the drawings or specifications must be reported to the architect/engineer for resolution. Pipes must be installed as indicated, with relocations requiring prior approval. Proposed utilities must conform to existing locations and elevations as verified by the contractor, who is also responsible for required openings. Horizontal drainage slopes must maintain a minimum of 1% unless noted otherwise, and all fixtures must be vented unless noted otherwise. The contractor must verify existing utilities and coordinate connection points. Refer to technical specifications for material and equipment details.

Uploaded by

Nortom Silencer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views1 page

Plumbing Notes

The plumbing notes specify that all sanitary works must comply with relevant codes and regulations. Any discrepancies found in the drawings or specifications must be reported to the architect/engineer for resolution. Pipes must be installed as indicated, with relocations requiring prior approval. Proposed utilities must conform to existing locations and elevations as verified by the contractor, who is also responsible for required openings. Horizontal drainage slopes must maintain a minimum of 1% unless noted otherwise, and all fixtures must be vented unless noted otherwise. The contractor must verify existing utilities and coordinate connection points. Refer to technical specifications for material and equipment details.

Uploaded by

Nortom Silencer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PLUMBING NOTES:

1. All sanitary works herein shall be executed according to the provisions of the National Plumbing
Code, the National Building Code of the Philippines, and its implementing rules and regulations.

2. Coordinate the drawing with other related drawings and specifications. The Architect/Engineer shall
be notified immediately of any discrepancy found therein. His/Her decision is final.

3. All pipes shall be installed as indicated. Any relocation required for the proper execution of other
trades shall be with prior approval of the Architect/Engineer.

4. Proposed sanitary utilities shall conform to the actual location, depth, and invert elevation of
existing pipes and structures as verified by the Contractor.

5. The Contractor shall be responsible for all required floor and wall openings.

6. All slopes for horizontal drainage shall maintain 1% as minimum, unless otherwise noted.

7. All fixtures shall be vented, unless otherwise noted.

8. The work shall be executed in the best and most thorough manner known to the trade and to the
thorough manner known to the trade and to the

9. The Contractor shall verify all existing site utilities and coordinate the works with the sewer disposal
and water- line service connecting point.

10. Refer to technical specifications for the detailed material and equipment specifications.