The document provides safety instructions for erecting the main truss of a structure. Key steps include shifting scaffolding materials into place between 20 and 10 foot horizontal pipes, clamping the pipes with vertical supports and braces, and laying planks. Safety measures are outlined such as tying materials to prevent slipping, erecting handrails with mid rails and toe boards, inspecting ropes, and using safety harnesses and fire blankets to prevent falling sparks during welding.
The document provides safety instructions for erecting the main truss of a structure. Key steps include shifting scaffolding materials into place between 20 and 10 foot horizontal pipes, clamping the pipes with vertical supports and braces, and laying planks. Safety measures are outlined such as tying materials to prevent slipping, erecting handrails with mid rails and toe boards, inspecting ropes, and using safety harnesses and fire blankets to prevent falling sparks during welding.
The document provides safety instructions for erecting the main truss of a structure. Key steps include shifting scaffolding materials into place between 20 and 10 foot horizontal pipes, clamping the pipes with vertical supports and braces, and laying planks. Safety measures are outlined such as tying materials to prevent slipping, erecting handrails with mid rails and toe boards, inspecting ropes, and using safety harnesses and fire blankets to prevent falling sparks during welding.
The document provides safety instructions for erecting the main truss of a structure. Key steps include shifting scaffolding materials into place between 20 and 10 foot horizontal pipes, clamping the pipes with vertical supports and braces, and laying planks. Safety measures are outlined such as tying materials to prevent slipping, erecting handrails with mid rails and toe boards, inspecting ropes, and using safety harnesses and fire blankets to prevent falling sparks during welding.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
ERECTION OF MAIN TRUSS
Sr # STEP SAFETY KEY POINT
1 Shifting of scaffolding material to location Scaffolding material may fall down
20 ft scaffolding pipe will be horizontally laid
2 Pipes may be slipped on channel just below secondary truss
10 ft pipe will be laid horizontally on lowest
3 Pipes may be slipped angle of secondary truss Both these layers will be clamped with 6 ft 4 vertical pipes These 6 ft vertical pipes will be interlinked with 5 braces using fixed joints Planks will be laid on lowest layer of 10 ft Planks may be slipped and may be fell 6 horizontal pipes down At peripherry of scaffolding plateform, hand Objects may fell down from space 7 railing will be erected between top and bottom pipe
Welding or grinding spatters may fall
8 Working will be started on this plateform down
Marking of truss will be done as per drawing
9 Person may be fall down for erection. rope can be broken through sharp 10 Material will rigged manually, with rope edges Tacking will be done by welder as per marked welding sparks and metal particals may 11 locations. be fell down 12 fit ups will be inspected. Person may be fall down welding sparks and metal particals may After inspection final welding will be done. 13 be fell down S PREVENTION / COUNTERMEASURE Maximum 20 KG load will be lifted by 2 persons
Pipes will be tied to structure with binding
wire
Pipes will be tied to structure with binding
wire
Planks will be interlinked with binding wire
Mid rail and toe board will also be erected
Handrail will be covered with fire cloth, so
that no spatters or anything may come out of canopy
Person will wear safety harness
rope inspection will be carried out, area
will be baricated Fire blanets will be tied to the area to prevent the sparks Person will wear safety harness Fire blanets will be tied to the area to prevent the sparks