0% found this document useful (1 vote)
167 views2 pages

Work Breakdown Structure

The document outlines a work breakdown structure for a web-based training project. It involves: 1) Planning hardware and software purchases and replacements, designing training materials, and getting necessary approvals. 2) Installing new hardware and software, setting up web servers, databases, and internet connections. 3) Testing the system through simulation, checking for errors, and deploying the final product.

Uploaded by

redx1205
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
167 views2 pages

Work Breakdown Structure

The document outlines a work breakdown structure for a web-based training project. It involves: 1) Planning hardware and software purchases and replacements, designing training materials, and getting necessary approvals. 2) Installing new hardware and software, setting up web servers, databases, and internet connections. 3) Testing the system through simulation, checking for errors, and deploying the final product.

Uploaded by

redx1205
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

The Web-based Training

Buy
Replacement of Design Project Design Design
Hardware computers and
and cables Design
Train users for
Design
web-server Design
web Upgrade Design media
Web linking testing web
help
future
quality database
internet program
for internet (deploy recomen
new connection desk
software plan. (OS)computers server
(bandwidth)
(viideos) scripts
ment) dation
and
enhance
ment

Work with Approvals


Installation: developers
Plan to
buy (per Look for hardware/
vendor and
local or as make software Installation: Design
one) contract Hardware Meeting Creation forms for
Approvals
and with ISP Work with
Flood requests
Software Install
and
software (contract developers testing services Research
account) and
develop
ment

Simulation
Check Simulatio
and testing
and n and
testing Simulation testing
and testing Simulatio Check and Check
n and testing and
testing testing

Redford G. Mangay
Work Breakdown Structure

You might also like