Villa Savoye
Villa Savoye
1 ENLARGED DETAIL
FLAGGING
BW BOTH WAYS FDN
FE
FOUNDATION
FIRE EXTINGUISHER L LENGTH
RCB
RCP
RUBBER COVE BASE
REINFORCED CONCRETE PIPE
VCB
VCT
VERT
VINYL COVE BASE
VINYL COMPOSITION TILE
VERTICAL
DRAWING LIST
C COURSE FEC FIRE EXTINGUISHER CABINET LAB LABORATORY RD ROOF DRAIN VEST VESTIBULE
A100 PLAN OR SECTION POROUS FILL CAB CABINET FF FINISHED FLOOR LAV LAVATORY REC RECESSED VG VERTICAL GRAIN
(GRAVEL, STONE) CB CATCH BASIN, CORNER BEAD FGL FIBERGLASS LBL LABEL RECP RECEPTACLE VIF VERIFY IN FIELD
CEM CEMENT FH FIRE HYDRANT LH LEFT HAND REF REFERENCE VIN VINYL
CF
CFLG
CUBIC FOOT (FEET)
COUNTERFLASHING
FHC
FHS
FIRE HOSE CABINET
FIRE HOSE STATION
LL
LMS
LIVE LOAD
LIMESTONE
REG
REINF
REGISTER
REINFORCE (D) (ING)
VJT
VNR
V-JOINT (ED)
VENEER
.A-CS COVER SHEET
A001 SITE PLAN
CFM CUBIC FEET PER MINUTE FIN FINISH (ED) LOC LOCATION REM REMOVED VR VAPOR RETARDER
PLYWOOD
CG CORNER GUARD FIXT FIXTURE LP LIGHTPROOF, LOW POINT REQD REQUIRED VRM VERMICULITE
CH CEILING HEIGHT FJT FLUSH JOINT LSW LIGHT SWITCH RES RESILIENT VT VINYL TILE
NORTH
CI
CIPC
CAST IRON
CAST IN PLACE CONCRETE
FL
FLG
FLOOR (ING)
FLASHING
LT
LTL
LIGHT
LINTEL
REV
RFG
REVISION (S), REVISED
ROOFING
VWF VINYL WALL FABRIC
A100 GROUND FLOOR PLAN
CIR CIRCLE FLUR FLUORESCENT LVR LOUVER RFL REFLECT (ED) (IVE)
A101 FIRST FLOOR PLAN
W WEST
RIGID INSULATION CIRC CIRCUMFERENCE FLX FLEXIBLE LWC LIGHTWEIGHT CONCRETE RGD RIGID W/ WITH
CJT CONTROL JOINT FNR FEMININE NAPKIN RECEPTACLE RH RIGHT HAND WB WOOD BASE
CL
CLG
CLL
CENTER LINE
CEILING
CONTRACT LIMIT LINE
FOC
FOF
FOM
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
M
MAR
MAS
METER (S)
MARBLE
MASONRY
RLG
RM
RO
RAILING
ROOM
ROUGH OPENING
WC
WD
WGL
WATER CLOSET
WOOD
WIRED GLASS
A102 UPPER LEVEL FLOOR PLAN Le Corbusier
A201 SOUTH & WEST ELEVATION
NEW (PROPOSED) ELEVATION
GYPSUM WALLBOARD CLN CLEAN FOS FACE OF STUD MAX MAXIMUM RTN RETURN WH WALL HUNG
CLR
CMPL
CMU
CLEAR (ANCE)
6/27/2013 8:58:57 PM
QUARRY TILE CPT CARPET MT MOUNT (ED) (ING) SLR SEALER Checked by Checker
CPTT CARPET TILE GA GAGE, GAUGE MTFR METAL FURRING SLV SLEEVE
ALUMINUM
CS
CSMT
CAST STONE
CASEMENT
GC GENERAL CONTRACT (OR) MTL ST
MULL
METAL STUD
MULLION
SNT
SP
SEALANT
SOUND PROOF
A902 PERSPECTIVE SECTION
.A-CS
Scale
R4
"
-0
3' -
-1'
6"
75' - 0"
12' - 0" 12' - 0"
Le Corbusier
Villa Savoye
SITE PLAN
Site
1 Project number Project Number
1/16" = 1'-0"
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 8:58:59 PM
Checked by Checker
A001
Scale 1/16" = 1'-0"
1 2 2.7 3 3.3 2
4 5
1 A202
2 A302
A302
A301
2
9' - 11" 5' - 4" 31' - 10" 5' - 4" 9' - 11"
005-2 006-1
Salle
0' - 4"
E Linen Room
006
005
7' - 2"
7' - 1"
005-1
008-1
0' - 4"
D.5
15' - 7"
2' - 7"
Reserve
009
D.4
1' - 6"
009-1 Room
7' - 1"
Chambre
008
D.3 004 004-1
0' - 4"
D
003-1
Garage
9' - 3"
Chambre 3' - 8" 0' - 4" 4' - 0" 0' - 8" 4' - 0"
A201 2 007 1 A202
003
C.6
15' - 7"
1' - 1"
Foyer
C.4 002-1 001
5' - 10"
WC
002 11"
R 30' -
1 UP
A301
3
A501
007-1
7"
B.5
'-
20
R
RAMP UP
Foyer
001
001-1
15' - 7"
Le Corbusier
A
Villa Savoye
15' - 7" 10' - 11" 4' - 8" 4' - 8" 10' - 11" 15' - 7" GROUND FLOOR
PLAN
Project number Project Number
Date Issue Date
1
Drawn by Author
6/27/2013 8:58:59 PM
A201 Checked by Checker
A100
00-Ground Floor 1/4" = 1'-0"
1 Scale
1/4" = 1'-0"
1 2 2.7 3 3.3 4 5
2 A202
2
1
A301 A302
A302 2
E
106-1 110-1
Chambre
105 Chambre Boudoir
106 110
D.5
D.4
5' - 3" 2' - 2" 4' - 2"
D.3
104-2 105-1
8' - 1"
104-1
D Bains
104
A201 2 1 A202
4' - 9"
C.6 Bains
107 107-1
C.5
Chambre
C.4 109-1
102
WC
109
WC
C 103
WC
4 108
1 A501 UP
A301 102-1
DN
No. Description Date
B.5
RAMP DN RAMP UP
Terrasse
101-1
101
114-2
112-1
B
113-1
112-2
Cuisine Office
114 113
Salle
112 Le Corbusier
Villa Savoye
A 113-2
FIRST FLOOR PLAN
9' - 2" 6' - 3" 46' - 3"
6/27/2013 8:59:00 PM
A201 Checked by Checker
001-First Floor
A101
1 Scale 1/4" = 1'-0"
1/4" = 1'-0"
1 2 2.7 3 3.3 4 5
A202
1 2
2 2 A302
A302
A301
19' - 8"
D.5
D.4
D.3
A201 2 1 A202
C.6
C.5
C.4
29' - 8"
C
5
A501
1
A301
Roof Access
201
DN
No. Description Date
B.5
RAMP DN
OPEN TO BELOW
201-1
20' - 0"
20' - 6"
Le Corbusier
13' - 2"
Villa Savoye
A
UPPER LEVEL
FLOOR PLAN
Project number Project Number
Date Issue Date
1 Drawn by Author
6/27/2013 8:59:03 PM
A201 Checked by Checker
002-Solarium
A102
1 Scale 1/4" = 1'-0"
1/4" = 1'-0"
1 2 2.7 3 3.3 4 5
2 1 2
A301 A302 A302
Roof
28' - 6"
7' - 0"
OPEN TO BEYOND
Solarium
20' - 0"
4' - 7"
2' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 10' - 0" 1' - 8"0' - 8"
4 4 4 4 4 4 4 1
3' - 5"
3' - 6" First Floor
10' - 0"
Ground Floor
0' - 0"
SOUTH ELEVATION
1
1/4" = 1'-0"
1
E D.5 D.4 D.3 D C.6 C.5 C.4 C A301
B.5 B A
Roof
28' - 6"
No. Description Date
Solarium
20' - 0"
4' - 7"
4' - 5" 7' - 6" 7' - 6" 0' - 8" 7' - 6" 7' - 6" 0' - 8" 3' - 4" 1' - 8"0' - 8" 9' - 3" 0' - 8" 7' - 6" 7' - 6" 4' - 5"
3 3 3 3 2 1 5 3 3
3' - 5"
3' - 6"
First Floor
10' - 0"
Le Corbusier
10' - 0"
Villa Savoye
SOUTH & WEST
Ground Floor
0' - 0"
ELEVATION
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 8:59:29 PM
Checked by Checker
2
WEST ELEVATION
1/4" = 1'-0"
A201
Scale 1/4" = 1'-0"
A B B.5 1 C C.4 C.5 C.6 D D.3 D.4 D.5 E
A301
Roof
28' - 6"
7' - 6"
Solarium
4' - 11" 1' - 8" 7' - 6" 3' - 4" 1' - 8" 1' - 1" 46' - 0" 4' - 5"
20' - 0"
1 3 2 1 5
11' - 6"
OPEN TO BEYOND
First Floor
10' - 0"
Ground Floor
0' - 0"
EAST ELEVATION
1
1/4" = 1'-0"
5 4 2
3.3 3 1
2.7 2 2
1
A302 A302 A301
Roof
28' - 6"
No. Description Date
7' - 6"
OPEN TO BEYOND
Solarium
20' - 0"
4' - 7"
0' - 8" 7' - 6" 7' - 6" 0' - 10" 7' - 6" 7' - 6" 0' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 1' - 4"
3 3 3 3 3 3 3 3
3' - 5"
0' - 8" 7' - 6" 7' - 6" 0' - 10" 7' - 6" 7' - 6" 0' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 1' - 4"
3' - 6"
First Floor
10' - 0"
63' - 0"
Le Corbusier
10' - 0"
Villa Savoye
EAST & NORTH
Ground Floor ELEVATIONS
0' - 0" Project number Project Number
Date Issue Date
Drawn by Author
6/27/2013 8:59:53 PM
Checked by Checker
2
NORTH ELEVATION
A202
1/4" = 1'-0" Scale 1/4" = 1'-0"
5 4 3.3 3 2.7 2 1
2 1 2
A302 A302 A301
Roof
28' - 6"
Solarium
20' - 0"
First Floor
10' - 0"
Ground Floor
0' - 0"
Section A
1
1/4" = 1'-0"
Roof
28' - 6"
No. Description Date
Solarium
20' - 0"
First Floor
10' - 0"
Le Corbusier
Villa Savoye
BUILDING SECTIONS
Ground Floor
0' - 0"
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:00:12 PM
Checked by Checker
Section B
2
1/4" = 1'-0" A301
Scale 1/4" = 1'-0"
E D.5 D.4 D.3 D C.6 C.5 C.4 C 1 B.5 B A
A301
Roof
28' - 6"
Solarium
20' - 0"
First Floor
10' - 0"
Ground Floor
0' - 0"
Section C
1
1/4" = 1'-0"
Solarium
20' - 0"
First Floor
10' - 0"
Le Corbusier
Villa Savoye
BUILDING SECTIONS
Ground Floor Project number Project Number
0' - 0" Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:00:26 PM
Checked by Checker
2
Section D
1/4" = 1'-0"
A302
Scale 1/4" = 1'-0"
2
2 2.7
Roof
28' - 6"
2
DN
A501
B.5
STAIRS 02
5
Solarium 1/2" = 1'-0"
20' - 0"
UP
2
DN
A501
No. Description Date
First Floor
10' - 0"
B.5
STAIRS 01
4
1/2" = 1'-0"
UP
Ground Floor
0' - 0"
Le Corbusier
2 Villa Savoye
A501
STAIR DETAILS
B.5 Project number Project Number
Date Issue Date
Drawn by Author
6/27/2013 9:00:40 PM
Checked by Checker
1
STAIR AXON
2
STAIRS SECTION
1/2" = 1'-0"
3
STAIRS 00
1/2" = 1'-0"
A501
Scale 1/2" = 1'-0"
Floor Schedule Window Schedule
Level Type Area Cost Window Sill
Ground Floor
ID# Count Family Type Height Width Height
Ground Floor VS 6" slab 2072 SF First Floor
Ground Floor VS 4"x4" tile 75 SF 1 5 Corbu Fixed Fixed 20" 3' - 5" 1' - 8" 3' - 0"
Corner
Ground Floor VS 8"x8" tile 607 SF
2 4 Corbu Fixed Fixed 40" 3' - 5" 3' - 4" 3' - 0"
Ground Floor VS ramp 114 SF
Corner
Ground Floor VS ramp 35 SF
3 15 Corbu Slider Corbu 3' - 5" 7' - 5 1/2"
Ground Floor VS ramp 113 SF Slider
Ground Floor VS 4"x4" tile 14 SF WestSide
First Floor 4 7 Corbu Slider Corbu 3' - 5" 8' - 4" 3' - 0"
First Floor VS 6" slab 4094 SF Slider
First Floor VS 4"x4" tile 47 SF 5 2 Corbu Opening Fixed20" 3' - 5" 3' - 0"
First Floor VS skylight 1" 11 SF Solarium
First Floor VS planter 40 SF 3 1 Corbu Slider Corbu 3' - 5" 7' - 5 1/2" 3' - 0"
First Floor VS skylight 1" 8 SF Slider
WestSide
First Floor VS planter 17 SF
5 1 Corbu Opening Fixed20" 3' - 5" 6' - 9 19/32" 3' - 0"
First Floor VS ramp 114 SF
First Floor VS ramp 33 SF
First Floor VS ramp 124 SF
First Floor VS 4"x4" tile 143 SF
First Floor VS 4"x4" tile 11 SF
First Floor VS 4"x4" tile solarium 90 SF
First Floor VS 4"x4" tile solarium 1017 SF
First Floor
Solarium
VS 4"x4" tile first floor 43 SF Room Schedule
Solarium
Solarium
VS 6" slab sand
VS skylight 1"
2698 SF
7 SF
Floor
Solarium VS skylight 1" 15 SF Level Number Name Finish Area
Solarium VS skylight 1" 3 SF
Ground Floor
Solarium VS skylight 1" 3 SF
Ground Floor 001 Foyer 657 SF
Solarium VS skylight 1" 3 SF
Ground Floor 002 WC 14 SF
Solarium VS planter 70 SF
Ground Floor 003 Chambre 131 SF
Solarium VS 4"x4" tile solarium 281 SF
Ground Floor 004 Chambre 87 SF
Solarium VS solarium stairs tile 65 SF
Ground Floor 005 Linen Room 151 SF
Solarium VS planter 19 SF
Ground Floor 006 Salle 220 SF
Solarium VS planter 24 SF
Ground Floor 007 Garage 500 SF
Roof
Ground Floor 008 Room 74 SF
Roof VS 6" slab 2 white 148 SF
Ground Floor 009 Reserve 145 SF
First Floor
First Floor 101 Terrasse 91 SF
First Floor 102 Chambre 162 SF
No. Description Date
First Floor 103 WC 11 SF
First Floor 104 Bains 53 SF
First Floor 105 Chambre 256 SF
First Floor 106 Chambre 286 SF
First Floor 107 Bains 177 SF
First Floor 108 WC 11 SF
First Floor 109 WC 11 SF
First Floor 110 Boudoir 195 SF
First Floor 112 Salle 910 SF
First Floor 113 Office 112 SF
First Floor 114 Cuisine 176 SF
Solarium
Solarium 201 Roof Access 65 SF
Le Corbusier
Villa Savoye
SCHEDULES
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:00:40 PM
Checked by Checker
A600
Scale
AXON SW SOLARIUM FLOOR AXON NE SOLARIUM FLOOR
3 6
Le Corbusier
Villa Savoye
AXONOMETRIC
DRAWINGS
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:00:55 PM
Checked by Checker
1
AXON SW GROUND FLOOR
4
AXON NE GROUND FLOOR A900
Scale
No. Description Date
PERSPECTIVE 1
1
Le Corbusier
Villa Savoye
PERSPECTIVE VIEW
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:01:22 PM
Checked by Checker
2
PERSPECTIVE 2
3
PERSPECTIVE 3
A901
Scale
No. Description Date
SECTION PERSPECTIVE 1
1
Le Corbusier
Villa Savoye
PERSPECTIVE
SECTION
Project number Project Number
Date Issue Date
Drawn by Hiu Cheng
6/27/2013 9:03:39 PM
Checked by Checker
2
SECTION PERSEPECTIVE 2
3
SECTION PERSPECTIVE 3
A902
Scale