Model File Check List: (If No Workset Is Need For Submission)
Model File Check List: (If No Workset Is Need For Submission)
1 Open central file with Detached from Central and Audit selected . ( if No workset is need for submission)
2 Remove non transmittal linked-in file / remove unnecessary imported CAD file
3 Remove all non-required Views / Legends / Schedules / Sheets etc.
4 Remove unwanted Design Options
5 Purge model.
6 Correct Inserting Point ( Grid, Level ).
7 Check Ceiling Height or Head Room Clearance
8 All Riser are Inline/vertical elements are correct position as floor to floor alignment.
9 Graphic: Electrical system to be modelled in "Service Type" and filters with service type
10 Line Pattern - No Override.
11 Tagging size, Annotation and Leader are in to be standardize.
12 Family and View Name as agreed Naming System.
13 Elements/ Service are modelled as agreed method and correct colour code.
14 Service routine are parallel to building out line.
15 Use the TAB key to check the connectivity of your duct, pipe and electrical systems.
16 Interference Checks ( Clash Detection/Report)
Please run Interference check between such as Pipe Vs Pipe, Duct Vs Duct, Pipe Vs Duct and
Structural Column Vs Duct etc. List down all your checked categories in below table.
Categories Categories Result Zero
Clash
example : Duct example : Duct N.A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Checked by :__________________
Approved by : ________________