Trichy Tollway Private Limited: Ijm (India) Infrastructure Limited
Trichy Tollway Private Limited: Ijm (India) Infrastructure Limited
Trichy Tollway Private Limited: Ijm (India) Infrastructure Limited
Observation Sheet
Determination No. 1 2 3 4 5
Mould No.
Volume of Mould (v) (cc)
Weight of Mould (m1) (gm)
Weight of Mould + Compacted Soil (m2) (gm)
Weight of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of soil (DW) = m3 / v (gm/cc)
Container No.
Weight of Container (gm)
Weight of Wet Soil + Container (gm)
Weight of Container + Oven dry soil (gm)
Weight of Water (gm)
Weight of oven dry soil (gm)
Moisture content (%)
Dry Density of soil (Dd) =100 x Dw / (100 + w) (gm/cc)
Optimum Moisture
Content : (%)
Dry Density (gm/cc)
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/03
Revision - 00
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.08.06
Four Lanining and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch.
93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Observation Sheet
Liquid
Limit : (%)
Plastic
Limit : (%)
Plasticity
Index : (%)
Water Content (%)
for CSC
Cone Penetration (mm)
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/04
Revision - 01
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.11.06
Four Lanining and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil
Nadu, Construction Pkg. - VI - B (EPC II)
Observation Sheet
Liquid
Limit : (%)
Plastic
Limit : (%)
Plasticity
Index : (%)
Water Content (%)
for CSC
Cone Penetration (mm)
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/05
Revision :- 02
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 19.03.07
Four lanining and Strengthening of the Existing two Lane Road From km. 192.250 (Ch. 0.000) Ulunderpet to km. 285.00 (Ch. 93.894) Padalur Section of NH - 45 in
Tamil Nadu, Construction Pkg. - VI B, (EPC - II)
4 Average
Remark's : -
Four lanining and Strengthening of the Existing two Lane Road From km. 192.250 (Ch. 0.000) Ulunderpet to km. 285.00 (Ch. 93.894) Padalur Section of
NH - 45 in Tamil Nadu, Construction Pkg. - VI B, (EPC - II)
OBSERVATION SHEET
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
FM/QC/S/07/7.0
TRICHY TOLLWAY PRIVATE LIMITED Revision : 00
IJM (INDIA) INFRASTRUCTURE LIMITED Date :-25.08.06
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of
NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
CALIFORNIA BEARING RATIO (CBR) TEST SOAKED (AS PER IS : 2720 , PART 16),1987
Sample Location : Date Sample
Source of Materials : Date of Soaking :
Description of Sample : Date Testing :
Observation Sheet
Type of Compaction : Static / Dynamic Mass of Original Sample :
Type of Method : Standard / Modified Retained on 19 mm sieve :
Weight of Rammer : 4.89 Kgs. Passing on 4.75 mm :
No. of Blows : 56 blows Soaking Period :96 hours
No. of Layers :5 MDD : (gm/cc)
Surcharge Weight : 5000 Gms. OMC : (%)
UNSOAKED SOAKED
Determination No. 1 2 3 1 2 3
Mould No.
Volume of Mould (v) (cc)
Weight of Mould (m1) (gm)
Weight of Mould + Compacted Soil (m2) (gm)
Weight of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of soil (DW) = m3 / v (gm/cc)
Container No.
Weight of Container (gm)
Weight of Wet Soil + Container (gm)
Weight of Container + Oven dry soil (gm)
Weight of Water (gm)
Weight of oven dry soil (gm)
Water content (%)
Mean Water Content (w) (%)
Dry Density of soil (Dd) =100 x Dw / (100 + w) (gm/cc)
% of MDD :
Swelling Data
Surcharge Weight Used : (gm) 5000 5000 5000
Initial Dial Reading : (mm)
Final Dial Reading : (mm)
Final Expansion : (mm)
Expansion Ratio : (%)
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/07/7.2
Revision : 01
IJM (INDIA) INFRASTRUCTURE LIMITED Date :-25.11.06
Four lanining and Strengthening of the Existing two Lane Road From km. 192.250 (Ch. 0.000) to km. 285.00 (Ch. 93.894) Section of NH - 45 in Tamil
Nadu, Construction Pkg. - VI B, (EPC - II)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
7.50
10.00
12.50
C.B.R. Value : -
2.5 mm Penetration : -
5.0 mm Penetration : -
C.B.R. Value : -
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/08
Revision :- 01
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.11.06
Four lanining and Strengthening of the Existing two Lane Road From km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.00 (Ch. 93.894)
Padalur Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI B, (EPC - II)
IN-SITU DRY DENSITY BY SAND REPLACEMENT METHOD (IS : 2720 , PART 28)
(Small Pouring Cylinder / Large Pouring Cylinder)
Cylinder No. 1 2 3
Hole Chainage
Mass of Wet Soil from hole (m1) (gm)
Mass of Cylinder
+ Sand before pouring (m2) (gm)
Mass of Cylinder
+ remaining sand after pouring (m3) (gm)
Mass of sand in hole (Ms) = m2 - m3 (gm)
Volume of sand in the Hole (v) (cc)
Wet Density of Material = m1 / v (gm/cc)
Container No. - - -
Mass of Container + Wet Soil (gm) - - -
Mass of Container + Dry Soil (gm) - - -
Mass of Container (gm) - - -
Mass of Water (a) (gm) - - -
Mass of Oven Dry Soil (b) (gm) - - -
Moisture Content of Soil (w) = a / b x 100 (%)
Dry Density of Soil Gd = Gb x 100 / (100 + w) gm/cc
Lab.Max. Dry Density (MDD) gm/cc
Relative Compaction achieved (%)
Average Compaction ( %)
Specification Requirement (%)
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/09
Revision :- 01
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.11.06
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in
Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Container No.
Container No.
Container No.
Container No.
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/10
Revision :- 00
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.08.2006
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in
Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Sieve Size Weight Retained Weight Retained Cum. Wt. Retained Passing MORTH
Specification Limits
(gm) (%) (%) (%)
75 mm 100
53 mm 80 - 100
26.5 mm 55 - 90
9.5 mm 35 - 65
4.75 mm 25 - 55
2.36 mm 20 - 40
425 m 10 - 25
75 m 3 - 10
Pan -
TOTAL -
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/11
Revision :- 00
IJM (INDIA) INFRASTRUCTURE LIMITED Date :- 25.08.2006
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894)
Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Description of sample :
Sieve Size Weight Retained Weight Retained Cum. Wt. Retained Passing MORTH Specification
(gm) (%) (%) (%) Limits
53 mm 100
45 mm 95 - 100
22.4 mm 60 - 80
11.2 mm 40 - 60
4.75 mm 25 - 40
2.36 mm 15 - 30
600 m 8 - 22
75 m 0-8
Pan -
TOTAL -
Remarks :
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
FM/QC/S/12
Revision :- 00
TRICHY TOLLWAY PRIVATE LIMITED Date :- 25.08.2006
IJM (INDIA) INFRASTRUCTURE LIMITED
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
1 Test No. 1 2 3 4 5 6 7 8 9 10 11 12
2 Chainage
6 % Compaction (%)
1 Test No. 13 14 15 16 17 18 19 20 21 22 23 24
2 Chainage
6 % Compaction (%)
Lab Tech. (IJMII) Material Manager (IJMII) CCSC Representative Concessionaire Representative
Name : Name : Name : Name :
Date: Date: Date: Date:
TRICHY TOLLWAY PRIVATE LIMITED FM/QC/S/13
Revision :- 00
IJM (INDIA) INFRASTRUCTURE LIMITED Date :-
25.08.2006
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
IS Designation Total Tests upto previous month Tests conducted during current month Total tests upto this month
TEST or Project Frequncy of
S. No.
PERFORMED Specification Test Retested Retested
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Clause (Passed) (Passed)
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
IS Designation Total Tests upto previous month Tests conducted during current month Total tests upto this month
TEST or Project Frequncy of
S. No.
PERFORMED Specification Test Retested Retested
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Clause (Passed) (Passed)
Four Laning and Strengthening of the Existing two Lane Road from km. 192.250 (Ch. 0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
IS Designation Total Tests upto previous month Tests conducted during current month Total tests upto this month
TEST or Project Frequncy of
S. No.
PERFORMED Specification Test Retested Retested
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Clause (Passed) (Passed)
0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
Retested
(Passed)
-
TOLLWAY PRIVATE LIMITED FM/QC/S/13
Revision :- 00
IA) INFRASTRUCTURE LIMITED Date :-
25.08.2006
0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
Retested
(Passed)
-
TOLLWAY PRIVATE LIMITED FM/QC/S/13
Revision :- 00
IA) INFRASTRUCTURE LIMITED Date :-
25.08.2006
0.000) Ulundurpet to km. 285.000 (Ch. 93.894) Padalur, Section of NH - 45 in Tamil Nadu, Construction Pkg. - VI - B (EPC II)
Month:
Retested
(Passed)
-
STATISTICAL GRAPH BETWEEN TEST NO & RELATIVE COMPACTION ( FM/QC/S/14)
100
90
NO OF TESTS TAKEN
80
70
60
50
40
30
20
10
0
90 91 92 93 % OF
94 COMPACTION
95 ACHIEVED 96 97 98 99 100