The weekly report provides an update on construction progress at the Thai Binh Thermal Power Plant and Transmission Lines Project, with 12 photos documenting work between June 11-17, 2017. Piping installation continued across the plant, including boiler drain piping, coal bunker instrument air lines, nitrogen lines at Boiler 2, and auxiliary steam supply to flue gas desulfurization and electrostatic precipitator systems. Insulation work also progressed on steam piping and drain lines. Additional updates include installation of ash conveyor piping and an underground firefighting water line.

Uploaded by

Roland Nicolas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views2 pages

Bop PDF

The weekly report provides an update on construction progress at the Thai Binh Thermal Power Plant and Transmission Lines Project, with 12 photos documenting work between June 11-17, 2017. Piping installation continued across the plant, including boiler drain piping, coal bunker instrument air lines, nitrogen lines at Boiler 2, and auxiliary steam supply to flue gas desulfurization and electrostatic precipitator systems. Insulation work also progressed on steam piping and drain lines. Additional updates include installation of ash conveyor piping and an underground firefighting water line.

Uploaded by

Roland Nicolas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

THAI BINH THERMAL POWER PLANT PROJECT & TRASMISSION LINES CONSTRUCTION PROJECT

Weekly Report No. 83 - Site Progress Photos (June 11-17, 2017)


E. BOP AREA

Date Taken: 17-Jun-17 Location: Unit 2 Boiler/Bunker Area #1 Date Taken: 17-Jun-17 Location: Unit 2 Ball Mills Area #2

Work Description: Installation of BLR drain piping Unit#2 Work Description: Installation of CCCW piping at Ball Mill#2 area

Date Taken: 17-Jun-17 Location: Unit 2 Coal Bunker Area #3 Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #4

Work Description: Installation of Instrument Air piping at Coal Bunker#2 Work Description: Installation of N2 piping at Boiler #2

Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #5 Date Taken: 17-Jun-17 Location: Near Unit 2 Boiler Area #6

Work Description: Installation of Service Air piping at BLR#2 Work Description: Insulation of SCAH drain Unit#2
THAI BINH THERMAL POWER PLANT PROJECT & TRASMISSION LINES CONSTRUCTION PROJECT

Weekly Report No. 83 - Site Progress Photos (June 11-17, 2017)


E. BOP AREA

Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #7 Date Taken: 17-Jun-17 Location: Unit 2 Boiler to ESP/FGD Area #8

Work Description: Insulation of steam piping at BLR2 Work Description: Insulation of Auxiliary steam supply to FGD&ESP

Date Taken: 17-Jun-17 Location: Yard piping trench area #9 Date Taken: 17-Jun-17 Location: Pipe Rack @ Unit 2 #10

Work Description: Installation of discharge piping for Boiler blowdown water Work Description: FRP raw water Unit#2 installation

Date Taken: 14-Jun-17 Location: Unit 2 Economizer Area #11 Date Taken: 15-Jun-17 Location: East of Gypsum Dewatering Bldg. #12
Work Description: Installation of ash conveyor piping Work Description: Installation of Pipe for Fire Fighting Underground Line 13A