Existing Drainage: 300mm Thick Hardcore 100mm Thick Bedding

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

CADANGAN KERJA-KERJA PEMBAIKAN KEMUDAHAN DAN NAIKTARAF AIR HANGAT VILLAGE, DI ATAS LOT

1338, 1339, 225 DAN SEBAHAGIAN LOT 1341, 220, 224, 228 DAN 227 MUKIM AIR HANGAT, DAERAH LANGKA
DARUL AMAN. (TENDER SEMULA)

ARAHAN PERUBAHAN KERJA 2

KURANGAN
ITEM KETERANGAN KERJA RUJ. BQ UNIT KUANTITI HARGA
(RM)

DRAINAGE

A Clearance of the site as directed by


removal of grass, cutting 25 nos of
existing trees, load and cart away from
the site and pay all dues in connection
including filling in any voids and making
good all works distrubed. ITEM

To demolish all existing structure and


material incorparated as per
Architecture's and Engineer's drawing
and remove all demolish item from site to
contractor's own dump as described :

B Existing drainage M 28

P.C. Box Culvert (1.8m x 0.90m)

Excavate get out, part return, fill in and


ram, remove surplus excavate material,
deposit spread and level where directed
or remove to contractor's own dumping
site:-

Trench for p.c box culvert maximum depth


not exceeding 2.00m deep.
D M3 308

Supply and lay to location as specified


precast concrete box culvert from an
approved source including 300mm thick
hardcore, 100mm thick bedding of
compacted sand or approved granular
material, selected suitable fill materials
free from lumps of cohesive soil larger
than 35 and roots and other vegetations
to be brought up equally on bothsides of
the P.C. box culvert and carefully
compacted in layers not more than
200mm thick and jointing with 12mm thick
cement mortar between box culvert all as
per specification and Engineer's drawing.
the P.C. box culvert and carefully
compacted in layers not more than
200mm thick and jointing with 12mm thick
CADANGAN
cementKERJA-KERJA
mortar between PEMBAIKAN
box culvertKEMUDAHAN
all as DAN NAIKTARAF AIR HANGAT VILLAGE, DI ATAS LOT
1338, per
1339, 225 DAN SEBAHAGIAN
specification LOT
and Engineer's 1341, 220, 224, 228 DAN 227 MUKIM AIR HANGAT, DAERAH LANGKA
drawing.
DARUL AMAN. (TENDER SEMULA)

ARAHAN PERUBAHAN KERJA 2

KURANGAN
ITEM KETERANGAN KERJA RUJ. BQ UNIT KUANTITI HARGA
(RM)

1.80m x 0.90m P.C. box culvert complete


E with cover. M 85

Stopper M 85

JUMLAH KURANGAN / TAMBAHAN DI BAWA KE HADAPAN (c/f) 0.00

JUMLAH KURANGAN / TAMBAHAN DI BAWA KE HADAPAN (b/f) 0.00

Sump For P.C. Box Culvert - 2 Nos

Excavate get out, part return, fill in and


ram, remove surplus excavate material,
deposit spread and level where directed
or remove to contractor's own dumping
site:-

Pit for sumps maximum depth not exceeding


A 2.00m. M3 35

Hardcore, spread, levelled, well rolled and


consolidated including blinding top
surface with sand as described :

300mm Thick under concrete base M2 16

100mm Thick lean concrete Grade 15 as


described :

Under sump. M2 16

Vibrated Reinforced Concrete Grade 20


in :

250mm thick concrete base M3 4

Two layer of steel mesh fabric


reinforcement to BS 4483 well lapped at
joint and embedded (measured nett - no
allowance made for laps) as described :

BRC A6 in concrete base M2 32

Sawn formwork :
CADANGAN KERJA-KERJA PEMBAIKAN KEMUDAHAN DAN NAIKTARAF AIR HANGAT VILLAGE, DI ATAS LOT
1338, 1339, 225 DAN SEBAHAGIAN LOT 1341, 220, 224, 228 DAN 227 MUKIM AIR HANGAT, DAERAH LANGKA
DARUL AMAN. (TENDER SEMULA)

ARAHAN PERUBAHAN KERJA 2

KURANGAN
ITEM KETERANGAN KERJA RUJ. BQ UNIT KUANTITI HARGA
(RM)

To edge of concrete base n.e 250mm high. M 18

Ditto, concrete lintol n.e 150mm high. M 18

Brickwork in cement and sand (1:3)


mortar as described :

230mm thick brickwall M2 27

Concrete Grade 20 lintol inclusive of 5


nos 12mm diameter high tensile steel
reinforcement bar to BS4449 and 10mm
diameter mild steel stirrup at 200mm
centres as described :

To top of brickwork. M3 2

JUMLAH KURANGAN / TAMBAHAN DI BAWA KE HADAPAN (c/f) 0.00


CADANGAN KERJA-KERJA PEMBAIKAN KEMUDAHAN DAN NAIKTARAF AIR HANGAT VILLAGE, DI ATAS LOT
1338, 1339, 225 DAN SEBAHAGIAN LOT 1341, 220, 224, 228 DAN 227 MUKIM AIR HANGAT, DAERAH LANGKA
DARUL AMAN. (TENDER SEMULA)

ARAHAN PERUBAHAN KERJA 2

KURANGAN
ITEM KETERANGAN KERJA RUJ. BQ UNIT KUANTITI HARGA
(RM)

JUMLAH KURANGAN / TAMBAHAN DI BAWA KE HADAPAN (b/f) 0.00

Cement and sand (1:6) plaster mixed with


an approved plasticiser and finish with
wood float as described :

20mm thick to wall and top surfaces of sump.


M2 27

M.S Grating

Supply and fix M.S. grating placed on top


of sump P.C box culvert, constructed of
50mm x 50mm x 12mm thick M.S. angle
frame, 40mm x 4mm thick M.S. flat welded
at both ends at 32mm centres, including 2
nos of 25mm x 50mm x 10mm thick plate
fixed with M12 bolt and nut welded to M.S.
angle frame and painting all as illustrated
in Engineer's drawing as described :

1800mm x 1800mm M.S. grating for box


culvert NO 6

1800mm x 1800mm M.S. grating for sump NO 6

Miscellaneous Works

Relocation of utility services ITEM

Dewatering works ITEM

Make good to existing drainage system, brick


fencing,landscape and all other affected
works. ITEM

JUMLAH KURANGAN / TAMBAHAN 0.00

JUMLAH TAMBAHAN
CADANGAN KERJA-KERJA PEMBAIKAN KEMUDAHAN DAN NAIKTARAF AIR HANGAT VILLAGE, DI ATAS LOT
1338, 1339, 225 DAN SEBAHAGIAN LOT 1341, 220, 224, 228 DAN 227 MUKIM AIR HANGAT, DAERAH LANGKA
DARUL AMAN. (TENDER SEMULA)

ARAHAN PERUBAHAN KERJA 2

KURANGAN
ITEM KETERANGAN KERJA RUJ. BQ UNIT KUANTITI HARGA
(RM)
JUMLAH TAMBAHAN
AGE, DI ATAS LOT 1335, 1337,
DAERAH LANGKAWI, KEDAH

TAMBAHAN
(RM)

4,000.00

0.00

0.00
AGE, DI ATAS LOT 1335, 1337,
DAERAH LANGKAWI, KEDAH

TAMBAHAN
(RM)

0.00

0.00

4,000.00

4,000.00

0.00

0.00

0.00

0.00

0.00
AGE, DI ATAS LOT 1335, 1337,
DAERAH LANGKAWI, KEDAH

TAMBAHAN
(RM)

0.00

0.00

0.00

0.00

4,000.00
AGE, DI ATAS LOT 1335, 1337,
DAERAH LANGKAWI, KEDAH

TAMBAHAN
(RM)

4,000.00

0.00

0.00

0.00

5,000.00

3,000.00

10,000.00

22,000.00

22,000.00
AGE, DI ATAS LOT 1335, 1337,
DAERAH LANGKAWI, KEDAH

TAMBAHAN
(RM)
22,000.00

You might also like