Transformer Stability Test Example Procedure #2
Transformer Stability Test Example Procedure #2
Transformer Stability Test Example Procedure #2
The transformer stability test used to conform the CT connections for Differential and REF protection. This test
also used as a primary injection test for HV & LV side BCT's.
PRIMARY SIDE : -
HV side full load current = Power / 3 x Voltage = 10010^3 = 100000000 = 251 Amps
3 230 1000 399050
HV side Impedence/ Phase = HV side Impedence X % Impedence = 916 X 12.24 = 112 Ohms
100
LV side SIDE : -
Note : -
To make this condition open any one of CT FT fingers and short by insert the FT jack.
Test connection: Three phase short circuit outside protected zone on LV side. Three phase voltage injected on
HV side = 380V
Test connection : The shorting and grounding bar was removed from the Delta winding and current was injected
with Severker Test Kit and secondary currents were measured in the Transformer LCP panel.
Blog Archive
2017 (3)
2016 (17)
2014 (3)
2013 (24)
2012 (46)
o December (3)
o October (2)
o September (4)
o August (5)
o July (7)
o June (1)
o May (3)
o April (3)
HV TEST FOR 230 KV GIS High Voltage level of inje...
THE STORY OF TRANSFORMER STABILITY The transformer...
TIMINGS & TIME SETTINGS
o March (3)
o February (6)
o January (9)
2011 (35)
2010 (13)
About Me
SIVAKUMAR
THIS IS SIVA T&C ENGINEER IN NCC LTD - SAUDI.
View my complete profile