0% found this document useful (0 votes)
22 views33 pages

Industrial Engineering 3

The document discusses various methods for solving the least cost transportation problem including the Northwest corner method, Vogel's Approximation Method (VAM), Russel's Approximation Method (RAM), and the Modified Distribution method (MODI). It provides examples applying these methods to transportation problems with supply and demand quantities and transportation costs.

Uploaded by

sarmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views33 pages

Industrial Engineering 3

The document discusses various methods for solving the least cost transportation problem including the Northwest corner method, Vogel's Approximation Method (VAM), Russel's Approximation Method (RAM), and the Modified Distribution method (MODI). It provides examples applying these methods to transportation problems with supply and demand quantities and transportation costs.

Uploaded by

sarmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

Transportation Model 5 1

5195
5197
5115 5113
Modify Distribution method (MODI)
5119 Stepping Stone
Assignment problem 5111
5117
R.A.M. 5112 V.A.M.
5112
The least cost transportation problem 8 5 1
n m
i Si
j Dj
j i (i,j) Cij
j i Xij
j i

56
m n
min . Z C ij X ij
i 1 j 1
n
s .t . X
j 1
ij ai
m

X
i 1
ij bj
X ij 0

unbalanced
5
b a
j
j
i
i

8
a b
i
i
j
j

S.B.F.S. 5
8

S.B.F.S. 8 5 1

Northwest corner method 5


X11
X11=min.(a1 ,b1 )

Least cost method 8

57
Vogel's Approximation Method ( V.A.M.) 3

Russel's Approximation Method (R.A.M.) 9

bj ai
ij C ij a i b j
ij
.min.(ai , bj )

58
Optimal Solution 3 5 1
S.B.F.S.
m n m+n-1

Stepping Stone method 5

C ij
C ij

Multipliers method 8
Modified Distribution method (MODI)

Duality theory
Vj j Ui i
Xij
U i V j C ij

59
(m+n) (m+n-1) (m+n-1)

U1=0
Xpq C pq
C pq = Cpq- ( Up+Vq)

C pq

81 80 51 S3 , S2 , S1 5
51 58 50 2 C4 , C3 , C2 , C1

C1 C2 C3 C4
S1 8 3 9 1
S2 3 8 1 8
S3 9 5 8 3
(25+20+15=60)
C5 (8+10+12+15=45)
(60-45=15)
S.B.F.S. 5

C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
2 7 51
3 8 1 8 0
S2 80
3 58 1
9 5 8 3 0
S3
50 51 81
Demand 2 50 58 51 51 10

61
T.T.C. = 2*8 + 3*7 + 2*3 + 5*12 + 2*5 + 3*10 + 0*15 = 143

C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
0 51 51
3 8 1 8 0
S2
1 51 80
9 5 8 3 0
S3
3 50 58 81
Demand 2 50 58 51 51 10

T.T.C. = 2*0 + 0*15 + 3*5 + 2*15 + 4*3 + 1*10 + 2*12 = 91

VAM
C1 C2 C3 C4 C5 Supply P.C.
8 3 9 1 0 2 1 1 3
S1
0 51 51
3 8 1 8 0 2 0 0 11
S2
1 51 80
9 5 8 3 0 1 1 2 11
S3
3 50 58 81
Demand 2 50 58 51 51 10
P.C. 1 5 8 5 0
1 5 8 5
1 5 8 5
1 5
1 5

T.T.C. = 2*0 + 0*15 + 3*5 + 2*15 + 4*3 + 1*10 + 2*12 = 91

61
RAM
C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
2 7 51
3 8 1 8 0
S2
51 1 80
9 5 8 3 0
S3
50 58 3 81
Demand 2 50 58 51 51 10

C1 C2 C3 C4 C5
S1 -7 -5 -6 -5 -5
S2 -6 -6 -5 -8 -5
S3 -4 -6 -7 -6 -4
C4 X24
C1 C2 C3 C5
S1 -6 -4 -5 -4
S2 -6 -6 -5 -5
S3 -4 -6 -7 -4
C3 X33
C1 C2 C5
S1 -5 -3 -3
S2 -4 -4 -3
S3 -4 -6 -4
C2 X32
C1 C5
S1 -4 -2
S2 -4 -3
S3 -4 -4
S3 X35
C1 C5
S1 -3 -2
S2 -3 -3
X15 , S2 X25
X11
T.T.C. = 2*8 + 0*7 + 2*15 + 0*5 + 1*10 + 2*12 + 0*3 = 80

62
RAM 15 VAM 15 593
20
VAM RAM
VAM S.B.F.S.
RAM

No. of basic cells = m+n-1 = 5+3-1=7

Optimal solution 8
Stepping stone
C ij
C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1 51
0 51
3 8 1 8 0
S2
1 51 80
9 5 8 3 0
S3 81
3 50 58
Demand 2 50 58 51 51 10

X 12 X 32 X 31 X 11 : C 12 3 1 4 2 4
X 13 X 33 X 31 X 11 : C 13 4 2 4 2 4
X 14 X 24 X 21 X 11 : C 14 5 2 3 2 4
X 22 X 32 X 31 X 21 : C 22 2 1 4 3 2
X 23 X 33 X 31 X 21 : C 23 5 2 4 3 4
X 25 X 15 X 11 X 21 : C 25 0 0 2 3 1
X 34 X 23 X 21 X 31 : C 34 3 2 3 4 0
X 35 X 15 X 11 X 31 : C 35 0 0 2 4 2 most negative

63
entering variable C 35
leaving variable X35

Xij X 35 X 15 X 11 X 31
X31
C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
3 58 51
3 8 1 8 0
S2
1 51 80
9 5 8 3 0
S3
50 58 3 81
Demand 2 50 58 51 51 10
T.T.C. = 6 + 0 + 15 + 30 + 10 + 24 + 0 = 85
No. of basic cells = 5 + 3 1 = 7

X 12 X 32 X 35 X 15 : C 12 3 1 0 0 2
X 13 X 33 X 35 X 15 : C 13 4 2 0 0 2
X 14 X 24 X 21 X 11 : C 14 5 2 3 2 4
X 22 X 32 X 35 X 15 X 11 X 21 : C 22 2 1 0 0 2 3 0
X 23 X 33 X 35 X 15 X 11 X 21 : C 23 5 2 0 0 2 3 2
X 25 X 21 X 11 X 15 : C 25 0 3 2 0 1 negative
X 31 X 11 X 15 X 35 : C 31 4 2 0 0 2
X 34 X 24 X 21 X 11 X 15 X 35 : C 34 3 2 3 2 0 0 2
X21 X25
C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
2 7 51
3 8 1 8 0
S2 80
51 1
9 5 8 3 0
S3
50 58 3 81
Demand 2 50 58 51 51 10
T.T.C. = 16 + 0 + 30 + 0 + 10 + 24 + 0 = 80
No. of basic cells = 7

64
X 12 X 32 X 35 X 15 : C 12 3 1 0 0 2
X 13 X 33 X 35 X 15 : C 13 4 2 0 0 2
X 14 X 24 X 25 X 15 : C 14 5 2 0 0 3
X 21 X 25 X 15 X 11 : C 21 3 0 0 2 1
X 22 X 32 X 35 X 25 : C 22 2 1 0 0 1
X 23 X 33 X 35 X 25 : C 23 5 2 0 0 3
X 31 X 35 X 15 X 11 : C 31 4 0 0 2 2
X 34 X 35 X 25 X 24 : C 34 3 0 0 2 1

C ij
2
51
58 50

Vj , Ui Multipliers method 8
U1=0 U i V j C ij
VAM
C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
0 51 51
3 8 1 8 0
S2
1 51 80
9 5 8 3 0
S3
3 50 58 81
Demand 2 50 58 51 51 10
T.T.C. = 91 and no. of basic cells = 7
U 1 0
C 11 U 1 V1 2 V1 2
U 1 0
C 15 U 1 V5 0 V5 0
V1 2
C 21 U 2 V1 3 U2 1
U 2 1
C 24 U 2 V4 2 V4 1
V1 2
C 31 U 3 V1 4 U3 2
U3 2
C 32 U 3 V2 1 V 2 1
U3 2
C 33 U 3 V3 2 V3 0

65
C ij C ij ( U i V j ) C ij
C 12 C 12 ( U 1 V2 ) 3 ( 0 ( 1 )) 4
C 13 C 13 ( U 1 V3 ) 4 ( 0 0 ) 4
C 14 C 14 ( U 1 V4 ) 5 ( 0 1 ) 4
C 22 C 22 ( U 2 V2 ) 2 ( 0 1 ) 2
C 23 C 23 ( U 2 V3 ) 5 ( 1 0 ) 4
C 25 C 25 ( U 2 V5 ) 0 ( 1 0 ) 1
C 34 C 34 ( U 3 V4 ) 3 ( 2 1 ) 0
C 35 C 35 ( U 3 V5 ) 0 ( 2 0 ) 2 most negative

X35 C ij

X 35 X 15 X 11 X 31
X31

C1 C2 C3 C4 C5 Supply
8 3 9 1 0
S1
3 58 51
3 8 1 8 0
S2
1 51 80
9 5 8 3 0
S3
50 58 3 81
Demand 2 50 58 51 51 10
T.T.C. = 6 + 0 + 15 + 30 + 10 + 24 + 0 = 85
No. of basic cells = m + n 1 = 3 + 5 1 = 7
C ij

V1=2 V2=1
V3=2 V4=1 V5=0
C1 C3 C2 C4 C5 Supply
U1=0 S1 2 3 4 5 0
3 2 2 4 12 15
U2=1 S2 3 2 5 2 0
5 0 2 15 -1 20
U3=0 S3 4 1 2 3 0
2 10 12 2 3 25
Demand 8 10 12 15 15 60

66
X21 C ij X25

V1=2 V2=1 V3=2 V4=2 V5=0 Supply


C1 C2 C3 C4 C5
U1=0 S1 2 3 4 5 0
8 2 2 3 7 15
U2=0 S2 3 2 5 2 0
1 1 3 15 5 20
U3=0 S3 4 1 2 3 0
2 10 12 1 3 25
Demand 8 10 12 15 15 60

T.T.C. = 16 + 0 + 30 + 0 + 10 + 24 + 0 = 80
C ij

2
51
58 50

67
Assignment model 8 1
Jobs n
m (machines

(n<m) (m n) m=n
(n>m) (n-m)

minimized
5

8 1
maximized

68
8
jobs machines
M1 M2 M3 M4 M5
J1 10 11 4 2 8
J2 7 11 10 14 12
J3 5 6 9 12 14
J4 13 15 11 10 7

1 9

M1 M2 M3 M4 M5 M1 M2 M3 M4 M5
J1 10 11 4 2 8 J1 8 9 2 0 6
J2 7 11 10 14 12 J2 0 4 3 7 5
J3 5 6 9 12 14 J3 0 1 4 7 9
J4 13 15 11 10 7 J4 6 8 4 3 0
J5 0 0 0 0 0 J5 0 0 0 0 0

9
5 1

1 M1 M2 M3 M4 M5
J1 1 9 2 0 7
J2 0 3 2 6 5
J3 0 0 3 6 9
J4 6 7 3 2 0
J5 1 0 0 0 1

Jobs Machines
J1 M4
J2 M1
J3 M1 , M2
J4 M5
J5 M2 , M3 , M4

69
9 8 8 3 5
5 3 1
8 9 5
7 5 8
1 8 3
88 7 1 9
3 88

3
Machines
Jobs M1 M2 M3 M4
J1 50 3 8 9
J2 1 9 5 3
J3 2 1 5 1
J4 7 1 8 1

50

Machines Machines
Jobs M1 M2 M3 M4 Jobs M1 M2 M3 M4
J1 0 7 8 6 J1 0 7 8 6
J2 1 6 9 7 J2 0 5 8 6
J3 2 5 9 5 J3 0 3 7 3
J4 3 4 8 4 J4 0 1 5 1

Machines
Jobs M1 M2 M3 M4
J1 0 6 3 5
J2 0 4 3 5
J3 0 2 2 2
J4 0 0 0 0
8 9 8

71
Machines
Jobs M1 M2 M3 M4
J1 0 4 1 3
J2 0 2 1 3
J3 0 0 0 0
J4 2 0 0 0
5 9 3

Machines
Jobs M1 M2 M3 M4
J1 0 3 0 2
J2 0 1 0 2
J3 1 0 0 0
J4 3 0 0 0
9

Jobs Machines
J1 M1 , M3
J2 M1 , M3
J3 M2 , M3 , M4
J4 M2 , M3 , M4

Jobs Mach. profit Jo. Ma. Pr. Jo. Ma. Pr. Jo. Mach. Pr.
J1 M1 10 J1 M1 10 J1 M3 2 J1 M3 2
J2 M3 1 J2 M3 1 J2 M1 9 J2 M1 9
J3 M2 5 or J3 M4 5 or J3 M2 5 or J3 M4 5
J4 M4 6 J4 M2 6 J4 M4 6 J4 M2 6
22 22 22 22

88

71
5
a) Destinations Supply b) Destinations Supply
Sources D1 D2 D3 Sources D1 D2 D3
S1 1 2 6 7 S1 5 1 8 12
S2 0 4 2 12 S2 2 4 0 14
S3 3 1 5 11 S3 3 6 7 4
Demand 10 10 10 30 Demand 9 10 11 30

c) Dest. Sup. Dest. Sup.


Sou. D1 D2 D3 Sou. D1 D2 D3 D4
S1 5 1 7 10 S1 10 20 5 7 10
S2 6 4 6 80 S2 13 9 12 8 20
S3 3 2 2 15 S3 4 15 7 9 30
Dem. 75 20 50 S4 14 7 1 0 40
S5 3 12 5 19 50
Dem. 60 60 20 10 150
( ans. : a)(7,0,0,2,0,10,1,10,0;40) , b)(2,10,0,3,0,11,4,0,0;38) ,
c)(0,10,0,35,10,35,0,0,15,40,0,0;500) ,
d)(0,0,10,0,0,20,0,0,30,0,0,0,0,30,0,10,30,10,10,0;820))

M5 , M4 , M3 , W4 , W3 , W2 , W1 8
30 10 90 70 M2 , M1
10 10 30 80 90

Warehouses Markets
M1 M2 M3 M4 M5
W1 7 1 1 9 8
W2 1 7 3 1 3
W3 2 2 7 3 5
W4 9 3 5 8 5

(ans.: (30,0,0,40,0,0,0,30,0,10,0,0,0,20,40,10,20,0,0,0;690))

72
S4 D1 3
Destinations
Sources D1 D2 D3 Supply
S1 5 1 0 20
S2 3 2 4 10
S3 7 5 2 15
S4 9 6 0 15
Demand 5 10 15
(ans.: (0,10,5,5,5,0,0,0,10,0,0,0,15,5,0,10,0;55))

9
80 80 30 80 30 81
M4 81 50 30
J4
Jobs
machines J1 J2 J3 J4 J5
M1 10 2 3 15 9
M2 5 10 15 2 4
M3 15 5 14 7 15
M4 20 15 13 ---- 8
(ans.:(0,0,25,0,0,20,0,0,10,0,0,20,0,0,0,0,0,5,0,25;560))

1
machines Machines
a) Jobs M1 M2 M3 M4 b) Jobs M1 M2 M3 M4 M5
J1 10 5 5 2 J1 3 8 2 10 3
J2 9 8 4 3 J2 8 7 2 9 7
J3 7 7 6 4 J3 6 4 2 7 5
J4 8 7 5 5 J4 8 4 2 3 5
J5 9 10 6 9 10
(ans.:a) 1-2,2-4,3-1,4-3 or 1-4,2-3,3-1,4-2;20, b) 1-5 , 2-3 , 3-2 , 4-4 , 5-1 ;21 )

1
Machines
Jobs M1 M2 M3 M4 M5
J1 3 9 2 3 7
J2 6 1 5 6 6
J3 9 4 7 10 3
J4 2 5 4 2 1
J5 9 6 2 4 6
(ans.:1-2 , 2-5 , 3-4 , 4-3 , 5-1 ;38 )
73
P1 7
M4 P3 M3
machines
Processes M1 M2 M3 M4
P1 5 5 --- 2
P2 7 4 2 3
P3 9 3 5 ---
P4 7 2 6 7
(ans.: 1-4 , 2-3 , 3-2 , 4-1 ; 14)

2
Lines
Engineering L1 L2 L3 L4
E1 2 1 1 9
E2 1 7 7 2
E3 50 55 1 2
E4 3 1 1 7

L4 E1

(ans.: a)1-4 , 2-2 , 3-3 , 4-1;20 , b)1-3 , 2-2 , 3-4 , 4-1 ; 24 ; 4 )

74
Network planning

Critical Path 5 1

Event

Activity
Duration

Path

Critical Path (C.P.)

C.P.time
Forward pass
Earliest time
(ESj)
ES j max .ES j Dij ( i , j )activities
i

(i,j) Dij ES1 = 0

75
Backward pass
Latest time (LCi)

LC i min . LC i Dij
j
( i , j )activities
LCn = ESn
(i,j)
ESj ESi = LCj LCi =Dij
Free Float Time (F.F.)

FFij = ESj ESi - Dij


5
a) Act. Pre-act. b) Act. Pre-act. c) Act. Pre-act.
A ---- A ---- A ----
B ---- B A B ----
C A,B C A C A,B
D A D B D A,B
E C,D E B,C E B
F D,E F D,E
G C,F
H D,E
I G,H

a)
A 2 D

1 4 E 5

B 3 C
b)
B 3 D
A F
1 2 5 6

C 4 E

76
C 5
3 G
A
6 I 7
1 F
D
H
B 4
2 E

8
C,B,A
D B,A
H,F,E B
G F,C
J,I H,E
K J,F,D,C
L K
L,I,G

D 7 K 8
3
L
A 4 J

H I 9
1 B 5
2 E
F G
C
6

activity 1-2 2-3 2-4 3-4 3-5 3-6 4-5 4-6 5-6
Dij 3 3 2 0 3 2 7 5 6

77
6

6
0
3 19
3
0 13
3 2 19
3 3 13
1 3 2 0 6
5 6
2
7
5
4
6

Forward pass Backward pass


ES1 = 0 LC6 = 19
ES2 = 0 + 3 = 3 LC5 = 19 6 = 13
ES3 = 3 + 3 = 6 LC4 = min. { 13-7, 19-5 } = 6
ES4 = max. { 3+2,6+0 } = 6 LC3 = min. { 6-0, 13-3, 19-2 } = 6
ES5 = max. { 6+3, 6+7 } = 13 LC2 = min. { 6-3, 6-2 } = 3
ES6 = max. { 6+2, 6+5, 13+6 }= 19 LC1 = 3 3 = 0
1-2-3-4-5-6
51 Critical time (1,2) , (2,3) , (3,4) , (4,5) , (5,6)
9
activity Preceding activity Duration
A --- 14
B A 12
C B 16
D B 7
E B 12
F C 20
G C 18
H C 6
I F,G 4
J E,H,I 2
K D,J 3

78
62

62
62
5 1 6
42 62
21
18
42 4 4
1 14 66
16 6
1 14 66
7
1 14 2 12 3 12
68
2 71
26 7 68 71
26 8 3 9

75 ABCFIJK
1
activity Preceding activity Duration
A --- 5
B --- 2
C A,B 3
D A,B 4
E B 6
F D,E 5
G C,F 3
H D,E 2
I G,H 1

14
5
14
5
17 18
3 5
1
3 3 17 18
5
1 6 7
1 4 5 1
1
2 2
4
2 6 9
3
9
2

79
C.T.= 18 I,G,F,D,A

Program Evaluation and Review 8 1


Technique (PERT)
PERT

Optimistic time ( a )
Pestimistic time ( b )
Most likely time ( m )
(i,j) Expected time ( D )
a b 4m
D
6
Variance ( V )
2
ba
V
6

STi CTi
Pr Z
V ( i )

STi
CTi
V( )

1
80

81
activity a b m
1,2 2 8 2
2,3 1 11 1.5
2,4 0.5 7.5 1
3,5 1 7 2.5
3,6 1 3 2
4,5 6 8 7
4,6 3 11 4
5,6 4 8 6

activity D V
1,2 3 1
2,3 3 ---
2,4 2 1.36
3,5 3 ----
3,6 2 ----
4,5 7 0.11
4,6 5 ----
5,6 6 0.44
V( ) 2.91
9

6
0
3 18
3
0 12
3 2 18
3 3 12
1 3 2 6
5 6
2
7
5
4
5

CT =18 (5,6) , (4,5) , (2,4) , (1,2)


20 18
Pr Z i Pr Z 1.17 0.879
2.91
22 80

3 1

81
Cn Dn Normal 5
Cc Dc Crash 8

( CTN ) 5
8
( CTC )
T = CTN CTC 3
Slope 9
Cc Cn
Slope
Dn Dc
Free Float ( FF) 1
FFij = ESj ESi - Dij

FF
Dc Dn
1

7
1 1 8 ( CTC )

normal Crash
activity Dn Cn Dc Cc
1,2 8 100 6 200
1,3 4 150 2 350
2,4 2 50 1 90
2,5 10 100 5 400
3,4 5 100 1 200
4,5 3 80 1 100
--- 580 --- 1340

82
2

8
0 11 52
8 2
0 5 52
9 3 1
4
5 51
3 50
50

CTN = 18 , Total Cost = 580

8
0 5 55
6 1
0 5 55
9 1 1
2
1 50
3 7
1

CTC = 11 , Total Cost = 1340


CTN CTC = 18 11 = 7
7

activity slope F.F.


1,2 50 * --------
1,3 100 404=0
2,4 40 10 8 2 = 0
2,5 60 * --------
3,4 25 10 4 5 = 1
4,5 10 18 10 5 = 5 max.

83
min. { 5, 8-6} (1,2)
=2
(1,2)

8
0 11 51
6 2
0 5 51
9 3 1
4
5 53
3 1
2

Critical Path C.P. is : (1 , 2) , (2 , 5) and Total Cost T.C.= 580+ 2 * 50= 680

min.{ 4 , 10-5 } = 4 (2,5)

8
0 6 58
6 2
0 5 58
9 3 1
4
5 1
3
9 1
9

C.P. is : (1,2) , (2,5) and (1,3) , (3,4) , (4,5)


T.C. = 680 + 4 * 60 = 920
(2,5)
1

84
(2,5)

activity Slope
(2,5) , (1,3) 60 + 100 = 160
(2,5) , (3,4) 60 + 25 = 85
(2,5) , (4,5) 60 +10 =70 min.
(4,5) , (2,5)

8
0 5 55
6 2
0 5 55
9 2 1
4
5 1
3 1
9

C.P. is (1,2) , (2,5) and (1,3) ,(3,4) , (4,5)


T.C. = 920 + 1 * 70 = 990

110 120 55 52
5390

85
5
C,B,A
A F,E,D
D,B G.I
G,C H
I L,K
H,E J
H,E F N,M
I,M O
O,L,J P
P,N,K
8
activity Pre. Act. Duration activity Pre. Act. Duration
R ---- 24 D C,B 6
E R 16 C A 8
H G 16 B A 16
N P, Q, U, S 8 U F 8
M L,K 8 Q E 12
K H 16 A R 16
P E,D 36 F R 40
S T,M 16 G R 24
L H 24 T G 4
(ans.: R , G , H , L , M , S , N ; 120 )
3
activity Pre. Act. Duration Activity Pre. Act. Duration
A ---- 10 J F 5
B ---- 28 K E,G,H 1
C A 2 L I,J 6
D C 1 M J,L 2
E D 2 N K,M 1
F D 30 O K,M 4
G D 45 P N 1
H B,D 1 Q N, O 1
I E,H 6 R P,Q 1
(ans.: A , C , D , G , K , O , Q , R ; 65)

86
31 9
5.1
Act. A B C D E F G H I
Pre.act. --- --- A A,B A,B C,D A C,D,G E,F,H
Duration 5 7 6 8 7 5 6 9 10
(ans.: 99.6% )
1
Act. A B C D E F G H I
Pre.act. --- --- A,B A,B B D,E C,F D,E G,H
Duration 6 5 7 8 4 6 7 4 X
Z = 1.5 I X
8 39
81 H
51

1 10000
7 1 C
81000
30000
(ans.: a) 4 ; b) 600000 ; c)- 300000 )
1
Act. (a,b,m) Act. (a,b,m)
1,2 5,7,6 3,6 3,5,4
1,4 1,5,3 4,6 4,9,8
1,5 2,6,4 4,7 4,8,6
2,3 4,6,5 5,6 9 , 14 , 10
2,5 6 , 10 , 8 5,7 4,8,6
2,6 8 , 13 , 9 6,7 3,5,4
3,4 5 , 10 , 9
39
( ans.: 98.9% )

87
7
Normal crash normal crash
Act. Dn Cn Dc Cc Act. Dn Cn Dc Cc
1 , 2 4 100 1 400 3,7 14 120 12 140
1 , 4 9 120 6 180 4,5 15 500 10 750
1 , 3 8 400 5 640 4,7 10 200 6 220
1,6 3 20 1 60 5,6 11 160 8 240
2,3 5 60 3 100 5,7 8 70 5 110
2 , 5 9 210 7 270 6,7 10 100 2 180
3 , 4 12 400 8 800 --- 2460 -- 4090
( ans.: 33 ; 3750 )

2
normal crash
Act. Dn Cn Dc Cc
1,2 5 1000 4 1400
1,3 9 2000 7 3000
2,3 7 2500 4 3400
2,4 9 2800 7 3400
3,5 5 2500 2 4600
3,6 11 4000 7 7200
4, 6 6 3000 4 4200
5,6 8 800 6 1400
-- 18600 -- 28600
( ans.: 16 ; 24600 )