Checklist For Weighbridge

The document is a checklist for preventative maintenance and planned downtime (PM/PDM) of weigh bridge scales 1 and 2 at Notore Chemical Industries. The 18-item checklist includes steps to power off and clean equipment, check load cells and terminals, inspect for damage or water ingress, test functionality, and document the condition of the scales before and after maintenance. The performing officer and supervisor must sign off after completing the PM/PDM tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views4 pages

Checklist For Weighbridge

The document is a checklist for preventative maintenance and planned downtime (PM/PDM) of weigh bridge scales 1 and 2 at Notore Chemical Industries. The 18-item checklist includes steps to power off and clean equipment, check load cells and terminals, inspect for damage or water ingress, test functionality, and document the condition of the scales before and after maintenance. The performing officer and supervisor must sign off after completing the PM/PDM tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

DATE TAG NO..

1. POWER OFF FROM JUNCTION BOX.


2. CLEAN JUNCTION BOX.
3. CLEAN TERMINALS AND EARTH LINKS.
4. CHECK TO ENSURE FIRM TERMINATION ON BLOCKS.
5. CARRY OUT FUNCTIONAL TEST ON THE LOAD CELL CABLES.
6. CHECK FOR POLARITY ON DCV AND MVOLTS IN ALL JUNCTION
BOXES.
INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

7. CARRY OUT RESISTANCE CHECKS ON ALL THE LOAD CELLS.


8. CHECK FOR PHYSICAL DAMAGE ON ALL THE LOAD CELLS.
9. CHECK FOR WATER INGRESS IN ALL THE JUNCTION BOXES.
10. CHECK CONDITION OF SUSPENSION RODS & TENSION RODS.
11. CHECK FIRMNESS OF BOLTS/NUTS ON THE PLATFORM.
12. CHECK PRINTER AND EFFECT FUNCTIONAL TEST.
13. CHECK FUNCTIONALITY OF SECTIONALIZATION
CARD/HOUSING.
14. QUARTERLY FLUSHING OF THE BRIDGE EFFECTED?
15. STATE DATE OF LAST FLUSHING EXERCISE. DATE
.
INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

16. WHEN NEXT IS FLUSHING DUE DATE


17. CHECK BRIDGE FOR FUNCTIONAL TEST AFTER PM/PDM
18. STATE CONDITION OF THE BRIDGE:
AS FOUND .....


AS LEFT



INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

PERFORMING OFFICER.
SIGN/DATE

WORKSHOP SUPERVISORS
COMMENT.

SIGN/DATE..