Activity Progress

This document outlines the progress of mechanical, electrical, and plumbing (MEP) works for three buildings. It provides status updates from February 28th and planned activities from March 1st to 8th. For each building, it lists activities and their percentage completion across plumbing, firefighting, HVAC, and electrical systems. The overall progress ranges from initial groundworks that are 30-80% complete to other tasks just beginning. The planned work focuses on continuing groundworks and piping installation over the one week period.

Uploaded by

Neal Johnson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views20 pages

Activity Progress

This document outlines the progress of mechanical, electrical, and plumbing (MEP) works for three buildings. It provides status updates from February 28th and planned activities from March 1st to 8th. For each building, it lists activities and their percentage completion across plumbing, firefighting, HVAC, and electrical systems. The overall progress ranges from initial groundworks that are 30-80% complete to other tasks just beginning. The planned work focuses on continuing groundworks and piping installation over the one week period.

Uploaded by

Neal Johnson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 20

MEP WORKS:- (as on 28.02.

2017)

S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BELOW GROUND PIPING WORKS 10% 40% %20

2 BLOCKWALL CHASING & MARKING 0% 4% %1

3 HIGHER LEVEL DRAINAGE PIPEWORKS 0% 2% 2%

4 CONCEALED DRAINAGE PIPE WORKS 0% 4% %0

5 H/L WATER SUPPLY PIPE WORKS 0% 0% %0

6 CONCEALED WATER SUPPLY PIPEWORKS 0% 4% %0

7 SANITARYWARES FIXING 0% 4% %0

8 PUMPROOM & WATER TANK AREA S.N %2 S.N

9 ROOF @WORKS 0% 0% %0

FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 2% 4% 2%

2 Below Ground HDPE piping 70% 70% 70%

3 FHC installation 0% 0% 0%

4 Sprinkler Installation 0% %4 0%

5 Fire Pump Installation & Testing 0% 0% 0%

6 Conduting works for Fire Alarm systems 50% 50% 50%

7 Cabling works for Fire Alarm systems 0% 10% 0%

HVAC
1 DUCT WORK INSTALLATION & INSUALTION 0% %4 %0

2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 0% %4 %0

3 FLEXBILE DUCT INSTALLATION 0% %4 %0

4 GRILL/DIFUSER INSTALLATION 0% %4 %0

5 FCU INSTALLATIONS 0% %0 %0

6 THERMOSTAT FIXING 0% %4 %0

ELECTRICAL
1 Slab Conduiting %20 %20 %20

2 Marking on Blockwall 10% 10% %10

3 Cutting & Chasing works 5% 5% 5%

4 Conduit piping 5% 5% 5%

5 Distribution Board & back boxes (I.G) Fixing 0% 0% 0%


Activities Planned for the Week (01.03.17 to 08.03.17)

S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BELOW GROUND PIPING WORKS %60 60% 60%
2 BLOCKWALL CHASING & MARKING 10% 10% %10
3 HIGHER LEVEL DRAINAGE PIPEWORKS 10% 10% 10%
4 CONCEALED DRAINAGE PIPE WORKS 10% 10% %10
5 H/L WATER SUPPLY PIPE WORKS 10% 10% %10
6 CONCEALED WATER SUPPLY PIPEWORKS 10% 10% %10
7 SANITARYWARES FIXING 0% 4% %0
8 PUMPROOM & WATER TANK AREA S.N %10 S.N

9 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 8% 8% 8%
2 Below Ground HDPE piping 70% 70% 70%
3 FHC installation 0% 0% 0%
4 Sprinkler Installation 0% %4 0%
5 Fire Pump Installation & Testing 0% 0% 0%
6 Conduting works for Fire Alarm systems 60% 60% 60%
7 Cabling works for Fire Alarm systems 20% 20% 20%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 10% 10% 10%

2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 10% 10% 10%

3 FLEXBILE DUCT INSTALLATION 0% 4% 0%

4 GRILL/DIFUSER INSTALLATION 0% 4% 0%

5 FCU INSTALLATIONS 0% 0% 0%

6 THERMOSTAT FIXING 10% 10% 10%

ELECTRICAL
1 Slab Conduiting %50 %50 %50

2 Marking on Blockwall 30% 30% 30%

3 Cutting & Chasing works 10% 10% 10%

4 Conduit piping 20% 20% 20%

5 Distribution Board & back boxes (I.G) Fixing 10% 10% %10

MEP WORKS:- (as on 08.03.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BELOW GROUND PIPING WORKS %30 80% 70%
2 BLOCKWALL CHASING & MARKING 2% 6% %4
3 HIGHER LEVEL DRAINAGE PIPEWORKS 4% 10% 10%
4 CONCEALED DRAINAGE PIPE WORKS 2% 6% %4
5 H/L WATER SUPPLY PIPE WORKS 0% 4% %0
6 CONCEALED WATER SUPPLY PIPEWORKS 0% 4% %0
7 SANITARYWARES FIXING 0% 4% %0
8 PUMPROOM & WATER TANK AREA S.N %2 S.N

9 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 8% 8% 8%
2 Below Ground HDPE piping 70% 70% 70%
3 FHC installation 0% 0% 0%
4 Sprinkler Installation 0% %4 0%
5 Fire Pump Installation & Testing 0% 0% 0%
6 Conduting works for Fire Alarm systems 60% 60% 60%
7 Cabling works for Fire Alarm systems 20% 20% 20%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 10% %15 %10
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 10% %15 %10
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 10% %4 %10
ELECTRICAL
1 Slab Conduiting %40 %40 %40
2 Marking on Blockwall %40 %40 %40
3 Cutting & Chasing works 20% 20% 20%
4 Conduit piping 18% 18% 18%
5 Distribution Board & back boxes (I.G) Fixing 15% 15% %15

Activities Planned for the Week (09.03.17 to 15.03.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BELOW GROUND PIPING WORKS %60 100% 100%
2 BLOCKWALL CHASING & MARKING 15% 15% 15%
3 HIGHER LEVEL DRAINAGE PIPEWORKS 30% 30% 30%
4 CONCEALED DRAINAGE PIPEWORKS 20% 20% 20%
5 H/L WATER SUPPLY PIPE WORKS 20% 20% 20%
6 CONCEALED WATER SUPPLY PIPEWORKS 20% 20% 20%
7 SANITARYWARES FIXING 0% 4% 0%
8 PUMPROOM & WATER TANK AREA S.N %2 S.N

9 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 20% 20% 20%
2 Below Ground HDPE piping 100% 100% 100%
3 FHC installation 0% 0% 0%
4 Sprinkler Installation 0% %4 0%
5 Fire Pump Installation & Testing 0% 0% 0%
6 Conduting works for Fire Alarm systems 70% 70% 70%
7 Cabling works for Fire Alarm systems 30% 30% 30%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 25% 25% 25%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 25% 25% 25%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 20% 4% 20%
ELECTRICAL
1 Slab Conduiting %50 %50 %50
2 Marking on Blockwall %50 %50 %50
3 Cutting & Chasing works %50 %50 %50
4 Conduit piping 30% 30% 30%
5 Distribution Board & back boxes (I.G) Fixing 25% 25% 25%

MEP WORKS:- (as on 15.03.2017)


Building
S. No Activity Description Building No.2 Building No.3
No.1

PLUMBING
1 BELOW GROUND PIPING WORKS %100 100% 100%
2 BLOCKWALL CHASING & MARKING 30% 30% 30%
3 HIGHER LEVEL DRAINAGE PIPEWORKS 15% 15% 15%
4 CONCEALED DRAINAGE PIPE WORKS 10% 10% 10%
5 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
6 CONCEALED WATER SUPPLY PIPEWORKS 10% 10% 10%
7 SANITARYWARES FIXING 0% 4% 0%
8 PUMPROOM & WATER TANK AREA S.N %2 S.N

9 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 10% 10% 10%
2 Below Ground HDPE piping 100% 100% 100%
3 FHC installation 0% 0% 0%
4 Sprinkler Installation 0% %4 0%
5 Fire Pump Installation & Testing 0% 0% 0%
6 Conduting works for Fire Alarm systems 70% 70% 70%
7 Cabling works for Fire Alarm systems 25% 25% 25%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 15% 15% 15%
CHILLED WATER PIPES INSTALLTION,INSULATION &
2
TESTING
15% 15% 15%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %50 %50 %50
2 Marking on Blockwall %40 %40 %50
3 Cutting & Chasing works %40 %40 %40
4 Conduit piping 25% 25% 25%
5 Distribution Board & back boxes (I.G) Fixing 20% 20% 20%

Activities Planned for the Week (16.03.17 to 22.03.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 40% 40% 40%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 20% 20% 20%
3 CONCEALED DRAINAGE PIPE WORKS 15% 15% 15%
4 H/L WATER SUPPLY PIPE WORKS 10% 4% 10%
5 CONCEALED WATER SUPPLY PIPEWORKS 15% 15% 15%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 15% 15% 15%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 80% 80% 80%
6 Cabling works for Fire Alarm systems 30% 30% 30%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 20% 20% 20%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 20% 20% 20%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %60 %60 %60
2 Marking on Blockwall %50 %50 %50
3 Cutting & Chasing works %50 %50 %50
4 Conduit piping 30% 30% 30%
5 Distribution Board & back boxes (I.G) Fixing 25% 25% 25%

MEP WORKS:- (as on 22.03.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 35% 35% 35%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 18% 18% 18%
3 CONCEALED DRAINAGE PIPE WORKS 12% 12% 12%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 12% 12% 12%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 12% 12% 12%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 75% 75% 75%
6 Cabling works for Fire Alarm systems 28% 28% 28%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 18% 18% 18%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 18% 18% 18%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %60 %60 %60
2 Marking on Blockwall %50 %50 %50
3 Cutting & Chasing works %50 %50 %50
4 Conduit piping 30% 30% 30%
5 Distribution Board & back boxes (I.G) Fixing 25% 25% 25%

Activities Planned for the Week (23.03.17 to 29.03.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 40% 40% 40%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 25% 25% 25%
3 CONCEALED DRAINAGE PIPE WORKS 15% 15% 15%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 15% 15% 15%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 15% 15% 15%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 85% 85% 85%
6 Cabling works for Fire Alarm systems 35% 35% 35%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 25% 25% 25%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 25% 25% 25%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %70 %70 %70
2 Marking on Blockwall %60 %60 %60
3 Cutting & Chasing works %60 %60 %60
4 Conduit piping 40% 40% 40%
5 Distribution Board & back boxes (I.G) Fixing 30% 30% 30%

MEP WORKS:- (as on 29.03.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 38% 38% 38%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 22% 22% 22%
3 CONCEALED DRAINAGE PIPE WORKS 15% 15% 15%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 15% 15% 15%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 15% 15% 15%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 80% 80% 80%
6 Cabling works for Fire Alarm systems 32% 32% 32%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 22% 22% 22%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 22% 22% 22%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %70 %70 %70
2 Marking on Blockwall %55 %55 %55
3 Cutting & Chasing works %55 %55 %55
4 Conduit piping 35% 35% 35%
5 Distribution Board & back boxes (I.G) Fixing 30% 30% 30%

Activities Planned for the Week (30.03.17 to 05.04.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 50% 50% 50%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 30% 30% 30%
3 CONCEALED DRAINAGE PIPE WORKS 20% 20% 20%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 20% 20% 20%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 20% 20% 20%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 40% 40% 40%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 30% 30% 30%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 30% 30% 30%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %80 %80 %80
2 Marking on Blockwall %65 %65 %65
3 Cutting & Chasing works %65 %65 %65
4 Conduit piping 50% 50% 50%
5 Distribution Board & back boxes (I.G) Fixing 35% 35% 35%

MEP WORKS:- (as on 05.04.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 42% 42% 42%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 30% 30% 30%
3 CONCEALED DRAINAGE PIPE WORKS 20% 20% 20%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 20% 20% 20%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 20% 20% 20%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 85% 85% 85%
6 Cabling works for Fire Alarm systems 36% 36% 36%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 28% 28% 28%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 28% 28% 28%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %75 %75 %75
2 Marking on Blockwall %60 %60 %60
3 Cutting & Chasing works %60 %60 %60
4 Conduit piping 45% 45% 45%
5 Distribution Board & back boxes (I.G) Fixing 35% 35% 35%

Activities Planned for the Week (06.04.17 to 12.04.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 60% 60% 60%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 40% 40% 40%
3 CONCEALED DRAINAGE PIPE WORKS 30% 30% 30%
4 H/L WATER SUPPLY PIPE WORKS 5% 5% 5%
5 CONCEALED WATER SUPPLY PIPEWORKS 30% 30% 30%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 30% 30% 30%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 50% 50% 50%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 40% 40% 40%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 40% 40% 40%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %90 %90 %90
2 Marking on Blockwall %75 %75 %75
3 Cutting & Chasing works %75 %75 %75
4 Conduit piping 60% 60% 60%
5 Distribution Board & back boxes (I.G) Fixing 45% 45% 45%

MEP WORKS:- (as on 12.04.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 52% 52% 52%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 35% 35% 35%
3 CONCEALED DRAINAGE PIPE WORKS 30% 30% 30%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 30% 30% 30%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 25% 25% 25%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 45% 45% 45%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 35% 35% 35%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 35% 35% 35%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %80 %80 %80
2 Marking on Blockwall %70 %70 %70
3 Cutting & Chasing works %70 %70 %70
4 Conduit piping 55% 55% 55%
5 Distribution Board & back boxes (I.G) Fixing 40% 40% 40%

Activities Planned for the Week (13.04.17 to 19.04.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 70% 70% 70%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 50% 50% 50%
3 CONCEALED DRAINAGE PIPE WORKS 40% 40% 40%
4 H/L WATER SUPPLY PIPE WORKS 5% 5% 5%
5 CONCEALED WATER SUPPLY PIPEWORKS 35% 35% 35%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 40% 40% 40%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 60% 60% 60%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 50% 50% 50%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 50% 50% 50%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %90 %90 %90
2 Marking on Blockwall %75 %75 %75
3 Cutting & Chasing works %75 %75 %75
4 Conduit piping 70% 70% 70%
5 Distribution Board & back boxes (I.G) Fixing 60% 60% 60%

MEP WORKS:- (as on 19.04.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 60% 60% 60%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 45% 45% 45%
3 CONCEALED DRAINAGE PIPE WORKS 40% 40% 40%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 35% 35% 35%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 35% 35% 35%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 50% 50% 50%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 40% 40% 40%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 40% 40% 40%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %85 %85 %85
2 Marking on Blockwall %70 %70 %70
3 Cutting & Chasing works %70 %70 %70
4 Conduit piping 65% 65% 65%
5 Distribution Board & back boxes (I.G) Fixing 50% 50% 50%
Activities Planned for the Week (20.04.17 to 26.04.17)

S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 75% 75% 75%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 55% 55% 55%
3 CONCEALED DRAINAGE PIPE WORKS 45% 45% 45%
4 H/L WATER SUPPLY PIPE WORKS 10% 10% 10%
5 CONCEALED WATER SUPPLY PIPEWORKS 40% 40% 40%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 45% 45% 45%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 65% 65% 65%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 55% 55% 55%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 55% 55% 55%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %90 %90 %90
2 Marking on Blockwall %80 %80 %80
3 Cutting & Chasing works %80 %80 %80
4 Conduit piping %80 %80 %80
5 Distribution Board & back boxes (I.G) Fixing 70% 70% 70%

MEP WORKS:- (as on 26.04.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 65% 65% 65%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 50% 50% 50%
3 CONCEALED DRAINAGE PIPE WORKS 45% 45% 45%
4 H/L WATER SUPPLY PIPE WORKS 0% 4% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 40% 40% 40%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 40% 40% 40%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 60% 60% 60%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 50% 50% 50%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 50% 50% 50%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %85 %85 %85
2 Marking on Blockwall %75 %75 %75
3 Cutting & Chasing works %75 %75 %75
4 Conduit piping 70% 70% 70%
5 Distribution Board & back boxes (I.G) Fixing 55% 55% 55%

Activities Planned for the Week (27.04.17 to 03.05.17)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 75% 75% 75%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 55% 55% 55%
3 CONCEALED DRAINAGE PIPE WORKS 50% 50% 50%
4 H/L WATER SUPPLY PIPE WORKS 10% 10% 10%
5 CONCEALED WATER SUPPLY PIPEWORKS 45% 45% 45%
6 SANITARYWARES FIXING 0% 4% 0%
7 PUMPROOM & WATER TANK AREA S.N %2 S.N

8 ROOF @WORKS 0% 0% %0
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 45% 45% 45%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% %4 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 65% 65% 65%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 55% 55% 55%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 55% 55% 55%
3 FLEXBILE DUCT INSTALLATION 0% 4% 0%
4 GRILL/DIFUSER INSTALLATION 0% 4% 0%
5 FCU INSTALLATIONS 0% %0 %0
6 THERMOSTAT FIXING 0% 4% 0%
ELECTRICAL
1 Slab Conduiting %90 %90 %90
2 Marking on Blockwall %80 %80 %80
3 Cutting & Chasing works %80 %80 %80
4 Conduit piping %80 %80 %80
5 Distribution Board & back boxes (I.G) Fixing 70% 70% 70%

MEP WORKS:- (as on 03.05.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 70% 70% 70%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 55% 55% 55%
3 CONCEALED DRAINAGE PIPE WORKS 50% 50% 50%
4 H/L WATER SUPPLY PIPE WORKS 0% 0% 0%
5 CONCEALED WATER SUPPLY PIPEWORKS 45% 45% 45%
6 SANITARYWARES FIXING 0% 0% 0%
7 PUMPROOM & WATER TANK AREA S.N S.N S.N

8 ROOF @WORKS 0% 0% 0%
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 50% 50% 50%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% 0% 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 65% 65% 65%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 60% 60% 60%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 60% 60% 60%
3 FLEXBILE DUCT INSTALLATION 0% 0% 0%
4 GRILL/DIFUSER INSTALLATION 0% 0% 0%
5 FCU INSTALLATIONS 0% 0% 0%
6 THERMOSTAT FIXING 0% 0% 0%
ELECTRICAL
1 Slab Conduiting %85 %85 %85
2 Marking on Blockwall %85 %85 %85
3 Cutting & Chasing works %80 %80 %80
4 Conduit piping 75% 75% 75%
5 Distribution Board & back boxes (I.G) Fixing 65% 65% 65%

MEP SITE ACTIVITY PROGRESS (as on 09.05.2017)


S. No Activity Description Building No.1 Building No.2 Building No.3

PLUMBING
1 BLOCKWALL CHASING & MARKING 75% 75% 75%
2 HIGHER LEVEL DRAINAGE PIPEWORKS 60% 60% 60%
3 CONCEALED DRAINAGE PIPE WORKS 55% 55% 55%
4 H/L WATER SUPPLY PIPE WORKS 15% 15% 15%
5 CONCEALED WATER SUPPLY PIPEWORKS 50% 50% 50%
6 SANITARYWARES FIXING 0% 0% 0%
7 PUMPROOM & WATER TANK AREA S.N S.N S.N

8 ROOF @WORKS 0% 0% 0%
FIRE FIGHTING
1 Sprinkler /Hose Reel G.I piping 60% 60% 60%
2 FHC installation 0% 0% 0%
3 Sprinkler Installation 0% 0% 0%
4 Fire Pump Installation & Testing 0% 0% 0%
5 Conduting works for Fire Alarm systems 90% 90% 90%
6 Cabling works for Fire Alarm systems 75% 75% 75%
HVAC
1 DUCT WORK INSTALLATION & INSUALTION 65% 65% 65%
2 CHILLED WATER PIPES INSTALLTION,INSULATION & TESTING 65% 65% 65%
3 FLEXBILE DUCT INSTALLATION 0% 0% 0%
4 GRILL/DIFUSER INSTALLATION 0% 0% 0%
5 FCU INSTALLATIONS 0% 0% 0%
6 THERMOSTAT FIXING 0% 0% 0%
ELECTRICAL
1 Slab Conduiting %90 %90 %90
2 Marking on Blockwall %90 %80 %80
3 Cutting & Chasing works %85 %80 %80
4 Conduit piping %80 %80 %80
5 Distribution Board & back boxes (I.G) Fixing 70% 70% 70%