This document provides details for temporarily propping a 15m tall precast concrete column during erection of a 4 story braced office building. The column is being erected and temporary props are needed to support the column against the wind load and vertical loads from the second and third floors that have already been constructed. The summary asks to choose a suitable position and orientation for the props, determine the ultimate moment capacity required in the column, and the forces in the props using given structural properties and loads.

Uploaded by

Vance Kang
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Assignment 1

This document provides details for temporarily propping a 15m tall precast concrete column during erection of a 4 story braced office building. The column is being erected and temporary props are needed to support the column against the wind load and vertical loads from the second and third floors that have already been constructed. The summary asks to choose a suitable position and orientation for the props, determine the ultimate moment capacity required in the column, and the forces in the props using given structural properties and loads.

Uploaded by

Vance Kang
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Assignment 1: Temporary stability of precast column during erection.

A four storey braced office building is to be erected. The edge columns are 400 mm
x 400 mm and 15 m long. Consider the temporary propping requirement when the
column is vertical and propped on 4 faces above the top of the column foundation.
Level 2 and 3 are supported and are 50 m2 each resulting in a load of 150 kN per
floor. Choose a suitable position and orientation for the props.

The distance from the face of the column to the centre of the beam reactions is 75
mm. The characteristic wind load during erection is expected to be 0.8 kN/m 2.

Using BS8110, determine the ultimate moment of resistance required in the column
and the forces in the props required to stabilize the column. Assume that beams at
level 2 are not secured until level 3 units placed and that all beam/column
connections and foundations
R are pinned.

4
3.5m

3
3.5 m
2
3.5 m
1
4m 4T32
0.5 m

Completed building and column section are shown. Use fcu = 50 N/mm2 and fy = 460