Gyanendra Prakash Profile
Gyanendra Prakash Profile
Gyanendra Prakash Profile
PERSONAL PROFILE
CAREER OBJECTIVE
Aspiring to work with Company that offers a genuine opportunity for progress.
EDUCATIONAL QUALIFICATION
THESIS PROJECT
COMPUTER LITERACY
1 of 10
PROFESSIONAL EXPERIENCE ( 16+ Years)
S. No.
NAME OF FIRM / COMPANY DESIGNATION DURATION
1
September 2014 To
Viridian RED AGM-Design
February 2016.
PROFESSIONAL MEMBERSHIP
PROJECT PROFILE
WTC Noida
This project is located in Gift City, Ahmedabad, The site is of 9 acres with BUA of
10.41 Lac sqft. The Land use is commercial 80% and residential 20%. Being the
Head of In-house design team, I provided GFC drawings at site as per requirement of
site and execution team.
2 of 10
WTC Chandigarh
This project is located in Greater Mohali, Punjab. I was involved in design &
execution of barricading, site office and branding tripole.
I also, designed & exected interior of 1400 Sqft of sales office for WTC Chandigarh
at Sector-17, Chandigarh.
RESPOSIBILITIES
Co-ordination of all drawings (Arch. Structural and all services dwg.) with Consultants.
Total project management of above with co-ordination of all services (Local consultant)
on site as per requirements.
Preparation of Municipal drawing and Working drawing with details including Site Plan
and its details.
ESIC Medical College, Baltikuri Kolkata-WB (35 Acre Site)
Client EMPLOYEE STATE INSURANCE
CORPORATION
Project Manager ENARCH CONSULTANT & SRIJAN
ARCHITECT PVT. LTD.
Contractor L&T
Present status Construction is under progress
Project cost Rs. Over 550crores
Preparation of Site Plan, Municipal drawing and Working drawing with details.
1) MUKHARJEE NAGAR
2) KHAYALA
3 of 10
3) JANAKPURI
4) PUPS VIHAR
5) GOKUL PURI
4 of 10
3. NLCC - Church in Chennai (India)
4. Hotel Project in CA (U.S.A.)
Bangladesh Hospitals Project
VCHS, CA- Healthcare Project
BFHL, CA Commercial Project
Projects undertaken
o May 2004 to Dec. 2006
RESPOSIBILITIES
Co-ordination of all drawings (Arch. Structural and all services dwg.) with Unitech and
Callision Group (U.S.A. Architectural Firm).
Total project management of above with co-ordination of all services (Local consultant)
and co-ordination with site as per requirements.
Preparation of Municipal drawing and Working drawing with details.
Client Institute
Project Manager IIM, Indore
5 of 10
Contractor Simplex
Present status Construction of Phase I nearing completion
Project cost Rs. Over 50 crores (Phase I)
RESPOSIBILITIES
Total project management of IIM, Indore with co-ordination of all services and co-
ordination with site as per requirements.
Road Layout Preparation of working drawing of the Site with total area 192 acres.
Seminar Block- Preparation of working drawings for 350 capacities, covered area is
1250 sqm, with air conditioning and acoustical treatment.
Library Block Designing and preparation of working drawings with all detailing.
And site development of this block.
Housing Type5 & type 2, Designing and preparation of working drawings with all
detailing. And site development of this block.
Main Enterence Gate -- Designing and preparation of working drawings with all
detailings. And site development of this block.
Site Developments of the IIMI Capmus.
RESPOSIBILITIES
Presentation drawings for this competition project in October 2001, which won the
Second prize.
RESPOSIBILITIES
6 of 10
Conceptual & Presentation drawings for this competition project in May 2002.
RESPOSIBILITIES
Conceptual & Presentation drawings for this competition project in Oct 2002.
Client Institute
Project Manager Educational Consultants India Ltd (Ed.CIL)
Contractor L&T
Present status Construction of Phase I nearing completion
Project cost Rs. 35 crores (Phase I)
Project brief
Indian Institute of Information Technology and Management (IIITM), Gwalior, a
Deemed University, is an apex IT and Management Institute, established by the
Government of India. IIITM strives to become a brand name as a world-class institution,
to contribute towards research and teaching, and produce technology and business
leaders. The Institute awards degree at Masters and Doctorate levels.
The Institute is built on a 160 acre campus on the foothills of Gwalior Fort has
Institutional buildings, hostel facilities for students, residential facilities for staff, all
completely wired with latest technology.
Construction of First phase started in December 2000 which involves the following
RESPOSIBILITIES
External Services
Road layout Six type of road width are designed.
Site Development
Storm water drainage scheme
Sewerage scheme
Street lighting
Prepared scheme with consultant and preparation of working
drawings for all the services.
Residential
Housing Housing part in the 2nd phase, four type of housing, type
A(55sqm), type B(68sqm), type C(120 sqm), type D(150sqm) & type
E(175sqm).Designing and preparation of working drawing.Internal
finishing include Mosaic flooring for rooms and Kota stone flooring
7 of 10
with marble strips in common areas. External finishing is of Exposed
Brick and Regular cement plaster.
Guest House Initial designing for 50 room (12 double bed & 38
single bed room), kitchen, dining, games room & common room,
covered area 2250 sqm. Internal finishing include Mosaic flooring
rooms and Kota stone flooring with marble strips in common areas.
External finishing is of White sand stone and Red sand stone.
Boys Hostel 3 block of boys hostel Accommodation for 300
students, covered area 8500 qsm. approx each.
Girls Hostel - Accommodation for 250 students, covered area 4500
qsm. approx. For 120 student in first phase.
Academic
Administration Two storied with covered area of 4500 sqm. All
academic buildings are finished with combination of white & red sand
stone.Apart from the buildings, the present phase include all services
including two Utility buildings, Under ground tank, and Septic
tanks.As an Architect of this project, my work involves total
involvement from design, working drawings and Co-ordination with
consultants.
Second phase of the project involving Faculty housing and
Guesthouse is in the tender stage.
Still in preliminary design phase, the design involves rehabilitation for shops and
residential structures adjoining Panchkuian road, property development and traffic
integration for the above said client.
8 of 10
Karamchari Staff Quarters
Designing & preparation of working drawings.
Projects undertaken
Jan.1999 to Aug.1999
Commercial Complex, Gomti Nagar, Lucknow
Preparation of working drawing
Sept.1999 to March 2000
REFERENCES
Gyanendra Prakash
9 of 10
Gyanendra Prakash, B.Arch., Registered to Council of Architecture, Membership of AIIA
36/110, Vrandavan Apts., I.P. Extension, Patparganj, New Delhi-110092.
10 of 10