Green Line Underground
Green Line Underground
Green Line Underground
D
1.1.9 Programme 6
N
1.1.10 Equipment and Materials Approval 6
U
1.1.11 Fire and Safety Precautions 7
1.1.12 Protection 8
O
1.1.13 Quality of Staff/Personnel 8
R
1.1.14 Climatic Conditions 9
G
1.1.15 Samples 9
1.1.16 Quality of Materials 9
ER
1.1.17 Equipment Duties and Ratings 10
1.1.18 Workmanship 10
D
1.1.22 Polarity 14
1.1.23 Safety Interlocks 14
E
1.1.1 Scope
1 The Electrical Installation Contractor, herein referred to as the 'Contractor' within this part and
all other Section 21 parts of this specifications shall carry out all electrical works complete in
accordance with the requirements of the Project Documentation.
(a) (The supply and installation of all services, equipment, components, accessories and
D
fittings required for the operation of the facility to the extent specified and detailed on
N
the Drawings and Specifications including 400 days maintenance or as stipulated in
the contract specification and all extended warranties after provisional handover
U
(b) Builder's work in connection with the Electrical Installations, including supply,
O
necessary inserts sleeves and making good.
R
(c) Any work which can be reasonably inferred as necessary for the safe, satisfactory
operation of each system, whether such work is specified or shown on drawings or not
(d)
G
The supply and installation of cables, conduits, boxes and termination points, for the
ER
motors, starters, controls and the like for the Process Equipment, Heating, Ventilation
and Air-conditioning and Plumbing services
D
(e) (Arranging for installation of permanent Electrical supply by the Qatar General
Electricity and Water Corporation (QGEWC), including submission of all necessary
N
documents to the QGEWC, and carrying all necessary approvals and obtaining
consumption meters Moreover, the Contractor shall allow in his tender and be
U
(f) Supply and installation of permanent electrical supply equipment and cables in
LI
accessories, consumption meters, and all related civil works, and including submission
of all necessary documents to QGEWC, and carrying all necessary approvals
EE
(g) Coordinating with QGEWC regarding outage schedule, attending upon the Supply
Authority installing mains power supply and carrying out primary and secondary
R
(h) Arranging and carrying out all necessary approvals with Telecom Provider for the
Telephone System
(i) Arranging and carrying out all necessary approvals with the Qatar Civil Defence
Department for the Fire Alarm System, extinguishing and protection systems.
1.1.2 Regulations
1 All supplies and services offered in response to this specification shall conform to the latest
standards.
2 The design, equipment and installation requirements shall comply with the standards and
recommendations laid down by the following :
(a) Regulations for Electrical Installations as issued by the Qatar General Electricity and
Water Corporation (QGEWC) Qatar
QCS 2014 Section 21: Electrical Works Page 3
Part 01: General Provisions for Electrical Installation
D
3 Where two or more applicable standards and/or the Specifications are in conflict, the most
N
stringent shall apply.
U
1.1.3 Existing Services
O
1 The Contractor is deemed to have visited and inspected the site to familiarise himself with
R
the existing site conditions and services at tender stage.
2
G
The Contractor shall obtain the existing services record drawings from QGEWC and various
ER
utility services departments (i.e. Q-TEL, CDD etc).
3 Co-ordination between shop drawings, work on site and existing services shall be carried out
D
by the Contractor.
N
4 The Contractor shall be fully responsible for any damages to the existing services including
U
repairs, and penalties imposed by the concerned parties etc and for removing any site
obstacles such as underground cables, pipes, civil works etc. which is obstructing his work
on site.
E
N
5 The Contractor shall also be responsible for liaison with QGEWC, Q-TEL and all other
government utility departments to disconnect or divert the existing services supply to the
LI
1 The indication and/or description in any of the Contracts documents, unless otherwise
specifically stated, implies an instruction to supply and fix such items.
R
2 Notes on Drawings referring to individual items of work take precedence over the
G
Specification.
3 Drawings show the general run of cables, raceways, etc. and the approximate location of
equipment and utilities; symbols and schematic diagrams are of no dimensional significance.
Obtain from the Engineer dimensions not shown on, or which cannot be determined from
Drawings. Do not scale drawings to obtain locations.
4 Notify the Engineer of conflicting requirements. Where departures from the drawings are
deemed necessary, details of such departure and reasons thereupon shall be submitted to
the Engineer for approval.
5 No such departure shall be made without prior written approval of the Engineer.
QCS 2014 Section 21: Electrical Works Page 4
Part 01: General Provisions for Electrical Installation
6 The design specifications and criteria shall not relieve the Contractor from continuously
following up with the respective authorities to obtain up-to-date requirements and
instructions.
1 The term 'shop drawings' includes fabrication, erection, layout and setting out drawings;
manufacturer's standard drawings, schedules; descriptive literature, illustrations, catalogues
and brochures; performance and test data; wiring and control diagrams and other drawings
and descriptive data pertaining to materials, equipment, raceway systems, control systems
and methods of construction as required to show that materials, equipment and systems and
position thereof, conform to the Contract Documents. The term 'manufactured' applies to
standard units usually mass produced. The term 'fabricated' means items specifically
assembled or made out of selected materials to meet individual design requirements.
D
N
2 Shop drawings shall establish actual detail of all manufactured or fabricated items, indicate
proper relation to adjoining work, amplify design details of electrical equipment in proper
U
relation to physical spaces in the structure, and incorporate minor changes of design or
O
construction to suit actual conditions.
R
3 The Contractor shall submit for approval, and obtain in due time to conform to the Contract
Program, all shop and installation drawings based on the design drawings approved by the
G
QGEWC and all other relevant Municipality and Government Authorities.
ER
4 The Contractor, immediately after being awarded the said Contract, shall prepare and submit
shop drawings. Shop drawings shall be submitted with such promptness as to cause no
D
delay in his own work nor to any other Contractor. No extensions of time will be granted
because of failure to have shop drawings submitted in ample time to allow for processing, in
N
accordance with the submittals schedule outlined in Section 9, Part 1, Clause 1.1.4.
U
5 Provide shop drawings, to a scale not smaller than the corresponding layout drawings,
showing the following and obtain approval before commencing work:
E
(a) exact runs and sizes of conduits, ducts, cables, cable trays and trunking
N
(b) layout drawings for each separate electrical installation showing the actual locations
LI
(c) plans showing the equipment assembly, space requirements, clearances and
EE
(e) schedules of points, indicating how the various outlets are connected to the
distribution boards, size of circuit wiring, the rating of the protective device and the
type and size of appliance of fitting
(f) schematic diagram of connections of distribution boards, and equipment to main
switchboards showing sizes of feeders, etc
(g) schematic and elementary wiring diagrams, of each unit of each equipment, showing
numbered terminal points, numbered wires and numbered interconnections to other
equipment and remote devices
(h) connection wiring diagrams, of each unit of each equipment, showing numbered
terminal points, numbered wires and numbered interconnections to other equipment
and remote devices
(i) complete catalogue information of all parts and components of electrical equipment
QCS 2014 Section 21: Electrical Works Page 5
Part 01: General Provisions for Electrical Installation
(j) all cable routings and layouts for the different electrical services, feeders and branch
circuits showing routes, sizes and types of cables
(k) any other data necessary for the proper maintenance of the installations.
6 Drawings shall be ISO standard size A1. Lettering shall be stencilled. Shop drawings and
samples shall be properly identified with the name of the Project, the Contractor, the Sub-
Contractor and the date, and signed by Contractors Authorised Engineers.
7 Final co-ordination of electrical works with mechanical, structural and architectural work shall
be carried out from complete shop drawings and sufficient time shall be allowed for co-
ordination and checking of shop drawings and calculations after shop drawings are
submitted.
D
8 Individual shop drawings shall be submitted following the distribution of the co-ordination
drawings and shall bear a stamp indicating that the work has been co-ordinated with other
N
trades.
U
9 The Engineer's review and approval of shop drawings submitted by and approved by the
O
Contractor is for general conformance with the design concept and information given in the
Contract Documents and shall not relieve the Contractor from responsibility for any
R
deviations from the requirements of the Contract Documents. The Engineer's review and
G
approval shall not be construed as a complete check nor shall it relieve the Contractor from
responsibility for error of any sort in shop drawings or schedules, or from the necessity of
ER
furnishing any work required by the Contract Documents which may have been omitted on
the shop drawings. The Engineer's review and approval of a component item shall not
indicate review and approval of the complete assembly in which it functions.
D
10 The Engineer or the supervising consultant shall forward electrical drawings and
N
However, it shall be the Contractors responsibility to obtain written approval from QGEWC for
all such drawings and specifications appertaining to the work carried out under the contract.
QGEWC approvals may take a considerable time to obtain and the Contractor should make
E
allowance for this and be available for liaising with and pursuing approvals with QGEWC.
N
1 Provide and keep on the job at all times, one complete and separate set of blackline prints of
N
the electrical work on which shall be clearly, neatly and accurately noted, promptly as the
work progresses, all architectural and electrical changes, revisions and additions to the work.
EE
Whatever work is installed otherwise than as shown on the Contract Drawings, such changes
shall be noted.
R
2 Indicate daily progress on these prints by colouring in the various conduit, ducts, trunking,
G
1 The Contractor shall provide the as built drawings, as approved by the Engineer, in DXF
format or AutoCAD DWG format, either in floppy diskettes or in CD-ROM, as per the Project
Documentation requirement. The drawings shall be submitted not later than 2 months after
completion of the Project, or putting into operation, whichever is earlier. An addition, 3 sets of
hard copy of all relevant drawings, which will be required for operation and maintenance,
shall be supplied in bound book forms immediately after the commissioning of the Project.
The quality of these drawings shall be consistent with the standard of QGEWC. Diary sheets
for Work completed shall not be authorised until such records have been presented to the
Engineer and accepted.
QCS 2014 Section 21: Electrical Works Page 6
Part 01: General Provisions for Electrical Installation
2 The Contractor shall supply, 3 sets of all operation and maintenance manuals in original,
from the manufacturer in bound book forms, at least 2 weeks prior to commissioning of the
equipment. These shall also be supplied, in computer diskettes, based on popular Microsoft
window based publishing software programmes, along with the as built drawings as
mentioned above, as specified in the Project Documentation or as directed by the Engineer.
1 Lay electrical works in advance of pouring concrete slabs and construction of walls. Obtain
Engineer's approval before commencing builder's work in connection with electrical
installation. Related co-ordinated shop-drawings shall be submitted for approval as per the
related clause 1.1.5 of this section. Materials approval shall be obtained as per procedure
detailed in clause 1.1.9 below. The Contractor shall make it certain that drawings properly co-
ordinated with other works are submitted immediately after signing of the contract and
D
approval of drawings and the materials are obtained at least one month prior to the
N
commencement date of the construction.
U
2 Check with other trades to ensure equipment and material can be installed in space provided.
O
3 Provide other trades with information necessary for them to execute their work.
R
4 Details on drawings which are specific regarding dimensions and locations, are for
G
information purposes. Co-ordinate with other trades to ensure work can be installed as
ER
indicated.
1.1.9 Programme
D
1 The Contractor shall produce a work programme based on CPM or Bar-chart form or as
N
directed by the Engineer indicating the time required for various operations to complete the
Project in time. The following points shall be highlighted in the programme:
U
(a) mobilisation
E
(b) drawings/submittals
N
(c) approvals
LI
(d) equipment deliveries including delivery periods from supply sources external to the
State of Qatar
N
(f) cabling
(g) main/sub-main distribution equipment
R
2 The Contractor is responsible for all liaison with QGEWC in respect of programming the
installation and commissioning of complete electrical system. The Contractor shall ensure
that QGEWC are at all times kept informed of the current progress of the electrical works on
site and that his approved electricity supply subcontractor programs the cable laying works in
the specified sequence in accordance with the approved programme.
1 Approval of materials and equipment shall be based on latest manufacturer's published data.
QCS 2014 Section 21: Electrical Works Page 7
Part 01: General Provisions for Electrical Installation
2 Complete and detailed information of all materials and equipment to be incorporated in the
work shall be submitted. Submit detailed description and specifications, catalogues cuts,
installation data, diagrams, dimensions, controls and any other data required to demonstrate
compliance with the Contract Documents. Each item submitted shall be referenced to the
applicable paragraph in the Specification.
3 At the request of the Engineer, submit a sample of any equipment or material for further
study before approval. Where samples are required by the Engineer, the period required to
obtain the sample will be taken into account when scheduling approvals.
4 Only approved materials shall be employed at the site. All materials installed which are not
approved shall be removed and reinstated by approved ones.
5 Time periods for equipment and materials approvals shall be as outlined in Section 9, Part 1,
D
Clause 1.1.4.
N
1.1.11 Fire and Safety Precautions
U
O
1 Establish from Architectural Drawings where fire and smoke barriers exist, and make
adequate provision of fire and smoke barriers in and around trunking, conduits, cables, etc.,
R
where they pass through floors and fire rated walls, and where protection systems are
installed pack space between wiring and sleeve full with Fire Retardant Material and seal with
G
caulking.
ER
2 The Contractor shall ensure that this work is carried out such that the integrity of any such
fire barrier is properly maintained where pierced by electrical services.
D
3 For each switchboard the Contractor shall supply the following equipment:
N
(a) 1 no. electrical grade rubber mat to BS 921 1000 mm wide extending the full length of
U
the switchboard
(b) 1 no. pair of electrical grade rubber gloves to BS 697. The hand glove should have the
E
(c) 1 no. notice in English and Arabic advising treatment for a person suffering from
LI
electrical shock.
4 The Contractor shall put the notice for electrical shock treatment in details with sketches and
N
instructions as per standard procedures. The notice shall comply with the requirement of the
EE
QGEWC in content and format. However, this should include the following as a minimum,
(iv) Support the nape of the neck and press top of the head so that it is tilted
backwards
(v) Open your mouth and take a deep breath, pinch the casualtys nostrils with your
fingers. Seal your lips round his mouth and blow into his lungs until the chest
rises.
(vi) Remove your mouth and watch the chest falls
(vii) Repeat and continue inflation at your natural rate of breathing. Continue to give
artificial respiration until natural breathing is restored or until the medical aid
arrives
(viii) When the casualty is breathing, place in recovery position, lying and resting on
the side. Remain with and watch casualty closely.
D
1.1.12 Protection
N
1 The Contractor shall be responsible for his work and equipment until finally inspected, tested,
U
accepted and handed over. Materials and equipment which are not immediately installed
after delivery to site shall be stored carefully. Close open ends of work with temporary covers
O
or plugs during construction to prevent entry of obstructing material.
R
2 Protect work and material of other trades from damage that might be caused by his work or
G
workmen and make good damage thus caused.
ER
3 Protect exposed live equipment during construction for personnel safety.
4 Shield and mark live parts "LIVE 240 VOLTS" or with appropriate voltage in English and
D
Arabic.
N
5 Arrange for installation of temporary doors for room containing electrical distribution
U
equipment. Keep these doors locked except when under direct supervision of an electrician.
E
2 Electrical Contractor shall be to the classifications required by QGEWC and shall carry a
valid licence.
EE
3 Prior to the commencement of works the Contractor shall notify the Engineer of his intended
site staffing levels.
R
4 The Contractor shall appoint one graduate Electrical Engineer full time with 5 years
G
experience in similar works and qualified staff/personnel for the supervision of the Electrical
Installation Works.
5 The name, qualifications and experience of the nominated engineers shall be submitted to
the Engineer for approval within 15 days of the receipt of the order to commence the works.
6 An Electrical Foreman of 10 years experience in similar projects should be full time available
on site for direct follow up and implementation of the electrical works.
7 Qualified and Experienced Electricians shall be available on site to carry out the works in
accordance with the programme.
8 The Engineer reserves the right to require the Contractor to provide information and
documentation as may be necessary to establish the validity of any individual persons
proficiency and effect their removal from site should they prove to be unsatisfactory.
QCS 2014 Section 21: Electrical Works Page 9
Part 01: General Provisions for Electrical Installation
1 The climate in Qatar in the summer months is hot and humid and a humidity of 100 % at
30 C has been recorded.
(a) violent sand and dust storms of several hours duration occur and even on
comparatively still days, fine dust is carried in suspension in the atmosphere.
(b) all apparatus and equipment shall, therefore, be so designed and constructed that
they operate satisfactorily and without any deleterious effect for prolonged and
continuous periods in the conditions stated above and at the following ambient
temperature conditions:
(i) maximum sun radiation temperature in summer - 84 C
D
(ii) maximum ambient temperature in summer - 52 C
N
(iii) average max. ambient temperature in summer - 45 C
U
O
(iv) minimum ambient temperature in winter - 0 C
R
(v) the altitude of Qatar may be taken as sea level.
G
2 The temperatures quoted above make no allowance for heat generated from equipment itself
or from any other equipment in the vicinity
ER
3 The capacity and ratings of all electrical equipment and materials given are, unless otherwise
indicated, for Qatar climatic conditions. Provide the basis of the derating factors applied in
D
each case
N
4 Where specific sizes are indicated e.g. cable sizes, due allowances have been made in the
U
design for the climatic conditions of Qatar and derating has been applied
E
5 Where no ratings or sizes are indicated for components and other accessories, supply
equipment which will give trouble free service in the ambient conditions stated above.
N
LI
1.1.15 Samples
1 The term samples includes natural materials, fabricated items, equipment, devices,
N
appliances, or parts thereof as specified and other samples as may be required to determine
EE
whether kind, quality, construction, workmanship, finish, colour and other characteristics of
materials conform to requirements of the Contract Documents.
R
2 Samples shall establish kind, quality and other required characteristics of various parts of the
work. Indicate details of construction, dimensions, capacities, weights and electrical
G
3 Samples and sample board should be prepared and identified by the manufacturer and
stamped/engraved with make, type, Cat No. and size marking should be indelible and legible.
1 Manufacturers shall provide their standard guarantees for products furnished under this
Contract. However, such guarantees shall be in addition to and not in lieu of all other
liabilities which manufacturers and the Contractor may have by law or by other provisions of
the Contract Documents.
QCS 2014 Section 21: Electrical Works Page 10
Part 01: General Provisions for Electrical Installation
2 All materials, items of equipment and workmanship furnished under this Contract shall carry
standard warranty against all defects in materials and workmanship. Any faults due to
defective or improper material, equipment, workmanship or Contractor's design which
develop shall be made good, forthwith, by and at the expense of the Contractor, including all
other damage done to areas, materials and other systems resulting from this failure.
3 Guarantee that all elements of the systems are of sufficient capacity to meet the specified
performance requirements as set forth herein or as indicated.
4 Upon receipt of notice from the Engineer, of failure of any part of system or equipment during
the period of maintenance, the affected parts shall be replaced.
D
1 Power ratings shown for the proposed equipment are in accordance with the best information
N
available to the Engineer and are to be considered as minimum ratings. In the event
equipment items proposed by the Contractor should require motors with different power
U
rating than shown, it shall be the Contractors responsibility to furnish circuit breaker, starting
O
equipment, feeder and branch circuits, conduits, and accessories etc. as required to comply
with the electrical code and prevent excessive voltage drop without added cost to the Client.
R
2 Where equipment to be furnished is installed in an existing enclosure or adjacent to existing
G
equipment, the Contractor shall field check the dimensions of existing equipment, location of
ER
conduits, etc., and shall familiarise himself with all existing conditions and difficulties to be
encountered in performing such work.
D
5 The equipment shall be located generally as indicated on the drawings and the Contractor
shall ensure that the equipment is suitably constructed to permit installation as shown. The
LI
equipment shall where necessary be constructed in modular form to permit access into the
buildings and facilitate ease of erection at site.
N
6 The equipment arrangements and single line diagram are for guidance only and show a
EE
practical arrangement that would be acceptable. The Contractor may propose an alternative
arrangement which meets the requirements of the specification.
R
7 All equipment performing similar duties shall be of a single type and make and be fully
G
interchangeable in order to limit the stock of spare parts required. This is to apply particularly
to such items as motors, switchgear, instruments, controls, relays, etc.
1.1.18 Workmanship
1 The entire work provided in this specification shall be constructed and finished in every
respect in a workmanlike and substantial manner. The Contractor shall provide the system in
accordance with the best trade practice and to the satisfaction of the Engineer.
2 Keep others fully informed as to the shape, size and position of all openings required for
apparatus and give full information sufficiently in advance of the work so that all openings
may be built in advance. Provide and install all sleeves, supports, etc., hereinafter specified
or required.
QCS 2014 Section 21: Electrical Works Page 11
Part 01: General Provisions for Electrical Installation
3 Obtain detailed information from the manufacturers of apparatus as to the proper method of
installing and connecting same. Obtain all information from others which may be necessary
to facilitate work and the completion of the whole Project.
4 Provide the services of an experienced foreman, who shall be continuously in charge of the
erection of the electrical work, together with all necessary skilled workmen, helpers and
labourers, required to properly unload, transfer, erect and connect up, adjust, start, operate
and test the system.
5 Before installing any work, verify that it does not interfere with clearance required for other
work. Notice of adverse conditions shall be forwarded in writing to the Engineer before any
work in question is installed. If notification is not made, and work installed causes
interference with the contemplated design, make such changes in his work as directed by the
Engineer to permit the installation of all work of the Project, at no additional cost to the Client.
D
N
6 Raceways shall be run as straight and direct as possible in general forming right angles with
or parallel with walls or piping and neatly spaced, with risers erected plumb and true,
U
maintain a clearance of at least 25 mm between finished coverings and adjoining work.
O
Approved ceiling height shall be obtained from Architectural Drawings.
R
7 All equipment and accessories shall operate without objectionable noise or vibration. Should
operation of any of the equipment or systems produce noise or vibration which is, in the
G
opinion of the Engineer objectionable, make change in equipment and do all work necessary
ER
to eliminate the objectionable noise or vibration at no additional cost to the Client.
8 Wherever possible services shall not cross expansion joints. Where this is unavoidable the
services shall accommodate the design movement without damage, by use of approved
D
9 All MV, HV and EHV works shall be carried out by a contractor or sub-contractor pre-qualified
U
and approved by QGEWC. Proof of such approval shall be required in writing prior to the
works commencing on site and the name of any subcontractor to be used shall be entered
E
in the relevant form of tender when the tender is submitted. All cable jointers to be used on
N
the Contract shall be required to undertake and pass a trade test conducted by QGEWC at
the Contractors expense.
LI
1 For substations, switchgears, switchboards, motor control centres and panel boards:
EE
(a) engraved lamacoid name plates, black with minimum 10 mm high white lettering.
R
(b) in panel boards with doors : directories mounted inside transparent plastic covers in
metal frames.
3 Wiring Identification:
(a) identify wiring with permanent indelible, identifying markings, either numbered or
coloured, heat shrinkable tube or ferrules, on both ends of phase conductors of
feeders and branch circuit wiring.
(b) maintain phase sequence and colour coding throughout
(c) colour code to standards above as specified elsewhere
(d) use colour coded wires in communication cables, matched throughout system.
QCS 2014 Section 21: Electrical Works Page 12
Part 01: General Provisions for Electrical Installation
5 Device Plates:
D
(a) for Device Plates of local toggle switches, toggle switch type motor starters, pilot
N
lights and the like, whose junction is not readily apparent : plates to be engraved with 3
mm high letters describing equipment controlled or indicated.
U
6 For Busbars:
O
(a) phase identification letters shall be stamped into the metal of the busbars of each
R
phase of the main buses in each substation, switchgear, switchboards, motor control
G
centre and panel board in addition to colour identification
(b) Letters shall be visible without disassembling current carrying supporting elements.
ER
(c) busbars shall be sleeved for phase identification by using high temperature grade heat
shrinkable coloured PVC sleeving throughout its length. In no circumstances will any
D
7 For Doors:
U
(a) where switchboard rooms, cable chambers, metal screened spaces and the like
contain electric power cables, bus bars or equipment operating at voltages exceeding
E
600 V : enamelled sheet metal, red on white, reading "Danger - High Voltage".
N
8 For Rooms:
LI
(a) to switchboard rooms, electric closets, metal screened spaces assigned to electrical
equipment, and the like : enamelled sheet metal, red on white, reading "Electrical
N
9 Languages:
(a) nameplates with directional, operational or warning labels shall be in Arabic and
R
English.
G
1 Electrical services shall be segregated as specified throughout the installation to obviate the
following;
2 All raceways shall be kept clear of other services except where intentionally earthed or
bonded. Generally, raceways shall be kept 150 mm away from and above hot water and 75
mm away from other services.
3 Unless specifically indicated otherwise, normal, emergency, low voltage cables and wiring
shall be segregated throughout the installation generally in the following manner:
(a) armoured and sheathed cables: Where more than one tray has been specified or is
necessary to accommodate the number of cables on a run, where practical,
segregation shall be achieved by dedicating each tray to either normal or emergency
services. Where normal and emergency cables have to run together in trays, ducts
or trenches, they shall be formed in two groups, one normal and one emergency
(b) insulated conductors: Insulated conductor circuits shall, where possible, be
D
segregated throughout by enclosing in separate conduits, trunking or trunking
compartments.
N
4 Fire Alarms:
U
(a) fire alarm cables shall be segregated from other services throughout and be either
O
armoured and sheathed cable, or insulated conductors enclosed in conduit or
R
trunking, as indicated on the drawings.
G
1.1.21 Electricity Supply
ER
1 The Supply Authority will make available, at the incoming terminals of each Main Switchboard
(Medium Voltage Panel) a 3 phase + Neutral, 4 wire, 415 V, 50 Hz supply of adequate
capacity and having the following tolerances:
D
(b) frequency 50Hz 0.1 Hz (short term 0.15 Hz for a duration of only a few
U
seconds)
E
5 Obtain fault level and fault duration time from the Supply Authority (QGEWC).
EE
6 Obtain confirmation from the Supply Authority of the size and number of cables they will
provide to Main Switchboards. Allow for adequate and appropriate cable glands, lugs and
R
boxes.
G
7 After inspection and approval of the Contractors installation, QGEWC will permit
energisation of the feeder cables to the installation.
8 QGEWC will only inspect the Contractor's installation and permit energisation of the power
supply after receiving a written request to do so from the Contractor.
9 The Contractor will be responsible for any delay caused by omission to make the request in
good time.
10 The Contractor shall provide a generator of adequate capacity to carry out all pre-
commissioning tests. Per-commissioning tests may be carried out using mains electricity if
this is available.
QCS 2014 Section 21: Electrical Works Page 14
Part 01: General Provisions for Electrical Installation
1.1.22 Polarity
1 The polarity of all apparatus used for the Works specified shall be arranged as follows when
apparatus is viewed from the front:
(a) for two pole apparatus the phase or live pole at the top (or left hand side) and the
'neutral or earthed pole at the bottom (or right hand side). On plug and socket outlets
the polarity shall conform to BS 196, BS 546, or BS 1363 as appropriate
(b) for three or four pole apparatus the phases in order red, yellow, blue and neutral
reading from top to bottom or left to right in the case of vertical and horizontal layouts
respectively.
2 All cables shall be so connected between main switchboards, distribution boards, plant and
accessories so that the correct sequence of phase colours is preserved throughout the
D
system.
N
3 All cable cores shall be identified with phase colours. Where more than one phase is
U
incorporated on a common system in one room then the live cores shall be red, yellow, blue,
O
as appropriate, and fittings and switch accessories shall be permanently labelled and
segregated in accordance with I.E.E. Regulations.
R
1.1.23 Safety Interlocks
G
ER
1 A complete system of interlocks and safety devices shall be provided as necessary for the
safe and continuous operation of the plant in order to provide for the following:
(b) correct sequence of operation of the plant during start up and shut down
N
(c) safety of the plant when operating under normal or emergency conditions.
U
3 The Contractor shall be responsible for the preparation of interlocking schemes for the
N
6 Device items are to be arranged to ensure that there is no danger of interchange with existing
locks on other units.
R
1 General:
(a) provide sufficient spare parts for all the electrical items included within the scope of
works. Submit to the Engineer a list of all spare parts to be required for a further two
years operation from the date of issue of the Maintenance Certificate
(b) spare parts required include but not necessarily limited to those listed below, provided
specified in the Project Documentation or where quantities for each item or equipment
is recommended by the manufacturer
(c) spare parts to be delivered to central stores.
(a) 2 % spare moulded case circuit breakers of all different frame sizes, but in any case
not less than 2 nos. circuit breaker of each size
QCS 2014 Section 21: Electrical Works Page 15
Part 01: General Provisions for Electrical Installation
(b) 5 % spare indicating lamps for each indicating lamp in the switchgear
D
(d) 5 % spare of load break switch (isolators) of each size
N
(e) 5 % spare of current operated ELCB of each size
U
4 Disconnecting Switches:
O
(a) 5 % spare switch of each size.
R
5 Circuit Accessories:
(a)
G
plug fuses - furnish ten percent (10%) of the number of each size and type of fuses
ER
installed, but in any case not less than six fuses of each sizes
(b) wall switches - provide five percent (5%) of the number of each size and type of wall
D
switch installed
N
(c) socket outlets - provide five percent (5%) of the number of each size and type installed
U
(d) lamps - provide five percent (5%) lamps of each size and type for indicating panels and
pilot lights installed for different systems.
E
6 Lighting Fixtures:
N
(i) 2 % of the total quantity of each type of lighting fixture. This quantity shall
not be less than one fixture of each type
N
(ii) additional diffusers for 5 % of the total quantity of each type of lighting fixture
EE
each type
(iii) 10 % spare lamps of each wattage of different type
G
(iv) 5 % of the total quantity of control gear (ballast) of each type and size but in
no case less than (6) ballast of each size and type.
(a) complete itemised list of different spares to be included and priced by the tenderers.
For emergency generator, furnish by the generator supplier to maintain it for two
years.
8 The tenderer shall submit with his offer detail prices of the spare parts he is required to
provide under the Contract indicating the quantity and the unit rate of each item.
QCS 2014 Section 21: Electrical Works Page 16
Part 01: General Provisions for Electrical Installation
1 The Contractor shall comply with all requirements of the Police Department for marking,
lighting and protecting excavations. It is the responsibility of the Contractor to ascertain the
requirements of Police Department and to comply fully with these requirements. No additional
payments will be authorised under any circumstances for marking, lighting or protecting
excavations.
2 Where carriageway works and road crossings are performed the Contractor shall provide
steel plates of sufficient size and quality to permit the safe passage of traffic and the plate
shall be so placed (if necessary fixed) to permit reasonable traffic flow.
3 All doorways, gates and entrances shall be kept clear with full access. Where excavations
impede pedestrian access, crossings boards shall be provided. Crossing boards shall be
D
1250mm wide with a hand rail on both sides 1 metre high and guard rails on both sides at
N
vehicular access to premises etc. Ducts will not be installed at entrances to premises unless
instructed by the Engineer.
U
O
4 Materials excavated shall be placed so as to prevent nuisance or damage. Where this is not
possible, the material shall be removed from site and returned for backfilling on completion of
R
cable laying at the Contractors expense. In cases where the excavated material is not to be
used for backfilling trenches it must be removed from site on the same day as it is excavated.
G
Surplus material shall only be disposed of at Government approved sites. At the time of
ER
Contract award the Contractor shall contact the Ministry of Municipal Affairs and Agriculture
to ascertain the approved sites and route.
D
1 Where materials are to be supplied by the Contractor, the following shall apply:
U
(a) Materials shall be ordered in accordance with the Specifications issued by QGEWC.
(b) Specifications and details of the proposed supplier shall be submitted to QGEWC
E
(c) On delivery of materials from outside of Qatar, QGEWC inspectors shall be given the
LI
1 The Contractor shall consult the public utility authorities not less than one month before it is
proposed to commence work to ascertain whether any underground installations will be
affected by the proposed work, in which event the Contractor shall make all necessary
R
2 The Contractor shall give at least one weeks notice in writing to the public utility authorities of
the dates upon which it is intended to operate plant or equipment or carry out any work for
which permission has been given in writing by the public utility authorities: such operations of
work shall only be carried out in the presence of the public utility authorities unless notice has
been obtained in writing from the public utility authorities that they do not require to be
present.
3 The public utility authorities may require work to be executed on their installation during the
period of the Contract: the Contractor shall afford all facilities to the public utility authorities
contractors or workmen until their diversion work is complete. The Contractor shall co
ordinate the work of the public utility authorities and his own activities and when necessary
shall amend his programme of working to suit all requirements of the department in
connection with their diversion work and shall keep the Engineer informed of all
arrangements made.
QCS 2014 Section 21: Electrical Works Page 17
Part 01: General Provisions for Electrical Installation
4 The Contractor shall locate and mark with suitable posts all the public utility authorities
underground installations that are within the area of the Works and shall ensure that such
markers are maintained in their correct positions at all times; the Contractor shall advise the
public utility authorities of any installation not found where shown on the Drawings, or found
but not shown or found damaged or subsequently damaged.
END OF PART
D
N
U
O
R
G
ER
D
N
U
E
N
LI
N
EE
R
G