0% found this document useful (0 votes)
72 views3 pages

Engineering Procedure

Contoh prosedur engineering

Uploaded by

Browie Chandra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views3 pages

Engineering Procedure

Contoh prosedur engineering

Uploaded by

Browie Chandra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project : Doc.No.

:
Customer : Revision :
: sheet include cover
PO No. Sheet :
Project No. :

ENGINEERING PROCEDURE

DATE DESCRIPTION PREPARED CHECKED APPROVED


Type of Document Revision
01
Company Name Standard Operating Procedure Page
1 of 1

Engineering Processing

Resp.Person/Department Flow Chart of Activities Description

- Review project tech.specs


- Fill in order check list
Engineering Technical Contract Review - Commit to the project schedule
- Identify the deviation to the
standard product

Engineering - Technical clarification with customer & vendor


Project Manager & assure that there are no outstanding technical
Technical Clarification
Vendor issue during the project life
Customer
-Prepare & issue for customer approval of Basic
Engineering Design drawings : Front View; Panel
Project Manager Arrangement; Single Line Diagram; Foundation;
Basic & Detail Design
etc
Doc.Controller
- Prepare & issue Wiring & Schematic Diagram
for approval.
- Do the special design (if any) in cooperation
with pre-fab.
Vendor - Create Sales Order BOM on Software.
Approval Process - Design review in liasion with PM prior to
Customer
submittal for customer approval.
No - For RCP is only Basic Design will be submitted
for customer approval.
- In case customer does not approve and raise
the comment or request, PM & Engineering to
check whether there is something categorized as
Approved? change order or not.
- If there is change order, proceed the change
order process, which is consider as new order. If
no, incorporate the customer comments/
Yes requests.
Electrical Engineering
Mechanical Engineering - Release drawing Issued for Production to be
Project Manager able Prefab & Production Dept. commencing
Shop Design
Doc.Controller their activities.

Yes

Changes?

No

Engineering - Issued As Factory Tested Drawing, incorporate


As Factory Tested Design all modifications may be done during test stage.

Document type (please use wet stamp only)


Annexes : -- pages(s)

QR No.: POS 1101-TC1

Prepared by: Checked by: Reviewed by: Approved by:

Date / Signature Date / Signature Date / Signature Date / Signature


Type of Document Revision
01
Company Name Standard Operating Procedure Page
1 of 1

Spesific Mechanical Design Process Flow

Resp.Person/Department Flow Chart of Activities Description

Providing the datas :


- Basic Construction/Sketch
- Dimension
Project Management Basic Design - Arrangement
- Material
- Surface Treatment
- Single Line
- Etc

- Create Detail Drawing


Design - Create Bill of Material
Mechanical Engineering - Engineering Evaluation
Development

- Check the design as Customer


Project Management required

NO
Design Review

Approved?

YES

Project Management - Creating the Order Quantity


- Define time schedule
Production Planner - Converting Plan Order to
Production Order
Production Order

- Refer to WI of Prefabrication
Production Planner Process
Order Execution

Document type (please use wet stamp only) Annexes : -- pages(s)

QR No.: POS 1101-TC2

Prepared by: Checked by: Reviewed by: Approved by:

Date / Signature Date / Signature Date / Signature Date / Signature