Case Study to Develop Models of Compliant
Ship Recycling Facilities
Final Report
July 2012
iii
iv
Table of Contents Page No
1
3.2.4 Hong Kong Convention Guidelines .................................................................................. 25
3.2.5 The Hong Kong Convention and waste management ....................................................... 26
3.3 Other Relevant International and Regional Agreements....................................................... 27
3.3.1 International Labour Organization ................................................................................... 27
3.3.2 The European Union ....................................................................................................... 28
4. Global Practice and Field Study Examples of Ship Recycling Standards ................................... 29
4.1 Global Practices in Ship Recycling ......................................................................................... 29
4.2 Field study Ship Recycling in Turkey ................................................................................... 30
4.2.1 Summary of field study findings ...................................................................................... 31
4.2.2 Waste Management in Turkey ........................................................................................ 35
4.2.3 Site Visit Impressions ...................................................................................................... 36
4.2.4 Turkeys accession to the Hong Kong Convention ............................................................ 37
4.2.5 Conclusion ...................................................................................................................... 37
5. Baseline Information on ship recycling yards and waste management facilities in Pakistan... 39
5.1 Study Location....................................................................................................................... 39
5.2 Previous study on SBRI in Pakistan World Bank ................................................................. 39
5.3 Baseline report for this study Summary ............................................................................. 42
5.3.1 Government Institutions and Competent Authorities ...................................................... 42
5.3.2 Regulatory Framework .................................................................................................... 43
5.3.3 The Ship Recycling Yards and waste management at Gadani brief overview ................. 44
5.3.4 Waste Management - available downstream capacity for ship recycling wastes .............. 47
5.3.5 Conclusion - downstream waste capacity provision ......................................................... 47
5.3.6 General infrastructure ..................................................................................................... 47
5.4 Summary - Gap analysis of the current conditions ................................................................ 47
5.4.1 Proposed Actions to fill the gaps at Gadani, Pakistan ....................................................... 48
6. Criteria, standards and operationally compliant model selection for Ship Recycling and Waste
Management .................................................................................................................................. 58
6.1 Introduction .......................................................................................................................... 58
6.2 Criteria for ship recycling and waste management facilities ................................................. 58
6.3 Environmentally Sound Management standards and their application ................................ 60
6.4 Compliant Models: Description and Model selection ........................................................... 62
6.4.1 Compliance Framework requirement .............................................................................. 62
6.4.2 Model Description and Selection ..................................................................................... 63
2
6.5 Compliant Model .................................................................................................................. 64
6.5.1 Criteria checklist for ship recycling and waste management facilities .............................. 64
6.5.2 Criteria checklist for operators of facilities ...................................................................... 65
6.5.3 Criteria checklist for competent authorities..................................................................... 66
7. Actions towards ESM Compliant Model Standards: Short, Medium and Long Term .............. 68
7.1 General approach.................................................................................................................. 68
7.2 The Compliance approach ..................................................................................................... 70
7.3 The Facility approach ............................................................................................................ 70
7.4 Short, Medium and Long Term actions.................................................................................. 70
7.4.1 Actions to be taken at Ship Recycling Facilities ................................................................ 70
7.4.2 Actions to be taken at Waste Management (treatment and disposal) facilities ................ 74
7.4.3 Actions to be taken by Competent Authorities ................................................................ 76
7.4.4 Underpinning Legislation................................................................................................. 78
7.5 Implementation Matrix ......................................................................................................... 79
8. References and Bibliographic material .................................................................................... 82
Appendix A: Government Institutions and Regulatory Framework for Ship Recycling in Pakistan . 86
Appendix B: Hazardous materials and wastes found on ships ........................................................ 97
Appendix C: Ship Recycling Facility Plan Elements .......................................................................... 99
Appendix D: Ship Recycling Plan - Example of Turkey .................................................................. 101
3
List of Acronyms
4
Glossary of Terms
Ballast Seawater taken into a vessel's tanks in order to submerge the vessel to
proper trim
Basel Convention The Basel Convention on the Control of Transboundary Movements of
Hazardous Wastes and their Disposal (1989)
Dead weight tonnage (DWT) The lifting or carrying capacity of a ship when fully loaded. The
deadweight is the difference, between the displacement and the lightweight
in tons. It includes cargo, fuel, water (potable, boiler, ballast), stores,
passengers, and crew.
Decommission The decision and process of taking a ship out of service; often used regarding
naval vessels
Demolition The process of taking a ship apart; mostly used for on shore operations
Dismantling The process of taking a ship apart; term used by the Basel Convention and
its guidelines, and by the European Commission (DG Environment)
Displacement Displacement is a measure of the weight of a navy vessel without monitions,
fuel, and crew
Environmentally sound Basis for system of management of wastes under the Basel Convention
management
Displacement tonnage the weight of water displaced by the vessel, which equals the weight of the
vessel, expressed in tons
Gas free certificate (for A certificate stating that the atmosphere in a tanker's (empty) cargo tanks is
hot work) safe for work using cutting equipment (see hot work)
Gross tonnage The internal capacity of a vessel
Hong Kong Convention International Convention for the Safe and Environmentally Sound Recycling
of Ships adopted in Hong Kong in May 2009
Hot Work Means any activity requiring the use of electric arc or gas welding
equipment, cutting burner equipment or other forms of flame, as well as
heating or spark-generating tools, regardless of where it is carried out on
board a ship.
Inventory of Hazardous A list of hazardous materials on board a ship, prepared by the shipowner
Materials under the Hong Kong Convention
International Labour The United Nations agency dealing with international labour standards and
Organization promoting decent work for all
International International standards setting body that publishes management standards
Organization for such as the environmental management standard series ISO14000 and ISO
Standardization 30000 on Ship Recycling Management Systems
International Maritime The specialized agency of the United Nations responsible for the regulatory
Organization framework for shipping including maritime safety and preventing pollution
from ships
Light displacement tons Displacement, in tons, without cargo, fuel, lubricating oil, Water ( ballast,
(or lightweight) fresh feed), consumable stores and passengers and crew and their effects,
including liquids in piping,
MARPOL International Convention for the Prevention of Pollution from Ships, 1973, as
modified by the Protocol of 1978
Marine Environment A committee of the IMO, its senior technical body on marine pollution
Protection Committee related matters
Occupation Health and OHSAS 18000 is an Occupation Health and Safety Assessment Series, for
Safety Assessment health and safety management systems
5
Series
Recycling The process of taking a ship apart; term employed by the shipping industry
and IMO.
South Asia Geographical area, but in particular the three countries involved in SBRI:
Bangladesh, India, and Pakistan
Scrapping The process of taking a ship apart; the term employed by the U.S.
Environmental Protection Agency
Ship breaking and In this study, the industry that converts end-of-life ships into steel for use in
recycling industry (SBRI) construction and other recyclable items which are sold in local markets
Ship breaking The process of taking a ship apart; the term employed by the ILO, the EU, and
many national ship breakers associations
Ship Recycling The Hong Kong International Convention for the Safe and Environmentally
Convention Sound Recycling of Ships (2009)
6
Executive Summary
This case study describes models for compliant ship recycling facilities in consideration of the
requirements of the Basel Convention on the Control of Transboundary Movements of Hazardous
Wastes and their Disposal (1989) (the Basel Convention) and the Hong Kong International
Convention for the Safe and Environmentally Sound Recycling of Ships (2009) (the Hong Kong
Convention or HKC). The tasks were carried out with respect to ship recycling facilities employing the
beaching method, being the predominant system currently in use. The case study identifies actions
to be undertaken in the short, medium and long term at ship recycling facilities to facilitate
compliance with the two Conventions, dealing in particular with the environmentally sound
management of hazardous wastes and other wastes and materials. To assist baseline information on
ship recycling and downstream waste management in Pakistan has been obtained from
questionnaires and interviews with Government, including Competent Authorities (CAs) and industry
stakeholders.
A number of areas for improvement have been identified in connection with the segregation and
safe storage of hazardous wastes at ship recycling facilities, including provision of impermeable
surfaces for temporary storage, on site infrastructure and off-site specialist treatment facilities such
as engineered landfill for asbestos and incineration for poly chlorinated biphenyl (PCB) wastes and
ozone depleting substances (ODS). The compliant models developed envisage stepwise progression
through simple low cost techniques and improved management to investment in equipment and
facilities in the longer term. The models are to be tested in cooperation with the Government of
Pakistan and industry following an information gathering stage and consultation with relevant
stakeholders and are intended to be applicable to all facilities employing the beaching method. From
the results two sets of guidance and train-the-trainer manuals, with accompanying materials for
operators and for competent authority(ies) will be produced.
Background information on the Basel and Hong Kong Conventions has been supplemented with a
field study of ship recycling in Turkey that has provided insights into the development of
environmentally sound management of hazardous wastes and materials and other wastes with
respect to both Conventions. The study emphasises that fulfilment of ESM of hazardous wastes for
ship recycling does not provide complete compliance with the Hong Kong convention which contains
7
a number of other obligations. However Basel Convention compliance would be improved through
more systematic management of wastes and their control by industry and regulatory competent
authorities.
8
SECTION 1
9
1. Introduction - Background to the Case study
1.1 Project outline
The intention of this project is to develop a case study on models of compliant ship recycling
facilities in consideration of the requirements of the Basel Convention on the Control of
Transboundary Movements of Hazardous Wastes and their Disposal (1989) (the Basel
Convention) and the Hong Kong International Convention for the Safe and Environmentally
Sound Recycling of Ships (2009) (the Hong Kong Convention or HKC). Actions are to be
identified to be undertaken in the short, medium and long term at ship recycling facilities to
facilitate compliance with the two Conventions dealing in particular with the
environmentally sound management of hazardous wastes and other materials. This will
include developing an investigative study on downstream waste management for ship
recycling in Pakistan. The models developed are to be tested in cooperation with the
Government of Pakistan and Industry following an information gathering stage and
consultation with relevant stakeholders.
The project comprises a number of discrete tasks, the combined outputs of which will be the
case study and the guidance and training materials. These tasks have been elaborated and
are broken down into the main elements as described below and presented in the
accompanying Table and Timeline.
10
Government, including Competent Authorities (CAs) and industry
stakeholders;
Develop operationally compliant models for dealing with the wastes and
materials from ship recycling in an environmentally sound manner;
Develop two sets of guidance and train-the-trainer manuals, with
accompanying materials comprising:
o Guidance (i) for operators;
o Guidance (ii) for competent authority (ies), with accompanying
train the trainer manuals.
All the above tasks are to be carried out with respect to ship recycling facilities employing
the beaching method, being the predominant system currently in use. Therefore to be
replicable the results obtained must relate to this method.
11
2. Study Methodology
The Case Study was carried out according to the methodology outlined below. The breakdown of the
tasks is as follows:
2.2 Review global practice and field study examples of ship recycling standards
Global Practices Examples of global practice and technical studies on ship recycling have been
reviewed. There is now an extensive literature on ship recycling in developing countries and
elsewhere. A short summary has been made of key literature and reported experience of
implementing ship recycling techniques and controls for environmentally sound management. This is
described including any success criteria, where available, for such approaches and the challenges
met in achieving changes.
Field Study- A specific investigation of waste management practice and ship recycling has been
undertaken by a field visit to ship recycling and waste management facilities in Turkey. This includes
a review of discussions with representatives and visits to facilities in Turkey carried out for this
study.
2.3 Baseline study on ship recycling yards and waste management facilities for ship
recycling in Pakistan
Preparation of Baseline Report The case study relies on the acquisition of baseline information to
inform development of the outputs. Some of this was obtained from readily available information
and some from the field work and direct inquiry. Desk studies were undertaken examining available
literature and published information. The baseline study consisted of more detailed investigations
employing targeted questionnaires, sent to stakeholders involved with SBRI in Pakistan, in order to
supplement the existing knowledge and provide up-to-date information. The elements of this latter
task were:
Design of the questionnaire
Selection of stakeholder recipients among:
12
o Ship recycling facilities
o Competent authorities
o Downstream waste management facilities
Circulation of questionnaires
Gathering of responses
Evaluation of the results and
Preparing Baseline Report.
Legislative development.
The implementation of compliant ship recycling goes in parallel with the development of
appropriate legislation, regulations and guidelines at the domestic level. Opportunities
to affect the direction and timing of changes can be mediated through legislation
directed by government policy. Any such opportunities may be identified from the
information obtained by the baseline study.
13
SBRI coordination and cooperation between operators
New possibilities may emerge for cooperation between ship recycling facility operators,
with waste management companies and other industries producing waste, either
identified from the baseline survey or stimulated as a result of the investigation.
Other parallel infrastructure development
Any general development need such as transport infrastructure, energy supply, water
may be considered for the potential to support both ship recycling activities other
industry and businesses and local communities.
14
2.4 Develop criteria and standards, select operationally compliant models for
Ship Recycling and Waste Management
15
SECTION 2
16
3. Background Information -International Agreements
(Conventions) and their guidelines
3.1 The Basel Convention
The Basel Convention on the Control of Transboundary Movements of Hazardous Waste and their
Disposal (1989) is an international agreement that seeks to provide for the environmentally sound
management of hazardous and other wastes. Parties to the Convention implement its provisions in
national legislation according to the Conventions obligations. The Basel Convention was adopted on
22 March 1989 and entered into force on 5 May 1992. Currently (in June 2012) there are 179 Parties
to the Convention. The full text of the Convention can be found at:
http://www.basel.int/text/documents.html.
The Basel Convention provides for the regulation of the transboundary movements of hazardous
and other wastes. In order to protect human health and the environment against the adverse effects
that may result from such wastes, the Conventions system for controlling transboundary
movements of hazardous and other wastes is based, inter alia, on the following principles and
actions:
The requirement of prior informed consent of a State of import and States of transit and
of a contract between the exporter and the disposer specifying environmentally sound
management of the wastes in question before an export of waste can take place and, for this
purpose, the establishment of a notification procedure;
The requirement referred to in the Convention as environmentally sound management
that all practicable steps are taken to ensure that such wastes are managed in a manner to
17
protect human health and the environment from the adverse effects that could result from
those wastes
A restriction on exports to a country which is not Party to the Convention; and
An obligation on the exporting state to take back the wastes in the case of a transboundary
movement of hazardous wastes or other wastes deemed to be illegal traffic as the result of
conduct on the part of the exporter or generator.
Any person within the national jurisdiction of a State that is a Party to the Basel Convention, who is
involved in transboundary movement of hazardous wastes or other wastes, is therefore legally
bound to comply with the relevant national laws and regulations governing the transboundary
movements of wastes and their disposal. A checklist for the legislator indicating the key provisions to
be included in the national legal framework is available on the Basel Convention website1. The
Checklist does not cover all aspects of the Convention but seeks to identify the most fundamental
matters that should be addressed in the national implementing legislation. A Model National
Legislation document2 is also available for the benefit of Parties.
A number of general rights and obligations are found in Article 4 of the Convention, including the
right of Parties to prohibit the import of hazardous wastes or other wastes for disposal (note that
disposal is defined as final disposal or recovery as described below). As a consequence, the extent of
regulation on the transboundary movement of hazardous wastes may differ from country to
country. A list of the restrictions imposed under national law in individual country parties is
1
Available from the website of the Basel Convention under the Legal Frameworks section- Tools for the
development of legal frameworks at:
http://www.basel.int/Implementation/LegalMatters/LegalFrameworks/Tools/tabid/2750/Default.aspx
2
Ibid.
18
available on the website of the Convention at: http://www.basel.int/natdef/frsetmain.php. There is
a corresponding obligation of Parties to respect such import prohibitions when duly notified,
through the Secretariat of the Convention, of the existence of such prohibitions. The relevant entity
at the national level must ensure that information about import prohibitions is circulated to all
involved with enforcement and implementation in his country. This would include the Competent
Authority, which is the governmental authority designated by a Party to be responsible, within such
geographical areas as the Party may think fit, for receiving the notification of a transboundary
movement of hazardous wastes or other wastes, and any information related to it, and for
responding to such a notification3. The Competent Authority should know about every shipment of
hazardous wastes that is expected to, and actually leaving from, transiting through or entering its
country, what is regulated by the Basel Convention and what by national legislation. A list of the
Competent Authorities is available at: http://www.basel.int/contact-info/frsetmain.html.
An amendment to the Convention, the Ban Amendment inserts a new Article 4a that prohibits all
transboundary movements of hazardous waste from Annex VII (in effect OECD Countries) to non
Annex VII Countries (non OECD Countries)4. The amendment is not yet in force (as of October
2012) although the Parties have agreed on the interpretation of Article 17 paragraph 5 of the
Convention (concerning the interpretation of the entry into force of amendments to the Convention)
at the tenth meeting of the Conference to the Parties of the Convention on October 2011.
Combating illegal traffic is an important part of the Convention. Article 4.3 asserts that the Parties
consider that illegal traffic in hazardous waste is criminal and the associated Article 9.5 requires each
Party to introduce appropriate national/domestic legislation to prevent and punish illegal traffic.
A country that has become a Party to the Basel Convention has, amongst other things, thus agreed
to:
Commit itself to introduce appropriate national legislation to regulate the transboundary
movements of hazardous and other wastes;
Consider that illegal traffic in hazardous wastes or other wastes is criminal; and
Introduce legislation to prevent and punish illegal traffic.
3
Article 2 paragraph 6 of the Convention
4
This is described on the Basel Convention website under Legal Matters The Basel Convention Ban Amendment at:
http://www.basel.int/Implementation/LegalMatters/BanAmendment/tabid/1484/Default.aspx
19
3.1.2 The Basel Convention and Ship Recycling
The Basel Convention has two main potential impacts on ship recycling. The first is that of the
obligations of the Convention with respect to downstream management of hazardous and other
wastes generated from ship recycling. While the wastes so generated may not be considered to be
transboundary movements by a State in whose jurisdiction the waste is generated, the obligations of
the Convention itself require environmentally sound management of hazardous and other waste (in
the General Obligations under Article 4.2). Secondly, a State may decide to invoke the application of
the Convention to ship recycling pending the entry into force of the Hong Kong Convention. In this
respect the Conference of the Parties, at its seventh meeting, in Decision VII/26 recognized the
importance of the environmentally sound management of the dismantling of ships and that a ship
may become waste as defined in Article 2 of the Basel Convention and at the same time it may be
defined as a ship under other international rules5. It is for the State to decide how to apply its own
environmental protection legislation to the range of activities and processes that are undertaken
within its jurisdiction.
"...taking all practicable steps to ensure that hazardous wastes or other wastes are
managed in a manner which will protect human health and the environment against
the adverse effects which may result from such wastes".
This is one of the basic tenets of the Basel Convention. Others include Prior Informed Consent,
applied to the transboundary movement of hazardous waste and the requirement to reduce the
5
Decision VII/26 of the Conference of the Parties to the Basel Convention is on the website of the Convention
at: http://www.basel.int/Portals/4/Basel%20Convention/docs/meetings/cop/cop7/docs/33eRep.pdf#page=63
20
amounts of hazardous waste that are generated in the first place and are not considered further
here.
The utility of the Basel concept of ESM is that it establishes a broad framework which can be applied
to many circumstances where protection of the environment is a factor in the operation of a
process. It does however have its limitations. This definition may appear to be too narrow for the
operation of a ship recycling facility as it deals primarily with hazardous wastes (the subject of the
Basel Convention). Ship recycling activities cover more than just waste and the processes that are
associated with it may give rise to releases of harmful substances that may not be regarded as
wastes, in the Basel sense, but nevertheless they may have the capacity to cause harm to the
environment. An example of this may be emissions to air of harmful gases caused by the dismantling
activity or leakage of oil from storage facilities for use in site plant and equipment.
When considering the operation of a ship recycling facility as a whole, a broader definition is
required for the purposes of ESM. This must take into account the nature of the facility and the
environment around it. These differ from the majority of facilities covered by the Basel Convention
which are wholly land-based. Ship recycling facilities often operate at a land-sea interface with the
consequent impacts of tides and shore conditions adding a complicating factor. A definition that may
be applied for ESM for operational purposes may be:
Such a definition seeks to overcome the limitations of the Basel Conventions own definition while
encompassing the particular site and process specific principles applicable to ship recycling and
pointing to how they might be converted to have practical expression. A description of ESM that
attempts to interpret it for ship recycling purposes was submitted to the 2nd meeting of the
IMO/ILO/BC JWG in December 2005, entitled Environmentally Sound ManagementNote by the
21
United Kingdom as WEOG Representative for the Basel Convention to the Joint Working Group, as
found in the report of the IMO/ILO/BC JWG6 [5].
Gas-free-for-hot-work certification
6
Found at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/reportofsecondiloimobaselgroupdec2
005.pdf
22
National policies
3.2.1 Overview
The Hong Kong International Convention for the Safe and Environmentally Sound Recycling of Ships,
2009 (the Hong Kong Convention), was adopted at a diplomatic conference held in Hong Kong,
China, in May 2009. This was one of the actions of the International Maritime Organization (IMO) in
response to the invitation to it to contribute to the development of an effective solution to the issue
of ship recycling. The objective was to bring about the means to minimize, in the most effective,
efficient and sustainable way, the environmental, occupational health and safety risks related to ship
recycling, taking into account the particular characteristics of world maritime transport and the need
for securing the smooth withdrawal of ships that have reached the end of their operating lives.
The Hong Kong Convention is aimed at ensuring that ships, when being recycled after reaching the
end of their operational lives; do not pose any unnecessary risks to human health, safety and to the
environment. Regulations in the new Convention cover: the design, construction, operation and
preparation of ships so as to facilitate safe and environmentally sound recycling without
compromising the safety and operational efficiency of ships; the operation of ship recycling facilities
in a safe and environmentally sound manner; and the establishment of an appropriate enforcement
mechanism for ship recycling, incorporating certification and reporting requirements.
Upon entry into force of the Hong Kong Convention, ships to be sent for recycling will be required to
carry an inventory of hazardous materials, which will be specific to each ship. An appendix to the
Convention provides a list of hazardous materials the installation or use of which is prohibited or
restricted in shipyards, ship repair yards, and ships of Parties to the Convention. Ships will be
required to have an initial survey to verify the inventory of hazardous materials, renewal surveys
during the life of the ship, and a final survey prior to recycling.
Ship recycling yards will be required to provide a "Ship Recycling Plan", specifying the manner in
which each ship will be recycled, depending on its particulars and its inventory. Parties will be
required to take effective measures to ensure that ship recycling facilities under their jurisdiction
comply with the Convention.
23
3.2.2 Requirements of the Hong Kong Convention for ship recycling States
States that become Party to the Convention (by ratification or accession) will be seeking to
implement its obligations through a number of actions, these include the need to:
Establish the necessary legislation to ensure that Ship Recycling Facilities (SRFs) are
designed, constructed, and operated in a safe and environmentally sound manner in
accordance with the regulations of the Convention;
Establish a mechanism for authorizing SRFs;
Establish a mechanism for ensuring that SRFs comply with the HKC; and
Designate one or more Competent Authorities (CAs) and a single contact point for
communication with relevant entities.
Ship recycling facilities themselves will need to comply with a number of requirements that will be
implemented to ensure compliance with the Convention. In particular an SRF:
Located within the jurisdiction of a Party shall be authorized by that Party. The
authorization shall have 5 years maximum validity;
Shall only accept ships that comply with the Convention, or which meet its
requirements. The SRF shall only accept ships they are authorized to recycle; and
Shall develop and implement a Ship Recycling Facility Plan (SRFP) that covers: worker
safety and training; protection of human health and the environment; roles and
responsibilities of personnel; emergency preparedness s and response; and systems for
monitoring, reporting and record-keeping.
Separate requirements exist under the Convention for ships being dismantled at recycling facilities.
These requirements include that:
A ship-specific Ship Recycling Plan (SRP) shall be developed taking into account
information provided by the ship owner (i.e. IHM, ICIHM, etc.);
An SRF preparing to receive a ship shall notify its CA of the intent.
The notification shall include details of:
o The flag State;
o The ship and its particulars;
o The owner and company;
o The classification society.
o Details of the IHM and the draft SRP;
24
The SRP shall be approved, tacitly or explicitly, by the CA and then shall be made
available to the ship for its final survey;
When the ship has acquired the IRRC, the SRF shall report to its CA the planned start of
recycling. The report shall include a copy of the IRRC. Recycling of the ship shall not start
prior to the submission of this report;
When recycling is completed, a Statement of Completion shall be issued by the SRF to its
CA. The CA shall copy the Statement to the Administration which issued the IRRC for the
ship.
Of the key technical requirements of the Hong Kong Convention, the following could be considered
as suitable interim measures:
Prohibition of installation or use of Hazardous Materials listed in its Appendix 1;
Provision of the Inventory of Hazardous Materials: (a) to new ships; (b) to existing ships; and
(c) to ships going for recycling;
Safe-for-hotwork and Safe-for-entry : (a) obligations for shipowners; and (b) obligations for
ship recycling facilities;
Preparation of a Ship Recycling Plan for ships destined for recycling;
(Progressive) Compliance of ship recycling facilities to the Conventions safety, health and
environmental standards.
25
2012 Guidelines for the Authorization of Ship Recycling Facilities, adopted by resolution
MEPC.211 (63)
Two further guidelines have recently been developed that will assist in the implementation of the
Convention once it enters into force, while MEPC may also identify and develop additional guidance
or circulars:
Guidelines for Survey and Certification of Ships under the Hong Kong Convention; and
Guidelines for Inspection of Ships under the Hong Kong Convention.
These were adopted at MEPC 64, October 2012. 7
The Guidelines for Safe and Environmentally Sound Ship Recycling make specific reference to
environmentally sound management of hazardous materials generated by the activities by reference
to the Ship Recycling Facility Plan. The environmental compliance approach is described in the
guideline:
7
Available on the IMO website at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.222(64)%20Su
rvey%20and%20Certification%20Guidelines.pdf and at
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.223(64)%20Ins
pection%20Guidelines.pdf respectively.
26
SRFP should reflect applicable requirements of the Convention (particularly regulations 20 to
22). The SRFP should describe dedicated infrastructure for the treatment and disposal of
Hazardous Materials generated from ship recycling operations pursuant to national laws and
regulations. The Ship Recycling Facility should also take account of guidelines developed by
international organizations as appropriate. A reference list of such guidelines is provided in
appendix 5.
These other guidelines developed by international organizations mentioned include those produced
by the Basel Convention and are listed in the References Section (Section 8) of this Case study.
The International Labour Office of the ILO continues to be involved in initiatives to assist
improvements in the working conditions at ship breaking yards.
8
Safety and health in shipbreaking: Guidelines for Asian countries and Turkey; Interregional Tripartite Meeting of Experts
on Safety and Health in Shipbreaking for Selected Asian Countries and Turkey; Bangkok, 7-14 October 2003; published
2004, International Labour Office Geneva. Found at:
http://www.ilo.org/public/english/standards/relm/gb/docs/gb289/pdf/meshs-1.pdf
27
3.3.2 The European Union
The European Commission has developed proposals for an EU-wide Ship Recycling Regulation. On
23 March 2012 the Commission adopted a proposal for a regulation on ship recycling, and for a
Council decision regarding ratification of the Hong Kong Convention9. This proposal aims to reduce
significantly the negative impacts linked to the recycling of EU-flagged ships, especially in South Asia
without creating unnecessary economic burdens. The proposed Regulation brings into force an early
implementation of the requirements of the Hong Kong Convention, therefore hastening its entry
into force globally. The proposal includes an evaluation of the standards of facilities for ships being
moved from the EU to other facilities by way of inclusion on a list of acceptable facilities. The
intention is that this instrument replaces, for ships, the EU Waste Shipments Regulation (that
implements the Basel Convention within the EU). This proposed EU Regulation would cover the
whole life cycle of EU-flagged ships, allow for early implementation of the requirements of the Hong
Kong Convention and, as allowed by the Convention, include more stringent environmental
requirements for ship recycling facilities. Ships flying the flag of EU Member States would only be
allowed to be recycled in facilities meeting certain requirements. EU Member States would be
informed in writing and in due time of the shipowners intention to send a ship for recycling. Ship
recycling facilities will have to meet a set of environmental and safety requirements in order to be
included on a list of authorized facilities, which can be situated world-wide. European ships will be
allowed to be recycled only in facilities on that list. Some of the requirements to be met by the ship
recycling facilities are stricter than those foreseen by the Hong Kong Convention. This is intended to
ensure better traceability for European ships, and guarantee that the waste resulting from
dismantling (and any hazardous materials it contains) is managed in an environmentally sound way.
This requirement as well as the introduction of sanctions, which would be at least equivalent to
those applicable under the current legislation, is to ensure compliance.
Of interest for this current study it is important to note that the proposal states that: While it is
difficult to expect the current beaching facilities to be able to meet these requirements, it is
possible that upgraded facilities might be able to fulfil these criteria in the future. What this means
in practice is not specified. To avoid confusion, overlaps and administrative burden, it is proposed
that ships covered by this new legislation would no longer fall within the scope of the EU Waste
Shipments Regulation.
9
Found at http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=COM:2012:0118:FIN:EN:PDF
28
4. Global Practice and Field Study Examples of Ship
Recycling Standards
The ship recycling industry is based predominantly in South Asia (in India, Bangladesh and Pakistan),
which according to 2010 statistics, has approximately 70% of the global ship recycling market.
Significant recycling activity also takes place in China (19%), with Turkey and other countries
occupying the remaining 10% of the market. Beaching is the predominant method of ship recycling
in the South Asian Region, whilst China and some other countries employ an alternative method
known as pier breaking. Through the period of development of the Hong Kong Convention and
following its adoption in May 2009, the conditions at some of the ship breaking facilities prompted
legal challenges which have led to new rules being introduced. In Bangladesh, following a temporary
ban on ship breaking, in 2011 the Government of Bangladesh promulgated the Ship Breaking and
Recycling Rules10 pursuant to the order of the Honourable High Court Decision of the Supreme
Court, applicable to all ship recycling activities in Bangladesh (predominantly at Chittagong), to be
administered by the Ministry of Industries as the lead. The rules create a Ship Building and Ship
Recycling Board and concern matters including: examination of the ship before beaching for the
presence of hazardous materials; issue of certificates for gas free for man entry and gas free for hot
work; the submission of a Ship Recycling Plan by the yard owner prior to demolition and a permit for
a Ship Recycling Facility Plan and other matters relating to worker safety and environment.
In India the major part of ship recycling activity is carried out at Alang, Gujarat, although it does
occur elsewhere, employing the beaching method. Conditions have been subject to improvements
through legal processes as well as by specific upgrading carried out by facilities wishing to tap the
market for green ship recycling. The controls on ship recycling at Alang have been applied though
the Gujarat Pollution Control Board and the Gujarat Maritime Board, which leases the plots. A
number of downstream waste treatment facilities are available including hazardous waste treatment
and specialized landfill managed by GEPIL (Gujarat Environment Protection Infrastructure Ltd). The
10
The Ship Breaking and Recycling Rules 2011, Ministry of Industries, Govt of Bangladesh at
http://www.moind.gov.bd/index.php?option=com_content&task=view&id=478&Itemid=572
29
Supreme Court has issued a number of rulings11 with respect to ship recycling, in 2007 setting out
directions informed by the recommendations of a Technical Experts Committee appointed by the
Supreme Court aimed at regularizing the standards particularly concerning the management of
hazardous wastes. More recently in July 2012 the Supreme Court banned the import of ships
containing hazardous wastes in accordance with the provisions of the Basel Convention.
A number of countries, including regional groupings, have undertaken extensive studies into the
practice of ship recycling and published reports on the conditions found. The results of these studies
have been applied to policy actions and decisions to control the processes of ship recycling and, to
the extent possible, their international travel with respect to environmental and other obligations.
In this context the United Kingdom published its Ship Recycling Strategy in 2006 to make its policies
with respect to ship recycling consistent with its obligations under the Basel Convention for the
transboundary movements of hazardous waste. The European Union is a regional integrated
economic organization and an area where active ship recycling is being carried out. The EU has made
a number of declarations concerning the expected environmental and occupational standards for
ship recycling. The European Commission of the EU, following a number of investigations including
publication of a Green Paper on better ship dismantling in 2007, produced a Communication on an
EU strategy on ship dismantling in 2008. This strategy focused on measures to improve ship
dismantling conditions as soon as possible, including in the interim period before the entry into force
of the Hong Kong Convention: i.e. dealing with key elements of the Convention, encouraging
voluntary industry action, providing technical assistance and support to developing countries and
better enforcing the current legislation. Support has been provided to ship recycling countries
through a grant under their Thematic Programme for the environment and sustainable management
of natural resources including energy (ENRTP) to the "Global Programme for Sustainable Ship
Recycling" coordinated by the Secretariat of the Basel Convention, with the participation of the
International Maritime Organization and of the International Labour Office of the International
Labour Organization.
11
Rulings from the Supreme Court of India (Order dated 14/10/2003 and 06/09/2007 in the writ petition
No.657/95).
30
Directorate for Shipbuilding and Shipyards, Ministry of Transportation, Maritime Affairs and
Communication, Ministry of Environment and Urbanization, the Ministry of Labour and Social
Security, all in Ankara; the Turkish Ship Recyclers Association, Office of the Harbour Master and
regional officials of the Ministry of Environment and Urbanization in Izmir. Although not available at
the time, the role Ministry of Customs and Trade was also recognized.
31
Ship Recycling Policy and Regulation
Turkey has designated Aliaga as a ship recycling area since 1976 and has had legislation in place
concerning ship recycling since 1986, having been updated most recently in 2004. Environmentally
sound management at the ship recycling yards is based upon Basel Convention guidelines.
Regulations and bylaws are prepared at the national level and implemented by local authorities.
Approval and authorization for new recycling yards is made by the local office. Their mandate
includes renewal of ship recycling authority certificates. An Environmental Impact Assessment (EIA)
is required when the yards are being developed but is not required for each incoming ship.
Compliance Monitoring
All relevant departments have the right to inspect recycling yards at any time. The Provincial
authorities have been keeping records of their inspections since 2004. Inspectors spend two days
every week at the ship recycling yards for audits and observations. The inspectors make their
findings on the basis of samples, videotapes, aerial photography and other evidence collected during
inspections. Water sampling is carried out every three months. Reports of the analyses have
indicated no contamination of the seawater. A working conditions audit is conducted every six
months.
While no specific training programmes are in place for inspectors they gain their experience by
onthe-job and onsite training given by more senior inspectors.
32
Enforcement
The Harbour Master has the powers to enforce all applicable legislation. The Ministries also share
information about ship recycling activities with each other. Yards which carried out ship recycling
activities in breach of permitted conditions have been fined. In extreme cases this can lead to
cancellation of a permit or permission to dismantle a ship. If the permission to recycle is withdrawn,
all ministries are notified of the decision.
Ship recycling yards have been fined for oil spills four yards were fined in 2010, six in 2011 and a
single yard was fined during the first three months of 2012. At one point during 2012 the licences of
8 ship breaking yards had been suspended for lacking firefighting equipment and work being carried
out on soil/unpaved areas. Ship recycling yards may appeal against penalties in the courts, however,
any fines and penalties must be paid before any appeal court hearing.
Overview
Most of the workers engaged in ship dismantling are high school graduates. The median age is 35
years and the literacy rate is around 50%. The average working hours are 7.8 hours per day with a
sixday week. A typical worker has 10 years experience. Research has indicated that some 3.5% have
had occupational disease and 8.6% of the workers have had a chronic disease for more than a year.
About 23% of work force has been affected by occupational accidents. Some of the workers had OSH
training before joining shipbreaking yards.
The Ministry of Labour and Social Security has three key organizations, which carry out OSH related
activities, the Directorate General of OHS, the Labour Inspection Board and CASGEM (the centre for
labour and social security training and research). The Directorate General OHS has been tasked with
preparing national policies as well as drafting, adopting and enforcing the legislation. It also carries
out research work on safety and prevention of occupational accidents and diseases. The DG OHS is
also responsible for authorizing institutions for manufacturing of personal protective equipment
(PPE) and addressing compatibility issues of imported materials. In its preparation for accession to
the European Union, DG OHS has enacted 33 new regulations.
33
At present labour laws cover OHS related issues. A draft OHS law covering all sectors is in final stages
of preparation. Once passed by the Council (Parliament), risk assessment would be made
mandatory. Turkey also has a National Occupational Health and Safety council comprising members
from government, private sector, trade unions, NGOs and academia. The major projects launched by
the Ministry include improvement of health and safety conditions at workplaces; technical
assistance for the development of labs in the OHS Centre; and raising awareness on occupational
diseases.
OHS Training
The ILO guidelines on shipbreaking were translated in 2001 and are now in use by some of the ship
breakers. To develop a positive approach to control and compliance, from 1985 to 2003 the DG for
OHS focused on cooperation (information, education and training) with the ship breakers which
fostered an improved attitude to meeting regulatory compliance. With the involvement of CASGEM
some 20,000 workers were trained in ship-breaking activities over a span of three months, the
training costs being borne by the ship breakers. A decline in accidents and fatalities has occurred,
attributable to this approach.
The Ship Recyclers Association of Turkey may be considered to be pivotal to the successful
operation of the ship recycling yards through the resources it provides for them. The Association
provides administration, legal, waste management, training and marketing services. It is also a point
of contact with international organizations and national authorities. Training covering occupational
health and safety, risk assessment, emergency response and evacuation and asbestos management,
is conducted by third party professionals. The Association manages a common health unit, OHSAS
and environmental monitoring unit. The Waste Management Centre, run by the Association, also
34
manages specialist asbestos removal. This involves all the activities for safe identification and
removal according to the standards and procedures. The destinations of wastes and materials for
recycling from ship recycling the waste management centre is summarised in the Table below.
Only licensed vehicles may be used for transportation of waste. All waste from ships must be
immediately transported to the Waste Management Centre for safe storage. The Waste
35
Management Centre must make regular returns to the competent authority on the waste generated
from the ships.
At the top end of the facility were offices with dining/rest areas and adjacent to them was a
weighbridge. A temporary storage area for waste and recyclables with a building with secure
covered storage was close to the weighbridge. The yard was clearly delineated from the
neighbouring yard with a boundary wall. It was clean and tidy, wash down hoses were available and
in use. Materials from dismantling were either being carted by lorry straightaway to storage direct
from the ship or placed in discrete piles on the hard standing. A small, level, secondary breaking area
also on hard standing was laid out approximately 100 metres from the shore line. Ships were
moored bow-facing the yard, held fast with chains ready to be winched further in as dismantling
progressed. Workers were wearing personal protective equipment, boots, hard hats and overalls.
Inspectors regularly visit yards to assess compliance.
At the Waste Management Centre in addition to the storage facilities for oil, asbestos and other
wastes, an ISO container is located, equipped with booms and other pollution control equipment.
Next to this is the on-site medical centre.
36
4.2.4 Turkeys accession to the Hong Kong Convention
Turkey is ready to ratify/accede to the HKC with general support for the process from all
stakeholders. In mid-2012 the process was at Parliamentary approval stage, prior to acceding to the
Convention. Approvals have been given by a Ministerial committee, followed by the consent from
the Council of Commissions and SubCommissions. Turkey may then submit the accession document
to the Depositary at an appropriate time.
4.2.5 Conclusion
The field visit to Turkey was instructive on a number of points with respect to the issue of developing
compliant models for ship recycling at the facilities currently employing the beaching method. The
lessons that may be learned from the experience of Turkey and applied by them can be described as
follows:
Ship recycling commenced on essentially unprepared ground deemed suitable for
bringing ships close to shore for dismantling;
Legislation to control ship recycling has been developed over time with policies
underpinned by reference to international agreements to which Turkey is party (e.g.
ILO on labour and the Basel Convention for waste management and the IMO in due
course for the Hong Kong Convention) and followed up with compliance actions;
Differing Ministerial responsibilities (e.g. labour environment, shipping) do not appear to
have hindered development of coherent arrangements to effectively regulate ship
recycling and improve environment, health and safety conditions each has cooperated
and contributed to improvements;
The ship recyclers association played a pivotal role in helping to raise standards as well
as act as a coordinated voice for the industry;
The ship recyclers association has been proactive in developing practical support to the
yards through provision of communal waste management facilities and specialist
expertise (such as asbestos removal), these may not have been as cost effective readily
if each yard had to supply their own;
The ship recyclers recognized the need to work with the Ministries;
Investment in improvements to the facilities has been progressively undertaken over
time, to provide affordable environmentally sound management conditions;
The availability of downstream specialist waste management facilities has greatly
facilitated the capacity of the ship recyclers to comply with requirements for off-site
hazardous materials and waste treatment and disposal.
37
Overall, the similarities with beaching nations, such as the close proximity of the yards to each
other in one geographical area, the application of the landing method of ship dismantling and
the multiplicity of responsible Ministries involved each with legislative powers within a wide
framework, mean that useful comparisons between the experiences of Turkey and the main
ship recycling countries can be drawn as helpful indicators for development of improvements at
ship recycling facilities.
38
5. Baseline Information on ship recycling yards and waste
management facilities in Pakistan
5.1 Study Location
The principal area of interest is at the ship breaking yards, located at Gadani, Balochistan.
Dismantling is carried out by the beaching method. The beaching area is spread over 1,256 acres
consisting of 314 plots of some 4 acres each. About one third of these yards have been developed.
Twothirds of the developed plots are owned by a local Balochi tribe leaders family and the
remaining onethird are under the ownership of the Balochistan Development Authority with a few
plots in private ownership.
The following summarises the results of studies made on the conditions of the regulatory and
physical infrastructure for waste management in Pakistan and the current practices at the ship
recycling yards to inform the approach towards compliant models for sound waste management.
39
Metals in paint pollute the working environment.
Large volumes of oil and oily water must be managed.
The study also determined that waste management was a key issue but that:
Hazardous materials that remain on beaches can be well managed locally with improved
housekeeping practices and with adequate handling and storage. The lack of hazardous
waste disposal and treatment facilities in Bangladesh and Pakistan means that wastes
produced must nevertheless be disposed of somewhere. And informal disposal may occur
on the beaches, on adjacent unused plots, or on other land in the vicinity.
At the same time it was noted that (with ship recycling continuing at similar levels) large amounts of
hazardous materials are likely to accumulate if the prevailing practices continue over the next 20
years. Table ES3 of the World Bank report showed that Pakistan may accumulate 5,200 tonnes of
asbestos, 16,000 tonnes of PCB and 14,000 tonnes of ODS among other materials over the next 20
years.
On regulatory control mechanisms, the report commented that Pakistan possesses some form of
basic control mechanism for ship recycling, based around the no objection concept. However, the
report also observed that such mechanisms do not meet the international norms being put in place
under the Hong Kong Convention for the Safe and Environmentally Sound Recycling of Ships and
noted that Pakistan will need extensive institutional building and infrastructure upgrading to meet
those standards.
The report considered the possible consequences of sea level rise and indicated the risk of having
vast amounts of sand contaminated from present and historic ship breaking activities exposed to
dynamic tidal and wave action over the long term. The view was presented that such redistribution
of metals and persistent pollutants from their relative immobilization in the dry sand and shore soils
to the dynamic aquatic ecosystem of the tidal zone will pose direct environmental and human health
hazards, including through the transfer of pollutants in the marine and human food chains.
Combined with other runoff from industrial discharges, it was considered that this added pollution
pressure can affect biodiversity and economically important areas such as fisheries and fish and
shrimp farms.
40
Recommendations of the World Bank Study
Recommendations of the report were made against the following objectives, to:
Reduce the risks to and impacts on workers and the environment of unsafe dismantling
practices in the recycling yards;
Provide safe storage, transport, and disposal options for hazardous materials derived from
the recycling process in order to reduce the distribution of unsafe materials in communities;
Provide options for financing investments and managing them through public-private
partnerships; and
Clean ships prior to starting any breaking or recycling activity.
A key recommendation was to reduce the risks from hazardous materials before ship recycling
commences. It was found that ships for recycling often call at Karachi and Chittagong or anchor
outside for approvals. Such calls can be made mandatory, as it provides an opportunity to perform
various pre-demolition cleaning activities such as cleaning cargo tanks, emptying bilge tanks, paint
and chemical stores, and waste oil, and unloading surplus fuel under controlled conditions. To
manage the operationally generated waste of ships calling at the port of Karachi, MARPOL (the
International Convention for the Prevention of Pollution from Ships) reception facilities should be
developed. These facilities may, in light of the particular situation at a port of final call, be
supplemented with a capacity for handling solid waste and non-operationally generated waste,
providing a broader cost recovery base.
41
Recommendations specifically for Pakistan included the following:
Infrastructure improvements are needed in the capacity and safety of the main road for
transport of all waste and reusable materials generated in the ship recycling yards.
Significant infrastructure and capacity development in the hazardous waste management
sector is required in particular in the long term in order to achieve proper storage and
disposal levels leading to compliance with national regulations, the Hong Kong Convention,
and other relevant international agreements.
Investments in hazardous waste management and waste disposal may present opportunities
for engaging in public-private partnerships to the benefit of the local urban area of Hub, the
greater urban zone of Karachi, the Port of Karachi, and the ship breaking and recycling
industry.
42
Develops general or sector specific policy framework for the protection of the
environment;
Disseminates information on environmental matters of public importance;
Balochistan Development Authority (BDA) and Balochistan Environment Protection Agency (BEPA)
BDA has had responsibility for providing basic infrastructure requirements relating to the ship
breaking industry at Gadani since September 1978, road construction has been the main activity.
BEPA serves as the environmental regulatory body for the province. BEPA is responsible for
approving an Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA),
required before permission can be granted for a ship to be imported.
43
the regulatory regime for hazardous substances and wastes. Ship breaking is subject to the
Balochistan Ship Breaking Industry Rules, 1979. These empower the BDA to lease plots for ship
breaking (of the 132 developed plots, some 31 are under this scheme, the rest being in private
ownership).
Waste Management
Waste management is dealt with through environmental legislation and local governmental
legislation. For both cases, solid waste management is not the primary focus. At present there are
no landfill regulations or standards that can provide municipalities with some framework for
compliance and monitoring. There are no National Environmental Quality Standards (NEQS) related
to waste collection points, equipment or vehicles for transportation of waste, transfer solutions,
treatment or recycling facilities including sanitary or landfill sites.
5.3.3 The Ship Recycling Yards and waste management at Gadani brief
overview
The yards at Gadani beach are mainly sand. Containment or protection against contamination of soil,
seawater and the surrounding areas is largely lacking. The layout of the yards can be divided into
three distinct zones:
1. Permanently zoned areas at the foreshore. Activities performed in these areas are:
Oil and other fluids removed from the ship by pumping;
Cutting area - into suitable size for transportation consisting of-
o Primary beaching/block breaking area;
o Secondary block breaking area
Other activities including removal and dismantling of reusable equipment and
material including batteries, cables, refrigeration systems, etc.
44
Workshops
Consumables (stores, spares, chemicals) storages; and
Mosque.
There is no particular consistency in the location of these structures which are not grouped in a
specific zone.
3. The remainder of the yard. There are no fixed or permanently allocated areas for any
specific activity. The space is mostly used for the following activities:
Sorting areas for materials and equipment;
Stockpiling/storage of assorted and finished materials; and
Storage/dumping of hazardous and nonhazardous waste.
It has previously been estimated by the World Bank study that wastes from the ship recycling
industry in Pakistan may accumulate as projected over the next 20 years. An updated survey to
determine the actual quantities being produced at present to confirm these projections would be
valuable. In the interim planning and provision for these quantities (subject to any update) would be
necessary to determine and scope the available environmentally sound capacity within the region,
to avoid informal disposal.
Table 5.1 Projected Accumulated Hazardous Waste Amounts from SBRI at Gadani, 2010-30
3
Miscellaneous (mainly sewage) M 15,700 7,000
Source: World Bank Report No 58275-SAS Ship Breaking and Recycling Industry in Bangladesh and Pakistan, December
2010
45
* The Values given for PCB correspond to the amount of contaminated materials, which must be treated as hazardous
waste under Hong Kong Convention. The actual PCB content based on 1,500 ppm in cables corresponds to 24 Tons.
The World Bank study also projected the fate of the wastes, assuming no new capacity came on
stream and the existing ship recycling practice remains unaltered as shown in the following table.
Table 5.2 Projected Principal Disposition of Hazardous Waste from SBRI at Gadani, 2010-30
Hazardous Materials Units Remain at Yard Sold with Re-rolling Waste Unknown
/in Beach Equipment or Mills Disposal Site
Sediment as an Item
Paints (metals, PCBs and TBT) Ton 455 228 3,867 Nil Nil
Heavy Metals (mainly batteries, Ton 22.5 22.5 Nil Nil Nil
bearings and anodes)
Waste Liquids Inorganic (acids) Ton 25.5 25.5 Nil Nil Nil
Source: World Bank Report No 58275-SAS Ship Breaking and Recycling Industry in Bangladesh and Pakistan, December 2010
* The calculations assume a small amount of halons in fire-fighting equipment and most of it in foam. Therefore, only small amount is allocated to
equipment.
The baseline conditions examined for the World Bank study confirmed the likely widespread variable
contamination of the ship recycling yards at Gadani beach with heavy metals, chromium, lead and
mercury. Oil and PCB was also found. Followup studies would be useful to improve the
understanding of the distribution of contaminants and their concentration range. This would assist
in identifying any hot spot that may benefit from remedial treatment and to help estimate likely
costs for any such work.
46
5.3.4 Waste Management - available downstream capacity for ship recycling
wastes
In general this study found that provision for wastes generated from ship recycling is largely similar
to that already described in previous studies. Capacity exists for easily recycled materials but is
limited for the more hazardous wastes.
There are no known engineered landfill sites for asbestos in the Karachi and Hub region. Similarly
there are no known designated facilities for safe disposal of Polychlorinated Biphenyls (PCB), neither
incinerators nor engineered landfill suitable for low level PCB wastes. For ozone depleting
substances a number of incinerators operate in the Karachi area for industrial and hospital waste
although their capacity and capability to deal with ODS is unknown.
Facilities for dealing with lead acid batteries are available as well as for liquid organics (oil and
sludge) that have value for energy recovery. Much waste that can be classed as municipal in
character is recyclable and is so treated.
47
ship recycling yards and downstream. The main features of the expected improvements that could
be made in the short, medium and longer term to ensure environmentally sound management of
materials and wastes at ship recycling yards are described in terms of operational and compliance
needs. The gaps to be filled in order to develop operationally compliant approaches are set out
below in four groups, as actions to fill gaps relating to ship recycling, wastes management and
their regulation. How they can be addressed is set out in section 5.4.1. The gap actions are for:
The actions may consist of one or more factors classed as operational, procedural or infrastructural.
The overall intention is to reduce as far as possible, over time, the potential for pollution or harm to
the environment and human health and to increase the level of control to provide a consistent
approach through application of management and procedures to the process of ship dismantling
that ensures the best possible standards of environmentally sound management.
48
A combination of spill prevention and management techniques can be applied to
help overcome this problem to the extent that it is possible at a beach. A defined
area of the beach where potentially polluting activities are carried out is protected
by simple infrastructure (e.g. a concrete base) that acts as a barrier to the escape of
polluting materials. There would be drainage for contaminants and the capacity to
be periodically cleaned.
This may be achieved by taking defined areas of the beach and creating
impermeable hard standing, with environmental protection such as drainage
catchpits, on which operations involving hazardous or polluting materials can be
carried out.
Improvement to vehicle access at the facility to provide firm, level roadways will
help to reduce wear and tear on the vehicles. This would permit easier and faster
loading onto trucks by mechanical equipment. And provide better stability in poor
weather. Simple road base can be constructed with e.g. crushed concrete.
49
Construction of site roads can be carried out gradually according to a phased plan
improving their standards as resources permit. A compacted road base can be
provided initially on a single track, ensuring that this is well drained and maintained
(filling in pot holes, repair of the edges damaged by traffic and weather).
50
Use of generators and pumps (themselves obtainable from dismantled ships) will
enable for example safer working under low light conditions and the pumping of
liquids from drainage catchpits.
51
Simple covered storage area for hazardous materials using an ISO container with
one side cut away.
Photo: R Watkinson
52
Employing on-site mobile plant
Photo: R Watkinson. Aliaga, Turkey 2012
53
b) Develop Management Procedures
This is similar to the development of the Ship Recycling Plan and the Ship Recycling
Facility Plan under the Hong Kong Convention. Quality management systems can be
used to provide overall consistency of approach.
Initially the most urgent need is for the safe disposal of asbestos waste, the safe
treatment of PCB and ODS and facilities for properly dealing with oily sludges and oils
that cannot be recycled or used as fuel. The latter may have outlets at other industrial
facilities that are adapted to or capable of receiving them (subject to an assessment of
suitability), or at specialist disposal facilities. The latter will need to be developed and
most likely coordinated with a wider strategy for dealing with wastes from other
industries. Landfill facilities for wastes for which no other management option is
available will be needed and may be designed to accept hazardous wastes in special
cells. For example, wastes from cutting such as paint chips, other debris and asbestos
can be landfilled with suitable precautions.
54
The potential intermediate treatment of other wastes needs to be explored further to
identify available methods in the short term, e.g. the management of insulation foams,
some of which may contain ODS.
Final disposal of some wastes such as PCB may be considered in conjunction with other
parallel programmes such as for Stockholm POPs. High temperature incinerators are
costly to install, operate and maintain and require careful design to ensure they are well
utilised without falling into disrepair. Any projects involving these will require planning
for the longer term.
Some of these facilities may be supplied as joint ventures with other waste producing
entities such as municipalities and businesses and attention will need to be applied to
the optimal siting and sizing of any joint facilities.
55
Competent Authority capacity can be established firstly with a needs assessment that
will determine the overall capability required in terms of manpower and skills training to
reach the desired level of competence to inspect and regulate the yards under the
current legislation prior to implementation of the Hong Kong Convention, i.e. with
respect to the Basel Conventions obligations. In the longer term, a second stage needs
assessment will determine the overall capability required in terms of manpower and
skills training to reach the desired level of competence to inspect and regulate the yards
under the Hong Kong Convention. These may apply to different staff in different
Ministries and Departments and may involve skills transfer at appropriate times.
56
SECTION THREE
COMPLIANT MODELS:
CRITERIA & STANDARDS,
DESCRIPTION & SELECTION,
IMPLEMENTATION PROGRAMME
57
6. Criteria, standards and operationally compliant model
selection for Ship Recycling and Waste Management
6.1 Introduction
In this section the criteria for environmentally sound management in the context of the Basel and
Hong Kong conventions are discussed on the basis of the obligations of the conventions. From this a
compliant model approach can be selected. The conventions have to be translated into practical
models that can be implemented to ultimately deliver the conventions requirements. How this is
achieved depends on the interrelationship between the legal obligations flowing from the
conventions into national laws and regulations, the standards set by compliance guidance and
industry standards and the level of facility operator applied compliance systems (such as third party
auditing) and regulator (competent authority) oversight and compliance processes. It is this network
of systems combining the actions of all stakeholders that delivers compliance. Without active input
or application from all sources cooperating and contributing to the control it is unlikely that
compliance can be achieved. This implies at least two considerations when developing a model
approach: i) that any system will inevitably be diverse depending on the range of actors working
together (e.g. different government Ministries and Departments, waste and ship recycling industries
and their individual and collective organizations), ii) that the number of potential model approaches
is likely to be small in terms of variety even if apparently complex (depending on the range of
stakeholders involved from i)) through their network of interactions. From this perspective the
model approach will be generic. The following sections discuss how the development of appropriate
criteria for setting standards of sound management for ship recycling and waste management
downstream may be approached and can assist in determining the steps to be taken in the short,
medium and long term to deliver ESM compliant approaches.
58
1995. Article 1 of the HKC then identifies the general obligations in the first four paragraphs of the
Article:
1 Each Party to this Convention undertakes to give full and complete effect to its
provisions in order to prevent, reduce, minimize and, to the extent practicable, eliminate
accidents, injuries and other adverse effects on human health and the environment caused
by Ship Recycling, and enhance ship safety, protection of human health and the
environment throughout a ships operating life.
2 No provision of this Convention shall be interpreted as preventing a Party from
taking, individually or jointly, more stringent measures consistent with international law,
with respect to the safe and environmentally sound recycling of ships, in order to prevent,
reduce or minimize any adverse effects on human health and the environment.
3 Parties shall endeavour to co-operate for the purpose of effective implementation
of, compliance with and enforcement of this Convention.
4 The Parties undertake to encourage the continued development of technologies and
practices which contribute to safe and environmentally sound Ship Recycling.
Paragraph 1 of this Article presents key criteria concerning the prevention, reduction and
minimization of accidents and adverse effects on the environment and human health while
paragraph 2 recognizes that parties may take more stringent measures than the Convention
provides for. Paragraph 4 recognizes the role of continued development of technologies and
practices.
Similarly the Basel Convention, in its Article 2.8, defines the meaning of environmentally sound
management as:
all practicable steps are taken to ensure that such wastes are managed in a manner to
protect human health and the environment from the adverse effects that could result from
those wastes.
Article 4 on General Obligations, within paragraph 2(b), requires Parties to the Convention to take
appropriate measures to:
59
Ensure the availability of adequate disposal facilities for the environmentally sound
management of hazardous wastes and other wastes, that shall be located, to the extent
possible, within in it, whatever the place of their disposal;
Under the Basel Convention more detailed interpretation of ESM is provided with reference to the
Technical guidelines which elaborate on its meaning for the relevant waste operations and ship
dismantling.
At the international level absolute standards are not always defined for the protection of the
environment and human health in the operation of facilities processing materials, except in specific
cases where, for example emission limits for combustion plant may be set. Rather, guiding principles
and examples of current best practice and available methods are provided so that standards can be
established at the national level, with an expectation of continuing improvement. Ultimately the
actual standards of management at facilities will depend on the level set by the government in
regulations, as monitored through compliance processes by the Competent Authority, together with
the degree of compliance that operators achieve. This approach has already been carried out for the
environmentally sound management of wastes and is described by the obligations of the Basel
Convention for environmentally sound management of wastes, as they are transposed into national
legislation. Accompanying guidelines are available at the international level for a range of hazardous
wastes and processes for treating and disposing of them, as well as guidelines and standards created
for use by competent authorities and operators at the national level. Some examples of these are
found in the bibliography in Section 8. The approach for environmentally sound management at ship
60
recycling facilities should not need to be different, largely reflecting the same standard-setting
mechanisms that are also used to apply to other industrial processes.
The detail of ESM standards to be achieved is often technical and extensive. It is therefore usual to
elaborate these in guidance documents that are more easily capable of being revised and updated
according to experience and progress. This is a more flexible, adaptable and efficient approach
compared to setting standards on legislation. The guidance documents themselves may have legal
backing by being referenced in the appropriate legislation and can help to interpret the meaning of
that legislation in more precise and practical terms. Examples of this at the international level are
the BAT/BEP guidelines (guidelines on best available techniques and guidance on best environmental
practices) prepared for the Stockholm Convention on Persistent Organic Pollutants. Also a series of
reference documents produced by the European Commissions Joint Research Centre has been
established for a regional integrated economic organization (the European Union). This publishes
documents on Best Available Techniques (BAT) for a wide range of process industries known as BAT
Reference documents or BREFs. Versions of these are published for waste incineration and planned
for waste treatment among others.
A range of general guidance documents are already available for waste management and for ship
recycling. At the international level for ship recycling those most commonly known are the Basel
Convention Technical Guidelines series, the IMO Ship Recycling Guidelines and the ILO Guidelines -
Safety and Health in Shipbreaking Guidelines for Asian Countries and Turkey. Also available is the ISO
standard ISO 30000:2009 which specifies requirements for a management system to enable a ship
recycling facility to develop and implement procedures, policies and objectives in order to be able to
undertake safe and environmentally sound ship recycling operations in accordance with national and
international standards. These are all freely available for use by States, whether party to the
Conventions or not, and, in the case of the Hong Kong Convention, irrespective of whether the
Convention itself has entered into force or not. The guidance documents are normally only produced
in a limited range of (UN) languages, however, and a State wishing to make use of these may also
wish to translate, adapt them, or add supplementary guidance that deals with the specific
circumstances prevailing in their territory. The Basel Convention Technical Guidelines for the
Environmentally Sound Management of the Full and Partial Dismantling of Ships are, however, also
available in Bengali, Hindi, Turkish and Urdu.
61
Over time standards may improve incrementally, depending on a number of factors, such as the
complexity of the process, the degree of technology applied, technological progress and the
competence and level of training of the workers and management. The rate of improvement can be
enhanced by consistent regulation by an expert competent authority, investment and a commitment
to continuous improvement. Through applying these improvements in a systematic way standards
can be set for the short, medium and longer term that can be met without excessive cost.
The main elements of each approach should apply to methods of working to encapsulate the criteria
and standards discussed in the preceding sections above to ensure:
a. Environmentally sound management at the yards through facility design, use and
maintenance of equipment, skills and training of workers;
b. Environmentally sound management at downstream waste management facilities
through facility design, equipment, skills and training;
c. Monitoring programmes to measure the level of ESM desired is achieved such as
Environmental Assessment are in place and used;
d. Occupational safety and health is provided for by risk identification, providing safe
systems of work, protective equipment.
62
The last element concerning OSH is included not to elaborate on the separate requirements for this
that are addressed under national and international agreements and law but because environmental
management and health and safety are linked, the objectives and means of achieving them are
closely aligned. Implementation of good OSH practice tends to lead to good environmental practice
and vice versa.
The first approach may be considered to be appropriate where the State concerned is already a
Party to the Basel Convention: the existing national legislation should be suitable or readily
adaptable at the national level; Competent Authorities should already exist; the Basel Convention
principles are applicable to any kind of materials / waste processing facility where a desired outcome
is protection of the environment and human health according to systems of environmentally sound
management; there is a large body of published guidance both by the Basel Secretariat and others;
and many examples of practical experience of its implementation can be readily found.
The second approach may also be considered appropriate because: the Hong Kong Convention is
specific to ship recycling; its provisions have been developed according to the particular needs of
shipping and address the design, construction, operation and preparation of ships so as to facilitate
safe and environmentally sound recycling without compromising the safety and operational
efficiency of ships; it provides for the operation of ship recycling facilities in a safe and
environmentally sound manner; and the establishment of an appropriate enforcement mechanism
for ship recycling, incorporating certification and reporting requirements; it requires
environmentally sound downstream waste management to be taken into account; and it enables
States intending to ratify the HKC to develop their implementation in a stepwise manner and be
prepared for entry into force of the Convention along a planned route suited to the State in
question.
63
The third approach may comprise a combination of the two above approaches. This may be
considered suitable as it potentially represents a better means of ensuring compliance with the
Convention currently in force (Basel) while enabling preparation and capacity building to ensure
successful implementation of the Hong Kong Convention, which is yet to enter into force. While a
Government is considering the steps to take with respect to ratification of the HKC, key aspects of
the Hong Kong Convention can be incorporated into existing compliance and regulatory regimes in
advance of acceding to the Convention. This approach would be consistent with Resolution 5 of the
Diplomatic Conference adopting the Hong Kong Convention which invited Member States of the
Organization to consider applying the technical standards contained in the Annex to the Convention
on a voluntary basis to ship recycling facilities under their jurisdiction, as soon as operationally
feasible. The model can take the form of practical steps that can be supported by appropriate
regulatory drivers as found necessary by experience of implementation. This approach may
therefore be used as a step wise means of preparing for the entry into force of the Hong Kong
Convention without compromising existing compliance with the Basel Convention.
The third approach meets the criteria outlined above in section 6.2 incorporating the relevant
aspects of the two conventions and, where appropriate can also take on board linked provisions
from other connected conventions such as the Stockholm Convention for Persistent Organic
Pollutants and the Montreal Protocol for Ozone Depleting Substances. The approach is adaptable in
practical terms and can take on board developments and changes in regulatory infrastructure as
they arise.
The model approach itself can be divided into three components: i) practical infrastructure related,
ii) operational management and procedural factors and iii) regulatory approaches. The basis of the
model can be expressed as a series of checklists that address the various factors that need to be
taken into account to establish the standards and means of implementing them together with an
implementation matrix that can be completed to act as a road map for introduction of the compliant
systems. These are set out in the following sections.
6.5.1 Criteria checklist for ship recycling and waste management facilities
In order to determine standards at the national level, in line with the Basel Convention obligations
already in place as described above and to incorporate those of the Hong Kong Convention, a
checklist may be used to determine that the relevant criteria for ESM are being applied in practical
64
terms. This will determine the level of infrastructure that is to be installed and developed over time.
The relevant criteria would include for example that environmentally sound management policies
are established and adopted. This will help to confirm that appropriate actions are being put in place
to achieve the objectives of the Conventions. Such a checklist may consider the following points and
the current status identified to enable progress to be checked:
Table 6.1 Criteria for ship recycling and waste management facilities infrastructure
Criterion Status
Yet to start In progress Achieved
Are there published environmental criteria at national or local
level that identify the expected level of environmental
protection?
Are there published environmental standards13 at the national
level, either derived from the above criteria or independently
(may include relevant recognised international standards)?
Are there published industry standards, especially those based
on convention objectives and obligations?
Are there technical standards for operation of facilities, such as
may have been developed by the operators, including practical
manuals?
Are there environmental assessment techniques or procedures
for identifying the potential impact of facilities?
13
A standard means a defined method of undertaking a task or set of actions that may include the sequence of actions and
numerical limits e.g. values that should not be exceeded. A standard will determine the quality of the action or output.
For example the OSPAR Commission. 2008. Overview of Contracting Parties National Action Levels for Dredged Material
(for Denmark). London .
65
Table 6.2 Criteria checklist for operators of facilities
Criterion Status
Yet to start In progress Achieved
Are there documented operational procedures?
Are quality management systems (that may be audited by a
third party, such as an accredited independent auditor) in place,
that underpin the operation of the facility?
Are staff trained and technically competent?
Is there monitoring of the operation of individual facilities by the
operator to check for compliance with the permit?
Is there monitoring of the environment outside and in the
vicinity of the facility?
Are records kept of monitoring results and made
available/reported to the competent authority?
Are there provisions (e.g. emergency plans, shut down
procedures) for dealing with non-compliance or remediating
effects of non-compliance?
66
Each one of these may be elaborated further to incorporate the specific elements that are applicable
in the context of national legislation, policies and procedures. The actions for implementation in the
short, medium and long term and the generic implementation matrix are described in chapter 7.
67
7. Actions towards ESM Compliant Model Standards:
Short, Medium and Long Term
Ship recycling activities can also have implications for workers health and safety dependent on the
practices employed at the facilities. While provisions for occupational health and safety at ship
recycling facilities are elaborated in the Hong Kong Convention and its associated guidelines, the
focus of this study is on environmentally sound ship recycling, focusing on mitigation measures to
reduce impacts on the environment. The study does not therefore prescribe specific actions to be
undertaken to improve occupational health and safety standards at the facilities, but acknowledges
the strong link between environmentally sound management, in accordance with the obligations of
the Basel Convention, and human health.
The actions set out here have been derived from the information obtained on conditions prevailing
at the ship recycling facilities for this study to improve compliance with the Basel and Hong Kong
Conventions. It is emphasised that, to be effective, coordinated actions may be required both on-
site at the ship recycling facilities and at downstream waste management facilities. The actions may
be planned and developed in stepwise fashion. The actions are designed to be broadly applicable to
conditions prevailing at any beaching facilities. The number of actions proposed may be increased or
the timing of their implementation may be adjusted according to more detailed analyses that may
be undertaken in the follow up to this case study or for implementation for specific facilities. The
aim is to identify first those preparatory actions which will assist in planning, resourcing and
management of the later stages and are also relatively easy to implement at low cost. Then those
68
actions requiring greater financial investment can be planned for at later stages. Several further
examples of practical actions have been proposed in a research document submitted to the IMOs
Marine Environment Protection Committee by the United Kingdom as a report on potential
transitional technology solutions for environmentally sound ship recycling in developing countries14.
Some of these practices may be dependent on the creation of additional guidance and standards for
regulation. The rationale for the actions set out for the short, medium and longer term therefore is
that progressively over these time frames, actions are selected that involve:
1. Short term - Minimal Equipment /Cost
2. Medium term - Simple/low cost techniques
3. Longer term - Improved infrastructure and equipment.
The time periods for the actions to be completed are indicative. The Basel Convention Technical
Guidelines provided a generic checklist15 for achieving ESM compliance with timescales within one
year, one to five years and five to ten years. Those planning to implement the actions from this
report should use the Basel Guidelines as a basis adapted to the specific circumstances found. As
the Basel Guidelines have been published for nearly ten years it may be possible to accelerate some
of the actions.
14
Potential Transitional Technology Solutions For Environmentally Sound Ship Recycling In Developing Countries"
Research report WR1110, Department for Food Environment and Rural Affairs, UK, 2009 as submitted to the IMO MEPC 61
as MEPC 61/INF.14, 19 July 2010. Found at:
http://randd.defra.gov.uk/Default.aspx?Menu=Menu&Module=More&Location=None&Completed=0&ProjectID=15944
Aim: To identify, assess and produce guidance on a selected number of appropriate transitional technology solutions for
application to environmentally sound ship recycling, which are suitable for use in developing countries.
Objectives
Develop contextual approach for identifying good practice transitional technology techniques for environmentally sound
management at ship recycling facilities in developing countries, based on existing requirements and guidance.
Propose a range of transitional technology options that will contribute towards environmentally sound ship recycling
practice to inform development of standards and guidance (e.g. International Maritime Organization (IMO) consideration
of draft guidance documents, development of programmes to support interim measures such as the Global Programme of
the International Labour Organization (ILO)/IMO/Basel Convention and any European Commission outreach programme).
Evaluate health, safety and environmental performance of such transitional technology options, their ease of uptake in
developing countries and suggest possible solutions to any barriers to implementation.
Produce a series of guidance notes on each specific option that could be used to support development of interim
measures.
15
Table 11 of the Basel Convention Technical Guidelines for the Environmentally Sound Management of the Full and
Partial Dismantling of Ships, 2003.
69
7.2 The Compliance approach
This programme assumes that not the only the operators of the facilities desire to make the
necessary changes to improve standards towards those set out in the Hong Kong and Basel
Conventions and their respective Guidelines but also the competent authorities will assist in
achieving this objective. The CAs can do this by establishing the conditions whereby the managers
of the facilities are set consistent achievable targets that they, and all involved in the chain, can be
reasonably expected to meet. For example the CAs can, as part of its initial regulatory approach,
focus on encouraging, facilitating and incentivising improvements through creation of planned
approaches towards compliance with the Basel and Hong Kong Conventions in contrast to taking
enforcement action, at least in the short to medium term, while the programme is established. The
competent authorities themselves can use this time period to develop their own capability in
inspection, sampling, monitoring and permit setting in order to become better informed about the
ship recycling process and its regulation. This will help to build a body of knowledge and practical
experience that can be employed to provide consistent, proportionate regulation.
70
the short to medium term. The kinds of materials that need to be identified and dealt with are listed
in Appendix B. This lists the materials described in the Hong Kong Convention Inventory of
Hazardous Materials (IHM Parts I) together with the materials identified in the IMO Guideline for
Safe and Environmentally Sound Ship Recycling, adopted at MEPC63 in 2012, listing materials that
would form operationally generated wastes and other materials found on board ships that the ship
recycling facility should be prepared to handle. The lists (except Part I) are typical rather than
exhaustive and potentially other materials that may be Basel Convention hazardous wastes might
also be found. Hence the need to ensure an inventory for each ship is provided and is complete.
Many of these materials as wastes will require at least temporary storage and protection. Liquid
waste will require tank facilities (the tanks can be recovered from ships) and other solid wastes may
be kept in distinct zones, either covered or uncovered depending on their hazard properties.
Pending next steps such wastes may be later disposed of as waste management options
downstream become increasingly available, according to the actions undertaken to identify and
develop new facilities.
Key actions for ship recycling facilities are outlined in Tables 7.1a and 7.1b. The actions are
separated into those dealing with the ship itself (Table 7.1a) and those dealing with shoreside
activities (Table 7.1b). Tables 7.1a and 7.1b can be applied to facilities being authorized either under
the requirements of the Basel or the Hong Kong Convention in general terms (as well as some ILO
related actions particularly where health safety and environmental protection issues merge), as
allowed for in the applicable domestic legislation. They are practically based and are not necessarily
convention specific. Table 7.2 additionally describes a route for graduated development of specific
processes aiming towards compliance with the Hong Kong Convention requirements in the short,
medium and longer term, where a State is taking steps towards implementation of HKC
requirements and accession to this convention. These may be carried out in parallel with the
practical actions described in Tables 7.1a and 7.1b. These actions flow from consideration of the
format for the Ship Recycling Facility Plan, an example of which is reproduced in Appendix C.
71
TABLE 7.1a - Actions for Ship Recycling Facilities - The Ship
SHORT TERM MEDIUM TERM LONG TERM
WITHIN ONE YEAR ONE TO THREE YEARS THREE TO EIGHT YEARS
Minimal Equipment /Cost Simple/low cost techniques Improved infrastructure and
equipment
Carry out visual inspection, Test suspect hazardous materials Document all hazardous
identification and labelling of in situ, sample for confirmatory materials on board against
hazardous materials on board testing supplied Inventory of Hazardous
prior to beaching. Materials
Determine pollutant Apply simple tests for key Apply full monitoring protocol
concentrations prior to removal parameters: oil, selected metals for key parameters: oils, PCB,
of bilge and ballast water. metals (mercury, cadmium)
Make and record visual Deploy spill containment boom
inspection of pollutants in waters with spill clean-up equipment on
around ship. standby
Pump out heavy oils and sludges Pump out liquids to secure Prioritise pumping over man
to drums before starting other storage entry for liquid removal
work. operations inside the tanks
Test compartments for presence Install gas monitoring equipment
of toxins, corrosives, irritants and at key locations
breathable and flammable gases
before entering.
Ventilate spaces (compartments/
tanks) and monitor for
breathable and flammable gases
during work.
Remove combustible and
recyclable materials, including
cables before hot work.
Clean oil tanks and
compartments before starting
hot work.
Apply hot work certification
system.
Identify and remove toxic or
flammable paint prior to metal
cutting.
Collect and contain waste paints
removed
Identify and remove to safe store
presumed PCB-containing
material (closed and open
sources - solids and liquid).
No hot work carried out on or
near any PCB.
Create dedicated area for Seal areas on board ship where Install dedicated
asbestos removal. Apply safe asbestos has been identified. decontamination system.
removal procedures. Limit access Limit access. Filter air emissions.
to trained workers. Securely pack all asbestos.
72
TABLE 7.1b - Actions for Ship Recycling Facilities On Shore
SHORT TERM MEDIUM TERM LONG TERM
WITHIN ONE YEAR ONE TO THREE YEARS THREE TO EIGHT YEARS
Minimal Equipment /Cost Simple/low cost techniques Improved infrastructure and
equipment
Set out facility plan - design Provide firm compacted surfaces Pave roadways.
major areas to indicate places for suitable for vehicle access. Employ lifting machinery and
storage, cutting, roadways etc. plant for heavy items, with low
ground-bearing capacity or on
firm services.
Create a dedicated area for Cover hazardous waste handling
segregation of hazardous areas.
materials (e.g. PCB, hazardous Test, remove and dispose of PCB
waste, liquids). containing material to hazardous
waste facility.
Install clear signs to show where (Optional) Develop communal
each type is put. ship decontamination facility.
Utilise environmentally sound
treatment/ disposal facilities for
hazardous materials.
Install warning signs, buffer Protect fuel tanks (bunds) on
protection zone around fuel hard standing.
drums and tanks.
Inspect winch cables regularly, Test cables regularly, install Install strain gauges and alarms.
replace damaged and frayed pulley and block system.
cable.
Develop and implement spill Provide storm water discharge Install and operate draining and
clean-up and notification facilities, to avoid contamination pumping equipment to
procedures. of storm water run-off. impermeable areas linked to
storage tanks /catch pits.
Supply and use Personal
Protective Equipment: (Hard
hats, gloves, eyes/face
protection, welding goggles,
torches, safety shoes).
Supply and use respiratory
hazard protective equipment.
Supply fire extinguishing Commission dedicated fire and
equipment at risk areas. rescue service (joint venture).
Implement appropriate asbestos Collect and contain all wastes
management procedures in from asbestos removal
accordance with ILO code of processes.
practice. Asbestos work by Pack asbestos in approved
trained personnel only. Access packaging.
to asbestos identified areas to Decontaminate workers when
designated personnel. leaving the designated area.
Post notices/pictograms of key
safety hazards.
Provide occupational health Establish medical centre
service. (cooperative venture)
73
TABLE 7.2 Specific Additional Actions for Ship Recycling Facilities Iin States Progressing Towards
Hong Kong Convention Compliance
SHORT TERM MEDIUM TERM LONG TERM
ONE YEAR ONE TO THREE YEARS THREE TO EIGHT YEARS
Establish basic Ship Recycling Implement Intermediate Ship Advanced Ship Recycling
facility Plan (referring to the Recycling Facility Plan: Facility Plan
IMO Guidelines for the
Development of the Ship Worker ESM and safety Performance
Recycling Plan) Training and Monitoring Plan
information Quality System to
Employers and workers Emergency Plan achieve HKC goals and
responsibilities Record Keeping continuous
Worker Safety policy Reporting system for improvement
Worker Training discharges, incidents
programme accidents
Reporting system for
accidents injuries etc.
Basic check hazardous Use Inventory of Hazardous
materials on board Materials as main
(refer to IMO Guidelines for the
Development of the Inventory
of Hazardous Materials)
Safe and Environmentally Upgrade storage Upgrade Storage
Sound Management of Hard standing Cover/protect storage
Hazardous Materials Drainage areas
Identify
Label Identify waste disposal facilities Waste Management
Segregate Survey capacity All wastes to
authorized ESM
facilities
Basic Ship Recycling Plan
(Refer to IMO Guidelines for
Safe and Environmentally
Sound Ship Recycling)
74
introduce such facilities in a manageable phased programme of investment over a suitable
timescale, as will also be needed with wastes management at ship recycling facilities. The initiative
to deliver ESM waste facilities may be from Government, the private sector or a combination of the
two such as a public-private partnership. The actual approach taken will depend on the individual
circumstances prevailing.
Sound waste management for ship recycling has the following characteristics:
o Facilities that operate to ESM standards;
o Suitable technology for wastes produced;
o A reporting system that allows timely action to be taken;
o Good quality data and management systems;
o Effective communication between industry and regulator;
o Appropriate guidance from Government and regulator; and
o Sharing of best practice information.
In step with developments at ship recycling facilities Table 7.3 sets out actions that may deliver
actual ESM capacity over time where the existing conditions indicate that provision is currently
minimal. Due to the likely combination of lead agency public or private sector it is assumed the
actions described here are likely to be commenced by a governmental agency in terms of initial
assessments in the short and medium term and later development may be undertaken by the
private sector operators as opportunities for investment are clarified.
TABLE 7.3- Actions for Development of Environmentally Sound Management at Waste Treatment
Facilities
SHORT TERM MEDIUM TERM LONG TERM
ONE YEAR ONE TO THREE YEARS THREE TO EIGHT YEARS
Undertake enhanced survey of Identify needs assessment and Complete infrastructure
waste facilities capacity gaps from waste survey development, commission new
waste arising at ship Identify infrastructure facilities into operation.
recycling yards gaps Temporary
waste arising at Gadani Decide priority needs storage/bulking and
wastes arising from (hazardous waste) transfer
Port Reception Develop infrastructure Physico-chemical
Facilities Improvement Plan (e.g. treatment
Wastes at industrial similar to Stockholm Incineration
Convention NIPs16) (specialized)
16
An example of this is the Bangladesh National Implementation Plan (NIP) For Management of Persistent Organic
Pollutants (POPs), Prepared under UNDP Project BGD/02/G31/1G/99 Bangladesh: Preparation of the POPs National
Implementation Plan under the Stockholm Convention, Department of Environment (DoE) Ministry of Environment and
75
areas (e.g. Hub) Identify financing Hazardous waste
Classify by Basel mechanism landfill
Convention Annexes Initiate development of Landfill
VIII and IX infrastructure
Identify priority needs for Assess alternative options for All waste to ESM facilities
specified waste streams e.g. long term wastes management
Asbestos Pre-decontamination
PCB facility
ODS Import bans
Waste oils
Establish temporary waste
treatment policy
storage facility for key
waste streams
import bans on
selected hazardous
wastes
export of selected
hazardous waste
streams
Implement policy decision on
above.
In each approach it is useful for the CA to develop and make available for use by industry
information about its activities so that the industry can be aware of what is expected of it and to
what standards it should be working. This establishes a means by which the expectations of the
regulator can be readily communicated to the industry without necessarily going through formal
compliance and enforcement processes.
Forests, Government of the Peoples Republic of Bangladesh, January 2007. Found at:
http://www.neeri.res.in/Stockholm/NIP_Bangladesh.pdf
76
The CA may produce a suite of documents as part of its education and informing approach that
identify standards and may include methods on how they may be achieved as a benchmark against
which the industry can judge its own working and management methods. In developing its
regulatory approach, the CA may produce guidelines and procedural manuals that describe how the
CA conducts it inspections, what evidence it expects to find is available and routine matters such as
the frequency of visits, whether and how unannounced visits are to be made, an inspectors
credentials, the facilities an inspector needs access to at the site and what areas. It may also include
what reports an inspector makes and how the reports results are to be communicated to the facility
operators. Other functions that the CA conducts may be for internal use only by the CA, especially
where this relates to the conduct of enforcement activities. The general process may be
summarized for external use. This would provide information to an operator of a facility on matters
such as how inspections are carried out, the range of compliance actions that may be applied (e.g.
form verbal advice/warnings, written advice/warnings, issue of prohibition notices and other notices
and notice of intention to prosecute for breach of permit conditions). In proceedings for
prosecution some internal rules and procedures may become disclosable for examination and it may
be useful to ensure these are as clear as possible, in terms of describing how inspectors and officials
should conduct themselves etc. Some guidelines are already available from the IMO and the Basel
Convention Secretariat which may be further adapted or elaborated for national use. Details of
these are in Section 8 - References and Bibliographic Material.
77
TABLE 7.4- Actions for Competent Authorities - Authorization of Ship Recycling and Waste
Management Facilities
SHORT TERM MEDIUM TERM LONG TERM
ONE YEAR ONE TO THREE YEARS THREE TO EIGHT YEARS
Establish (lead) Competent
Authority and Ministries
Develop specialized CA Develop Ship Recycling Facility Implement regular monitoring
awareness and training Authorization Process and inspection programmes
programme for ship recycling Conduct initial Site inspection
according to HKC requirements. inspections Sampling
Develop (voluntary) Analysis
compliance action
plans with facility Undertake compliance action
operators e.g.
Administrative notices
Develop specialized CA Develop Waste Management (inspection reports)
awareness and training Facility Authorization Improvement notices
programme for waste Package17: Prohibition notices
regulation (where not yet Determine ESM Enforcement
undertaken) requirements Court procedures
Authorize facilities
Develop Compliance
Implementation Plans for waste
and ship recycling facility
authorization
Review legislation Identify needs assessment and Implement legislation
Identify lead gaps from survey for waste in Refine processes and
Ministry(ies) the region revise published
liaise with Basel Include changes to guidelines
Convention Focal Point regulations
Develop plan for any Consult and publish
necessary legislative new guidelines
changes replace no objection
Develop procedural certificate with revised
manuals compliance process
Determine HKC ratification Initiate ratification/accession of Ratify/accede to HKC
process HKC
78
ship recycling and waste management. Some of these may need to be modified or updated in
accordance with the new provisions of the Hong Kong Convention in order to transpose this
Convention into domestic law. The basis for the following assessment is that the relevant Ministry
of the Government concerned may wish to act to adapt existing legislation in concert with its own
timetable:
a) In the short term for the implementation of existing laws and regulations as they may
apply to ship recycling taking into account any relevant aspects of the Basel Convention
especially for downstream waste management;
b) In the medium term to introduce interim measures specific to ship recycling that reflect
the key requirements of the Hong Kong Convention; and
c) For the smooth and effective ratification and implementation of the Hong Kong
Convention.
An analysis of the legislation already in place may indicate that, initially simple amendments may be
all that is required, while concentrating on building capacity for the competent authorities, or that
new legislation is required. In many cases the process of ratification/accession to the HKC may
require more fundamental changes that would be the subject of a comprehensive review.
79
TABLE 7.5 Compliant Model Ship Recycling Waste Management Implementation Matrix
(shaded blocks are indicative to illustrate how the project elements might be progressed)
Activity Lead Role Phase 1- Plan and Initiate (Years) Phase 2 Develop Enhance (Years)
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8
Competent Authorities
1. Identify lead Ministry(ies), review Government
legislation, plan change Ministry
2. Establish (lead) Competent Authority Government
Ministry
3. Develop awareness and training Competent
programme for HKC requirements Authority
4. Develop awareness and training Competent
programme for waste regulation Authority
5. Develop implementation manuals Competent
Authority
6. Establish, maintain dialogue with Competent
industry authority
7. Plan, implement phased compliance Competent
action plans programme authority
Ship Recycling Facilities ship
8. Initiate, implement minimal Industry - Ship
equipment / cost actions Recycling Facility
9. Implement, simple low cost techniques Industry - Ship
Recycling Facility
10. Improve infrastructure and equipment Industry Ship
Recycling Facility
11. Establish, maintain dialogue with Industry and
Ministry / Competent Authority Competent
Authority
Ship Recycling Facilities shore
12. Initiate, implement minimal Industry - Ship
80
equipment/ cost actions Recycling Facility
13. Implement, simple low cost techniques Industry - Ship
Recycling Facility
14. Improve infrastructure and equipment Industry - Ship
Recycling Facility
Develop ESM at Waste Treatment
Facilities
15. Undertake enhanced survey of waste Competent
generation, facilities, capacity Authority
16. Identify waste infrastructure gaps and Competent
needs , compliance requirements Authority
17. Identify priority needs for specific Competent
waste streams - asbestos, PCB, ODS Authority
18. Develop/enhance waste management Government
strategy Ministry
19. Devise long term wastes management Government
options e.g. pre cleaning, import bans Ministry
20. Implement priority waste treatment Competent
policy Authority
21. Develop / enhance regulatory Competent
compliance framework Authority
22. Establish new capacity, specialised Industry
Facilities
23. Establish, maintain dialogue with Industry
Ministry/Competent Authority
Strategic Financing
81
8. References and Bibliographic material
UNEP
Basel Convention
1. 1989, The Basel Convention on the Control of Transboundary Movements of Hazardous Waste
and their Disposal; www.basel.int
2. Technical Guidelines for the Environmentally Sound Management of the Full and Partial
Dismantling of Ships, 2003 Basel Convention series/SBC No 2003/2, ISBN 92-1-158620-8;
http://www.basel.int/Portals/4/Basel%20Convention/docs/meetings/sbc/workdoc/techgships-e.pdf
6. Basel Convention Technical Guidelines on Waste Oils from Petroleum Origins and Sources
http://www.basel.int/Portals/4/Basel%20Convention/docs/meetings/sbc/workdoc/old%20docs/tec
h-y8.pdf
82
Metal Compounds
http://www.basel.int/Portals/4/Basel%20Convention/docs/pub/techguid/r4-e.pdf
14. Training Resource Pack for Hazardous Waste Management in Developing Countries
http://www.basel.int/pub/pub.html
15. Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and
their Disposal Checklist for the Legislator http://archive.basel.int/legalmatters/natleg/index.html
16. Model National Legislation on the Management of Hazardous Wastes and Other Wastes as
well as on the Control of Transboundary Movements of Hazardous Wastes and Other Wastes and
their Disposal http://archive.basel.int/pub/modlegis.pdf
IMO
Hong Kong Convention
18. The Hong Kong International Convention for the Safe and Environmentally Sound Recycling of
Ships (2009): http://ec.europa.eu/environment/waste/ships/pdf/Convention.pdf
83
19. Guidelines for the development of the Inventory of Hazardous Materials, 2011; (adopted by
Resolution MEPC.179(59)), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.
179(59)%20Inventory%20guidelines.pdf
20. Guidelines for safe and environmentally sound ship recycling, 2012; (adopted by Resolution
MEPC.210(63), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/210(63).pdf
21. Guidelines for the development of the ship recycling plan 2011 ( adopted by Resolution
MEPC.196(62), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.
196(62).pdf
22. Guidelines for the authorization of ship recycling facilities; (adopted by Resolution
MEPC.211(63), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/211(63).pdf
23. Guidelines for survey and certification of ships under the Hong Kong Convention; (adopted by
Resolution MEPC.222(64), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.
222(64)%20Survey%20and%20Certification%20Guidelines.pdf
24. Guidelines for inspection of ships under the Hong Kong Convention; (adopted on 5th October
2012 by Resolution MEPC.223(64), at:
http://www.imo.org/OurWork/Environment/ShipRecycling/Documents/RESOLUTION%20MEPC.
223(64)%20Inspection%20Guidelines.pdf
26. Marine Environment Protection Committee, Recycling of Ships, MEPCs 54-63 Reports of the
Marine Environment Protection Committee; see IMO Knowledge Centre above
Other References
84
28. Defra, February 2007, UK Ship Recycling Strategy;
www.defra.gov.uk/environment/waste/strategy/ship.htm
29. Environmentally sound management of ship recycling principles and practice, Watkinson, R,
Department for Environment Food and Rural Affairs, London, Proceedings of the First
International Conference on Dismantling of Obsolete Vessels, 11-12 September 2006, Glasgow,
UK 2006 ASRANET LTD, ISBN: 0-9553550-1-X/978-0-9553550-1-1
30. 15. Commission Of The European Communities, Green Paper On better ship dismantling,
Brussels, 2007, COM(2007) 269 final
http://ec.europa.eu/environment/waste/ships/pdf/com_2007_269_en.pdf
31. Commission Of The European Communities: European Commission proposal for a regulation on
ship recycling, and for a Council decision regarding ratification of the Hong Kong Convention
http://ec.europa.eu/environment/waste/ships/
32. Ship breaking and recycling industry in Bangladesh and Pakistan. Final report, December 2010.
Washington, D.C., World Bank, 2010
http://siteresources.worldbank.org/INTPOPS/Publications/22816687/ShipBreakingReportDec20
10.pdf
33. The Ship Breaking and Recycling Rules 2011, Ministry of Industries, Government of Bangladesh
at http://www.moind.gov.bd/index.php?option=com_content&task=view&id=478&Itemid=572
85
Appendix A: Government Institutions and Regulatory Framework for Ship
Recycling in Pakistan
The MCC is actively pursuing issues related to the ship breaking and recycling industry. It has
participated in a Basel Convention-sponsored Ship Recycling Technology & Knowledge Transfer
workshop in Turkey in 2010 and at IMO meetings by invitation. The Ministry is not the focal point for
IMO related matters and so not in the lead for issues related to IMO or IMO conventions. Its role as
an overseer of environmental protection is however significant as the focal ministry of multilateral
environmental agreements to which Pakistan is a party. With respect to the Hong Kong Convention
the MCC role is likely to be through environmental protection agencies.
86
Formulate and revise as when required the National Environmental Quality Standards
(NEQS) see next section;
Promote research and development for the prevention of pollution and protection of the
environment;
Develop general or sector specific policy framework for the protection of the
environment;
Disseminate information on environmental matters of public importance;
Specify safeguards for the prevention of accidents and human induced catastrophes;
Promote community level initiatives that lead to conservation of the environment;
Investigate complaints of environmental degradation.
PEPA is not currently involved in projects with direct impact on SBRI. Responsibility for executing
environmental conservation projects in the provinces is delegated to provincial environmental
protection agencies and departments.
MoP&S enforces MARPOL. The daytoday operations are handled by the office of the Director
General of Ports and Shipping in Karachi. When a ship destined for recycling at Gadani has entered
the territorial waters of Pakistan, the Ministry of Ports and Shipping has jurisdiction over it with
87
respect to IMO conventions until the ship reaches the shore at Gadani. Where a ship has to be
towed to Gadani for recycling, the Office of the Chief Engineers and Ship Surveyors authorizes the
navigational route. It is expected that once the Hong Kong Convention has been ratified, the
Directorate General of Ports and Shipping Karachi would deal with matters related to the ship
breaking and recycling industry. It would approve the ship recycling plan and check the inventory of
hazardous materials.
Officers within the MoP&S may delegate some environmental aspects of ship recycling facilities and
the ship recycling plan by employing recognized organizations (ROs), in particular with respect to the
requirements of Regulation 16 (Authorization of Ship Recycling Facilities) and 18 (Ship Recycling
Facility Plan) of the Hong Kong Convention.
MMD has delegated a number of its responsibilities to classification societies acting as ROs as
defined by the IMO agreements. Officials of MMD are aware of the requirements of HKC. This
Department expects to be the lead for regulation of the ship breaking and recycling industry under
the HKC although some tasks may be delegated to ROs.
88
Chief Engineer and Ship Surveyors Office
The Office of the Chief Engineer and Ship Surveyors Office is part of the Maritime Safety
Administration of Pakistan under the Mo&PS. Its main functions are:
Implementation of IMO and other maritime conventions;
Ensuring safety of life at sea;
Ensuring safety of navigation at sea;
Protecting the marine environment;
Maintaining training standards and certification of seafarers for shipboard examination.
As the responsibility of implementing IMO conventions has been allocated to the Office of the Chief
Engineer, this department is expected to initiate the process of ratification of HKC.
Ministry of Industries
The Ministry of Industries (MoI) is the focal point for the promotion and expansion of the industrial
sector in Pakistan. The main objectives of MoI are to facilitate and promote development of
industrial clusters; provide incentives for forward and backward integration; enhance
competitiveness of the local industry; ensure optimal capacity utilization; and revival of distressed
units. It has responsibilities for national industry planning and coordination, development and
implementation of industrial policy, acting as a federal agency for promoting of industrial
productivity, special studies in the industrial fields and testing industrial products; developing Acts
and Rules. MoI is responsible for providing technical assistance and education according to the
requirements of the industry. If required, the Ministry can open new centres as well as enhance
capacity of the existing centres for imparting technical knowledge and enhancing skills base.
The SBRI has been accorded industry status. However, no incentives or policies have yet been
implemented by MoI for ship recycling activities. MoIs future role with respect to SBRI may involve
initiatives to increase the competence of ship breakers according to the requirements of the HKC.
89
Federal Board of Revenue
Federal Board of Revenue (FBR) is responsible for tax collection. The main responsibilities of FBR are
(i) formulation and administration of fiscal policies, and (ii) levy and collection of taxes. Pakistan
Customs is one of the departments of FBR, responsible for regulating imports and exports. The
department works under the powers provided to it through Custom Act, 1969 and Customs Rules,
2001. Chapter 13, Sub Chapter 2 of the Customs Rules 2001 deal with ship breaking. The Rules
require duties on ships imported for recycling to be paid in three instalments. Duty is determined on
the basis of the ship builders certificate confirming light displacement tonnage (LDT). The first
payment is due before permission can be granted to start beaching, the second instalment within 30
days and the final instalment within 30 days of the second instalment. Failure to pay may result in
cancellation of permission. The facility must then commence breaking the ship immediately after
receiving the permission from BDA (see below) and other departments.
90
The agency fulfils these responsibilities by:
Measuring and monitoring discharges into air, water and soil by industrial, urban and
agriculture activities;
Initiating approval process for IEE/EIA for government funded projects;
Creating awareness among policy and decision makers as well as the general public on
environmental damage;
Building technical capacity and enhancing infrastructure needs of the agency; and
Drafting provincial legislation on environmental issues facing the province.
BEPA is responsible for approving an Initial Environmental Examination (IEE) and Environmental
Impact Assessment (EIA), required before permission can be granted for a ship to be imported. The
quality of the IEE/EIAs and how they can contribute to the decision making process is not known
although it is believed they are essentially generic in nature. BEPA may be able to benefit from
capacity building activities such as for critical evaluation of IEE/EIAs submitted by ship recycling
facilities.
II - Regulatory Framework
The Pakistan Environmental Protection Act of 1997 is the basic environmental law of Pakistan. The
Act particularly focuses on the implementation of the Pakistan Environmental Protection Councils
policies, delegation of power to government agencies, enforcement of National Environmental
Quality Standards, and introduction of EIA/IEE review procedures/systems. The Act also addresses
the regulatory regime for hazardous substances/wastes, resource generation through establishment
of a Provisional Sustainable Development Fund, levying of pollution charges and provides an
appellant forum for environmental cases. Relevant sections of the Act include:
Section 11 prohibiting discharge or emission of effluent into to air, water or soil in excess
of National Environment Quality Standards (NEQS). Failure to comply with it would
result in payment of pollution charges and projects which commenced operations after
June 1994 can also be prosecuted on account of compliance failure;
Section 12 dealing with initial environmental examination (IEE) and environmental
impact assessment (EIA). IEE and EIA is required for projects listed in appendices A and B
respectively of the Pakistan Environment Protection Agency Review of IEE/EIA
Regulations, 2000;
91
Section 13 prohibiting the import of hazardous waste into Pakistan and its territorial
waters;
Section 14 dealing with handling of hazardous materials. It mandates the requirement of
a licence to generate, collect, consign, transport, treat, dispose of, handle, import and
store hazardous substances. Licences issued will be in accordance with the provision of
any other local law in force, or any treaty, convention, protocol to which Pakistan is a
party.
Ship breaking is primarily governed by the Balochistan Ship Breaking Industry Rules, 1979. These
rules are not specific to ship breaking at Gadani but are applicable to ship breaking activity carried
out on any beach and coastal place in Balochistan. According to these rules, the BDA has been
authorized to regulate affairs of SRF. The Ship Breaking Rules clearly state that the ship breakers are
responsible for injury to or death of a person due to the hazardous nature of the yards. They are also
responsible for any damage to yards during beaching or recycling/dismantling operations. The
dumping of oil at sea, on the beach or anywhere in the yard is strictly prohibited.
The Constitution of Pakistan contains a range of provisions on labour rights covering humane
working conditions, restrictions on women and children for certain occupations. Pakistan has ratified
34 ILO Conventions on labour standards of which 33 are in force.
Waste Management
Waste management is dealt with through environmental legislation and local governmental
legislation. For both cases, solid waste management is not the primary focus. At present there are
no landfill regulations or standards that can provide municipalities with some framework for
compliance and monitoring. There are no National Environmental Quality Standards (NEQS, role
described below)) related to waste collection points, equipment or vehicles for transportation of
waste, transfer solutions, treatment or recycling facilities including sanitary or landfill sites.
92
maximum permissible limits for 32 parameters which include total dissolved solids, fluoride,
sulphide, cadmium, etc.;
NEQS for industrial gaseous emission: The Standards for industrial gaseous emissions cover
16 parameters including smoke, chlorine, Hydrogen Fluoride, etc. The Standards also discuss
NOx and SOx for power plants;
NEQS for ambient air: The Standards lists nine pollutants, namely SO2, NOx, O3, SPM, PM10,
PM2.5, Lead and CO whose readings are to be recorded for ambient air quality. The
standards also mention reading frequency and method of measurement;
NEQS for drinking water: The Standards cover drinking water criteria for bacterial, physical
and chemical parameters; and
NEQS for noise: The Standards for noise sets permissible limits for residential, commercial
and industrial areas as well as silence zones. The limits vary according to the time of the day.
An EIA is mandatory for all projects occurring and situated in environmentally sensitive areas.
Similarly projects with adverse environmental effects are also required to carry out an EIA.
Adverse environmental effects are described as impairment of or damage to the environment
93
including impairment of or damage to human health and safety, biodiversity and property. It also
includes pollution.
The Regulations also lay down the procedure for conducting an IEE /EIA, filing for approval and
scrutiny of an IEE/EIA submitted for approval. It also describes the steps involved in conducting EIA
as well as the methodology for conducting stakeholder consultations. The Regulations give EPAs up
to four months for issuance of a No Objection Certificate (NOC). After the lapse of four months,
project proponents can proceed on the assumptions that NOC is deemed to have been granted.
Projects must comply with the mitigation measures mentioned in the IEE/EIA as well as any other
conditions mentioned in the NOC.
The Pollution Charge for Industry (Calculation and Collection) Rules, 2001
The Rules describe the procedure for calculating pollution charges payable by industrial units.
According Section 11 of the Environment Protection Act 1997, a pollution charge is to be levied
against units that do not comply with NEQS limits. Industrial units that discharge effluent and waste
or emit pollutants as well as noise in excess of NEQS are liable to pay pollution charges. The
responsibility for correctly calculating and payment of pollution charges lies with the industrial unit.
The charges are to be paid biannually on the basis of actual production for the last six months. The
Rules cover both liquid effluents and gaseous emissions. Liquid effluents covered include COD, TSS,
oil and grease, mercury, nickel, lead, copper, cadmium and pesticides/herbicides and the gaseous
emissions covered are CO, NOx, SOx and Particulate Matter.
94
public participation in amelioration of environmental issues, creating channels of
communication between NGOs and governmental institutions for adequate response and
strengthening the public participatory mechanism;
Merge environment and economics in decision-making this was to be achieved by giving
the responsibility of conservation to economic managers and recommended installing
environmental monitoring systems; and
Focus on durable improvements in quality of life this was to be achieved through balancing
natural resources with population, supporting durable improvements in human settlements,
preventing and controlling pollution and giving preference to biological solutions.
NCS recommended 14 program areas for priority implementation. Among them managing urban
wastes, preventing/abating pollution, protecting water bodies and sustaining fisheries are of
relevance.
The NEP provides guidelines for various sectors as well as cross sectors. Among the sectors
mentioned in NEP, waste management and multilateral environmental agreements are relevant to
this baseline study. In cross sector guidelines, environment and local governance are applicable. For
waste management, NEP mentions a long list of interventions. Pertinent to this case study are:
95
Enactment and enforcement of rules and regulations for management of municipal,
industrial, hazardous and hospital waste;
Devise strategies for integrated management of municipal, industrial, hazardous and
hospital waste at national, provincial and local levels;
Develop national emergency response and accident prevention plans to prevent and
mitigate the effects of accidents causing pollution;
Provision for financial and other incentives for technology upgradation, cleaner
production technologies, implementation of pollution control and measures as well
as compliance with NEQS; and
Establishment of a marine pollution control commission.
The cross sector guidelines for environment and local governance emphasize effective
environmental management at the local level. It is based upon a participatory approach involving all
stakeholders to achieve the following interventions:
Develop and implement EMPs at tehsil and district levels;
Build/enhance capabilities of local government officials and elected representatives
for effective environmental governance;
Devolve and entrust local governments with authority for effective environmental
management; and
Establish district level sustainable development funds.
The NEP was adopted in 2005 and over the last seven years some of the interventions suggested in
the policy have been adopted.
96
Appendix B: Hazardous materials and wastes found on ships
(Including Parts I, II and III of the Inventory of Hazardous Materials)
97
Alcohol/methylated spirits
Antifreeze fluids
Anti-seize compounds
Batteries (including lead-acid batteries)
Battery electrolyte
Boiler and feed water treatment and test reagents
Bunkers, e.g. fuel oil
Butane
Carbon dioxide
Chemical cleaner (including electrical equipment
cleaner, carbon remover)
Chemical refrigerants
Deionizer-regenerating chemicals
Detergent/bleacher (potentially a liquid)
Engine coolant additives
Evaporator dosing and descaling acids
Extinguishers
Fire-fighting clothing and personal protective equipment
Fuel additive
Fuel gas
Grease
Hydraulic oil
Hydrofluorocarbons (HFCs)
Kerosene
Lubricating oil
Methane
Miscellaneous medicines
Nitrous oxide (N2O)
Oxygen
Paints
Paint stabilizers/rust stabilizers
Perfluorocarbons (PFCs)
Pesticides/insecticide sprays
Propane
Solvents/thinners
Spare parts containing Hazardous Materials
Sulfur hexafluoride (SF6)
White spirit
98
Appendix C: Ship Recycling Facility Plan Elements
(From 2012 Guidelines For Safe And Environmentally Sound Ship Recycling adopted at MEPC
2/3/2012 Appendix 1: Recommended Format Of The Ship Recycling Facility Plan)
1 Facility management
1.1 Company information
1.2 Training programme
1.3 Worker management
1.4 Records management
2 Facility operation
2.1 Facility information
2.2 Permits, licences and certification
2.3 Acceptability of ships
2.4 Ship Recycling Plan (SRP) development
2.5 Vessel arrival management
2.6 Ship recycling methodology
2.7 Reporting upon completion
99
3.4.11 Worker exposure and medical monitoring
3.5 Emergency preparedness and response plan
3.6 Fire and explosion prevention, detection and response
Plan Attachments
Facility Map
Organizational Flow Chart
Permits, Licences and Certification
Resumes
100
Appendix D: Ship Recycling Plan - Example of Turkey
101
Type of vessel:
Name:
IMO Number:
Present owner:
Previous owner:
Present flag:
Classification:
Year of built:
Length over all:
Width over all :
Depth to maindeck:
Towage draft:
Dead weight DWT:
Net tonnage:
Gross tonnage:
Light displacement tonnage:
102
A. Upon arrival of (shp name) the vessels agency which is nominated by (ship owner
. will arrange arrival questionnaire and formalities at the anchorage area of the ship
recycling yard. .Ship Recycling yard will arrange a tug to take over the tow of the (ship
name)
`
Before the vessels mooring operation to the ship recycling yard , the
officers/inspectors from Maritime Health Administration, Custom Enforcement
office, Custom Immigration office, State Environment and Forestry regional office
and HAZARDOUS Waste Management regional office will attend on board for arrival
formalities and inspections.
1. The Custom enforcement officers inspect cargo holds/tanks, hatches, engine room, vessel
stores, superstructure and accommodation quarters for any materials, cargo, wastes or
undeclared materials which are not integral parts of the vessel.
2. The Custom Immigration police officers inspect cargo holds/tanks, hatches, engine room,
vessel stores, superstructure and accommodation quarters for any illegal passengers and
cargo.
3. The Environment and Forestry and Hazardous Waste Management officers inspect cargo
holds/tanks, hatches, engine room, vessel stores, superstructure and accommodation
quarters for solid/liquid wastes and cargo.
Following custom formalities and inspections, (SHP NAME ) will be made ready
for towing operation by qualified and authorized crews under control of the
operation manager.
SHIP NAME will be towed by the tugboat and grounded from bow-side to the SHIP
RECYLING yard shore and secured/tied by shore windlasses from forecastle,
starboard side and portside bollards with wire ropes and mooring ropes in order to
prevent any direction and position changes of the vessel due to weather and sea
conditions.
After completion of towing and mooring operation, heavy oil booms will be laid
around the vessel to avoid any oil pollution of the sea. Authorized persons will be
made ready with oil spill kits on shore for any oil spillage and pollution.
103
C. Recycling of (shp name)
1. Measurements and reporting of radiation amount on board by an authorized and certified
company.
2. Checking the inventory that was produced in the (country name)by measuring and reporting
of explosive/flammable/toxic/cooling gases in the cargo tanks/holds, enclosed spaces, vessel
stores, TST, ballast tanks, fuel tanks and cooling systems on board by the authorized and
certified company. Depending on the measurements and reports of gases on board, a Gas-
free test will be carried out to avoid any accident/explosion during cutting/dismantling of
the vessel by hot work and issued a Gas-free certificate by the certified company. [Cooling
gases in the system will be transferred to the gas cylinders by the authorized company and
transported to the temporary storage station.] Check necessary: are there still cooling gases
on board after the clean-up operation?
3. Removing and cleaning of asbestos materials on board of ship name will be done in Turkey ,
including the marking of remaining asbestos materials.
According to HAZMAT regulations, the certified company which is nominated by the Turkish
Ship Recycling Association, will attend on board for inspection of the remaining asbestos
materials on board, as specified in the inventory that was produced in the (country name,)
and to check whether the clean-up operation is being done properly.
4. Repetition of gas measurements in tanks and enclosed spaces on board during the cutting
progression on every other day basis, and reporting.
5. Hazardous materials in small quantities, like dry batteries, wet cell batteries, drugs,
medicines, paints, marine chemicals etc. Will be removed from on board and transported to
the authorized/certified temporary storage stations.
6. Liquid wastes which are risks for the environment will be removed by authorized company
and transported to the temporary storage station.
7. Any kind of materials/equipment in loose and packed condition on board will be removed
from on board and stored in accordance with their kinds in closed or open storage areas.
104
9. Insulation materials like glass wool, foam, stone wool, which are not covered under the
scope of dangerous wastes, will be removed from the vessel and stored in accordance with
their kinds in closed or opened storage areas.
10. Insulation, ship furniture and any kind of wooden materials, which are structural parts of the
ship and etc. will be removed from the ship to be dismantled before the cutting operations
at place begin, and they will be stored on land.
11. Fire extinguishing-covering up systems (carbon dioxide bottles) pressured gas tubes will be
taken out and dispatched by the authorized persons under the supervision of the Waste
Management Center to the storage area.
12. Cables, lightening and sprinkling systems will be dismantled and removed from the ship and
stored in the storage area. Cables which might contain HAZMATs and cause dioxin emissions
will be removed, stored and disposed of by authorized company which is licensed. The
licensed company dismantles and cut the cables from on board by special cutting
equipments and tools instead of hot work or cutting by gas torches. The dismantled cables
will be delivered to a licensed recycling company for peeling and separating the plastic,
rubber and copper.
13. The ship deck will be closed with scupper plugs in order to prevent liquid leakages from the
deck into the sea.
14. Prior to the dismantling works the fire fighting equipments will be made ready and subjected
to a control and additional precautions will be ensured in accordance with the risk
assessment.
15. The windlass, bollards, mooring/rigging equipments and other equipments and stores, spare
parts will be removed on the forecastle deck and in the bosun store. Completion of
removing these items, dismantling progress will be started from Forecastle deck and bosun
stores. Each piece will be cut between 1 and 10 tons by torches. Cut pieces will be
discharged by shore crane to the temporary storage, they are cut into smaller pieces for
loading and transporting to the steel plants.
16. Completion of cutting the forecastle and bosun stores, (ship name) will be shifted by shore
windlass to the shore in order to start for cutting the deck and make easier for discharging
by shore crane to the land.
17. Start of the actual recycling operation. After shifting the vessel, the main deck will be
dismantled and cut from forecastle deck . Pipes, valves and other lines will be cut. Each steel
plate and construction will be cut between 5 and 15 tons and discharged by the shore crane
to the storage area. Completion of dismantling main deck , the manholes will be opened and
gas measurement will be carried out in TST S&P. If any explosive/toxic gas detected then
105
gas-free will be carried out in TST S&P. Completion of gas-free TST P&S, steel frames will be
dismantled and cut.
18. Above progress will be continued until the superstructure and accommodation part are
dismantled. After completion of dismantling and cutting of each cargo tanks, deck, fuel and
FW tanks and equipments, the vessel will be shifted to the land from side frames of S&P of
the vessel by shore windlass. Furthermore it is important to insert here how (ship recyclng
company name) will dismantle the cargo tanks, followed by the removal of the remaining
asbestos below these tanks, under asbestos certified conditions. Furthemore it would be
helpful to provide some kind of network plannning or weekschedule, that makes clear that
the dispoasl operation (removal of remaining asbestos) starts some weeks after the start of
the recycling operation.
19. Dismantling of superstructure, will be started from Com. deck. Antennas and equipments on
Com. Deck will be dismantled and cut. Discharged by shore crane to the shore. The top part
of nav.bri.deck will be cut. Completion of cutting top of nav.bri.deck, insulation and other
materials between the sides will be taken out and ashore. The steel structure of p&s of
nav.bri.deck will be cut and dismantled as separate parts between 1 to 10 tons.
20. Completion of the nav.bri.deck , the dismantling progress will be continued same on Cap.
Deck, boat deck, poop deck, upper deck and lower deck until to the engine room.
Equipments such as windlasses, bollards, pulleys and other equipments on board will be
dismantled.
21. Main engine, Aux. engine, compressors, generator sets, other equipments in the main
engine room will be dismantled and ashored by shore crane from engine room to the
storage area for reconditioning and cleaning. These equipments which dismantled from the
main engine room will be sold as 2nd hand to the customers.
22. Completion of dismantling the main engine room , shaft and the propeller on deck will be
dismantled and ashored.
23. Before dismantling of the double bottom and bottom of the vessel, the liquid wastes
contained in the bottom, bilge, sludge and water etc. tanks of the ship will be removed
completely, if any.
24. Before dismantling of the double bottom and bottom, We will apply to the Harbor Master
for getting permission in order to start for cutting the double bottom and bottom. Upon
received confirmation and permission from The Harbor Master , The double bottom and
bottom will be cut.
106
25. Completion of dismantling the whole ship, ashore steel materials and other steel structure
which we can not re-sale and use will be sold to the steel plant. Rests of the equipments
which we can sell as 2nd hand as spare parts or whole will be stored in our storage are.
Project Manager
107
Back Cover: Ship Recycling at Aliaga, Turkey using mechanised equipment on hard standing.
Photo: R Watkinson