0% found this document useful (0 votes)
198 views4 pages

Daily Report Format

1) The daily report provides information on weather conditions, work description, manpower details, and plant/machinery status from a construction project. 2) 170 workers were listed across 36 job roles, with most plant/machinery reported as working. 3) A 3-day look ahead was outlined but without details. The planning engineer signed off on the report for the contractor.

Uploaded by

Amanda Long
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views4 pages

Daily Report Format

1) The daily report provides information on weather conditions, work description, manpower details, and plant/machinery status from a construction project. 2) 170 workers were listed across 36 job roles, with most plant/machinery reported as working. 3) A 3-day look ahead was outlined but without details. The planning engineer signed off on the report for the contractor.

Uploaded by

Amanda Long
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project Name

CONTRACTOR CLIENT

DAILY REPORT
Weather: Wind: Temperature:
Clear Still 00 - 300C
Cloudy Moderate 300 - 400C
Fog High 400 - 500C
Dusty 500C +

Description of Work:
1

Manpower
Sl No. Description No. Sl No. Description
1 Project Manager 1 13 Surveyor
2 Project Coordinator 1 14 Chainman
3 Site Manager 1 15 Lab Technician
4 QA / QC Engineer 1 16 Lab Assistant
5 Planning Engineer 1 17 Safety Engineer
6 Site Engineer 1 18 Safety Officer
7 Secretary 1 19 Store Keeper
8 Quantity Surveyor 1 20 Time Keeper
9 Assistant QS 1 21 Office Boy
10 Draughtsman 3 22 Watchman
11 Chief Surveyor 1 23 General Foreman
12 Rackman 4 24 Gaugeman
Plant / Machinery (WG - Working; IL - Idle; BD - Break Down)
Sl No. Description No. WG IL BD
1 DC Pick-up 4 4 0 0
2 Long Chase Pick up 0 0 0 0
3 Bus 1 1 0 0
4 Dozer 2 2 0 0
5 Excavator 1 1 0 0
6 Shovel 3 3 0 0
7 JCB 2 2 0 0
8 Grader 2 2 0 0
9 Steel Roller 3 2 0 1
10 PTR 7 6 0 1
Three Days Look Ahead
Sl No. Description Day 1

3
4
5

For Contractor:

Planning Engineer
Project Name

CLIENT CONSULTANT

DAILY REPORT
Temperature: Humidity
Dry Date : 20/11/13
Moderate
Humid Day: WED
Site Timing : 6:30AM to 5:30PM

No. Sl No. Description No. Total


4 25 Foreman 3 Manpower
8 26 Charge hand 2
0 27 LV / HV Driver 23
170
2 28 Operators 28
1 29 Mason 8
0 30 Carpenter 7 Plant / Machinery
1 31 Electrician 2 Total - 52
1 32 Grade Checker 2
2 33 Pipe Fitter 1 WG - 50
4 34 Steel Fixer 2 IL - 0
1 35 Labour 47 BD - 2
4 36

Sl No. Description No. WG IL BD


11 Bob Cat 1 1 0 0
12 Six Wheel / Trailor 7 7 0 0
13 Dumpers 0 0 0 0
14 Water Tankers 5 5 0 0
15 Plate Compactor 2 2 0 0
16 Hand Roller 2 2 0 0
17 Generators 5 5 0 0
18 Paver 2 2 0 0
19 Baby Roller 1 1 0 0
20 DDR 2 2 0 0

Day 2 Day 3