Work Progress Templates
Work Progress Templates
Work Progress Templates
A - 21
A - 22
A - 27
A - 25
A - 19
A - 20
A - 31
A - 28
A - 34
A - 24
A - 29
A - 33
A - 32
A - 23
A - 36
A - 26
A - 35
A - 30
PILES
PLINTH
GRAD SLAB
PARKING SLAB
G.F. SLAB
F.F. SLAB
CABIN SLAB
MASONRY
ELEC. PIPING
MS RAILING
INT. PLASTER
EXT. PLASTER
WINDOW SILLS
DOOR FRAMES
W. PROOFING
PLUMBING
FLOORING
BATH TILES
STAIR CASE
KITCHEN
PLARFORM
PUTTY - PRIMER
PRIMARY COLOR
STONE CREET
BACKFILLING
BACK YARD
WASH
SANITORY
WATER TANK
DOORS
WINDOWS
S.S. RAILING
SAFETY GRILL
FINAL PAINT
EXTERIOR PAINT
DOOR FITTINGS
ELEC. FITTING
CLEANING
POSSESISON
UNIT NO
B - 11
B - 12
B - 17
B - 15
B - 10
B - 01
B - 18
B - 14
B - 02
B - 13
B - 16
B - 07
B - 05
B - 08
B - 04
B - 09
B - 03
B - 06
PILES
PLINTH
GRAD SLAB
PARKING SLAB
G.F. SLAB
F.F. SLAB
CABIN SLAB
MASONRY
ELEC. PIPING
MS RAILING
INT. PLASTER
EXT. PLASTER
WINDOW SILLS
DOOR FRAMES
W. PROOFING
PLUMBING
FLOORING
BATH TILES
STAIR CASE
KITCHEN
PLARFORM
PUTTY - PRIMER
PRIMARY COLOR
STONE CREET
BACKFILLING
BACK YARD
WASH
SANITORY
WATER TANK
DOORS
WINDOWS
S.S. RAILING
SAFETY GRILL
FINAL PAINT
EXTERIOR PAINT
DOOR FITTINGS
ELEC. FITTING
CLEANING
POSSESISON