Green Line Underground: Section 27: External Works 05: Site Furniture
Green Line Underground: Section 27: External Works 05: Site Furniture
Green Line Underground: Section 27: External Works 05: Site Furniture
D
N
U
O
R
G
ER
D
N
U
E
N
LI
N
EE
R
G
QCS 2014 Section 27: External Works Page 2
Part 05: Site Furniture
5 SITE FURNITURE
5.1 GENERAL
5.1.1 Scope
D
2 The Contractor shall submit manufacturers literature, drawings, samples or mock-up units
for items covered in this Part for approval by the Engineer.
N
U
3 If external work items related to this Part are not specified or otherwise detailed within the
Project Documentation, the Contractor shall submit appropriate specifications for approval
O
by the Engineer.
R
5.2 PRODUCTS
(a) planters
N
(b) benches
U
(c) tables
(d) rubbish bins
E
2 Information on items covered in this Part that are to be submitted to the Engineer for
approval to include:
R
(a) dimensions
G
(b) weight
(c) construction
(d) material
(e) colour
(f) finish
5.3 EXECUTION
5.3.1 Installation