Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 1 of 6
Contractor : Contract no.: Substation No :
1. GENERAL DATA AND INFORMATION:
Panel No. Designation 87B/95B
Serial No. Rated Voltage 125 VDC
Make Aux. Voltage 110 250 VAC/DC
CT Ratio 2000/1A Frequency 50 60 Hz
2. MECHANICAL CHECKS AND VISUAL INSPECTION:
ITEM DESCRIPTION CHECKED
1 Inspect for physical damage / defects. Yes N/A
2 Verify Connections as per approved drawings. Yes N/A
3 Check tightness of all connections. Yes N/A
5 Check apparatus lists. Yes N/A
6 Check ferrules Yes N/A
7 Test Switch checked for correct function. Yes N/A
8 Check case earthing. Yes N/A
9 Watchdog contact (X319:3 , X319:2) Yes N/A
3. ELECTRICAL TESTS: With relay energized condition
ITEM DESCRIPTION CHECKED
1 Measured auxiliary supply. Yes N/A
2 Clock set at local time. Yes N/A
3 Time maintained when auxiliary supply removed. Yes N/A
5 Relay healthy (green) LED working. Yes N/A
6 Trip (red) LED working. Yes N/A
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date:
Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 2 of 6
Contractor : Contract no.: Substation No :
4. INPUTS AND OUTPUTS TESTS:
INPUT OPTO-ISOLATORS CHECKS (With Relay Energized):
Go to CONFIGURATION - MONITORING,
I/O STATUS,
then go to BINARY INPUTS VALUES ( X120 (AIM) X110 (BIO) )
to check the values after giving pulse on each BI.
OPTO TEST METHOD RESULT
INPUT (Energize only one at a time with Display FALSE to REMARKS
NO. 125V DC Station Battery voltage) TURE
X324
BI 1 ENERGIZE TB NO. X324 : 2 1 Yes N/A BB-CH PROT OUT
BI 2 ENERGIZE TB NO. X324 : 5 4 Yes N/A BB-CH PROT IN
BI 3 ENERGIZE TB NO. X324 : 6 4 Yes N/A BB-CH CT SHORTED
BB-CH IN/OUT DC
BI 4 ENERGIZE TB NO. X324 : 9 - 8 Yes N/A FAIL
BI 5 ENERGIZE TB NO. X324 : 10 8 Yes N/A RESET DC FAIL
BI 6 ENERGIZE TB NO. X324 : 13 12 Yes N/A INDICATION DC FAIL
BI 7 ENERGIZE TB NO. X324 : 14 12 Yes N/A AC SUPPLY FAIL
BI 8 ENERGIZE TB NO. X324 : 17 16 Yes N/A SPARE
BI 9 ENERGIZE TB NO. X324 : 18 16 Yes N/A SPARE
X329
BI 10 ENERGIZE TB NO. X329 : 2 1 Yes N/A SPARE
BI 11 ENERGIZE TB NO. X329 : 5 4 Yes N/A SPARE
BI 12 ENERGIZE TB NO. X329 : 6 4 Yes N/A SPARE
BI 13 ENERGIZE TB NO. X329 : 9 - 8 Yes N/A SPARE
BI 14 ENERGIZE TB NO. X329 : 10 8 Yes N/A SPARE
BI 15 ENERGIZE TB NO. X329 : 13 12 Yes N/A SPARE
BI 16 ENERGIZE TB NO. X329 : 14 12 Yes N/A SPARE
BI 17 ENERGIZE TB NO. X329 : 17 16 Yes N/A SPARE
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date:
Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 3 of 6
Contractor : Contract no.: Substation No :
BI 18 ENERGIZE TB NO. X329 : 18 16 Yes N/A SPARE
OUTPUT RELAYS CHECKS (With Relay Energized):
Test Procedure:
Go to IED CONFIGURATION,
TESTS, IED TEST, TEST MODE : ON,
then go to BINARY OUTPUTS-CHANGE THE POSITION OF EACH BO FROM FULSE TO TURE FROM
HMI,
then check contact resistance.
TEST METHOD RESULT
OUTPUT
(Energize only one relay at a time by Contact Checked REMARKS
RELAY No.
Test ON in IED TEST) 0.2
X317
BIO1 CONTACT OPERATED X317 : 1 2 (N/O) Yes N/A SPARE
BIO2 CONTACT OPERATED X317 : 3 4 (N/O) Yes N/A SPARE
BIO3 CONTACT OPERATED X317 : 5 6 (N/O) Yes N/A SPARE
BIO4 CONTACT OPERATED X317 : 7 8 (N/O) Yes N/A CT SUPVN. ALARM
BIO5 CONTACT OPERATED X317 : 9 10 (N/O) Yes N/A BB-CH OPTD
BIO6 CONTACT OPERATED X317 : 11 12 (N/O) Yes N/A SPARE
BIO7 CONTACT OPERATED X317 : 13 14 (N/O) Yes N/A SPARE
BIO8 CONTACT OPERATED X317 : 15 16 (N/O) Yes N/A SPARE
BIO9 CONTACT OPERATED X317 : 17 18 (N/O) Yes N/A SPARE
X321
BIO10 CONTACT OPERATED X321 : 1 2 (N/O) Yes N/A SPARE
BIO11 CONTACT OPERATED X321 : 3 4 (N/O) Yes N/A SPARE
BIO12 CONTACT OPERATED X321 : 5 6 (N/O) Yes N/A SPARE
BIO13 CONTACT OPERATED X321 : 7 8 (N/O) Yes N/A SPARE
BIO14 CONTACT OPERATED X321 : 9 10 (N/O) Yes N/A SPARE
BIO15 CONTACT OPERATED X321 : 11 12 (N/O) Yes N/A SPARE
BIO16 CONTACT OPERATED X321 : 13 15 (N/C) Yes N/A SPARE
BIO17 CONTACT OPERATED X321 : 14 15 (N/O) Yes N/A SPARE
BIO18 CONTACT OPERATED X321 : 16 18 (N/C) Yes N/A SPARE
BIO19 CONTACT OPERATED X321 : 17 18 (N/O) Yes N/A SPARE
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date:
Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 4 of 6
Contractor : Contract no.: Substation No :
X326
BIO20 CONTACT OPERATED X321 : 1 2 (N/O) Yes N/A SPARE
BIO21 CONTACT OPERATED X321 : 3 4 (N/O) Yes N/A SPARE
BIO22 CONTACT OPERATED X321 : 5 6 (N/O) Yes N/A SPARE
BIO23 CONTACT OPERATED X321 : 7 8 (N/O) Yes N/A SPARE
BIO24 CONTACT OPERATED X321 : 9 10 (N/O) Yes N/A SPARE
BIO25 CONTACT OPERATED X321 : 11 12 (N/O) Yes N/A SPARE
BIO26 CONTACT OPERATED X321 : 13 15 (N/C) Yes N/A SPARE
BIO27 CONTACT OPERATED X321 : 14 15 (N/O) Yes N/A SPARE
BIO28 CONTACT OPERATED X321 : 16 18 (N/C) Yes N/A SPARE
BIO29 CONTACT OPERATED X321 : 17 18 (N/O) Yes N/A SPARE
INDICATION LED TEST
LED Checks:
Go to hardware test to view the physical position of the LED.
Result Display On or
OPTO Input Number Function
Of
LED 1 Yes N/A PROT IN/OUT
LED 2 Yes N/A CT ALARM
LED 3 Yes N/A R-PHASE ALARM
LED 4 Yes N/A Y-PHASE ALARM
LED 5 Yes N/A B-PHASE ALARM
LED 6 Yes N/A 87BB-CH TRIP
LED 7 Yes N/A R-PHASE TRIP
LED 8 Yes N/A Y-PHASE TRIP
LED 9 Yes N/A B-PHASE TRIP
LED 10 Yes N/A SPARE
LED 11 Yes N/A SPARE
LED 12 Yes N/A SPARE
LED 13 Yes N/A SPARE
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date:
Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 5 of 6
Contractor : Contract no.: Substation No :
LED 14 Yes N/A SPARE
LED 15 Yes N/A SPARE
5. SERIES & SHUNT RESISTOR MEASUREMENTS:
SERIES RESISTOR SHUNT RESISTOR
PHASE
SETTING () MEASURED () SETTING () MEASURED ()
RN
YN
BN
6. PICK UP & DROP OFF TEST FOR CT SHORTING:
R PHASE Y - PHASE B -PHASE
CURRENT
SETTING
Pickup V Drop-off V Pickup V Drop-off V Pickup V Drop-off V
7. OPERATING TIME TEST FOR CT SHORTING:
TIME APPLIED R PHASE Y - PHASE B -PHASE
SETTING VOLTAGE
Pickup (sec) Pickup (sec) Pickup (sec)
8. PICK UP & DROP OFF TEST FOR HIGH IMPEDANCE
DIFFERENTIAL:
CURREN R PHASE Y - PHASE B -PHASE
T
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date:
Commissioning Service
Department
Commissioning Standard Test
Formats
Description: 87B HIGH IMP. BUSBAR ABB
REB650
Equip. No. Drawing ref.: Page 6 of 6
Contractor : Contract no.: Substation No :
Pickup Drop- Pickup Pickup Drop- Pickup Pickup Drop- Pickup
SETTING
mA off mA V mA off mA V mA off mA V
9. OPERATING TIME TEST FOR HIGH IMPEDANCE DEFFIERENTIAL:
TIME APPLIED R PHASE Y - PHASE B -PHASE
SETTING VOLTAGE
Pickup (msec) Pickup (msec) Pickup (msec)
1 Communication with PC
2 Event Record Check
3 Disturbance Record Check
AL-BABTAIN
Tested by: ENG. Witnessed by:
Signature & Date: Signature & Date: