0% found this document useful (0 votes)
36 views2 pages

Task 17: Production Plan: Date of Photoshoot: The Initial Shoot Will Be On The 6

The initial photoshoot will take place on April 6th from 1:30-2:30 pm. A reshoot is scheduled for April 8th from 10:30-11:30 am to correct any errors. The final shoot will be on April 10th from 12:30-1:30 pm. Production will begin on April 13th in room PA-20 and continue through April 22nd, involving editing and paperwork. The budget for equipment, including a camera, tripod, and three outfits, totals £330.98.

Uploaded by

matthew flanagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Task 17: Production Plan: Date of Photoshoot: The Initial Shoot Will Be On The 6

The initial photoshoot will take place on April 6th from 1:30-2:30 pm. A reshoot is scheduled for April 8th from 10:30-11:30 am to correct any errors. The final shoot will be on April 10th from 12:30-1:30 pm. Production will begin on April 13th in room PA-20 and continue through April 22nd, involving editing and paperwork. The budget for equipment, including a camera, tripod, and three outfits, totals £330.98.

Uploaded by

matthew flanagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Task 17: production plan

Date of photoshoot: The initial shoot will be on the 6th of April


from 1:30pm-2:30pm this is because it will be in school time.
The reshoot for anything that might need correcting like errors
in the photos. This will take place on the 8 th April 10:30-11:30.
The final shoot will be on 10th April 12:30-13:30.
When all the shoots are finished we will then go into
production.
Date for production: The production is any final editing and
also making any paperwork that might be needed for the final
product of the charity shoot.
The dates are as follows
Start of production 13th April in PA-20
Continue production 15th April PA-20
Continue production 17th April PA-20
Continue production 20th April PA-20
Finished production 22nd April PA-20
Budget:
Equipment:
Camera: 249.99
Tripod: 24.99
Travel fair: 0 we arent covering travel fair.
Costume 1: Green/Brown Lightweight Puffer Jacket, Dark blue
denim Jeans, White cotton T-Shirt and Soft grey ankle
trainers/Plimsolls.
Costume 2: Crystal white patterned T-Shirt (Honour), Dark blue
denim jeans and Grey Trainers with gold heel accents.
Costume 3: Black hoodie, Grey and red accents jogger bottoms
and Black and white sole canvas skater shoes.
So the total for the shoot is = 330.98

You might also like