Material Delivery Report: Sub Contractor: Suvidha Engineers India PVT LTD

Three cooling towers were delivered by Suvidha Engineers India Pvt Ltd to Samsung C&T India Pvt Ltd for the DMRC New Delhi metro project. The delivery report dated April 22nd, 2017 documents the delivery of three Bell model BCTI-90XEC2 cooling towers according to invoice number 465, with all items inspected and released for the CE-10 & 11 Lot-1 section of the Delhi metro.

Uploaded by

Cheerag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views3 pages

Material Delivery Report: Sub Contractor: Suvidha Engineers India PVT LTD

Three cooling towers were delivered by Suvidha Engineers India Pvt Ltd to Samsung C&T India Pvt Ltd for the DMRC New Delhi metro project. The delivery report dated April 22nd, 2017 documents the delivery of three Bell model BCTI-90XEC2 cooling towers according to invoice number 465, with all items inspected and released for the CE-10 & 11 Lot-1 section of the Delhi metro.

Uploaded by

Cheerag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

De

Material Delivery Report


MIR No. : Date :22/04/17
Client : DMRC, New Delhi
Main Contractor : Samsung C&T India Pvt Ltd Invoice No. : 465
Sub Contractor : Su
Pvt Ltd Invoice Date : 31/03/17

Name of Item Cooling Tower


4/22/2017

BOQ NO.

Make Bell

Size Qty
Quantity Delivered

Model :BCTI-90XEC2 03 Nos

Item Description

1 Invoice Attached

Comments : Inspection Status : Released [ ], Rejected [ ]

M/s SUVIDHA M/s SAMSUNG M/s DMRC


Signature : Signature : Signature :
Name : Name : Name :
Date : Date : Date :
Delhi Merto CE-10 & 11 Lot-1

ery Report
Date :22/04/17

voice No. : 465


Sub Contractor : Suvidha Engineers India

BOQ NO. S1-2/Part-B/ 3

Qty Remarks

03 Nos For NSP

Result
Yes No

Inspection Status : Released [ ], Rejected [ ]

M/s DMRC
Signature :
Name :
Date :