CIDB Building Material Rate
CIDB Building Material Rate
CIDB Building Material Rate
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
1. Cement
1.1 Ordinary Portland Cement, 50 kg bag Bag 60 Del 18.93 19.50 19.77 18.93 20.23 20.33 20.33 20.33 20.33 20.33 20.33 20.33
1.2 Ordinary Portland Cement in Bulk MT 60 Del 376.67 388.00 393.33 376.67 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33
2. Aggregate
2.1 Granite Aggregate 3/4" MT 60 Del 40.50 40.50 40.50 40.50 38.30 40.00 40.00 40.00 40.00 40.00 40.00 40.00
3. Sand
3.1 Normal River Sand- Ex MT 30 Ex 40.77 40.77 40.77 42.63 41.70 40.67 40.67 40.67 40.67 40.67 40.67 40.67
3.2 Fine River Sand for Plastering -Ex MT 30 Ex 40.77 40.77 40.77 42.63 46.20 43.33 43.33 43.33 43.33 43.33 43.33 43.33
3.3 Normal Mining Sand MT 30 Ex 41.83 41.83 41.83 43.80 49.43 45.00 45.00 45.00 45.00 45.00 45.00 45.00
3.4 Fine Mining Sand for Plastering MT 30 Ex 43.97 43.97 43.97 46.00 42.03 42.33 42.33 42.33 42.33 42.33 42.33 42.33
4. Steel Reinforcement
4.1 Mild Steel Round Bar R10, MS1646 MT 60 Del 1,913.33 1,932.33 2,615.67 2,857.00 2,956.67 2,783.33 2,783.33 2,783.33 2,783.33 2,783.33 3,031.00 3,031.00
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 1/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
4.2 Mild Steel Round Bar R12, MS1646 MT 60 Del 1,913.33 1,932.33 2,615.67 2,857.00 2,956.67 2,783.33 2,783.33 2,783.33 2,783.33 2,783.33 3,031.00 3,031.00
4.3 Mild Steel Round Bar R16, MS1646 MT 60 Del 1,812.67 1,831.00 2,488.33 2,717.00 2,766.67 2,783.33 2,783.33 2,783.33 2,783.33 2,783.33 3,031.00 3,031.00
4.4 High Tensile Deformed Bar-Y10, MS146 MT 60 Del 1,913.33 1,932.33 2,615.67 2,857.00 2,970.00 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.5 High Tensile Deformed Bar-Y12, MS146 MT 60 Del 1,913.33 1,932.33 2,615.67 2,857.00 2,970.00 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.6 High Tensile Deformed Bar-Y16, MS146 MT 60 Del 1,812.67 1,831.00 2,488.33 2,717.00 2,783.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.7 High Tensile Deformed Bar-Y20, MS146 MT 60 Del 1,812.67 1,831.00 2,488.33 2,717.00 2,783.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.8 High Tensile Deformed Bar-Y25, MS146 MT 60 Del 1,812.67 1,831.00 2,488.33 2,717.00 2,783.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.9 High Tensile Deformed Bar-Y32, MS146 MT 60 Del 1,812.67 1,831.00 2,488.33 2,717.00 2,783.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,922.33 2,922.33
4.10 BRC A6, MS145 m2 30 Del 9.90 9.90 9.96 9.96 8.03 7.50 7.50 7.50 7.50 7.50 7.50 7.50
4.11 BRC A7, MS145 m2 30 Del 12.44 12.44 12.50 12.50 10.33 9.67 9.67 9.67 9.67 9.67 9.67 9.67
4.12 BRC A8, MS145 m2 30 Del 29.94 29.94 30.10 30.10 20.40 22.33 22.33 22.33 22.33 22.33 22.33 22.33
4.13 BRC A9, MS145 m2 30 Del 21.42 21.42 21.53 21.53 17.77 16.67 16.67 16.67 16.67 16.67 16.67 16.67
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 2/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
4.14 BRC A10, MS145 m2 30 Del 28.46 28.46 28.61 28.61 22.30 21.67 21.67 21.67 21.67 21.67 21.67 21.67
5.1 Ready Mix Concrete - Normal Mix - Grade15, Granite m3 30 Del 273.72 273.72 275.09 275.09 263.37 256.67 256.67 256.67 256.67 256.67 256.67 256.67
5.2 Ready Mix Concrete - Normal Mix - Grade 20, Granite m3 30 Del 275.52 275.52 276.89 276.89 266.77 256.67 256.67 256.67 256.67 256.67 256.67 256.67
5.3 Ready Mix Concrete - Normal Mix - Grade25, Granite m3 30 Del 298.77 298.77 300.26 300.26 280.97 286.67 286.67 286.67 286.67 286.67 286.67 286.67
5.4 Ready Mix Concrete - Normal Mix - Grade 30, Granite m3 30 Del 310.22 310.22 311.77 311.77 291.70 286.67 286.67 286.67 286.67 286.67 286.67 286.67
5.5 Ready Mix Concrete - Normal Mix - Grade 35, Granite m3 30 Del 329.54 329.54 331.18 331.18 307.27 300.00 300.00 300.00 300.00 300.00 300.00 300.00
6. Bricks
6.1 Common Clay Bricks - Pallet piece 30 Del 0.44 0.44 0.44 0.46 0.50 0.45 0.45 0.45 0.45 0.45 0.45 0.45
6.2 Cement Sand Bricks - Pallet piece 30 Del 0.38 0.38 0.38 0.40 0.40 0.38 0.38 0.38 0.38 0.38 0.38 0.38
6.3 Smooth Face Facing Brick, Red piece 30 Del 0.91 0.91 0.91 0.91 1.07 1.00 1.00 1.00 1.00 1.00 1.00 1.00
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 3/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
7. Roofing
7.1 Interlocking Concrete Tiles - Standard Duotone Colour 420mm x 330mm piece 60 Del 2.11 2.11 2.11 2.11 2.37 2.20 2.20 2.20 2.20 2.20 2.20 2.20
7.2 MS Decking - Step Roofing M350 G24, 0.53mm TCT, Clean Colourbond m2 30 Del 75.94 76.34 76.54 76.75 67.70 70.33 70.33 70.33 70.33 70.33 70.33 70.33
MS Decking - Ajiya Euro Step Roofing M350 G28, 0.40mm TCT, Clean
7.5 m2 60 Del 47.91 48.16 48.29 48.42 50.03 48.33 48.33 48.33 48.33 48.33 48.33 48.33
Colourbond
MS Decking - Ajiya Euro Step Roofing M350 G26, 0.47mm TCT, Clean
7.6 m2 60 Del 61.39 61.72 61.88 62.05 59.90 58.33 58.33 58.33 58.33 58.33 58.33 58.33
Colourbond
7.8 MS Decking-Lysaght Colourbond-Spandex Hi- Ten 0.47mm TCT m2 60 Del 63.16 63.50 63.67 63.84 63.63 63.33 63.33 63.33 63.33 63.33 63.33 63.33
7.9 MS Decking-Lysaght Colourbond-Trimdex Hi-Ten 0.47mm TCT m2 60 Del 47.91 48.16 48.29 48.42 50.87 46.67 46.67 46.67 46.67 46.67 46.67 46.67
7.10 MS Decking-Lysaght Colourbond-Kliplok Hi-Ten 0.53mm TCT m2 60 Del 60.68 61.01 61.17 61.33 62.17 61.67 61.67 61.67 61.67 61.67 61.67 61.67
Page 4/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
9. Ceiling Board
9.3 Plain Gysum Board, 610mm x 1220mm x 9.5mm, (Boral/Armstrong) sheet 60 Del 9.28 9.28 9.28 9.28 8.50 8.33 8.33 8.33 8.33 8.33 8.33 8.33
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 5/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
10.7 HDPE Pipe PN 16 - 25mm Diameter, MS 1058 100m roll 60 Del 339.43 339.43 347.93 347.93 348.33 316.67 316.67 316.67 316.67 316.67 316.67 316.67
10.8 HDPE Pipe PN 16 - 50mm Diameter, MS 1058 100m roll 60 Del 1,279.63 1,279.63 1,311.60 1,311.60 1,315.00 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33
10.9 ABS Pipe PN 15 Class E - 20mm, MS1419 5.8m run 60 Del 19.03 19.03 19.03 19.20 22.13 20.00 20.00 20.00 20.00 20.00 20.00 20.00
10.10 ABS Pipe PN 15 Class E - 25mm, MS1419 5.8m run 60 Del 27.60 27.60 27.60 27.83 26.43 26.67 26.67 26.67 26.67 26.67 26.67 26.67
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 6/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
12. Paints
12.1 Paint-ICI dulux standard colour-Undercoat speed 5 litre 60 Del 119.53 119.53 119.53 121.53 116.60 112.67 112.67 112.67 112.67 112.67 112.67 112.67
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
12.6 Paint-Nippon standard colour-undercoat, 9000 undercoat 5 litre 60 Del 70.33 70.33 70.33 71.53 71.63 76.67 76.67 76.67 76.67 76.67 76.67 76.67
12.7 Paint-Nippon standard colour-timber/wood, timber finish 5 litre 60 Del 90.83 90.83 90.83 92.33 92.00 91.67 91.67 91.67 91.67 91.67 91.67 91.67
Page 8/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
13.2 Square hollow sections- 50mm x 50mm x 3.0mm (4.38kg/m) MT 60 Del 3,194.13 3,194.13 3,194.13 3,194.13 3,198.33 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00
13.4 Universal beams-102mm x 102mm x 8.76mm (19.35kg/m) MT 60 Del 3,515.50 3,515.50 3,515.50 3,515.50 3,518.33 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00
13.5 Universal beams-400mm x 400mm (2.17kg/m) MT 60 Del 3,859.93 3,859.93 3,859.93 3,859.93 3,861.67 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00
13.6 Equal angles-38mm x 38mm x 3.8mm (2.17kg/m) MT 60 Del 3,057.40 3,057.40 3,057.40 3,057.40 3,060.00 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67
13.7 Equal angles-50mm x 50mm x 4mm (3.06kg/m) MT 60 Del 3,188.77 3,188.77 3,188.77 3,188.77 3,191.67 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33
14. Plywood
14.1 Plywood-shuttering board, 4 x 8 x 12 mm piece - 83.56 83.56 83.56 83.56 71.77 76.67 76.67 76.67 76.67 76.67 76.67 76.67
14.2 Mixed Medium Hardword Papan Plank (GMS) 1" x 6" MT - 1,498.03 1,498.03 1,498.03 1,498.03 1,501.67 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33
15. Timber
15.1 GMS Heavy Hardwood, Balau 1 MT - 2,122.43 2,122.43 2,122.43 2,122.43 2,125.00 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33
15.2 GMS light Hardword, Dark Red Meranti MT - 3,671.20 3,671.20 3,671.20 3,671.20 3,676.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 9/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
15.3 GMS Medium Hardword, Kapur MT - 2,480.13 2,480.13 2,480.13 2,480.13 2,483.33 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00
15.4 Scantling Medium Hardword, Kapur MT - 2,966.07 2,966.07 2,966.07 2,966.07 2,968.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33
15.5 Scantling Mixed Medium Hardwood MT - 1,438.63 1,438.63 1,438.63 1,438.63 1,441.67 1,446.67 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33
15.6 GMS Heavy Hardwood, Balau 2 MT - 3,365.70 3,365.70 3,365.70 3,365.70 3,370.00 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33
16. Glass
16.1 Clear Float Glass 5mm Thk, Local/Imported m2 - 51.20 51.20 51.20 51.20 51.80 51.33 51.33 51.33 51.33 51.33 51.33 51.33
17. Ironmongery
Page 10/11
2016 BUILDING MATERIAL PRICES SARAWAK - MIRI
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
17.4 Concorde 102mm x 76mm x 2.0mm SS hinge SUS 304 pair 60 Del 38.03 38.03 38.03 38.03 41.57 45.33 45.33 45.33 45.33 45.33 45.33 45.33