Transformer Testing DYn11

This document discusses testing the vector group of a DYn11 distribution transformer. It provides details on: 1) Testing involves shorting the primary winding and applying a 3-phase supply to check voltages meet conditions for the DYn11 vector group. 2) The three conditions checked are: VRY = VRn + VYn, VBb < VBy, and VRb = VRy. Numerical examples are given to demonstrate satisfying the first two conditions. 3) Verifying the vector group is important to ensure the transformer can operate correctly in parallel with other DYn11 transformers.

Uploaded by

arsalanhamid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
3K views9 pages

Transformer Testing DYn11

This document discusses testing the vector group of a DYn11 distribution transformer. It provides details on: 1) Testing involves shorting the primary winding and applying a 3-phase supply to check voltages meet conditions for the DYn11 vector group. 2) The three conditions checked are: VRY = VRn + VYn, VBb < VBy, and VRb = VRy. Numerical examples are given to demonstrate satisfying the first two conditions. 3) Verifying the vector group is important to ensure the transformer can operate correctly in parallel with other DYn11 transformers.

Uploaded by

arsalanhamid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

qwertyuiopasdfghjklzxcvbnmqw

ertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopa
Transformer Testing
sdfghjklzxcvbnmqwertyuiopasdf
Vector Group Testing
Distribution Transformers- DYn11

ghjklzxcvbnmqwertyuiopasdfghj
Engr. Qazi Arsalan hamid

klzxcvbnmqwertyuiopasdfghjklz
xcvbnmqwertyuiopasdfghjklzxcv
bnmqwertyuiopasdfghjklzxcvbn
mqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwe
rtyuiopasdfghjklzxcvbnmqwerty
uiopasdfghjklzxcvbnmqwertyuio
pasdfghjklzxcvbnmqwertyuiopas
dfghjklzxcvbnmqwertyuiopasdfg
1

Contents
Transformer Testing ...................................................................................................................................... 2
Vector Group Testing ................................................................................................................................ 2
In star Connection; .................................................................................................................................... 2
In Delta Connection .................................................................................................................................. 3
We need to Test DYn11 Transformer ....................................................................................................... 4
Condition Simulations: .............................................................................................................................. 6
2

Transformer Testing

Vector Group Testing

We do this testing to check that vector group of transformers in parallel operation must be identical.

Star Connection

Delta Connection

In star Connection;

= 1.732

Please note,

=
3

In Delta Connection

= 3

Most of the distribution sides Transformers are Delta-Star Connected


4

We need to Test DYn11 Transformer

a) Disconnect transformer from any power supply side

b) Remove any ground from Transformer


c) Short Red phase(R) or A phase or U phase of Primary winding via bushings to red phase(r) or a
phase or u phase

d) We need to connect 3 phase generator AC supply to the primary side of Transformer


5

e) Use Voltmeter to check voltages at different point, in DYn11, three condition need to be check,
if conditions satisfied then vector group is correct as per nameplate data.

f) Conditions are
= +
<
=
Please note,
=
=
=
=
=
=
=
6

Condition Simulations:

= +

Here you can see,

= 293.4

= 42.29

= 251.2( )

1st condition satisfied


7

<

= 293.4

= 420.4

2nd condition satisfied

<
8

If these three conditions fulfilled, then transformer vector group is ok as per nameplate data and fit to
work with any DYn11 transformer in parallel.